Loading...
20100145 HD Ltr 07092013�Y�r�r- ' � COUNTY COMMISSIONERS Cathy Wolfe District One Sandra Romero o� District Two e - ��� Karen Valenzuela l�+. � District Three THURSTON COUNTY PUBLIC HEALTH AND SOCIAL SERVICES DEPARTMENT SINCE 1852 July 9, 2013 Don Sloma,MPH Director Diana T.Yu,MD,MSPH SEB, Inc. Health Ofi"icer Att'n: Mr. Stephen Berg 240 Stadium Way South Tacoma, WA 98402 Subject: Receipt of swimming pool and spa plans and specifications for the Yelm Creek Development lacated a� 10520 Creek Street SE, Yelm, WA 985°7 parcel#643Q340040� Dear Mr. Berg: We received a copy of the letter of approval dated June 25, 2013, and a set of plans and specifications for the referenced project from the Washington State Department of Health (WSDOH) on June 27, 2013. A review of these plans revealed they were incomplete for one reason or another or insufficient for some other reason. A letter dated July 5, 2013, was sent to you under separate cover requesting some of this information since a number of these issues were beyond what the pooUspa engineer or architect normally addresses. A second letter dated July 8, 2013, is being sent to the engineer stamping the plans requesting a plan revision, a clarification and an affirmation and is being sent to you along with this letter. This information will need to be supplied before we will do a pre-opening construction inspection as required under Chapter 246-260 of the Washington Administrative Code (hereafter WAC). Thurston County has entered into an agreement with the Washington State Department of Health to administer most but not all of the requixements for permitted water recreation facilities in Thurston County as found and defined in Chapter 246-260 WAC. Our section of the Thurston County Public Health & Social Services Department 1) has the responsibility to do a pre-openiii�-cuxist����ic��Yra;�p2cti�n based on th� p1anQ and s�ecifications anproved by WSDOH and any other relevant requirements, and 2) is the issuing agency with respect to the annual pool and spa operating permits as per Article VII of the Sanitary Code for Thurston County, and by reference, Chapter_24_f 2_�4_WAC. ,A fee is charged for both of these activities, the former on an hourly basis and the latter annually and on both a type- of-operation basis and a qualifications-of-personnel basis. A copy of Thurston County's current fee schedule with respect to the water recreation facility program is enclosed. As vou see there is a minimum fee of$280 00 for a pre-onenin�insnection with an additional $185 per hour chareed after the first 15 hours The minimum fee amount needs to be paid before we do a pre-openin�inspection Please arran�e for this to be done. All fees will need to be paid before we will issue the permit to operate. You have proposed an outdoor swimming pool and an outdoor spa pool. Please let us know at the time of the pre-opening construction inspection whether both will be open year �.�C����.� 412 Lilly Rd.N.E.,Olympia,Washington 98506-5132 (360)867-2500 FAX(360)867-2600 TDD(360)867-2603 TDD(800)658-6 4 J U L 11 2013 www.co.thurston.wa.us/health � �� . Mr.$tephen Berg, SEB, Ina Re: Yelm Creek Development, Yelm, WA July 9, 2013 Page 2 of 4 round, one open year round and one open seasonally (Memorial Day weekend through Labor Day weekend) or both will be seasonal. They will also be classified initially and as necessary afterwards as not being run by a Thurston County-certified pooUspa operator because that program requires the candidate to undergo a minimum probationary period of three months at the facility. The annual operating permit year runs from April 1 each year to March 31 of the following year. Again, I refer you to the enclosed fee schedule for the possible variations of the annual operating permit fees. Usually the first year's annual operating permit fees for most facilities are pro-rated. For the annual operating permit, an operating permit billing statement for the pooUspa facility account for an operational year is usually and routinely mailed out each year in mid-February with a payment deadline of March 31. As you can see from the enclosed fee schedule referring to facility classification as "Certified" or"Non-certified", we encourage owners to employ personnel: 1. who have taken and passed the pooUspa operator's course put on by the National Swimming Pool Foundation, or its equivalent, and 2. who demonstrate an ability to operate and maintain the pool and spa in a responsible manner, by providing a reduced operating permit fee for those facilities that do so. See Article VII of the Sanitary Code for Thurston County that is enclosed for more specific and further information. Construction stage The pool and spa are to be constructed according to the plans and specifications approved by the WSDOH. If construction is done otherwise, the engineer or architect overseeing the construction will need to be advised and approve of it since they will need to submit revisions to the plans and specifications at the time of submission of the Construction Report to the WSDOH. It is prudent in certain instances that he/she advise and seek approval of the change from the W�DOH before making the change since that change will affect the previously approved plans and specifications. Also, there may be aspects of the construction that go beyond what the WSDOH reviews during its plan review process that