Loading...
20130103 Wild Rose Yoga 01312013 STAFF REPORT City of Yelm Community Development Department Case Number: 20130103 Wild Rose Yoga Applicant/Owner: Jessica Caldwell 4933 Churchill Road SE Tenino, WA 98589 Request: Convert retail space for Yoga instruction and related retail. Action: Approval of the Site Plan Review Findings of Fact Proposal and Site Characteristics The proposal is to provide space to hold Yoga and other classes, with associated retail, and possible future expansion to include serving beverage and other food related items. The property is located at 104 Yelm Avenue E, Tax Parcel # 64400600800, and is currently vacant. The past use of this building has been retail in nature. The surrounding properties are developed as other commercial and food and beverage establishments. Site Plan Review The property is identified by the Yelm Comprehensive Plan Map as (CBD) Central Business District. All commercial uses, including health/exercise clubs, and retail sales uses are allowed, subject to site plan review approval. Site plan approval is exempt when there is no expansion of use, no additional tenant, or the use is similar as classified by the Standard Industrial Code Classification Manual. The Yoga and other classroom is classified as a service oriented use, and different than the previous retail use. A Notice of Application was mailed to local and state agencies and surrounding property owners on January 14, 2013. Section 17.84.020 (C) Yelm Municipal Code allows the Site Plan Review Committee to approve a proposal when the site plan conforms to the standards, provisions and policies of the City as expressed in its various adopted plans and ordinances. Concurrency Chapter 15.40 YMC requires the reviewing authority to determine that required urban infrastructure is available at the time of development. Concurrency means the facilities necessary to serve a proposed development are in place or planned for and properly funded with a reasonable expectation that the facilities will be in place at the time needed to preserve adopted levels of service. Concurrency with sewer infrastructure is achieved pursuant to Section 15.40.020 (B)(1) YMC when the project is within an area approved for sewer pursuant to the adopted sewer comprehensive plan for the City and improvements necessary to provide City standard facilities and services are present to meet the needs of the proposed development. The proposed site is located in the City’s sewer system service area and is currently connected to the sewer system. This satisfies the requirement for concurrency with sewer infrastructure. Concurrency with water infrastructure is achieved pursuant to Section 15.40.020 (B)(2) YMC when the project is within an area approved for municipal water service pursuant to the adopted water system plan for the City and improvements necessary to provide City standard facilities and services are present. The property is within the water service area as identified in the Yelm Water System Plan and is currently connected to the City’s water system. The applicant is responsible for ensuring that the requirements of the adopted Fire Codes are met through the provision of adequate fire flow, or construction methods that reduce the required fire flow. This satisfies the requirement for concurrency with water infrastructure. Concurrency with transportation infrastructure is achieved pursuant to Section 15.40.020 (5)(c) YMC when the project:  Makes on-site and frontage improvements consistent with City standards and roads necessary to serve the proposed project consistent with safety and public interest; Page 2 of 7  Makes such off-site facility improvements, not listed on the capital facilities plan, as are necessary to meet City standards for the safe movement of traffic and pedestrians attributable to the project;  Makes a contribution to the facilities relating to capacity improvements identified in the adopted six-year traffic improvement program, in the form of a transportation facility charge. Frontage improvements for Yelm Avenue East (SR 507) are currently complete. The health/exercise with associated retail does not increase vehicular trips at the site, so there are no additional traffic impacts. Concurrency with school infrastructure is achieved pursuant to Section 15.40.020 (B)(4) YMC when the developer provides a letter from the local school district that the school facilities impacted by the proposed development are present, or are on an approved and funded plan, to assure that facilities will be available to meet the needs and impacts of the proposed development. The proposed development will have no impact on the School system as it will not increase the number of students within the school district. Concurrency with Fire Protection is achieved pursuant to Section 15.40.020 (6) YMC when the developer makes a contribution to the fire protection facilities as identified in the most current version of the capital facilities plan adopted by the SE Thurston Regional Fire Authority and endorsed by resolution of the Yelm City Council. The City Council has waived the fire impact fee by Resolution 533 until the SE Thurston Regional Fire Authority establishes a region wide impact fee. This fee is subject to change by City Council resolution and is collected at the time of building permit issuance. The City will provide police protection, water service, and sewer service. Fire protection services are provided by SE Thurston Regional Fire Authority. State Environmental Policy Act Based on WAC 197-11-800, a Threshold Determination is only required when the proposal creates 4,000 square feet or 20 or more parking stalls. The proposal will not require an environmental checklist due to its size and parking requirements. Critical Areas All of Yelm is considered a critical aquifer recharge area. Existing development regulations require the treatment of stormwater prior to infiltration into the ground. The proposal creates no new impervious surface and will not require any upgrades to the existing stormwater collection, treatment, and disposal system on the site. Page 3 of 7 The City Critical Area Maps indicate that the property is located outside of wetlands, flood zones, and high ground water buffer areas. Design Review The property lies within the (CBD) Central Business District zone and the Old Town design guideline area. All development on the site is required to meet the City’s design guidelines for the Old Town district. The guidelines are intended to supplement the standards in the Zoning Code. Guidelines include provisions, requirements or considerations that are in addition to the Zoning Code standards. Existing buildings are exempt from new development design standards. The site is reviewed to assure existing facilities meet the intent of the design standards. Street Fronts The design guidelines require that development must define the street edge with buildings providing a “pedestrian oriented façade”, landscaping with “pedestrian oriented space”, provide direct access to the building from the public sidewalk, and assure that no more than 50% of the street frontage be occupied by parking. The building is pre-existing and was constructed prior to the establishment of current development regulations. The