20120306 Permit Pkg 11082012 �►�T� City of Yelm Permit ►vo.: 20120306
;� Community Development Department Issue Date: 11/08/2012
�" (Work must be completed within 180 days)
Building Division
Phone: (360)458-8407
"""' °" Fax: (360)458-3144
Applicant:
Name: MOUNTAIN TERRACE BUILDERS Phone: 360-458-1502
Address: 14730 STATE RT 507
YELM WA 98597
Property Information:
Site,4ddress: 10157 TERRA VALLEY ST 1 Owner: MOUNTAIN TERRACE
BUILDERS
Assessor Parcel No.: Subdivision: VINTAGE GREENS Lot: 1
Contractor Information:
Name: MOUNTAIN TERRACE BUILDERS Phone:
Address:
14730 STATE RT 507
YELM WA 98597
Contractor License No.: Expires: 0/00/0000
Project Information:
Project: NEW RESIDENTIAL BUILDING
Description of Work: SFR-4BDRM PLAN 7763-B
Sq. Ft. per floor: First 1249 Heat Type(Electric, Gas, Other): GAS
Second 1194
Third
Garage 456
Basement
Fees:
Item Contractor Fees
NEW RESIDENTIAL BUILDING MOUNTAIN TERRACE BUILDERS $16,786.92
MECHANICAL BEST CHOICE HEATING $ 84.75
PLUMBING JR'S PLUMBING $ 132.00
TOTAL FEES: $17,003.67
ApplicanYs Affidavit: � QF�I�tAL US�,ONLY �
I certify that I have read and examined the information contained within the application and know the same
to be true and correct.I also certify that the proposed structure is in conformity with all applicable City of I�Sets of Frints: '"
Yelm regulations including those governing zoning and land subdivision,and in addition,all covenants,
easements and restrictions of record. If applyi contractor, I further certify that I am currently ',Fin�4lnspeGtipn:
registered in the State of Washington.
Signature� . � Date i ( I `�.I 1�Z ' C�ate:
Firm I�-�� 1�—L—. gY�
� ��/2, o �� (�
CITY OF YELM
RESIDENTIAL BUILDING PERMIT APPLICATION FORM
Project Address I O�`�� �j�,'(4� �,�t Ll�'! 7� Parcel#:
Subdivision: i � ' e, Lot#: �- Plan#: ���� � Zoning:
�.New Construction � '� Re-Model/Re-Roof/Addition ' Home Occupation Sign
� Plumbing Mechanical �°' Mobile/Manufactured Home Placement � " Other
Project Description/Scope of Work: �U e...�-� Cc�v�s�r�c,�• ilc.,:,
Project Value: � ��� ,��, `�'
Building Area(sq. ft) 1S` Floor �Z-! / 2nd Floor� Garage � Deck
Basement Carport Patio
#Bedrooms� �f #Bathrooms�''2- Heatin GAS/ HER or ELECTRIC(Circle One)
��,'v
Are there any environmentally sensitive areas located on the parcel?
!f yes, a completed environmental checklist must accompany permit application.
BUILDING OWNER NAME: luv. c•.i•� "r '
ADDRESS I " � i '�- EMAIL
CITY s�- STATE�ZIP__��TELEPHONE �bp �/S�S /S�L
ARCHITECT/ENGINEER„��}"D LICENSE#
ADDRES�S � !� t vv EMAIL
CITYLe e7c�c STATE w�� ZIP TELEPHONE ZS3 -� — fo3 "
GENERAL CONTRACTOR S�irv�� � Oa.,.�.�- TELEPHONE 3t� SC��- Of�b�
ADDRESS EMAiL
CITY STATE ZIP FAX
CONTRACTOR'S LICENSE# v ? s L� XP DATE CITY LICENSE#
PLUMBING CONTRACTO ` r TELEPHONE "LS,� LIGi��'�l�iC7
ADDRESS �' EMAIL
CITY STATE ZIP FAX
CONTRACTOR'S LICENSE#JQS—��� �'� EXP DATE CITY LICENSE#
MECHANICAL CONTRACTOR TELEPHONE
ADDRESS MAIL
CITY STATE ZIP FAX
CONTRACTOR'S LICENSE# EXP DATE CITY LICENSE#
Copy of mitigation agreement with Yelm Community Schools, if applicable.
