Loading...
July 3 2003 concrete Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT REPORT OF CONCRETE TEST SPECIMENS Date Molded: Job No. July 03, 2003 0306.9 Client: Permit No: Mountain West Senior Housing LLC 6957 Project: Rosemont Retirement & Assisted Living Address: 215 Killion Road, Yelm, Washington Contractor:Sub-Contractor: Maddox Construction Finishing Edge Concrete Supplier:Cast By: Central Reddi Mix Mark Robinson ____________________________________________________________________________ o o Weather:Temp. Concrete:Temp. Air: sunny 68 66 Location of Concrete Placement: exterior continuous foundation walls from grid lines Q (4) west and south to 1 (H.1) and exterior continuous footings from grid line 1 (H.1) south and east to grid line 4. Sampled at the footings heading southward. _____________________________________________________________________________ Strength Requirement:Slump: 2500 PSI @ 28 days 4.5“ Cement Type: Sacks: Portland I-II 5.0 Mix: 470# cement; 1800# 7/8”; 1620# fine (Yelm Plant Mix #7). __________________________________________________________________________ Set Specimen Test @ Register Date Date Total Unit No. Size Days Number Rec'd Tested Load Load 05 4 x 8 7 6606 07-04 07-10 25500 2030 “ “ 28 6607 ” 07-31 40000 3180 “ “ 28 6608 “ 07-31 41000 3260 “ “ hold 6609 “ discard Remarks:Inspector: All tests comply with specifications. See Field Report for further information. Mark Robinson P.O. BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647