20130323 Drainage Report 08232013 . i
,
�
:
Fay Fuller Stormwater Renovation �
Yelm, Washington I
�
i
Drainage Report
March, 2013
I
Prepared For:
;
Prairie Park Commercial Development
P.O. Box 5210
Yelm, WA 98597
360.458.7508
3
i
�
�
Prepared By: �
Shea Carr Jewell I
Whitney Holm, P.E. �
2102 Carriage Dr SW, Bldg H j
Olympia, WA 98502
360.352.1465
I
�
_..�..
�. ��-
.:�..�,,. � _.�:�'
� �
SC.,1 1-`rLLIANCE
CC�NSULTING SERVICES
_ _.___----- -- I���IVED
AU G 2 3 2013
BY:
�
CERTIFICATE OF ENGINEER
PROJECT ENGINEER'S CERTIFICATION: I hereby certify that this Drainage
Report for the Fay Fuller Stormwater Renovation in Yetm, Washington, has been
prepared by me or under my supervision and meets the minimum standards of the
1992 Department of Ecology Stormwater Management Manual for the Puget Sound
Basin and normal standards of engineering practice. I understand that the
jurisdiction does not and will not assume liability for the sufficiency, suitability, or
performance of drainage facilities designed by me.
� 1��i�r ,
�l �F� �.
Prepared by Whitney Holm, P.E.
I
TABLE OF CONTENTS
1. STORM DRAINAGE REPORT..........................................................2
1.1 PROPOSED PROJECT DESCRIPTION...................................................... 2
1.2 EXISTING CONDITIONS...................................................................... 4
1.3 INFILTRATION RATES/SOILS REPORT................................................... 5
1.4 WELLS AND SEPTIC SYSTEMS ............................................................. 5
1.5 FUEL TANKS...................................................................................... 5
1.6 SUB-BASIN DESCRIPTION .................................................................. 5
1.7 ANALYSIS OF 100 YEAR FLOOD ........................................................... 5
1.8. AESTHETIC CONSIDERATIONS FOR FACILITIES..................................... 5
1.9 DOWNSTREAM ANALYSIS ................................................................... 5
1.10 COVENANTS, DEDICATIONS, EASEMENTS ............................................ 5
1.11 PROPERTY OWNER'S ASSOCIATION ..................................................... 6
2. EROSION CONTROL REPORT........................................................7
2.1 CONSTRUCTION SEQUENCE AND PROCEDURE ...................................... 7
2.2. TRAPPING SEDIMENT......................................................................... 7
Z.3 PERMANENT EROSION CONTROL AND SITE RESTORATION ..................... 8
2.4 GEOTECHNICAL ANALYSIS AND REPORT............................................... 8
2.5 INSPECTION SEQUENCE ..................................................................... 8
2.6 CONTROL OF POLLUTANTS OTHER TNAN SEDIMENTS ............................ 8
3. MAINTENANCE PLAN ...................................................................9
3.1 REQUIRED MAINTENANCE .................................................................. 9
Appendices
Appendix A-1 - Drainage Calculations
Appendix A-2 - Drainage Plans
Appendix A-3 - Vicinity Map & Drainage Basin Exhibit
Appendix A-4 - FEMA Map
Appendix A-5 - Soils Report and SCS Soils Map
Appendix A-6 - AquaSwirl Data
I
1. STORM DRAINAGE REPORT
The format of this report follows the outline provided in the Drainage Design and
Erosion Control Manual (DDECM) for Thurston County, 1994 Edition and meets the
requirements of the 1992 Department of Ecology Stormwater Management Manual
for the Puget Sound Basin.
l.i PROPOSED PRO7ECT DESCRIPTION
Project Proponent: Prairie Park Commercial Development
P.O. Box 5210
Yelm, WA 98597
(360) 458-7508
Parcel Number: 47410000300
Legal Description: Section 24, Township 18 North, Range 1
E, W.M., Thurston County, WA
Total Site Area: 0.98 acres
Zoned: C-1
Site Address: 201 Prairie Park Lane SE Yelm, Wa.
Project Overview:
The Prairie Park site is located in Yelm, Washington and is bordered on the southwest
by SR 507; on the south by 103�d Ave.; on the east by existing commercial property;
and on the north by West Road. The Prairie Park development was constructed in
2000. As a part of this project, a master stormwater facility was constructed which
was designed to provide stormwater treatment and storage for the entire 18.21
Prairie Park site. The developers of this property are now looking at the possibility of
reducing, reconfiguring, and/or eliminating this large facility to provide more
developable area for the site and a better site aesthetic. This project consists of
installing a separate stormwater system for the Fay Fuller building. This will remove
this area from the Prairie Park central stormwater system. Future projects may
remove other drainage areas of the Praire Park development from the central
stormwater facility.
The current project adds a standalone stormwater system to serve the existing Fay
Fuller building. This system consists of three basins located around the building.
Basin A would include part of the roof runoff. Basin B, would include part of the
parking lot. Basin C, would include the remainder of both the roof runoff and parking
lot. See the Basin Map in the appendix. When completed, it would reduce the
stormwater runoff to the existing Prairie Park central stormwater facility.
SCJ AIliance
Ma�ch 2013 Page 2
Development Coverage Summar�.
