Loading...
20050028 Plan Review Notes October 20, 2004 Tom Jensen 115 N. McCormick Olympia, WA 98506 Subject: Golden Dragon Tom, As we discussed this morning here are the initial comments on the Golden Dragon Drawings you submitted to me: 1.Drawing need to be signed by a licensed architect unless the project is design build by you and has a structural stamp 2.Kitchen Details are unclear. Need finished kitchen details and Health Department Sign Off. Hood suppression may be submitted later, but hood details and required make up air must be part of the submitted drawings 3.Need plumbing riser drawings 4.Need hardware schedule for egress review 5.Need to show how 5A requirement for a one hour exterior wall and roof are met 6.Public restrooms need to be dimensioned to verify ADA requirements. A separate detail should show counter, fixture and accessory heights. 7.Cooler door in the open position does not allow the required unobstructed space of the egress path 8.Mechanical access must be either 22x30 inches or larger to accommodate the removal of the largest piece of the furnace system. Verify. 9.Need energy and lighting calculations. 10.Need completed civil drawings for the final approval of drawings to verify egress outside of the building. Thanks, I will continue my review of the drawings, but do not anticipate many other comments after these have been completed by you. Gary