Loading...
20120312 Peer Cmt Ltr 02262013 ENGINEERING.PLANNING.ENVIRONMENTAL SCIENCES 1019 39th Avenue SE,Suite 100 Puyallup,WA 98374 T.253.G04.6G00 F.253.604.6799 www.parametrix.com February 25, 2013 PMX No. 216-1781-031 Ms. Karen Bennett City of Yelm 105 Yelm Avenue West Yelm, WA 98597 Re: McDonald's Restaurant Remodel Dear Karen: We have completed our review of the McDonald's Restaurant Remodel submittal by SCJ Alliance received in our office February 19,2013. The submittal included a Drainage Memorandum dated February 5,2013; a Sewer STEP Tank Sizing sheet dated January 14,2013; and full-size design drawings for the remodel project(13 sheets)dated September 2012(first two sheets of set)and February 2013 (remaining sheets in set). We have the following comments based on our review: Drainage Memorandum 1. No comments. Sewer STEP Tank Sizing 1. Sewer STEP Tank sizing is correct; however,a slight inconsistency was noted between the size(in square feet)of the addition on the plans and the size noted on the sewer STEP tank sizing sheet. This difference does not drastically impact overall tank sizing but the inconsistency should be resolved. Plans 1. Sheet SP-2: Project data differs from values shown in the Drainage Memorandum.Please resolve inconsistency between documents. 2. Sheet SP-2:Note SP-23 indicates that there is a Sheet T1.0 but this sheet does not appear to be part of the set supplied for review.Please include this sheet for review of the trash corral.Note that the City has two standard details that address these facilities; see details R-1 and R-2 of the City of Yelm Development Guidelines. 3. Sheet SP-2: Regarding note SP-26, spacing on trees around trash corral should be 2 to 2.5 feet. � Ms. Karen Bennett February 25, 2013 Page 2 4. Sheet C-100: Do the triangular callouts refer to particular notes located in the plan set?There are no corresponding notes on this sheet. Please remove if these are not serving any purpose to avoid future confusion. 5. Sheet C-200: How long will the existing onsite sewer facilities be disconnected from the sewer main? Since STEP tanks are sized to have 24 hours of emergency storage,will the removal of the existing pipe and installation of the new pipe, STEP tank,and pump equipment occur within 24 hours?If not,will temporary bypass pumping be provided?If so,where will this equipment be located and how will it be connected to the existing system? 6. Sheet C-200: Provide protection around curb inlet adjacent to Solberg Street SE to capture any sediment laden runoff. 7. Sheet C-300: Extend mountable curb in SR 510 back to the beginning of the turn lane as marked up on the plans. 8. Sheet G300: Does the mountable curb interfere with stormwater runoff collection on SR 510?Will the curb promote ponding due to the potential blocking of runoff flowing across the roadway? 9. Sheet C-400: What is the gap in the fencing around the trash corral?Is this a gated access?If so,please show gate on plans and provide enough room that gate will not interfere with adjacent parking space. 10. Sheet C-400: What is the slope on the new concrete being placed for the trash corral?Will this concrete be sloped so that runoff drains towards the curb inlet approaching Solberg Street SE? ll. Sheet C-400: The finished grade elevations and the north side of the access off of Solberg Street�E may cause some ponding issues. Please adjust finished grades to promote flow of parking lot runoff to the curb inlet located at the Solberg Street SE access. 12. Sheet G500: Ciry of Yelm Development Guidelines text indicates that all sewer pipe 2 inches or larger shall be SDR 21 or Schedule 40 PVC. See Section 7E.020 for more information. 13. Sheet G500: What is the station and offset of the new STEP tank? 14. Sheet G500: Will any irrigation piping require reconfiguration?This is not shown on the plans. 15. Sheet G500: Refer to City comments regarding the re-use of existing equipment in the STEP tanks. 16. Sheet G502: Consider removing Notes 1 and 2 under the"Sewer Spec Addendum"as the tank being installed is concrete and not fiberglass. 17. Sheet G501: Drawing 7-11 indicates that the orifice located on the baffle should be 29 inches above the floor of the tank;however,Note 5 on Sheet G502 states that the orifice should be 26 inches above the tank bottom.This inconsistency should be rectified. This orifice shall be 29 inches above the bottom of the tank. 18. Sheet C-502: Detail7-7—"Typical Connection"indicates that SDR 35 pipe is appropriate for this installation;however,City guideline text indicates that SDR 21 or Schedule 40 PVC shall be used for this application. Ms. Karen Bennett February 25, 2013 Page 3 Thank you for the opportunity to review this project for you. If we can be of further assistance,please let us know. Very truly yours, PARAMETRIX � _ .`._°� j � � �-� f � � �J �--_._._.-------..__- Ryan Jbhnstone, P.E. RJ:nkd Enclosure cc: Project File