affect the operation of the pool and spa that we will be expecting to find before we will issue a permit to operate such as where and how you will be disposing of waste water. Post-construction stage Upon completion of construction and prior to our pre-opening construction inspection, the owner must assure that a Construction Report from the engineer or architect overseeing the construction is submitted to WSDOH along with "as-built" plans for any deviations from the approved plans and specifications. A pre-opening inspection will not occur until we have received a copy of the approved Construction Report 412 Lilly Rd. N.E.,Olympia,Washington 98506-5132 (360)887-2600 FAX(360)867-2600 TDD(360)867-2603 TDD(800)658-6384 www.co.thurston.wa.us/health Mr. Stephen Berg, SEB, Inc. R,e: Yelm Creek Development, Yelm, WA July 9, 2013 Page 3 of 4 and any revised plans from the Washington State Department of Health. These plans must show and assure that the deviations made from the approved plans and specifications are still in conformance with the appropriate Washington Administrative Codes, primarily WAC 246-260, "Water R,ecreation Facilities". You should have received a Construction Report form from the WSDOH along with the approvaUconstruction permit letter. Please submit it and any plan revisions as soon as possible to the following mailing � address: Water R,ecreation Program Office of Environmental Health & Safety Department of Health, State of Washington P.O. Box 47825 Olympia, WA 98504-7825 Once WSDOH has reviewed and approved the construction report and has provided a copy and written approval thereof to us along with a copy of any"as-built" plans as needed, we may begin the pre-opening construction inspection process. Pre-opening Construction Inspection Process By this time, you should have paid the initial fee for the Pre-opening Inspection. If not, that needs to.be done. Also a completed annual operating permit application and application fee must be submitted to our section at this time as well. An operating permit application is enclosed. Please contact our Program Assistants at (360)867-2667 to determine what the operating permit fees will be for the first operating year period. The fees must be paid before we will issue the permits to operate. The date reauested for the pre openin�inspection must be made so that there are at least 5 workin� davs brior to intended use. We (Thurston County) expect the following from you: 1. The installation is to be �lone in a workmansrip like manner and according to the approved plans, Federal and State law, manufacturer's specifications, NSF Approval Standards, best or preferred industry practices and other applicable general and specialty codes; 2. Deviation from the approved plans and specifications must be reviewed and approved by an appropriate and knowledgeable engineer or architect; and 3. the construction report is to be submitted in a complete, accurate, timely and professional manner. For our part, you may expect the following: 412 Lilly Rd.N.E.,Olympia,Washington 98506-5132 (360)867-2500 FAX(360)867-2600 TDD(360)867-2603 TDD(800)658-6384 www.co.thurston.wa.us/health Mr. Stephen Berg, SEB, Inc. Re: Yelm Creek Development, Yelm, WA July 9, 2013 Page 4 of 4 1. The pre-opening inspection will be an observable-component verification that the facility construction conforms to the WSDOH approved plans and/or appropriate WAC; 2. It will be a "ready to operate" verification; and 3. It will be an opportunity for your staff to become acquainted with us since this will be an on-going and long-term relationship. Obviously, if the facility construction is found not to conform to the WSDOH approved plans and/or appropriate WAC or we find you are not "ready to operate", the operating permit will be held in abeyance and use of the facility will not be authorized until all deficiencies are addressed and alleviated. As noted previously, I have enclosed a copy of Article VII of the Sanitary Code for Thurston County. In addition, I encourage you to contact the Water Recreation Program of the Washington State Department of Health at (360)-236-3392 and request a copy of WAC 246- 260, "Water Recreation Facilities", or to find it on their website and download a copy for you and your staff since it is referenced in Article VII. Thank you for your time and consideration of what was covered in this letter. Please call me at (360) 867-2574 if it raises questions or concerns or if further aesistance from us may be appropriate and helpful. Sincerely, i���e�� �c�-e�-z� Robert Poole Food and Environmental Services Section Environmental Health Division Enclosures: - Water Recreation Facilities portion of the Thurston County Fee Schedule effective January 1, 2013 - Water Recreation Facility Operating Permit Application form -Article VII, Sanitary Code for Thurston County, effective November l, 2005 c: - Mr. Bill Johnston, Custom Pools, PO Box 77, Carbonado, WA 98323 - Mr. Joe Dominczyk, PE, Engineering Consultants Northwest, 811 Porter Way, Milton, WA 98354 - Mr. Gary Carlson, Building Official, City of Yelm, 105 Yelm Avenue West, Yelm, WA 98597 - Mr. Paul Reeves, Water Recreation Program, Washington State Department of Health, PO Box 47825, Olympia, WA 98504-7825 412 Lilly Rd. N.E.,Olympia,Washington 98506-5132 (360)867-2500 FAX(360)867-2600 TDD (360)867-2603 TDD (800)658-6384 www.co.thurston.wa.us/health