Loading...
20090210 Original Sewer Comments 04012013 Support Operations Center Fueling Station Yelm School District Sewer Dept. Review 1/25/13 by Randy Hatch&Jim Doty 1, Connection to new side sewer needs to have a wye at the connection not a tee. 2. The new side sewer on these drawings is incorrect.There is a wye and cleanout at the approxirr�ate(ocation of the new connection. 3. There needs ta be an emergency shutoff valve on the outiet of the oi1 water Separator such as a knife gate or similar apparatus that can be easily accessed and manually operated in case of a fuef spill to contain the spill in the oii water separator and prevent contamination of the STEP Tank. �- ,.:�-��IVED APR 01 2013 � � l__:_�,�_