Grant,
Sorry, but I was out and not able to get this to you any sooner. Here is our updated survey where I have outlined where
the 100 year flood plain plots, as shown on the FEMA map. I also attached a portion of the FEMA map with our site
outlined in red. Look this over and let me know the cities thoughts and ideas. As mentioned, I would be happy to meet
with you to discuss in more detail. Thank you.
Hal
From: Grant Beck [mailto:grantb ci.yelm.wa.us]
Sent: Tuesday, September 11, 2012 10:41 AM
To: Hal Grubb
Subject: RE: Yelm Mini Storage project
Hal -
If you email me a pdf of the survey showing the boundaries of the flood plain as you
have mapped it from the elevations, I will take the matter to our Site Plan Review
Committee to discuss options for you. I would need it tomorrow before 11 AM.
Thanks,
Grant
Grant Beck, Director of Community Development
City of Yelm 1 105 Yelm Avenue West I Yelm, WA 98597 1 www.ci.yelm.wa.us
(360) 458 -8408 1 (360) 458 -3144 FAX I grantb @ci.yelm.wa.us
From: Hal Grubb [mailto:hgrubb barghausen.com]
Sent: Monday, September 10, 2012 2:25 PM
To: Grant Beck
Cc: Tim Peterson; Randy Weber
Subject: Yelm Mini Storage project
Grant,
I have been wanting to discuss some ideas on this project with you as it relates to the flood plain issue. We had the
survey redone to be on the same datum as the new FEMA maps so there will be no confusion with the different datums.
The 100 year flood plain does indeed come onto the property and where we are proposing some work. I have read
through the city codes and as we discussed it says we cannot fill in the flood plain.
Here is an option the we discussed in house and with the owner. What if we do this without any filling. We have always
been proposing porous asphalt paving since the subsoils infiltrate very good, therefore I don't need to do any filling to
1
get the drainage system to work. The covered storage structures are open on all sides so as not to impede the possible
flood plain. We would need to relocate the office, if there will ever be one, into the area outside of the flood plain.
With this concept we would not be filling in a flood plain. Can you look at this and let me know what you think. I would
be more than happy to bring in my survey and review this with you and your staff to show how we will not be filling. Let
me know. Thank you.
Hal P. Grubb P.E.
Director of Engineering Services
Barghausen Consulting Engineers, Inc
18215 72nd Avenue South
Kent, WA 98032
(425) 251 -6222 - Phone
(425) 251 -8782 - Fax