Loading...
Soundbuilt Deck Guard Rail Plan 01252013DEGKNG FL,45I--IING DETAIL 'SIMPSON' PC 4x BEAM PER / x BRAE SIDE O2PPOSICTE IDE OF POST POST TO POST 2x BRACE (TYP) POST TO POST 5ie'0 THRU BOLT w/ 3'V WASHER EACH END. (TYP.) 4x PT POST CONCRETE FTG PER PLAN DECK BRACE FRAMING REQUIRED IF POST EXCEEDES 48' STAIRWAY ILLUMINATION PER SEC 303.6 IRC PLAN *HJG BARD ALL INTERIOR AND EXTERIOR STAIRWAYS SHALL BE PROVIDED WITH MEANS TO ILLUMINATE THE STAIRS, INCLUDING THE LANDINGS AND TREADS. INTERIOR STAIRWAYS SHALL BE PROVIDED WITH AN ARTIFICIAL LIGHT SOURCE LOCATED IN THE IMMEDIATE VICINITY OF EACH LANDING OF THE SYAIRWAY. EXTERIOR STAIRWAYS SHALL BE PROVIDED WITH AN ARTIFICIAL 6 LIGHT SOURCE LOCATED IN THE IMMEDIATE VICINITY OF THE TOP LANDING OF THE STAIRWAY, CONTROLLED FROM INSIDE THE DWELLING OR AUTOMATICALLY CONTROLLED. RATED %'o x '. BOLT a 3 'SIMIP501' TYPE J015T JOIST PER 2x PT LEDGE' ROWS 16d IOIST FLOOR PER PLAN WALL (BEAM a SIM.) FRAMING CONNECTION 'a DECK W/ MFG. FLOOR JST (PERPINDICULER) RATED 'ia'm x 5' LAG. BOLT 6 32' O.C. 'SIMPSON U OR LU TYPE JOIST HANGER JOIST PER 2x PT LEDGER w/ (2) ROWS 16d 6 8' O.C_ .ID RIM JOIST aia'm x 5' LAG BOLT s 32' O.C. SUBFLOOIR 'SIMPSON' LUS TYPE JOIST HANGE +>' 12' O.G. �-TJI JOIST PER PLAN JOIST PER PLAN 2x PT LEDGER w/ (3) 2x FRAMED WALL ROWS 16d o 8' O.G. (BEAM o SIMY FRAMING GONNECTION e pEC< W/ MFG. FLOOR JST (PARALELL) REAR EL.EVA710N :h \1015T PER PLAN RIM JOIST 2x WALL FRAMING. (BEAM AT SIM.) FRAMING CONNECTION 'o) DECK W/ DIMENSIONAL LUMBER �, r-OUN:�AiION / fRAMINO PI-AN 24 " -0' 36' HIGH GUARD RAIL W/ 2X2 PICKETS a 4' O.C. REQUIRED IF GREATER THAN 30' FROM DECK FF. TO GRADS k.� NO HAND DRIVE DAILS AND USE EXTERIOR ECK SCREWS ONLY ON DCKING r-LOOR PLAN 1/4" =1' -O" DECK 140 SQ, FT. 00 a00 611 O O 'vl - -A o) CA II t.�11 eta 001�u�_u �4 N— O 7JAN 2 3 2013 L Contractor er bulh,..r moat verily e11 dime....... before proceeding construction. 2. This plan » s deei: nod m to be arketed lhroutout many reuilki"Altfes. `'rne puraheser must verity o omphance lvtl, ell 1._ -e1 applicable builiu,g o..les where the hoi,e is l., be constructed. 3. Purchaser ahnuld 1 -1. plena reviewed by e fv:- ensed builder end slrnct . ral ngineer for c rnph "' to specific site ditionv. 4. 'These plane chock n.,t be altered by other th.,u e qualified "« desig n.:r, a - teat, or structural enyi DECK_ I -9 -13 1 C7 V] c p ♦ F_uIA � j t ♦♦♦ yNW !l!. P N � O Ny N� "a a00 611 O O 'vl - -A o) CA II t.�11 eta 001�u�_u �4 N— O 7JAN 2 3 2013 L Contractor er bulh,..r moat verily e11 dime....... before proceeding construction. 2. This plan » s deei: nod m to be arketed lhroutout many reuilki"Altfes. `'rne puraheser must verity o omphance lvtl, ell 1._ -e1 applicable builiu,g o..les where the hoi,e is l., be constructed. 3. Purchaser ahnuld 1 -1. plena reviewed by e fv:- ensed builder end slrnct . ral ngineer for c rnph "' to specific site ditionv. 4. 'These plane chock n.,t be altered by other th.,u e qualified "« desig n.:r, a - teat, or structural enyi DECK_ I -9 -13 1