1 hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the
above described property will be in accordance with the laws,rules and regulations of the State of Washington and the
City of Yelm.
�---- - �--�M__ �-� /v � rZ
Applicant's Signature �� "'"�°�""'" Date
Owner/Contractor I Owner's Agent/Contractor's Agent(Please circle one.)
All permits are non-transferable and will expire if work authorized by such permit is not begun__ .._, ,,.
within 180 davs of issuance. or if work is suspended or abandoned for a period of 180� ����; �,.:,, �
t,
/ � � ' _
��C,��, 1��� � - �(�' � __ . �:_.
.:� -� . -------------
�
�`/` �l� " �� (360)458-383
� �
j (360)458-3144 FAX
v✓/•��%�fL�c-��1 - �
�����Z"�`� � (
10/25/2012 THO 9: 39 FAX 3604583144 City of Yelm CCD ��u�iuv�
woo�sueEdauloHOHN'^ti�^r^ m (j� �
L090-SB9�£9l)�Xl�� 60£9-b89�E9Z) B6tiB6 dM`QOOM�NK'1 MS 1��231S H160 b SZ6ti � � y , � � o QH
�NI JNINJIS3O 3WON 1S3MH1aON � � _ � � T �.�
N
�
�
U
`,�
� _ �
�
IJ ;
� �1'� Z0�0'[.9-(.5 �dlV� `
�
� L�zO£� alq�.I ��il�2d '�� �' ��
<r uoi��n��suo�;u��sisa.�-a�i�epino�d ye�s saw� _ ° '�
.;�, ��ado�d oi iaa�� u�u� ssa� suoi��a(o�� -
,n , �_.�; � ��i
z ,�, , � _ :� � Q
� �v � �
t`� 3 � � , � .
� � � .. � �
� � y ` `� � � ��
� � � ' � � \� Q �
' � :" �` ;� ;' � �Q 7�.\ �,�,- 4� U
� il� �Y_ �� � �� `�l
�'t'
, a � E C1 � / � `? '�i
� � �, ' 4
.a.! ' �i �� .
; v
� „� u' ` � � /�' � � <
� 2 `^ � � � `;�� � �, �
ti � � � ' \ , ��� \\ � '�\�/i �i � w �
�
Z �W �� 1 \�\,` ''�� \� � �\;. �% / \� � �u� f--- �`-
h� � �. ` � \ ` `� . ?•- �� S
t'a- a \,.^ ��:� �� �� �"" a� � _ �
v J { tAi '
r
� � � �\..�._.�\\\" t ����\ � ' \ V! ��� ��� `�`'� �`
� \ \ �—�'1 � >
1
Q �\ Q � � � �
� ' -1 .i"- ����� j—��`'v� � � �� � 1/` .-._
� v , �� ��Q � �,. `` � , � � �
a � �` ` �\� , � � �
(' �' �\�� y�- \� �� � � � � � � �
� � � �' '`; �� �' \ . ' �` .
\ � 1
� v � 0 .���. �'`� � � �
�� �- ` � ,, � ! t,
� � �\� ``_,.-_- �;Wa+- , �_~ �.l
t., � ,� -� -y�� - —--�--_. ; ��
e 1� � t�� �� � C�
s '� `3Z
�� � � � � i;a �v
� � � �} �� J �/,.
N � V �
"e N ".t
� \ �� � _ � ;� � ��.
J �!�--- � a �4 a�a?,SE�,e�' :_.�
`� �� � �� �
,� � � �
� �
�
� � �
:z ;� `.
�
�
�
. YELM CPOM�OxT476CH00LS
YELM WA 98597
l��l. �4����02
�7erk: Gray (3b�) ;04 AM
Term7nal : 1 11/�»/�t�12 �
Receipt: 194882(Reprint) ���,�o ����[�3L1
Manual Receipt: �P��; G� TERM: �01
NMOUNTAiN TERRA� R�F#: 15191
NMOUNTAIN T�RR � �UILD7��G �����'
MOUNTAIN, TERRACE: SL!ILDERS 1�pN� �3��a�� �°�,003.