Impervious Area Pervious Area
Basin A 0.09 acres 0 acres
Basin B 0.16 acres 0 acres
Basin C 0.62 acres 0.11 acres
Total Area 0.87 acres 0.11 acres
Stormwater Treatment:
According to Section I-2.8 of the 1992 DOE Manual, the required stormwater
treatment flow is computed based on the 6 month storm flow. The 6 month storm is
computed as 64% of the 2 year storm. According to the isopluvial maps in Appendix
AIII-1.1 of the 1992 DOE stormwater manual, the Yelm area has a 2 year storm of 2
inches. Therefore, the 6 months storm is 1.28 inches. However, the runoff collected
will be conveyed directly to a stormwater storage facility. Therefore the sizing
calculations for treatment were based on the 100 year storm and the total area
entering the facility.
Basin A
Basin A includes only roof runoff, therefore treatment is not proposed.
easin B
Aqua-Swirl Stormwater Treatment System was sized using the 100 year flow rate
determined by StormShed. An on-line treatment flow rate of 0.17 cfs has been
computed (see the StormShed output in appendices).
Stormwater treatment will be provided by an Aqua-Swirl Model AS-2 Stormwater
Treatment System. This model will treat a water quality flow of 1.1 cfs, which is
over seven times the required treatment capacity.
Basin C
Aqua-Swirl Stormwater Treatment System was sized using the 100 year flow rate
determined by StormShed. An on-line treatment flow rate of 0.72 cfs has been
computed (see the StormShed output in appendices).
Stormwater treatment will be provided by an Aqua-Swirl Model AS-2 Stormwater
Treatment System. This model will treat a water quality flow of 1.1 cfs.
Stormwater Storage:
Stormwater for each basin will be conveyed into an infiltration trench, meeting the
requirements of Section III-3.6.5 of the 1992 DOE Manual. Each trench has been
sized to accommodate the 100 year storm event. In addition, per Section III-3.6.5
of the 1992 DOE manual, it must be demonstrated that the required volume for the
10 year storm can be recovered in 24 hours and the 100 year storm in 48 hours.
According to the Isopluvial maps in Appendix AIII-1.1 of the DOE stormwater
SGI Alliance
March 2013 Page 3
I
manual, the Yelm area has a 10 year storm of 3 inches and a 100 year storm of 4.5
inches.
The proposed infiltration trenches will be comprised of washed rock only and will not
contain perforated pipe. Therefore, per the WAC 173-218-050 Exemptions from UIC
Well Status item #4, this stormwater system will not qualify as an UIC well.
StormShed software was used to model and size the infiltration trenches. Per the
recommendations of the geotechnical investigation (see appendices), an infiltration
rate of 20 inches per hour was used for design. Only the bottom surface area was
modeled to infiltrate.
Basin A
The stormwater, which only includes roof runoff, will be conveyed directly into a 10'
x 10' x 3.5' rock infiltration gallery. The gallery will be located in the plaza area. It
has been sized to provide a minimum 1' of freeboard during the 100 yr event (0.09
cfs). The infiltration gallery was checked against the drawdown requirements for
both the 10 year and 100 year storms. The volumes for both of these storms area
available in a fraction of the time required (see appendices for computations).
Basin B
The stormwater will be conveyed from the AquaSwirl treatment system to a 20' x 10'
x 3' rock infiltration gallery. The gallery will be located southeast of the building in
the parking lot. It has been sized to provide a minimum 1' of freeboard during the
100 yr event (0.17 cfs). The infiltration gallery was checked against the drawdown
requirements for both the 10 year and 100 year storms. The volumes for both of
these storms area available in a fraction of the time required (see appendices for
computations).
Basin C
The stormwater will be conveyed from the AquaSwirl treatment system to a 45' x 15'
x 4.5' rock infiltration gallery. The gallery will be located southeast of the building in
the parking lot. It has been sized to provide a minimum 1' of freeboard during the
100 yr event (0.72 cfs). The infiltration gallery was checked against the drawdown
requirements for both the 10 year and 100 year storms. The volumes for both of
these storms area available in a fraction of the time required (see appendices for
computations).
Conveyance:
Per the attached StormShed computations, the 100 year flow for all the basins has a
maximum flow of 0.72 cfs. The proposed storm drainage conveyance pipes will be 8
inches in diameter and will have a minimum slope of 0.5%. Per Manning's Equation,
a pipe with that diameter and slope has a capacity of about 0.93 cfs. Therefore, all
pipes have sufficient capacity to accommodate on-site flows.
SCJ Alliance
March 2013 Page 4
1.2 EXISTING CONDITIONS
The project area currently is an existing two story building, plaza and associated
parking. The stormwater is conveyed off site to a large pond that is used for Prairie
Park's stormwater.
1.3 INFILTRATION RATES/SOILS REPORT
The Soil Conservation Service (SCS) Soil Survey of Thurston County classifies on-site
soils as Spanaway (110) series and Nisqually (74) series.
Soil testing was performed on-site to establish the expected infiltration rates of the
soils and to evaluate slope stability (report tocated in appendices). According to this
report, on-site soils have infiltration rates of 20 inches per hour.
1.4 WELLS AND SEPTIC SYSTEMS
No on-site wells or septic systems are known to be on-site. The proposed infiltration
facilities are not within 100 feet of any adjacent parcels.
