Loading...
July 10 2003 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT REPORT OF CONCRETE TEST SPECIMENS Date Molded: Job No. July 10, 2003 0306.9 Client: Permit No: Mountain West Senior Housing LLC 6957 Project: Rosemont Retirement & Assisted Living Address: 215 Killion Road, Yelm, Washington Contractor:Sub-Contractor: Maddox Construction Finishing Edge Concrete Supplier:Cast By: Central Reddi Mix Mark Robinson ____________________________________________________________________________ o o Weather:Temp. Concrete:Temp. Air: sunny 78 80 Location of Concrete Placement: Footings grid lines 5 (C.3) east to 8.2 (C.3), exterior foundation walls line 1 (E) south and east to 4.2 (E). Sample at footings. _____________________________________________________________________________ Strength Requirement:Slump: 2500 PSI @ 28 days 4 ¼” Cement Type: Sacks: Portland I-II 5.0 Mix: 470# cement; 1800# 7/8”; 1620# fine (Yelm Plant Mix #7). __________________________________________________________________________ Set Specimen Test @ Register Date Date Total Unit No. Size Days Number Rec'd Tested Load Load 07 4 x 8 7 6630 07-11 07-17 30000 2390 “ “ 28 6631 ” 08-07 44000 3500 “ “ 28 6632 “ 07-37 45500 3620 “ “ hold 6633 “ discard Remarks:Inspector: All tests comply with specifications. See Field Report for further information. Mark Robinson P.O. BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647