Loading...
20130108 Bldg Ltr on Eval of Structure 01272010 4�pg THE,�� �� V ���/'I I� � '� � a M 105 Y�ln��venzre W�.rt P.O. Box 479 YELM�N yelnz, i�ashiy�gtar� 98597 (.360) 458-3244 January 27, 2010 Mr. Rick Rochester 4810 45t"Ave. SE Lacey, WA 98503 Re: 108 Second St. NE, Yeim Mr. Rochester, Thank you for meeting with me yesterday. After my last site meeting with Ron Niemi and Greg Mauerman I forwarded an emaii to Ron requesting an evaluation of tne structure, see attached. My concern was that a partial repair wauld not be sufficient to bring the current structure into compliance with seismic and lateral requirements. Mr. Harold NahnenkratYs letter of Jan�ary 20, 2010 satisfied my requirement of an evaluatian and cnnfirmed my cancerns that a partial repair will not meet seismic or lateral requirements. I concur that replac�ment is the best alternative. However, if you chose to repair the structure, the following with the Building Permit Application wi11 be required: 1. Five (5) Capies of Canstruction Drawing 2. Two (2) Capie$ of Engineering calcuiation for loading, seismic and lateral forces. 3. Demolition Permit from 4lympic Region Clean Air Authority (ORCAA) for the sections of the structure removed. 4. Demolition, Safety Protection Plan and Engineered Plan for structural stability during foundatian replacement. 5. Site Plan for Utility lacation and connection ta the structure The plan revierrv pracess will require an engineering peer review. The cast af the review will be charged to yau in the permit review fees. Anticipate a 4 to 6 week review period. 7'he Cit�� v/'�'c.�lrn is a��Eqiral Op�at�rttrn%ty Pyv��zder� Rep(acement of the structure will require with the Building Permit Application; building drawings, a site plan for buifding footprint, utility location, utility connection and a Demolition Permit from ORCAA. If you chose to build under the Interna#ional Residential Code engineering wil! not be required if you chose the prescriptive methad. Anticipate a 2 to 3 week review period. As stated by the City of Yelm's Sewer Departmen# a new step tank wil! be required for the residence. Coordination of the step tank instalfation will be with Jim Doty. He can be reached at 360-458-8411. Due to non conforming setback issues, the requirement far rebuilding is that you maintain the existing building footprint, The new residence will be credited with the existing structure's, water, sewer, traffic and fire connection or impact fees. !f ! can be of further assistance please feel free to con#act me at 360-458-8407 or at q,aryc(a�ci.yelm.wa.us, Thank you. Sincerely `�':-�_ / .-_.___. Gary Carlson Building 4ffcial • � ` . , . ��L��a�k� ���141 l.�A�.�.���L.._. �� � .. . � .� d a a£z� �i.€L. � i';:! >t, i .)a. ;:?< '��° r .3'.' f .,)r, � . �`, .'r i,:�\,r—' df> ��,����y�a� 2a�o Rick��chester 4814 45'�Ave SE Lacey, GVA 98543 Attn; R.ick Roehester �: Fire Damage at 108 �"`� Street SE in�elrn, WA l�e�-Mr. Rflches�er; Per au�-cflnversation, it is my u�derstanding that the buildin:g c�fficiai for the city of Xel� has request�d a seisrrnic and vertical Ioad resisting system evaluatian be compl�ted d�e to the magnitude of da.;t�a:ge. It is also my understanding t�at the structure will be required tfl m�er currer�c coae. Qn Thursday, January I4�', I�net you on site tQ perform a visuai obsez�vation af the fir� damage and review bt�th the vertical and lateral systems afthe s�ructure. Structure Description The structure is a stick framed hc�use built in 1912. The foot prir�t is approxirnateiy �5' x 27' with a pop c�ut c�f appraximately 8'x16' that encompasses the ba�k daor and the lau�dry room. There are two bedroc�ms an the upper ievel xhat is Ioca�ed inside the roof structut'e. The raof struc€ure cc�nsists of raugh savm 2x4 raft�rs spanning to the e�teriar walls. The e�rt�rior wall are raugh�awn 2x4 studs at 32"on center with ship lap siding un�er vinyl sidian�. The upp+er floar framing is 2x ceiling joist that are ledgered to t�e exterior wa11. This#�oor system is extremei�a bouncy. The stair sysienn tha�accesses the upp�r flt�or is narr�w,steep and dc�e.�not have adequate head clearance. I was unable tc� gQ under the crawl space, but Gased on the construction type and ye�r built, the rnain. flQar framin,�is most likeiy 2x joists with interior past and beams. The exterior f�undation has been upgraded to cc�ncrete masonry units(Ch�TCT)on a cancrete fot�tin�vn the main portio�and a eombination of slab and CMIJ fc�r�he gop aut portian. Based c�n the amt�uur�t of crael�ing it is rny�pinifln that the CNILT stem wall da�s not haVe reinforcing stee�. ' Canci�rsic�n Both the vertical and 1�.teral force resistang systems would require significant upgr�de i� order to rneet current cod:�. The roof system,upp er floor framin;�, arid faundation would have to be virtually replaee,d. The e�terior walt would ne�d ac�ditic�n�1 studs a�d upgraded ta meet shear wall requirements. I have not addressed the issues��at da not pertain ta structwre Ii�e wiring, plurnbing, arid insulation. Based on the current ccsz�dition af the hfluse and the required repair�n�i upgrade it is rny 4pinian that it tuould be more cost effective to demolish the hous�and start over. If you ha�e any questions or I xnay be of further help please ca]I (360) 524-126�. Sincerely � .._...____.__ � � � ✓--�`"` � �-3arold�ahnen?�rai�P.E. ��,�. �� ��� PT'�SIt�ETI� "'��� `�'�i` `� ��-° " � F: �c Gre�Mauernnan,Big Raek Cot�structian �� -� .� � , c� sx� ;�0 75� �'�' *. � ��rsx�'���►'� ��`��1V�L � � �� ��� � . _ � � __ __