July 29 2003 Northwest Testing Company, Inc. CONSTRUCTION TESTING and INSPECTION ENVIRONMENTAL CONSULTATION and ASSESSMENT FIELD INSPECTION REPORT CLIENT:DATE: Mountain West Senior Housing LLC July 29/31, 2003 PROJECT:REPORT NO: Rosemont Retirement & Assisted Living 07 CONTRACTOR:PROJECT NUMBER: Maddox Construction 0306.9 PERMIT NO: INSPECTOR: 6957 Mark Robinson July 29: Inspector Mark Robinson on site, 1:00 pm, for review of epoxied anchor installation and reinforced concrete placement. Clear, 76 degrees. Anchor Bolt Installation Procedure: Materials: Hilti HAS HF 7/8” x 16”; Hilti HAS E 58 x 17” anchor bolts Hilti HY-150 epoxy Inspector reviews structural notes and details 2 and 3/S0.00. Locations completed today include all interior wall anchor bolts east of grid line 10. (Note: two locations were missed at grid line 12 (G.2) and 10 (G.2). Contractor informed and will insert anchors at next inspection). The holes for reinforcing have been drilled with the diameter of the drilled holes exceeding the reinforcing rod diameter by approximately 1/8”. All holes are blown free of debris and dust, brushed and re-blown out with pressurized air such that no dust or debris is noted leaving hole when compressed air is introduced. After ensuring proper color (mixing) of epoxy at the end of the dispenser nozzle the holes are filled approximately 2/3 full with epoxy, and the reinforcing bar are inserted into the hole with a slight clockwise rotation, with a 1/8” counter-clockwise turn upon complete penetration. Rods are randomly checked to ensure complete epoxy coverage. Contractor places concrete for the exterior footings and foundation wall (monolithic placement), grid line 10 (D-D.2), D (8-10). All areas approved for concrete per structural notes on sheet S1.0, plan notes schedules on sheet S1.1A, Steel form spreaders used. Concrete is placed by truck chute at a 4.5” maximum slump and is vibrated for consolidation. One set of compressive strength test specimens is made on the placement of 5 yards and is stored in the field away from the work area for pickup tomorrow. See Report of Concrete Test Specimens for further details on today’s placement. July 31: Inspector Mark Robinson on site, 7:50 am, for inspection of forms and reinforced concrete placement. High overcast, to sunny, 61 degrees. Contractor places concrete for the floor slab between grid line 4.2 and 10. Graded at 4” uniform depth. The #3 reinforcing bar is in place at 18” on center each way and supported mid-way in slab. Thickened wall footings and pads in place, sized and reinforced per schedules on sheet S1.1A. Vapor barrier in place with all edges and mechanical penetrations taped and sealed, and placed to envelope foundation wall. All subgrade conditions are well prepared. Concrete is placed by pump at a 5” maximum slump and is vibrated for consolidation in thickened wall footing areas. Three sets of compressive strength test specimens are made on the placement of 111 yards and are stored in the field away from the work area for later pickup. See Report of Concrete Test Specimens for further details on today’s placement. NORTHWEST TESTING COMPANY, INC. Mark Robinson Mark Robinson Professional Geologist Registered Site Assessor cc: Susanna Owens, Greg Elmore, Doug Meltzer, Gary Carlson, John Maddox PO BOX 11581 OLYMPIA, WASHINGTON 98508-1581 PHONE or FAX (360) 866-3647