Loading...
August 5 2003 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Mountain West Senior Housing LLC August 05, 2003 PROJECT:REPORT NO: Rosemont Retirement & Assisted Living 08 CONTRACTOR:PROJECT NUMBER: Maddox Construction 0306.9 PERMIT NO: INSPECTOR: 6957 Mark Robinson Inspector Mark Robinson on site, 1:00 pm, for review of epoxied anchor installation. Overcast, 70 degrees. Anchor Bolt Installation Procedure: Materials: ¾” x 12” all-thread anchor bolts; Hilti HY-150 epoxy Inspector reviews structural detail 10/SD-1for tube steel column anchor attachment. Locations completed today include four columns grid lines 12 & 12.8 (F.3 & F.7), 16 anchors total. The holes for reinforcing have been drilled with the diameter of the drilled holes exceeding the reinforcing rod diameter by approximately 1/16”. All holes are blown free of debris and dust, brushed and re-blown out with pressurized air such that no dust or debris is noted leaving hole when compressed air is introduced. Holes drilled to 8” minimum depth. After ensuring proper color (mixing) of epoxy at the end of the dispenser nozzle the holes are filled approximately 2/3 full with epoxy, and the reinforcing bar are inserted into the hole with tapping from hammer to seat. NORTHWEST TESTING COMPANY, INC. Mark Robinson Mark Robinson Professional Geologist Registered Site Assessor cc: Susanna Owens, Greg Elmore, Doug Meltzer, Gary Carlson, John Maddox PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647