Loading...
July 1 2003 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT REPORT OF CONCRETE TEST SPECIMENS Date Molded: Job No. July 01, 2003 0306.9 Client: Permit No: Mountain West Senior Housing LLC 6957 Project: Rosemont Retirement & Assisted Living Address: 215 Killion Road, Yelm, Washington Contractor:Sub-Contractor: Maddox Construction Finishing Edge Concrete Supplier:Cast By: Central Reddi Mix Mark Robinson ____________________________________________________________________________ o o Weather:Temp. Concrete:Temp. Air: partly cloudy 69 64 Location of Concrete Placement: Exterior continuous foundation walls grid line 9 (J.2) west to Q (4); exterior continuous footings from grid lines Q (2.2) west and south to 1 (H.1). Sampled at footings and north end of walls. _____________________________________________________________________________ Strength Requirement:Slump: 2500 PSI @ 28 days 4.5“ Cement Type: Sacks: Portland I-II 5.0 Mix: 470# cement; 1800# 7/8”; 1620# fine (Yelm Plant Mix #7). __________________________________________________________________________ Set Specimen Test @ Register Date Date Total Unit No. Size Days Number Rec'd Tested Load Load 04 4 x 8 7 6602 07-03 07-08 30000 2390 “ “ 28 6603 ” 07-29 41000 3260 “ “ 28 6604 “ 07-29 40000 3180 “ “ hold 6605 “ discard Remarks:Inspector: All tests comply with specifications. See Field Report for further information. Mark Robinson P.O. BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647