14730 Stt 507 SE Zp120306
� BUILDER�
YELM , �rJA 98597 MOUNfA1N ����A�'
11 � 2012 7,56 AM 1015� TERhA��A786.92CR
I / BLD-RES1 g,�.iSCR
�tY--__Item _.�--_..___._________ Price MEGH 13�.00CR
- -- Pl.
� MITIGATIDNTIuN 3015.�0 ��N��R��: 17 ��3.�� CW�L'K
APPLIED; 17,UO3.67-
05-p2� ;` Lot 1 / Terra Valley � .-----0
CNANGE�
5�idtotai ; 3��p,00
Tax:
Total ; 3015.00
i�neck 3015.00
1603G
C'r�anqe Due: ����
REPRINT RECEIPT
TfiAF1K YOU
�
' YELM CPOM�N�XT476CHOOLS
YELMf WA 98597
�
Clerk: �r0y
Termin�l : 194682(Reprint)
Receipt:
Manual Receipt:
NMOUNTHIN TERRAC
NhiOUNTAIN TERRAC
MDUNTAIhI, TERRACE: Sl!ILGERS
14730 SR 507 SE
YELM , WA 98597
11/�l'20�'� 7:56 AM
QtY____Item ---------____—J---Pr�-��
� CPF MITIGATIuN 3015.00
MITIGATION
��5-p2g ; L.ot 1 / Terra Valley
5i�btotai: 3��p,00
Tax,: 3015.00
Total :
�n��k 3015,t�0
1603�
Cnanqe Due: �•��
REPRIPiT RECEIPT
THANIt YOU
Prescriptive Energy Code Compliance for Single Family and Duplex Housing:Zone 1
' Project Information Contact Information
Lot 1 Vin e reens MTB
Mike Kem inski 360 507 0868
This set of forms has been developed to assist permit applicants documenting compliance with the
Washington State Energy Code, (2009 edition). This set is for structures built under the IRC and located
in Climate Zone 1.
The following forms provide much of the required documentation for plan review. The details noted here
must also be shown on the drawings(WSEC 104.2).
This form is not a substitute for the energy code itself. To obtain a copy of the energy code,
go to the following web address. http://www.energy.wsu.edulcode
Glazing Wa1112 Wall• int4 Wall• ext4 Slabb
lo Glazing U-Factor poor 9 Vaulted
Option Area : CeilingZ 3 Above Below Below F1oor5 on
%of Floor Vertical Overhead" U-Factor Ceiling Grade Grade Grade Grade
R-49 or R-21 R-21 R-10
D I 13% 034 0.50 0.20 R-38 R-38 Int.� TB R-10 R-30 2,
Adv.
R-49 or R-21 R-2l R-10
�II 25% 032 0.50 0.20 R-38 R-38 Int.' 'j'g R-10 R-30 2,
Adv.
R-49 or R_21 R-21 R-10
O III Unlimited 030 0.50 0.20 R-38 R-38 �t� ,I,B R-10 R-30 2,
Adv.
See WSEC tab/e 6-i for footnotes
Glazing Schedule Attached to Document
� Does not apply. (SEE INSTRUCTIONS) Usin�Prescriptive Option III.All glazing
and doors meet maximum U-factor.Alternate heating size method submitted.
0 Option I or II, Glazing to floor area limit(WSEC 602J.2) ��� �
❑ Area weighted window,skylight or door U-factor(WSEC 602.7.2) ��;.