Water and sewer services are connected to the City of Yelm systems.
1.5 FUEL TANKS
No fuel tanks are known to be on-site. A review of the Department of Ecology's
Leaking Underground Storage Tanks (LUST) list did not indicate any existing or
abandoned fuel tanks on the project site.
1.6 SUB-BASIN DESCRIPTION
The project area is part of the overall Prairie Park development. Stormwater from
this development is contained on-site.
There is no off-site drainage tributary to this site
1.7 ANALYSIS OF 100 YEAR FLOOD
This project has not been identified as a 100-year flood hazard area. A FEMA FIRM
Map is included in the appendices.
1.8. AESTHETIC CONSIDERATIONS FOR FACILITIES
All disturbed pervious area will be vegetated and landscaped. All stormwater
facilities will be underground and will not require landscape.
1.9 DOWNSTREAM ANALYSIS
All stormwater generated will be stored and infiltrated on-site. All retention facilities
have been designed to retain and infiltrate the 100-year storm event. Therefore,
downstream facilities will not be affected by this project.
1.10 COVENANTS, DEDICATIONS, EASEMENTS
On-site drainage facilities will require routine maintenance. A draft maintenance
agreement between the owner and City is attached in section 3 of this report that
SCJ AJliance
March 20i3 Page 5
will aliow the City to access the facilities. The owner is responsible for performing
regular maintenance of the storm drainage facilities.
1.11 PROPERTY OWNER'S ASSOCIATION
The entire parcel is currently under a single ownership and will not require an
association. If the ownership of parcels is transferred, an association will be formed
to address maintenance of joint facilities.
II
SCJ Alliance
March 2013 Page 6
2. EROSION CONTROL REPORT
2.1 CONSTRUCTION SEQUENCE AND PROCEDURE
The proposed commercial development will include site grading and erosion controi
measures designed to contain silt and soil within the project boundaries during
construction until permanent vegetation and site improvements are in place.
Erosion/sedimentation control shall be achieved by a combination of
structural/vegetative cover measures and construction practices tailored to fit the
site.
Best Management Practices (BMP's) will be employed to properly clear and grade the
site and to schedule construction activities. Before any construction begins onsite,
erosion control facilities shall first be installed. The planned construction sequence is
follows:
1. Schedule preconstruction conference with the City, contractor, project
engineer and construction staking surveyor.
2. Install rock construction entrance. Use 4" to 8" diameter quarry spalls with
12" minimum depth.
3. Install filter fabric fencing in the locations shown on the plans.
4. Provide inlet protection around existing catch basins.
S. Clear site (grubbing and rough grading).
6. Maintain equipment and water supply for dust control.
7. Designate an area for washing concrete trucks to control the runoff and
eliminate entry in the storm drainage system.
8. Install underground utilities.
9. Provide inlet protection around all new catch basins.
10. Maintain all erosion control facilities until the entire site is stabilized and silt
runoff ceases.
2.2. TRAPPING SEDIMENT
Filter fabric fencing will be installed to trap sediment before runoff exits the site. In
addition, inlet protection will be installed around all existing and new catch basins to
filter out sediment before runoff enters the storm system.
A stabilized construction entrance will be installed to prevent construction vehicles
from tracking soil onto roadways. If sediment is tracked off-site, it shall be swept or
shoveled from paved surfaces on a daily basis, so that it is not washed onto existing
catch basins or other storm drainage facilities.
SC1 Alliance
March 2013 Page 7
I
During the rainy season from November 1 through March 31, the contractor must
cover any disturbed areas greater than 5,000 sf in size if they will be unworked for
more than 12 hours. Mulch, sodding, or plastic covering shall be used to prevent
erosion in these areas.
2.3 PERMANENT EROSION CONTROL AND SITE RESTORATION
All disturbed areas will be paved with asphalt, covered with buildings, or landscaped
with grass, shrubbery, or trees per the landscaping plans.
2.4 GEOTECHNICAL ANALYSIS AND REPORT
None of the storm drainage facilities are located near the top of a steep slope.
Therefore a geotechnical analysis for slope or soil stability was necessary.
2.5 INSPECTION SEQUENCE
In addition to required City inspections, the project engineer will inspect facilities
related to stormwater treatment, erosion control, storage, and conveyance during
construction. At a minimum, the following items shall be inspected at the time
specified:
1. The erosion control facilities shall be inspected before the start of clearing and
grading to ensure the following structures are in place:
a. Construction Entrance
b. Filter Fabric Fence
c. Infet protection of existing catch basins.
2. The conveyance systems will be inspected after construction of the facilities,
but before project completion to ensure the following items are in working
order:
a. Pavement Drainage
b. Catch Basins
c. Conveyance Piping
3. The stormwater treatment and storage systems shall be inspected during and
after construction to ensure:
a. The facility is constructed to design specifications and that protection
from sediments in place.
4. The permanent site restoration measures shall be inspected after landscaping
is completed.
A final inspection shall be performed to verify final grades, settings of control
structures and all necessary information to complete the Engineer's Construction
Inspection Report Form. This form must be completed prior to final public works
construction approval.
