20130118 Permit Pkg 03132013 City of Yelm Permit No.: 20130118
� Community Development Department Issue Date: 3/13/2013
� (Work must be completed within 180 days)
Building Division
Phone: (360)458-8407
`"" " Fax: (360)458-3144
Applicant:
Name: PUGET SOUND BUILDERS ASSOC Phone: 253-202-5025
Address: 11012 CANYON ROAD E, STE. 8
PUYALLUP WA 98373
Property Information:
site Address: 14419 98TH WAY SE 197 Owner: PUGET SOUND BUILDERS
ASSOC
Assessor Parcel No.: 78640119700 Subdivision: TAHOMA TERRA Lot: 197
Contractor Information:
Name: PUGET SOUND BUILDERS ASSOC Phone:
Address:
11012 CANYON RD E, STE 8
PUYALLUP WA 98373
Contractor License No.: PUGETSB903MH Expires: 7/31/2013
Project Information:
Project: NEW RESIDENTIAL BUILDING
Description of Work: LOT 197, PLAN 2025-R
Sq. Ft. per floor: First 936 Heat Type(Electric, Gas, Other): GAS
Second 1139
Third
Garage 382
Basement
Fees:
Item Contractor Fees
NEW RESIDENTIAL BUILDING PUGET SOUND BUILDERS ASSOC $16,593.01
MECHANICAL KLIEMANN BROS. $ 78.25
PLUMBING RAINER VIEW ROOTER $ 125.00
TOTAL FEES: $16,796.26
ApplicanYs Affidavit: OFFICIAL USE ONLY
I certify that I have read and examined the information contained within the application and know the same
to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of #Sets of Prints:
Yelm regulations' cluding those governing zoning and land subdivision,and in addition,all covenants,
easements and strictions of r ord. If applying as a contractor, I further certify that I am currently Final Inspection:
registered in th tate of Wash' ton.
Signature Date
� ` �� Date:
By:
Firm • /
City of Yelm Permit No.: 20130118
,� Community Development Department Issue Date: 2/13/2013
� (Work must be completed within 180 days)
Building Division
Phone: (360)458-8407
T° Fax: (360)458-3144
Applicant:
Name: PUGET SOUND BUILDERS ASSOC Phone: 253-202-5025
Address: 11012 CANYON ROAD E, STE. 8
PUYALLUP WA 98373
Property Information:
Site Address: 14419 98TH WAY SE 197 Owner: PUGET SOUND BUILDERS
ASSOC
Assessor Parcel No.: 78640119700 Subdivision: TAHOMA TERRA Lot: 197
Contractor Information:
Name: PUGET SOUND BUILDERS ASSOC Phone:
Address:
11012 CANYON RD E, STE 8
PUYALLUP WA 98373
Contractor License No.: PUGETSB903MH Expires: 7/31/2013
Project Information:
Project: NEW RESIDENTIAL BUILDING
Description of Work: LOT 197, PLAN 2025-R
Sq. Ft. per floor: First 936 Heat Type(Electric, Gas, Other): GAS
Second 1139
Third
Garage 382
Basement
Fees:
Item Contractor Fees
NEW RESIDENTIAL BUILDING PUGET SOUND BUILDERS ASSOC $16,593.01
MECHANICAL KLIEMANN BROS. $ 78.25
PLUMBING RAINER VIEW ROOTER $ 125.00
TOTAL FEES: S 16,796.26
Applicant's Affidavit: OFFICIAL USE ONLY
I certify that I have read and examined the information contained within the application and know the same
to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of #Sets of Prints:
Yelm regulations including those governing zoning and land subdivision,and in addition,all covenants,
easements and restrictions of record. If applying as a contractor, I further certify that I am currently Final Inspection:
registered in the State of Washington.
Signature Date
Date:
Firm BY'
Cit� of Yelm
{36 ) 458-8402
REC#; 001222.G9 3/13/2013 11:03 AM
OPER. CO TERM: 001
REF#: 3128
TRAN: 33.GOU0 BUILDING PEf�MITS
20130119 7,OOCR
PUGET SOUND BUILDERS ASSOC
14407 98TH WAY SE 159
p� 7.00CR
TRAN: 33.00OU BUIL.DING ('ERMTrS
20130118 197.85CR
PUGET SOUND BUILDERS ASSOC
14419 98TH WAY SE 197
6Lq-RES1 197.85CR
TENDERED: 204.85 CHECK
APF'LIEQ: 2()4,85-
CHANGE; �0,00
CITY OF YELM S'��'���
RESIDENTIAL BUILDING PERMIT APPLICATtON FORM
Project Address: �-' i,q "1� � Parcel#:�$b���� � 1�v
��11._ ..
