Loading...
20090210 Redline Sewer 1 01252013UI S5 LE w rn U CA iL E 0 0 m J EL 33, - �/- - - - RESTORE DISTURBED SURFACES IN ACCORDANCE WITH THE RESTORATION DETAIL ON SHEET 01.2 -- I INSTALL 50 LF 2" SCH. 40 PVC; PIPE -- / SLOPE 0.0050 FT /FT / SEE ARCHITECT'S PLANS AND DETAILS / FOR FUELING STATION DESIGN / INSTALL OIL STOP VALVE VENT- / (SEE DETAIL SHEET C.1.2) / IE= 334.37 -- / / i i / ./ SECTION 19, TOWNSHIP 17 NORTH, RANGE 1 EAST, W.M. THURSTON COUNTY, WASHINGTON EXISTING CICANOUT 7 DUI T- 333.29 II EXISTING PUMP CHAMB //`�'�� _e RIM -33621 INS7g�L� @ VC^CL"P EANOUT & /2"�BEN AS REQUIRED 7" IE= 33 4.72 EXISTING 1500 GAL. SEPTIC L RIM = 336.34 \IE 6" PVC= 333.26 TOP TANK= 334.30 � t 0 i 0 �0 o I INSTALL 24 LF 2" SCH, 40 PVC PIPE SLOPE-0.0050 FT /FT REMOVE EXISTING ABANDONED SEWER SERVICE AS REOIRRED OCQP /PLUG EXPOSED ENDS INSTALL VORTCLAREX VCL30 OIL WATER SEPARATOR OR APPROVED EQUAL W/ HS -20 TRAFFIC PALED COVER m RIM =33125 4' IF (IN) 333.95 4"d3.9 `— INSTALL 4" PVC ED A.NOUT U — W/ TRAFFIC RATED CLEANOUT COVER "---`_ IE =333 92 B«TH Z 'T 2 L. Y O v Y \ sp a PROTECT � s/ O i2l LOCATION , 19 O / Fyn o' VALLEY \ 9 S � F ZZ ONG L I �N 703kO — fNSTALL -`T ' 4 4" PVC PIPE VICINITY MAP uca ucP ASTM -3034 SbF u p � SLOPE-0.0200 FT /F'T/E` i N.T.S. Oc,, uc INSTALL CUT —IN —TEE l p FIELD VERIFY DEPTH, MATERIALS, AND 51ZES PRIOR TO CONSTRUCTION AND ORDERING PAR1s PVC SPOOL LENGTHS AS REQUIRED 6" FL= 333.52 Or , I s oo •11 EP 337' L� 1 , \ \ L L, L L ' 1 IIL � A, lFU �/yl✓ Vie, i y, ,,338 oZ� FP - / _ - U„rP' ,v%es.fi `"�� Ir I.Je•- I lip 35 x SCH. 40) m \ s co" / 1 - ""'- -- - --- EXISTING CLEAfJCU- RI f MIE 3 70 34, 1 I 6° IE= 334.75 —'-- SIPAPA VOR / TRAFFIC F OIL /WE _R SFPARA TOR W/ TRAFFIC RATc'D LID RIM . =:338.10 4 IST �N C04 JSTU C s 4" IF OUT 334.82 EXISiIf -! STUB-OUT EXISTING 4" STUB -IJUT IE= 335.20 �ss =, ss INSTALL TYPE 1 CATCH eases W/ HERRINGBONE GRATE & OIL STOP VALVE (SEE DETAIL SHEET Cf.2) RIM =33727 IF AT (W)-334,29 INSTALL TYPE i CATCH BASIN IF OUT (E)= 334.21 W/ HERRINGBONE GRATE / CONSiYRUCT BOTTOM FLUSH WITH INVERT INSTALL 73 LF 4" PVC PIPE- / RIMM�337.27 ASTM 03034 SOR 35 IY OUT (E)= 334.89 SLOPE. =.0.0200 FT /FT INSTALL 34 LF 4" PVC PIPE INSTALL 4" PVC TEE (ADD .Jy ASTM D3034 SDR 35 INSTALL 4 "x2" REDUCER'(3bR SLOPE-0.0200 FT /FT 4" F1= 334.00 / O -ss — �AS - -- uca — EP EXISTING WATER LINE BOLLARD YARD HYDRANT LUM)NAIRE WATER VALVE FIRE HYDRANT SEPTIC PUMP CONTROL PANEL WATER LINE SEWER LINE GAS LINE UNDERGROUND POWER EDGE OF PAVEMENT FENCE LINE LEGEND Civil•Municipal•Geotechnical -Land Surveyi Jerome PROPOSED Morrissette CLEANOUT Associates CAP / PLUG P.S. TYPE 7 CATCH BASIN Road S.W. FLOW ARROW a-- GRADING SYMBOL F -G X'�X XX FINISHED GRADE 0 POTHOLE ss — SEWER MAIN VENT MAIN —� - -- FLOW LINE SA WONT LINE U i STRAW WATTLE �— NEW CONTOUR t NEW EDGE OF PAVEMENT Jerome W. Morrissette & Associates Inc., P.S. 1700 Cooper Pt. Road S.W. #13-2, Olympia, Wa. 98502-1110 Ph 360.352.9456 Fx 360.352.9990 SCALE: 1 " = ?0 FEET 0 5 10 20 DATUM: N.A.VD. 29 Support Operations Center 1 r Fueling Station Yelm School District Sewer Dept. Review 1/25/13 by Randy Hatch & lim Doty 1. Connection to new side sewer needs to have a wye at the connection not a tee. 2. The new side sewer on these drawings is incorrect. There is a wye and cleanout at the approximate location of the new connection. 3. There needs to be an emergency shutoff valve on the outlet of the oil water Separator such as a knife gate or similar apparatus that can be easily accessed and manually operated in case of a _ fuel spill to contain the spill in the oil water separator and prevent contamination of the STEP APPROVED FOR CONSTRUCTION Tank. BY: DATE: CALL BEFORE YOU DIG: DEVEnPMENfREVIEB'ENGINEER THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALI. UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT 1- 800 -424 -5555 APPROVAL A MINIMUM OF 48 HOURS PRIOR TO ANY CONSTRUCTION. EXPIRES: _ __.. z LLJ > } 0 X M U °m z 0 s * +_ S i z Q LU LU i' Q z z O Q z J W U_ z O Q O z LU r O H Q z J W LL W I- LLJ V� z V Oz � U W CL = Oo C O� U a_E C/)� Project: 2010 -16 Drawn: Sheet: Cl .0 S