2.6 CONTROL OF POLLUTANTS OTHER THAN SEDIMENTS
The contractor will be required to designate a washdown area for concrete trucks as
well as a temporary stockpile area for construction debris. Vehicle fueling, washing,
or maintenance shall occur in designated areas only.
SCJ Alliance
March 2013 Page 8
3. MAINTENANCE PLAN
3.1 REQUIRED MAINTENANCE
The following pages contain maintenance needs for most of the components that are
part of the project's drainage system, as well as for some components that the
project may not have. The checklist should be competed for all system components
on the following schedule:
M. Monthly from November through April
A. Once in late summer (preferably September).
S. After any major storm event (use 1" in Z4 hours as a guideline) items marked
"S" only.
Using photocopies of these pages, check off the problems investigated each time an
inspection was performed. Add comments on problems found and actions taken.
Keep these "Checked" sheets in the files as they will be used to rite an annual report
(due in May). Some items do not need to be looked at every item an inspection is
done. Use the suggested frequency at the left of each item as a guideline for the
inspection.
The jurisdiction may be called for technical assistance. Please do not hesitate to call,
especially if it is unclear whether a particular situation may be a problem.
SCI Alliance
March 2013 Page 9
ATTACHMENT"A": MAINTENANCE PROGRAM
Maintenance Checklist for Closed Detention Systems (Pipes/Tanks)
Drainage
System� CondiUons To Conditiom That
Frequency Feature ✓ Problem Check For Shall Exist
M Storage Plugged air One-half oF the end area of a vent is blocked at Venb free of debris and sediment.
area vents any point wilh debris and sedimrnt Plugged
(pipe tenk) (small pipe vent can cause storage arca to collapse.
that
connccts
catch basin
to storage
i
M Debris and Aceumulated sediment depth exceeds I S%oP All sediment and debris removed from storage
sediment dismeter. Example:72-inch storage Iarik would area. Contact Ciry Public Works for guidnnce
requiie cleaning when sediment reaches deplh of on sediment removal and disposal.
10 inches.
A loints Any crack allowing material to leak into faciliry. All joinls behveen tank/pipe sections are sealed.
between
tank/pipe
section
A Tank/pipe Any part of tank/pipe is noticeably bent out of Tank/pipe repaired or replaCed to duign.
bent out of shape. Contact a professional engineer for evaluation.
sha
M,S Manhote Cover not in Cover is missing or only partially in place. Any Manhole is closed.
lace o n manhole uires maintenance.
A Locking Mechanism cannot be opened by one Mechanism opens with proper tools.
mechanism maintennnce person�rith pmper tools. Dolts
not worlcing into freme have less�han 1/2-inch of thrcad
ma not a I to self-lockin lids.
A Cover One Maintenance person cannot remove lid afler Cover can be temoved and reinstalled by one
dilTicult to applying SO pounds of IiR Intent is to keep meintenance person.
remove cover Crom sealin ofTaaess W maintenance.
A Ladder Meintenance person judges that ladder is unsafe Ladder meets design standards and allows
rungs unsaPe due to missing nmgs,misalignment,rust,or maintenance persons sefe access.
cracks.
lf you are unsure whether a problem exists,pleace contact the Iurisdiction and ask for technical assistence.
Comments:
f5.fl'
A=Annual(March or April pre(erred)
M=Monthly(see schedule)
S=ARer major swrms
Page K- 16
ATTACHMENT"A" (CONTINUED)
Maintenance Checklist for Catch Basins and Infets
Drairrege
Sysoem ✓ Conditions To Conditions'fhat
F ue Feature Problem Check For Should Exist
M,S Gernral Trash,debris, Trash or debris in front of the catch besin No Vaah or debris located immediaoely in front
and sedimrnt opening is blocking capecity by moro than 10'�. of catch basin opening. Grate is kept clean and
in or on basin allows water to enter.
M Sediment or debris(in the basin)that exceeds No sediment or debria in tha catch basin. Catch
I/3 the depth from the bottom of basin W invert basin is dug out and clean.
of the lowest i into or aut of the basin.
M,S Trash or debris in airy inlet or pipe blocking Wet and ouUet pipes frea of trash or debris.
more than I/3 of its hei t
M S Wctural Comer of ftame extends moro than 3/4 inch past Fiame is even with curb.
damage to curb face into the street(if applicable).
frame and/or
to slab
M Top slab has holes larger lhan 2 square inches or Top slab is free of holes and cracks.
cracks wider►han I/4 inch(intent is to meke
sure all maurial is runnin into the besin.
M Frame not sitting(lush on top slab,i.e., Frame is sining flush on top slab.
separation of more than 3/4 inch of the frame
from the m slab.
A Cracks in Cracks wider than I/2 inch end longer than 3 E3asin replacal or repaired to design standards.
basin Ceet,any evidence of soil perticles entering catch Conlact a professional enginar for evaluation.
walls/bottom bazin through cracks,or maintenance person
'ud es that structurc is unsound.
A Cracks wider than I/2 inch and longer than 1 No cracks more than 1/4 inch wide ut the joint
foot at the joint of eny inler/oudet pipe or any of inledoutlet pipe.
evidence of soil particles entering catch basin
ttvou cracks.
A SedlemenV Buin has sepled more than 1 inch or has rotated Basin replaced or repaired to design standards.
misali ment mare than 2 inches out of ali ment Cantxta rofessional en ineer fo�evaluation.