Subdivision:�t�11i:'r1y T�PfN: Lot#.. 1b11 Plan#'�����'il Zoning:
�New Construction i! Re-Model/Re-Roof/Addition i: Home Occupation Sign
i Plumbing � Mechanical �� Mobiie/Manufactured Home Placement �! Other
Project DescriptioNScope of Woric:� �l�' `�F
Project Value:
Building Area(sq.ft) 15�Floor-Iq� 2nnd Floor �� Garage,l\16 Deck
Basement h�VT Carport Patio I6o
#Bedrooms 3 #Bathrooms d i� Heating:GAS/OTHE or ELECTRIC(Circle One)
Are there any environmentally sensitive areas lorated on the parcel? h()
lfyes,a completed environFnentai checklist must accompany permit application.
BUILDINGOWNEg NAME: • l�tM �C
ADD SS Ivl l , • - ' AIL f r �
CITY STATE�[�ZIP� " TELEPHON - '
ARCHITECT/ENGINEER LICENSE#
ADDRESS EMAIL
CITY STATE ZIP TELEPHONE
GENERALCONTRACTOR TELEPHONE
ADDRESS EMAIL(e � �� M
CITY STAT ZIP FAX
CONTRACTOR'S LICENSE# ' � EXP DAT ' CITY LICENSE#
PLUMBING CONTRACTOR TELEPHONE �- — �
ADD SS EMAIL
CITY STATE ZIP 7 FAX
CONTRACTO 'S LICENSE# EXP DAT CITY LICENSE# — l,�
MECHANICAL CONTRACTOR n ' ;� TELEPHONE �3-5'�7-0 5S
ADDRESS 1 � j EMAIL
CITY ''C�'101Mti STATE�_ZIP FAX
CONTRACTOR'S LICENSE# O EXP DATEi "CITY LICENSE#
Copy of mitigation agreement with Yelm Community Schools,if applicable.
I hereby certlty that the above information is correct and that the construeNon on,and the occupancy and the use of the
above described property will be in accordance with the laws,rules and tegulatlons of the State of Washington and the
Clty Yelm.
' �i�i�3
Applica Y Signature Date
Owner/Contractor/Owner's Agent/Contrecto�'s Agent(Please cirole one.)
All permfts are non-transferabfe and will expire if work authorized by such permit is not beyun
within 180 days of issua�ce,or if work is suspended or abandoned for a period of 180 days
705 YeIm Auenue West (860)458-3835
Ytlm,WA 98597 (860)458-2744 FA]f
wwro.ci.yelm.waus
RECEIVEI�
MAR 0 4 2�13
BY:
� ,.
�OT 19�
PUGET SOUND BUILDERS ASSICIA'I'ION, LLC
mAxo��=�.
1A419 98th WAY SOI3TTi F.tSS3' YII,M,WA 98597
P1�RCEI,NUMBF�2;?864�1 i 97p0
�---v SQ.a 1 ' _ �
I 7, s,� (
� � _4 -�
34' F E
f r� ;,�
4'xtQ' � ' I
�RY WELL (`�� � 2S' � +��i
( ' '�� ~ rA,w y J � � �
(� �� � I i �
J!( �I `�- � �,I
� i ( �V N (s,� � ^
� j m +� �W ai N � �� --i� �
�— �m �l N� N lAW � � �� Q
Q Ll,fn tn C� F (V
� �t� �a�- � � � r� Qa
a z � � ) �--
^1� � I � ' I
i-�� G�' � � , ,
► ^ r , �o�tA� � � CALL POR LOCA'iE
�� t-800-424-5555
6'x8'-g" � 0— — ____ �° w� i
Y£LM TANK-�--�. �-�� �BL m` � �
� E
f 1
io � '— / � � � � i�.