❑ As part of the heating system sizing calculation (IRC M1401.3&WSEC 503.2.2)
Radiant slab:
❑ R-10 foam insulation, continuous with thermal break(WSEC 502.1.4.9)
Chapter 9 Options Total of 1 Credit Reauired
Opt. Opt. Description
1a Hi h E�cienc HVAC E ui ment 1 1.0 �
1 b Hi h Efficienc HVAC Equipment 2 ❑
1c Hi h Efficienc HVAC E ui ment 3 �
Z Hi h Efficienc HVAC Distribution S stem �
3a Efficienf Buildin Envelo e 1 � �
3b Efficient Buildin Envelo e 2 ;; �,_, `_ _, „ �
3c Super-Efficient Buildin Envelope 3 � ? �
4a Air Leaka e Controf and Efficient Ventilation ��� �
4b Additional Air Leaka e Control and Efficient Ventilation ❑
5a Efficient Water Heatin �� ;': ____.._.__________ �
5b Hi h Effiecienc Water Heatin �
6 Small Dwellin Unit �
7 Lar e Dwellin Unit �
8 Renewable Electric Ener "1200 kwh ❑
Total Credits 1.00
WSEC Prescriptive Worksheet(2010 edition)Zone 1 WSUEEP10-010 Copyright 2010
Glazing Schedule
Project Infoimation Contact InfoRnation
' Lot 1 Vinta e reens MTB
Mike Kempinski 360 507 0868
Conditioned Floor Area 2443 Sum of UA for Heating System Sizing 219.2
Sum of All Glazing Areas From Below 363
Glazing to Floor Area Ratio 14.84% 602.7.2 Exception Ratio(not to exceed 1%)�
Exterior poors
Plan Component Door Percent Width Height Glazing Door poor
ID Descri tion Ref. U-factor Glazed Qt. Feet �"�' Feet '"°n Area Area UA
front door 2.00 1 3 6 18.0 36.0
back door 2.00 100°�6 1 6 6 8 40.0 40.0 80.0
One Exempt Swinging Door<24 Square Feet
Sum of Glazing Area, Door Area, and UA (do not indude exempt door) 40.0 58.0 116.0
Area Weighted U= UA/Area 2.00
Sum of Area and UA for Heating sysfem size only(include exempt door) 40.0 58.0 116.0
Vertical Glazing (Windows, Glazed doors using Exception 602.6#1)
Plan Component Glazing Width Height Glazing
I D Descri tion Ref. U-factor Qt. Feet '"�n Feet 1fOn Area UA
den , dinin 0.32 2 6 5 6 66.0 21.12
famil 0.32 4 3 5 6 66.0 21.12
famil 0.32 1 5 5 6 27.5 8.80
kitchen 0.32 1 4 3 6 14.0 4.48
master bed 0.32 4 3 5 60.0 19.20
master bath 4.32 1 6 1 6 9.0 2.88
bedroom, bedraom 2, bedroom 3 0.32 4 4 4 64.0 20.48
laund , ent 0.32 2 4 2 16.0 5.12
Sum of Area and UA 322.5 103.20
Area Weighted U= UA/Area 0.32
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEP10-010 Copyright 2010
Overhead Glazing
Plan Component Glazing Width Height
ID Descri tion Ref. U Qt. Feet �"`�' Feet �`�'' Area UA
Sum of Area and UA
Area Weighted U= UA/Area
Doube Glazed Garden Windows Section 602.7.2 Exception
Plan Component Width Height
ID Description Qt. Feet �"�' Feet �"`n Area UA
Sum of Area
Sum of Area X 3(This total is automatically included in the glazing area total.)
Glazing UA for Heating System Size Only=Area X 0.63
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEP10-010 Copyright 2010
Simple Heating System Size: Ciimate Zone 1
•Project/nformation Contact lniormation
Lot 1 Vinta e reens MTB
Mike Kempinski 360 507 0868
Indoor Design Temperature 70
Outdoor Design Temperature 17
Design Temperature Difference(oT)
4T=Indoor-Outdoor Design Temp 53
Conditioned Floor Area 2443
Conditioned Volume 22108
Glazing
Copy Sum of UA from Glazing Schedule 219
Attic U-Factor X Area = UA
R-49 0.027 1194 32.2
R-38 Advanced 0.026
Single Rafter or Joist Vaulted Ceilings
U-Factor X Area = UA
R-38 Vented 0.027 � �
Above Grade Walls U-Factor X Area = UA
R-21 Q.056 2356 131.9
Floors U-Factor X Area = UA
R-30 0.029 1249 36.2
Below Grade Walls U-Factor X Area = UA
2' Depth Walls 0.042
3.5' Depth Walls 0.041
7' De th Walls 0.037
Slab Below Grade F-Factor X Len th = UA
2' Depth 0.59
3.5' Depth 0.64
7' Depth 0.57
�
Slab on Grade F-Factor X Len th = UA
R-10 2' perimeter 0.54
R-10 Full-Heated 0.55
Sum of UA 420
Envelope Heat Load 22239 Btu/ Hour
Sum of UA X aT
Air Leakage Heat Load 12655 Btu/Hour
((Volume X 0.6)X 4T)X.018))
Building Design Heat Load 34893 Btu/Hour
Air Leakage+Envelope Heat Loss
Building and Duct Heat Load 1.15 40127 Btu/Hour
If ducts are located in unconditioned space:Sum of Building Heat Loss X 1.15
If ducts are located in conditioned space:Sum of Building Heat Loss X 1
Maximum Heat Equipment Output 150% 60191 Btu/Hour
Building and Duct Heat Loss X 1.50
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEP10-010 Copyright 2010
U
M >
� �
O
m N �
M �
� N � C
� � �
f6 �- c�
L
�'' � � � � O
� � � U•�N
�' � N _
� � �
S� � a� � U O �+
� � .n c� v �
� `�
c� � o �,, .� �,
q � Z °' � �
� � -�
�
� � � a � ��
� � � om �
� � � a� �
� � (�6 N
O 0 ,� L � a'
p� ''� cn �? c ti
� � � W � �c
rN, � � � p � � �
V �
?� �' � � � � N
� •� � m � � �
�' p�j J U � _ � a��i
� �3 Q � � � � �� �a
� �� � � � � � � c�
� � � I-W- W � m � o � U
� U
� � ZQa � � �W .� �° �
� � c�n � o � � o .� �
ZO � ° w � cNa
� � � � Z � J �
0 o � w o g o � �
�- � c- �" N � J V ti�..
