July 1 2003
Northwest Testing Company, Inc.
CONSTRUCTION TESTING and INSPECTION
ENVIRONMENTAL CONSULTATION and ASSESSMENT
REPORT OF CONCRETE TEST SPECIMENS
Date Molded: Job No.
July 01, 2003 0306.9
Client: Permit No:
Mountain West Senior Housing LLC 6957
Project:
Rosemont Retirement & Assisted Living
Address:
215 Killion Road, Yelm, Washington
Contractor:Sub-Contractor:
Maddox Construction Finishing Edge
Concrete Supplier:Cast By:
Central Reddi Mix Mark Robinson
____________________________________________________________________________
o o
Weather:Temp. Concrete:Temp. Air:
partly cloudy 69 64
Location of Concrete Placement:
Exterior continuous foundation walls grid line 9 (J.2) west to Q
(4); exterior continuous footings from grid lines Q (2.2) west and south to 1 (H.1). Sampled at
footings and north end of walls.
_____________________________________________________________________________
Strength Requirement:Slump:
2500 PSI @ 28 days 4.5“
Cement Type: Sacks:
Portland I-II 5.0
Mix:
470# cement; 1800# 7/8”; 1620# fine (Yelm Plant Mix #7).
__________________________________________________________________________
Set Specimen Test @ Register Date Date Total Unit
No. Size Days Number Rec'd Tested Load Load
04 4 x 8 7 6602 07-03 07-08 30000 2390
“ “ 28 6603 ” 07-29 41000 3260
“ “ 28 6604 “ 07-29 40000 3180
“ “ hold 6605 “ discard
Remarks:Inspector:
All tests comply with specifications. See Field Report for further information.
Mark Robinson
P.O. BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647