M,S Fire ha�ard or Presence of chemicals suc6 as natural gas,oil, No color,odor,or sludge. Basin is dug out and
other and gasoline. Obnoxious color,odor,or sludge clean.
Ilution noted.
M,S Outlet pipe is Vegetation or roots growing in inletlouUet pipe No vegetation or root growth present
clogged wilh joints that is more than six inches mtl and less
ve etarion than six inches a
If you aze unsure whether a problem exists,please contact the Jurisdiction and ask for technical assistance.
Comments:
�
A=Annual(March or April prefeRed)
M=Monthly(see schedule)
S=ARer ma�or sWrms
Pa eK- 18
g
ATTACHMENT"A" (CONTINUED)
Maintenance Checklist for tnfiltration Systems
Frequency Drainege / Problem Conditions to Check For Conditions That Should Exist
S tem Feature V
M,S Generai Trasfi.�debris See Maintrnance Checklist Cor Pondi. Sce Maintenance Checklist for Ponds_
buildu in nd
b1 Poisonous Sx Maintrnance Checkiist for Ponds. Sa Maintenance Checklist for Pondv.
ve etation
M,S Fice herard or See Maintenance Checkiist for Ponds. See Maintenance Checklisl for Ponds.
ilution
M Vegelation not See Maintenance Checklist for Pondc. See Maintenance Checklist for Pondr.
growu�g or�s
ove tvn
M Roden[holes See Maintenance Checklist for Ponds. See Maintenance Checklist for Ponde.
1�1 Insects See Maintenance Checklist for Ponds. See Maintenance Checklist for Ponds.
A Storage area Sediment buildup A soil texture test indicates facility is not Sediment is removed and/or facility is
in rysuem working at its designed capabilities or was cleaned so that infdtration system works
incorrectly designed according w design. A sediment trapping
area is installed to reduce sediment
trans rt into infiltrarion area.
A Storage area A soil texhue test indicates facility is not Additional volume is added through
drains slowly working at ils designed capabilitics or was excavation toprovide needed storage.
(more then 48 incorrectly designal. Soil is aerated and rototilled to improve
hours)or drainage. Contact the Ciry For
overffows information an its requirements regarding
excavation.
M Sediment Any sediment and debris filling acea to 10%of Clean out sump to design deplh.
trapping area depth from sump bottom to bottom oFouUet
pipe or obstructmg Flow mto the rnnnector
� .
One Time Sediment Stortnwater enters infiltration arca directly Add a trapping area by conswcting a
trapping area not without ueetmenL sump Cor senling of solids. Segregate
present settlmg area from rest of faciliry. Contact
Ci for uidance.
M Rock filters Sediment and By visual inspection linle or no water flows Replace gravel in rack filter.
debris throu filter durin hea rain storms.
IFyou aze unsure whether a problem exists,please contact the Iurisdiction and ask for technical assistance.
Comments:
KSY
A=Annual(March or April prefeRed)
M=Monthly(see schedule)
S=ARer major stortns
i
i
I
� Page K -20
ATTACHMENT"A" (CONTINUED)
Maintenance Checklist for Conveyance Systems (Pipes, Ditches, and Swales)
Frequenry Drainage ✓ Problem Conditlons to Check For Conditions Thet Should Exist
S stem Feahue
M,S Pipes Sediment� Accumulntod sediment thet exceeds 20%of the Pipe clea�d of ali sediment and debris.
debris diameter of the i .
M Vegctation Vegctalion that reduces Cree movement o( AII vegetation removed so water flows
water throu i freel tivou i
A Damaged(rostcd, Protective coating is damaged;rust is causing Pipe repaired or roplaced.
bent,or ccushed) more than 50%deterioration w any part of
i .
M Any dent that significanUy impedea Ilow(i.e., Pipe repaired or replaced.
decreases the cross sechon area of pipe by
more than 20%.
M Pipe has major cracks or tears allowing Pipe repaired or replaced,
oundwater leaka e.
M,S Open ditches 'frash&debris Dumping ofyard wastes such as grass Remove trash and debris and dispose a4
clippmgs atM brenches into bacin. Unsi�Uy pmsc ribed by City Waste Management
accumulation of non<fegradable materials such Section.
as IasNc,metal (oam and coated r.
M Sediment build�p Accumulated sediment that exceeds 20%of the Ditch clraned of all sediment and debris
desi de so that it matches desi .
A Vegetation Vegetation(e.g.,weedy sfwbs or saplings)that Water flows Prcely throuph ditches.
reduces free movements of water through Grnssy vegetation shouldbe IeR alone.
ditches.
M Erosion damage See Ponds Checklist. See Ponds Checklist
to slo
A Rock lining out Maintenance person can see native soil beneath Replace rocks to design standard.
of place or the rock lining.
misstng(if
a licable
Varies Catch basins See Catch Basins Checklist See Catch Basins Checklist
M S S�vales Trash&debris See above For Ditches. See abovr for Ditches.
