Loading...
July 3 2003 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Mountain West Senior Housing LLC July 01/03, 2003 PROJECT:REPORT NO: Rosemont Retirement & Assisted Living 03 CONTRACTOR:PROJECT NUMBER: Maddox Construction 0306.9 PERMIT NO: INSPECTOR: 6957 Mark Robinson July 01: Inspector Mark Robinson on site, 9:30 am, for inspection of forms and reinforced concrete placement. Partly cloudy, 63 degrees. Contractor places concrete for the exterior continuous foundation walls at grid lines 9 (J.2) west to Q (4) and the exterior continuous footings from grid lines Q (2.2) west and south to 1 (H.1). All areas approved for concrete per structural notes on sheet S1.0, plan notes schedules on sheet S1.1A, shear wall anchor schedule and relevant details on sheet SD.1. Concrete is placed by truck chute at a 4.5” maximum slump and is vibrated for consolidation. One set of compressive strength test specimens is made on the placement of 13 yards and is stored in the field away from the work area for pickup tomorrow. See Report of Concrete Test Specimens for further details on today’s placement. July 03: Inspector Mark Robinson on site, 8:15 am, for inspection of forms and reinforced concrete placement. Sunny, 62 degrees. Contractor places concrete for the exterior continuous foundation walls from grid lines Q (4) west and south to 1 (H.1) and exterior continuous footings from grid line 1 (H.1) south and east to grid line 4. All areas approved for concrete per structural notes on sheet S1.0, plan notes schedules on sheet S1.1A, shear wall anchor schedule and relevant details on sheet SD.1. Concrete is placed by truck chute at a 4.5” maximum slump and is vibrated for consolidation. One set of compressive strength test specimens is made on the placement of 18 yards and is stored in the field away from the work area for pickup tomorrow. See Report of Concrete Test Specimens for further details on today’s placement. (Note: the short section where the foundation wall at grid line G.8 (12-12.2) was offset on the footing is corrected today by doweling into the existing footing with several #4 dowels and adding to the footing). NORTHWEST TESTING COMPANY, INC. Mark Robinson Mark Robinson Professional Geologist Registered Site Assessor cc: Susanna Owens, Greg Elmore, Doug Meltzer, Gary Carlson, John Maddox PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647