Inspector Mark Robinson on site, 1:00 pm, for review of epoxied anchor installation. Overcast, 70
degrees.
Anchor Bolt Installation Procedure:
Materials: ¾” x 12” all-thread anchor bolts; Hilti HY-150 epoxy
Inspector reviews structural detail 10/SD-1for tube steel column anchor attachment. Locations
completed today include four columns grid lines 12 & 12.8 (F.3 & F.7), 16 anchors total.
The holes for reinforcing have been drilled with the diameter of the drilled holes exceeding the
reinforcing rod diameter by approximately 1/16”. All holes are blown free of debris and dust, brushed
and re-blown out with pressurized air such that no dust or debris is noted leaving hole when
compressed air is introduced. Holes drilled to 8” minimum depth.
After ensuring proper color (mixing) of epoxy at the end of the dispenser nozzle the holes are filled
approximately 2/3 full with epoxy, and the reinforcing bar are inserted into the hole with tapping from
hammer to seat.
NORTHWEST TESTING COMPANY, INC.
Mark Robinson
Mark Robinson
Professional Geologist
Registered Site Assessor
cc: Susanna Owens, Greg Elmore, Doug Meltzer, Gary Carlson, John Maddox
PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647