M Sediment buildup See above for Ditehes. Vegetation may need to be replanted aRer
cleanin
M Vegetauon not Grass cover is sparse and weedy or areas are Aerate soils and reseed and mulch bare
growmg or overgrown with woody vegetahon. areas. Maintain grus heiy►�t at a
overgcown minimum of 6 inches for 6est stormwater
treatrnent Remove woody growth,
recontow and reseed as nece
M,S Erosion damage See Ponds Checklist See Ponds Chxklist
ta slo
M Conversion by Swale has been filled in or blocked by shed, If possible,spenk with homeowner and
homrnwner to woodpile,shrubbery,etc. request that swale aeea be restored.
incompatible use Contact City to report problem if not
rectified voluntanl .
A Swale does not Water stands in swale or(low velociry is very A survey may be needed to checkgrades.
dwin slow. Stagnation occurs. Crades need to be in 1-5%range it-
possible. If grade is less lhan 1%,
underdrams ma need to 6e installed.
If you are unsure whether a problem exists,please contact the lurisdiction and ask for tecMical assismnce.
Comments:
K
� A=Annual(March or April proferred)
� M=Monthly(sa schedule)
�! S=After major storms
,
Page K-24
I
APPENDIX A-1 -
DRAINAGE CALCULATIONS
�'�
�
II
GALLERY A
Appended on:Monday,March 04,2013 30:50:26 AM
LPOOLCO�iPUTE(Level Pool)SUMMARY using Puls,24 hr Storm Event
Start of live storage:0 ft
Event Match Q(cfs) Peak Q(cfs) Max Depth(ft) Voi(c� Vol(acft) T(me to Empty(hr)
I6 month 0.0244 0.0244 0.0527 1.7378 0.00 0.0059
10 year 0.0614 0.0463 OJ969 26.2991 0.0006 0.0054 � ,`f d((�,,y�(�,Qj,t�►�
r
100year � � # #; ` U.�463� �::",��'�,, 84.4696 0.0019 �,I�,QQ�9;.. s����� a�Q.1/J�W�
Flow -f'h+'oc�,h ba+-lam o-� lo'�r 10° ;n-�' l�to�-�-,�or� -h'enc.�
Summary Report of all Detention Pond Data a
Project Precips
Event Precip(in)
6 mo 1.28
2 yr 24 hr 2.00
10 year 3.OQ
100 year 4.50
BASLIST2
(Basin 3�Using(TYPElA.RACj A5[6 mo�th][24.0)
[Basin 3j Using[TYPElA.RAt]As(6 mon[h][24.Oj
[Basin 3]Using[TYPEIA.RAC]As[10 year][24.0]
[Basin 3]Using[TYPElA.RAC]As[10 year][24.0]
[Basin 3]Using[NPElA.RAC�As[10�year][24.0]
(Basin 3]Using(TYPE3A.RAC]As[100 year][24.0]
LSTEND
BasinlD Event Peak Q(cfs) Peak T(hrs) Peak Vol(ac-c� Area(ac) Method/Loss Raintype
Bar sin 3 6 month 0.0244 8.01 0.008 0.09 SCS TYPElA.RAC
Ba B 6 month 0.0244 I 8.01 0.008 0.09 SCS TYPESA.RAC
Basin 3 10 year 0.0614 8.01 0.0208 0.09 SCS TYPElA.RAC
��������
i8as� 10 year 0.0614 8.01 0.0208 0.09 SCS TYPElA.RAC
�
��
l _- ---
Basin 3 100 year 0.0931 8.01 0.032 0.09 SCS TYPEIA.RAC
lBasr in3 l�4year 0.0931 8.01 0.032 0.09 SCS TYPElA.RAC
BASLIST
[Basin 3]
LSTEND
Record Id:Basin 3
iDesign Method SCS Rainfall type TYPElA.RAC
IHyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstrection Coeff 0.20
�Pervious Area � 0.09 ac DCIA 0.00 ac
�PerviousCN 98.00 DCCN 0.00
I
iPervious TC 5.00 min DC TC � 0.00 min
Pervious CN Calc
Description � SubArea Sub cn
Basin 2 � 0.09 ac 98.00
Pervious Composited CN(AMC 2) � 98.00
i
Pervious TC Calc
i
Type Description Length Slope Coeff Misc � TT
Sheet � 0.00 ft O.OYo 5.0 0.00 in 5.00 mi�
Pervious TC 5.00 min
HYDLIST SUMMARY
[6 month out][6 month out][100 year out]
LSTEND
H� ydlD Pear k Q(cfs) Peak T(hrs) Peak Vol(ac-ft) Cont Area(ac)
i ��-�
6 month out 0.0463 7.60 0.0208 0.09
��
���
�6 month out 0.0463 7.60 0.0208 0.09
I � ���
100 year out 0.0463 7.56 0.032 0.09 I
STORLIST
[Tank]
LSTEND
Record Id:Tank
Descrip: Prototype Record Increment 0.30 k
Start EI. 0.00 ft Max EI. 1.00 ft
Void Ratio 33.00 ��I ��(�G,_ , /,�.�,�,�
R CJ�""
Length 10.00 k Width 10.00 ft
��Consider Bottom Only
�Vault Type Node
DISCHLIST
[Infiltrertion Gallery Discharge]
LSTEND
Record Id:Infiltrartion Galiery Discharge
Infiltretion
Descrip: Infiltretion Gallery Storege Increment 0.10 ft
Start EI. 0.00 ft Max EI. 106.00 ft
Infiltretion rete Z0.00 in/hr WP Multlplier 1.00
Licensed to:E�geniaus Systems,Inc.