�
J �
� Q Q � N
�
� � H
� � C
f� Z � � 0 . .
� � •"= � � ;«_ (a
a -p � � � � U � U
�� � (Q "a � � � �
Q Z Q �j � V
� � L L � � U� � �
�� "� � � '� C (� ,� �
� W O O W LJ� �l �/J W
7/23/2014 2:58 PM INSPECTION HISTORY REPORT
PROJECT # DESCRIFTiON STATJS PROPERTY GEN C01
20120306 NEW RESIDENTIAL BOILllING COMPLETED 10157 TERRA VALLEY S'P SE MT'PGRR
SEGMENT
PHASE TASK INSPECTOR STATUS DATE TIME
----------------------------------------------------------------------------------------------�
NEW RESIDENTIAL BUILDING
FOUNDATION INSPECTION johnr CLOSED 11/29/2012 4:22P1
FRAME INSPECTION johnr CLOSED 1/03/2013 8: 4$AI
NEW BUILD RES-FINAL INSPECTION johnr CLOSED 2/26/2013 1:23PI
SETBACKS INSPECTION gary CLOSED 11/21/2012 10: 44AI
FOOTINGS INSPECTION gary CLOSED 11/21/2012 10: 45A1
FOOTINGS REINSPECTION gary CLOSCD 11/21/2012 10: 55A1
ENERGY-FOAM & SEAL INSPECTION johnr CLOSED 1/03/2013 8: 48AI
ENERGY-WINDOWS INSPECTION johnr CLOSED 1/03/2013 8: 48AI
DRYWALL INSPECTION johnr CLOSED 1/03/2013 8:48A[
SHEAR WALL INSPECTION johnr CLOSED 1/03/2013 8:4�Ai
UNDERFLOOR INSPECTION johnr CLOSED 12/07/2012 4:31P[
SEWER FINAL I�SPECTION randyh CLOSED 2/26/2013 10:24A1
WATER FINAL INSPECTION smitty CLOSED 2/20/2013 12: 11P[
WATER FINAL INSPECTION smitty CLOSED 2/20/2013 12:14P[
SIDEWALK FINAL INSPECTION john edwards CLOSED 2/26J2013 10: 52AI
DRYWELL INSPECTION johnr CLOSED 12/03/2012 3: 59P[
MECHANICAL
MECHANICAL COVER INSPECTION johnr CLOSED 1/03/2013 8:48A[
MECHANICAL FINAL INSPECTION johnr CLOSED 2/26/2013 1:22PI
ENERGY-DUCT CERT INSPECTION johnr CLOSED 1/03/2013 8:49A[
PLUMBING
PLUMBING COVER INSPECTION johnr CLOSED 1/03/2013 8:49P.f
PLUMBING FINAL INSPECTiON johnr CLOSED 2/26I2013 1:21P1
GAS PIPING INSPECTION johnr CLOSED 1/03I2013 8:49A1
TdTAL ACTIONS PRINTED: 22
TOTAL PROJECTS PRINTED: 1