N �=`I' — N
� �
� 14` UTILI Y EASEME 7 �
� �'QQ�� � SIDEWALK
CARSON 3
80X--''� ` � LANTtNG
AtlTUMN 91.AZE �--16'---j WATER
MAPLE METER
98fh WAY SE
51fi� �'�..�N ��
��
oaao s�c�5w, �y3��,i,�� tC08 5121s.y.rcet PaxVJad.WA9899R scat.��� =zm'
o�rt ra+a�a�wrc�aa+oea m-awi o�n aaa nn r�a,
� idb]N bb•1N 1�1.700 ).!b]DU 33.MN X!PEMrtHrit4ltfriw
... ,.._..-_.,'4�„"t`1 1 V 1.1.M...�
������'C��� )p� �J �(�$ (+j� /J�{(��(]^'f
_ .� /_� /, ��/"1�` V tl t.lJ I V
�-i.....e.,_ � ,--...�wti.
--�.�
��� ��..u:n
� � � � �
Prescriptive Energy Code Compliance for Single Family and Duplex Housing: Zone 1
Project Information Contact/nformation
Plan 2045 2271sf Pu et Sound Builders Assoc.
253-202-5025
This set of forms has been developed to assist permit applicants documenting compfiance with the
Washington State Energy Code, (2009 edition). This set is for structures built under the IRC and located
in Climate Zone 1.
The following forms provide much of the required documentation for plan review. The details noted here
must also be shown on the drawings (WSEC 104.2).
This form is not a substitute for the energy code itself. To obtain a copy of the energy code,
go tothe following web address. http://www.energy.wsu.edu/code
Glazin�g Glazing U-Factor poor 9 Vaulted Wall�Z WaII• int4 Wall• ext4 Slabb
Option Area : CeilingZ 3 Above Below Below Floors on
o �� U-Factor Ceiling Grade Grade Grade Grade
/o of Floor Vertical Overhead
�. I R-49 or R-21 R-21 R-10
13% 034 0.50 0.20 R-38 R-38 Int.' TB R-YO R-30 2,
O I R-49 or R-21 R-21 R-10
25% 0.32 0.50 0.20 R-38 R-38 Int.' TB R-10 R-30 2,
O III R-49 or R-2 T R-21 R-I O
Unlimited 0.30 0.50 0.20 R-38 R-38 Int.' TB R-10 R-30 2,
Adv.
See WSEC table 6-1 for footnotes
Glazing Schedule Attached to Document
� Does not apply, (SEE INSTRUCTIONS) Usin� Prescriptive Option III.All glazing
and doors meet maximum U-factor.Alternate heating size method submitted.
0 Option I or il,Glazing to floor area limit(WSEC 602.7.2)
C7 Area weighted window,skylight or door U-factor(WSEC 602.7.2)
� As part of the heating system sizing calculation (IRC M1401.3&WSEC 503.2.2)
Radiant s1ab:
� R-10 foam insulation, continuous with thermal break (WSEC 502.1.4.9)
Chapter 9 Options Total of 4 Credit Repuired
Opt. Opt. Description
1a Hi h Efficienc HVAC Equipment 1 � �
1b Hi h Efficienc HVAC Equipment 2 ❑
1c Hi h Efficiency HVAC Equipment 3 ❑
2 Hi h Efficienc HVAC Distribution S stem ❑
3a Efficient Buildin Envelope 1 ❑
3b Efficient Building Envefope 2 ❑
3c Super-Efficient Buildin Envelope 3 ❑
4a Air Leaka e Control and Efficient Ventilation ❑
4b Additional Air Leaka e Control and Efficient Ventilation ❑
5a Efficient Water Heating �
5b Hi h Effiecienc Water Heating �E������
6 Small Dwellin Unit �ps
7 �ar e Dwellin Unit *1 0o kwh R 0 4 2013 �
8 Renewable Electric Ener
Total Credits BY: 1.00
WSEC Prescriptive Worksheet(2010 edition)Zone 1 WSUEEP10-010 Copyright 2010
Glazing Schedule
Project Information Confact inPormation
Plan 2045 2271 sf Pu et Sound Builders Assoc.