i
GALLERY B
Appended on:Monday,March 04,2013 10:46:50 AM
LPOOLCO�IPUTE�Level Pool�SUMMARY'using Puls,24 hr Storm Event
Start of live storage:0 ft
� E�vent iMatcr h Q(cfs) Peak Q(cfs) Max Depth(ft) I Vol(cfl Vol(acft) Time to Empty(hr)
;6 month 0.0434 0.0433 0.0468 3.0894 0.0001 0.0059
I �
SO year 0.3092 0.0926 0.4554 30,0582 0.0007 Q•0059 3U �( d jp���`p W n
SOOyear "�"`����'`:� : .092 "�"��°� 129.4894 0.003 � o: ° �:: �y� dr�,��ow�
Floc� +hro�h b�tk�rri o� I v"�ao' �„��tk�A-h�� -hre�c�
Summary Report of all Detention Pond Data
Project Precips
iEvent Precip(in)
�6 m� onth � 118
� i '
�---�--
2 yr 24 hr 2.00
10 year 3.00
i100 year 4.50
BASLI5T2
[Basin B]Using[TYPElA.RAC]As[6 month)[24.0]
[Basin B]Using[TYPElA.RAC]As[6 month][24.0]
[Basin BJ Using[TYPElA.RAC�As[10 year][24.0]
[Basin 8]Using(TYPElA.RAC]As[10 year][24.0)
[Basin B]Usi�g[TYPElA.RAC]As[100 year](24.0)
[Basin 8]Using[TYPElA.RAC�As[100 year][24.0]
LSTEND
iBa i Ins D Event Peak Q(cfs) Pear k T(hrs) Peak Vol(ao-cf) Area(ac) Method/Loss Raintype
i
Ba�� sin B I6�nth 0.0434 S 0.0142 0.16 SCS �TYPE RAC
I, lBasin B 6 month 0.0434 I 8.01 0.0142 0.16 SCS INPElA.RAC
i
I� �Basin B 10 year 0.1092 I 8.01 0.037 I 0.16 SCS TYPElA.RAC
�
Basin 8 10 ear 0.1092 8.01 0.037 0.16 SCS TYPElA.RAC
I Y (-���--�
Bas� in B I100year 0.1656 8.01 0.057 0.16 SCS TYPElA.RAC
Basin B IOOyear 0.1656 8.01 0.057 0.16 SCS 1'YPElA.RAC
BASLIST
[Basin B]
LSTEND
Record Id:Basin B
IDesign Method � SCS Rainfall type � TYPElA.RAC
Hyd Intv 10.00 min Peaking Factor � 484.00
Storm Duretion 24.00 hrs Abstraction Coeff � 0.20
Pervious Area 0.16 ac DCIA 0.00 ac I
�Pervious CN 98.00 DC CN 0.00
I
Pervious TC 5.00 min �DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Basin 2 0.16 ac 98.00
�� Pervious Composited CN(AMC 2) 98.00
Pervious TC Calc
�
Type Description Length Siope Coeff Misc � TT
I
i Sheet 0.00 k 0.09� S.0 0.00 in 5.00 min
i �
Perviou5 TC 5.00 min
HYDLIST SUMMARY
[6 month out][10 year out][S00 year out]
LSTEND
I HydID Peak Q(cfs� Peak T(hrs)I Peak Vol(ao-ft) Cont Area(ac)
III 6 mor nth out 0.0433 8.01 0.0142 0.16
����
10 year out 0.0926 7.62 0.037 0.16
I ' �
��
100 year out 0.0926 7.57 0.057 0.16 I
STORLIST
[Tank]
LSTEND
Record Id:Tank
IDescrip: IPrototype Record Increment 0.10 ft
�
Start EI. 0.00 ft Max EI. 1.00 k
Void Ratio 33.00 ��� � �^��� }_ �Q 1�
� ���
Length 20.00 ft Width 10.00 ft
��iConsider Bottom Only
Vault Type Node
DISCHLIST
[Infiltrartion Gallery Discharge]
LSTEND
Record ld:Infiltrartion Gallery Discharge
Infiltretion
Descrip: Infiltration Galiery Storege Increment 0.10 ft
i
Start EI. � 0.00 ft Max EI. 106.00 ft
�
Inflitration rete Z0.00 in/hr WP Multiplier 1.00
I i I
Licensed to:Engenious Systems,Inc.