building is located adjacent to the street with a public sidewalk along the entire frontage. Side and Rear Yards The design guidelines indicate that service areas and outdoor storage be located away from neighboring properties to reduce conflicts, and require screening of refuse containers located behind the building. The refuse area must be large enough to accommodate a dumpster and recycle bin. Refuse areas must be screened with an enclosure of a material and design compatible with the overall architectural theme. For establishments that are able to use standard residential refuse pick-up, standard cans as opposed to container, must assure that the garbage cans are stored out of site or screened on non waste pick up days. Transportation Yelm is a small compact community most directly affected by two state highways, SR 510 and SR 507, which bisect the community. These state routes are used by local residents for transportation throughout the City, and for access to commercial and residential areas throughout the community as well as serving regional traffic. The updated Transportation element of the Yelm Comprehensive Plan identifies a number of improvements designed to avoid the need to significantly widen existing Page 4 of 7 streets, and particularly Yelm Avenue. New development impacts the transportation system in Yelm and, unless the improvements identified in the transportation plan are constructed, the City would need to require developers to pay the cost of internal street widening. The City has adopted a Transportation Facility Charge (TFC) of $1,321.00 per PM peak trip. The concurrency chapter of the Municipal Code provides a default table that is used to determine new peak PM trips generated by a proposed use. When a specific use is not listed in the trip generation rate table, the most similar use is used. Yoga classes are similar to a health/exercise club which generates less pm peak hour trips than miscellaneous retail, therefore not creating additional trips. Water Supply The City’s Water Comprehensive Plan identifies the property as being within the water service area. The proposed site is currently connected to the City’s water system. The State Building Code at Section 19.27.097 RCW requires evidence of water availability and the issuance of a building permit by the City is the City’s commitment to serve a proposal with potable water. The applicant is not proposing to increase the existing facilities; no additional water connections are required. The City is dedicated to providing the best quality water possible to its consumers. Section 246-290-490 WAC, requires that the City take measures to ensure that contamination does not occur as a result of cross contamination. There is an existing Reduced Pressure Backflow Assembly located at this site. The applicant shall verify the assembly is installed per Washington State requirements, and is operational. Sewer System The City’s Sewer Comprehensive Plan identifies the property as being within the sewer service area and the site is currently connected to the City’s STEP sewer system. The installation of an under counter grease trap was not completed, due to lack of payment by previous tenant according to plumber responsible for install. There were no manufacturer specifications, installation manuals etc. available for unit to verify complete and proper installation according to manufacturer specifications. Once inspected and approved, the Hydromechanical grease trap will need to be maintained on a regular basis according to manufacturer’s specifications. Page 5 of 7 Stormwater Impervious surfaces create stormwater runoff which, when uncontrolled and untreated can create health, safety, and environmental hazards. The City has adopted the 1992 Department of Ecology Stormwater Manual, which requires all development to treat and control stormwater. The parking lot is pre-existing and is not proposed to be expanded. There are no additional impervious surfaces that require storm water treatment. Parking The City Development Guidelines, Design Guidelines, and Municipal Code address parking regulations from many aspects, including, but not limited to the design of lots, the number of stalls required, pedestrian pathways within lots, site illumination and safety. The requirements of off-street parking and loading facilities and their design shall be regarded as the minimum; however, the owner, developer or operator of the premises for which the parking facilities are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space or its arrangement is in excess of the minimum set forth. The proposal does not include any expansion, simply a new tenant in the existing space. The Central Business District has on-street parking, and a public parking lot within a block of this site. Additional parking is not required. Fire Fire protection to the buildings shall be provided pursuant to the International Fire Code. The specific requirements for installation of all fire hydrants, fire sprinklers, and fire lanes were determined at the tenant improvement permit approval. The International Building Code (IBC) provides occupancy ratings for different types of uses. The fire coverage and sprinkler system for the proposed use must meet International Building Code requirements. Landscaping Landscaping and screening are necessary to provide screening between compatible and incompatible land uses, to safeguard privacy and to preserve the aesthetic assets of the City. Page 6 of 7 The site is located within the Central Business District, with the building fronting the public sidewalk, an alley in the rear, and common walls with the adjoining buildings, no landscaping is required. Conclusions of Law A. The Site Plan Review Committee has jurisdiction to consider and decide the issues presented by this request. B. The applicant has established that the request for site plan review approval satisfies all criteria set forth in Section 17.84.020(C) YMC, meets all requirements of the Central Business District (CBD) zoning classification, and meets all other requirements of the Yelm Municipal Code. 1. All conditions for cross connection control as required in Section 246-290- 490 WAC shall be met prior to issuance of a certificate of occupancy. 2. Prior to serving beverage and other food related Items, the installation of the Hydromechanical grease trap will need to be completed, inspected and approved. C. The Site Plan is valid for eighteen (18) months from the date of this approval. The applicant may request a six-month extension on the approval, if the request is made in writing prior to the expiration date of this approval. If you need additional information or assistance, please call the Community Development Department at (360) 458-3835. Decision The request for site plan review approval is hereby granted. st APPROVED this 31 day of January, 2013 Grant Beck, Director of Community Development Site Plan Review Committee Appeal Site Plan Approval is a Type II Administrative land use approval. An appeal of this decision can be filed within 14 days from the date of this approval, pursuant to YMC, Chapter 15.49, Integrated Project Review Process. Any appeal must be in writing, contain specific factual objections, and include the appeal fee of $50.00. Page 7 of 7