253-202-5025
Conditioned Floor Area 2271 Sum of UA for Heating System Sizing 102.3
Sum of All GlazingAreas From Below 279
Glazing to Floor Area Ratio 12.27% 602.7.2 Exception Ratio(not to exceed 1%)�
Exterior poors
Plan Component Door Percent Width Height Glazing Door poor
ID Descri tion Ref. U-factor Glazed Qt. Feet'"`n Feet'"`n Area Area UA
Interior to ara e fiber lass fire-rated 0.200 1 2 6 17.8 3:6
One Exempt Swinging Door<24 Square Feet 0.200 1 3 f) 2�.� 4.�
Sum of Glazing Area,Door Area,and UA(do not include exempt door) 17.8 3.6
Area Weighted U=UA/Area 0.20
Sum of Area and UA for Heating system size onty(include exempt door) 37.8 7.6
Vertical Giazing(Windows,Glazed doors using Exception 602.6#1)
Plan Companent Glazing Width Height Glazing
JD Descri tion Ref. U-factor Qt. Feet�"°n Feet�"`h Area UA
Main 2 I,Low-e1 1/2"+ar on 0.340 1 6 6 40.0 T3:60
Main 2 I,Low-e1 1/2"+ar on 0.340 1 6 5 30A 10:20
Main 2 I,Low-e1 1/2"+ar on 0.340 1 4 3 15.7 5.33
Main 2 I,Low-e1 1/2"+ar on 0.340 1 6 5 30.0 10:20
U 2 I,Low-e1 1/2"+ar on 0.340 2 6 4 48.0 16:32
U 2 I,Low-e1 1/2"+ar on 0.340 2 3 5 30A 1D.20
U 2 I,Low-e1 1/2"+ar on 0.340 4 4 4 64.0 2t:76
U 2 I,Low-e1 1/2"+ar on 0.340 1 3 3 9.0 3:06
U 2 I,Low-e1 1/2"+ar on 0.340 1 2 2 4A t:36
U 2 I,Low-e1 1/2"+ar on 0.340 1 4 2 8.0 2:7Z
Sum of Area and UA 278.7 94.75
A�ea Weighted U=UA/Area 0.34
Overhead Glazing
Plan Component Glazing Width Height
ID Descri tion Ref. U Qt. Feet�"`n Feet�"`h Area UA
Sum of Area and UA l�J
Area Weighted U=UA/Area
Doube Glazed Garden Windows Section 802J.2 Exception �
Plan Component Width Height � ���-9�`�.�?�j��
1D Descri tion Qt. Feet'"°n Feet�"°n Area UA
MAR 0 4 2013
Sum of Area
Sum of Area X 3(This total is automatically included in the glazing area total.)
Glazing UA for Heating System Size Only=Area X 0.63
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEPIO-010 Copyright 2010
Simple Heating System Size: Ctimate Zone 1
Project Information Contact Information
Plan 2045 2271sf Pu et Sound Builders Assoc.
253-202-5025
lndoor Design Temperature 7p
Ou#door Design Temperature 21
Design Temperature Difference (oT)
4T=fndoor-Outdoo�Design Temp 49
Conditioned Floor Area 2271
Conditioned Volume 19159
Glazing
Copy Sum of UA from Glazing Schedule 102
Attic U-Factor X Area = UA
R-49 0.027
R-38 Advanced 0.026 1280 33.3
Single Rafter or Joist Vaulted Ceilings
U-Factar X Area = UA
R-38 Ventetl 0.027 �
�
Above Grade Walls U-Factor X Area = UA
R-21 0.056 2179 122A
�
Floors U-Factor X Area = UA
R-30 0.029 1325 38.4
�
Below Grade Walls U-Factor X Area = UA
2' Depth Walls 0.042
3.5' Depth Walls 0.041
7' Depth Walls -0.037
Slab Below Gtade F-Factor X Len th = UA
2' Depth 0.59
3.5' Depth 0.64
T Depth 0.57
Slab on Grade F-Factor X Length = UA
R-10 2' perimeter 0.54
R-10 Full - Heated 0.55
Sum of UA 296
Envelope Heat Load 14506 Btu / Hour
Sum of UA X 4T
Air Leakage Heat ioad 10139 Btu/Hour
((Volume X 0.6)X OT)X:018))
Building Design Heat Load 24644 Btu/Hour ' �`- '�EI�JED
Air Leakage+En�elope Heat Loss
Building and Duct Heat Load 1.15 28341 Btu/ Hour MAR �4 Z013
If ducts are located in unconditioned space:Sum of Building Heat Loss X 1.15 •
If ducts are located in conditioned space:Sum of Building Heat Loss X 1 ' -'"------,._...._
Maximum Heat Equipment Output 15D% 42512 Btu/ Hour
Building and Duct Heat Loss X 1:50
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEPIO-010 Copyright 2010