Loading...
20100145 HD Ltr 07082013 COUNTY COMMISSIONERS Cathy Wolfe District One �� Sandra Romero District Two . �; �-=' Karen Valenzuela _____ �_, District Three THURSTON CULJNTY PUBLIC HEALTH AND SOCIAL SERVICES DEPARTMENT siivcE lasz Don Sloma,MPH July 8, 2013 Director Diana T.Yu,MD,MSPH Mr. Joe Dominczyk, PE Health Officer Engineering Consultants Northwest 811 Porter Way Milton, WA 98354 Subject: water recreation facility plan clarifications, Yelm Creek Development located at 10520 Creek Street SE, Yelm, WA 9�597 parcel#64303400400 Dear Mr. Dominczyk: This letter is sent to you as the engineer who has stamped the plans and specifications for the water recreation facilities being constructed at the Yelm Creek Development as noted above. Upon review of the plans and specifications and further review with the Yelm Building Official, a number of issues were identified that needed additional information or clarification. A number of those issues were not clirectly related to the plans and specifications that were stamped by you or were beyond what the Washington State Department of Health would require of you as a part of the information to supply during their plan review process. Those issues were presented to the applicant of record in a letter dated July 5, 2013. A copy of that letter was sent to you and Mr. Johnston, the pool and spa constructor, for your information and review under separate cover. However, there are some issues that I need to bring to your attention for additional clarification, correction or , affirmation. They are as follows: 1. Please provide a revised Sheet 1.1.1 showin� the stair hand rail for the swimmin�pool stairs. On Sheet 1.1.1, the "Pool & Spa Plan", of the copy of the plans sent to us by the Washington State Department of Health, the stair hand rail is missing from the pool stair steps. It apnears that it was either erased or something similar happened. The gtai.r hand rail for the spa is provided. 2. Please con�irm that the heaters for the pool and spa will be Mastertemp 400,000 BTU units. Technical information from the manufacturer's website indicates these are natural gas or propane powered heaters. There is no indication on the website that they may be converted to being electrically powered. It is my understanding from Mr. Gary Carlson, the Yelm Building Official, that natural gas is not being supplied to this site and that there has not been any discussion with respect to a propane tank installation at the site. 3. Please affirm with Mr. Johnston that he will be providing flow rate indicators for both the pool and spa continuous disinfectant feed units. This is a separate order item and is required in order for the unit to meet the NSF#50 standard as required under WAC 246- 260-031 (17). 412 Lilly Rd.N.E., Olympia, Washington 98506-5132 ��` -�i �V ..�r � (360) 867-2500 FAX (360)867-2600 TDD(360)867-2603 TDD(800)658-638 www.co.thurston.wa.us/health ��� � 1 20�3 Tt> Mr. Joe Dominczyk, PE, ECNW RE: Yelm Creek Development July 8, 2013 Page 2 of 2 Thank you for your time and attention to these matters. If you have further questions, please give me a call at (360) 867-2574 or email me at pooleb@co.thurston.wa.us or respond via mail using the mailing address given at the bottom of this page. Otherwise, I await your response. Sincerely, ����`e'V�/ �� /� Robert Poole Environmental Health Specialist c: - Mr. Bill Johnston, Custom Pools, PO Box 77, Carbonado, WA 98323 - Mr. Gary Carlson, Building Official, City of Yelm, 105 Yelm Avenue West, Yelm, WA 98597 - SEB, Inc., Att'n: Mr. Stephen Berg, 240 Stadium Way South, Tacoma, WA 98402 - Mr. Paul Reeves, Water Recreation Program, Washington State Department of Health, PO Box 47825, Olympia, WA 98504-7825 , , . .� , ti _ _ 412 Lilly Rd. N.E., Olympia,Washington 98506-5132 (360)867-2500 FAX(360)867-2600 TDD(360) 867-2603 TDD(800)658-6384 www.co.thurston.wa.us/health