i
�
GALLERY C
Appended on:Monday,March 04,2013 3:57:41 PM
LPOOLCObIPI�TE�Level Pool�Sl1;�iM�RY using Puls,24 hr Storm Event
Start of live storage:0 ft
Event Matcr h Q(cft) Peak Q(cfs) Max Depth(ft) Vol(c� Voi(acft) Time to Empty(hr)
I6�month 0.147 0.1465 0.0469 10.446 0.0002 0.0118
10 year I 0.4538 I 03125 I 0.9617 214.2096 0.0049 . O.O1S8 �Q �� �fGW�W�
100 year� 0.7192 '� �: 0.31d5 � 3.5835 � 780.4995 o.oi�9 o.oiia �pp y� d.raw�own
I ,
(=�D W -f-h�c t,,q ti. b o�vm a-('r zlS�i (5' i t�-�;��a�i cY`-Ktx�c.�h
Summary Report of ali Detention Pond Data �J
Project Precips
Event Precr ip(in)
6 month I 1.28
2 yr 24 hr 2.00
I
10 year 3.00
100 year I 4.50
BASLIST2
[Basi�C)Using[TYPElA.RAC]As[6 month)(24.Oj
[Basin C]Using[TYPElA.RAC]As[6 monthj(24.0]
(Basin C]Using(TYPElA.RAC]As[10 year](24.0]
[Basin C]Using[TYPElA.RAC]As[10 year][24.0]
[Basin C]Using[TYPElA.RAC]As[100 yearJ[24.0]
[aas�n c)using[TVPein.R,nc]as(ioo year�(za.o]
LSTEND
BasinlD Event Peak Q(cfs) IPear k T(hrs) Peak Vol(ac-cf) Area(ac) Method/Loss Raintype
Basin C 6 month 0.147 I 8.02 0.0494 I OJ3 SCS ITYPEIA.RAC
I �Ba�i6month 0.147 8.02 0.0494 OJ3 SCS NPEIA.RAC
I�
Basin C 10 year 0.4538 8.01 0.1492 0.73 SCS TYPElA.RAC
BasinC l0year 0.4538 I 8.01 0.1492 0.73 SCS TYPElA.RAC
II
Basin C �100 year 0.� 8.01 I 0.� 2392 0.73 SCS iTYPE�- lA.RAC
�Ba�sin C 100 eary 0.7192 8.01 0.2392 0.73 SCS 7YPElA.RAC
BASLIST
[Basin C]
LSTEND
Record td:ftasin C
�;Design Method I SCS Rafnfall type � TYPElA.RAC
( I �
Hyd Intv �10.00 min Peaking Factor � 484.00
Storm Duretion 24.00 hrs Abstractio�Coeff 0.20
Pervious Area � 0.73 ac DCIA 0.00 ac
Pervious CN ( 94.99 DC CN 0.00
j
,Pervious TC 10.00 min DCTC 5.00 min
I � �
Pervious CN Calc
� Description SubArea Sub cn
�� Basin 1-imperv 0.62 ac 98.00 �
IBasin 1-perv 0.11 ac 78.00
I I �
i( Pervious Composited CN(AMC 2) � 94.9863
�
I Pervious TC Calc
�
i �-
Type Description Length Slope Coeff Misc TT
I! I � ��
Sheet 0.00 k 0.0% 10.0 0.00 in 10.00 min
� � ���
Pervious TC 10.00 min
I �
DCI-TC Calc
�I Type �Description Length 51� ope- Coeff Misc r- 7'T
jl �
��
j�Sheet 0.00 k 0.0�'0 5.0 0.00 in �.00 min
�� I
�
I� i Pervious TC 5.00 min
�
(
I�
HYDLIST SUMMARY
[6 month out][100 year out][100 year out]
LSTEND
HydiD Peak Q(cfs) Peak T(hrs) Peak Vol(ac-ft) Cont Area(ac)
6 month out 0.1465 8.04 0.0494 0.73
100 year out 0.3125 I 7.60 0.2392 0.73
100 year out I 03125 7.60 0.2392 0.73
STORLIST
[TankJ
ISTEND
Record Id:Tank
IDescrip: Prototype Record Increment 0.10 ft
Start E�. 0.00 h Max EI. 5.00 ft
I I �
rVoid Ratio r33.00 �--r � ��C�,� ,^ �-�-a��
I I � �
Leng h 45.00r ft -Width i5.00k
I
��-�Consider Bottom Only
i I
Vault Type Node
� �
_.
DISCHLIST
(Infiltrartion Gallery Discharge]
LSTEND
Record Id: Infil[rartion Gailery Discharge
Infiltration I
I
I
Desc ir p Infiltration Gallery Storege Increment 0.10 ft
� � I
(
Start EI. 0.00 ft Max EI. 106.00 ft
�
'infiitration rete 20.00 in/hr WP Multfplier 1.00
i i I �
',I
Licensed to: Engenious Systems, Inc.
APPENDIX A-2-
DRAINAGE PLANS
�
APPENDIX A-3 -
VICINITY MAP & DRAINAGE BASIN EXHIBIT
�I
VICINITY MAP
� � �.,�,�m, � - -�r�pv.m-� .,: p.a++�+tc�,.. � �a^.,. ��.,� ffi �„
.��?'�w,1,`t��, "�. �� .. k . "� « '4q{I
� �,��, � + � �
�;:\; �'M.° .�" �� '��'"e. i�� '�. ..:�.1*�'"���y��`"��. ,'� ��� ' w� :T?
��v� / P ,',� . .�I, J .- . '.� �� '
t •� �����` �' ..*ti;:�-�, �*,''�,,�rI� i�,� t , �
�"�, , � ,' � ��, "G'd �.:. ,�, -'1'"'_" �",e;,� 4
���'�; .,•:�, . ��.."� ��,,, �� ���. ��Se. �wr�� � 4�"fiy�' ��� �C+�*,;�.h. itf�, `y; �
(:l"'� � � se t`i "> � • ,� ,' '�,' �
(, +' ,� � ► � �'� '-'``.j
xi, �� �k'. �;��h w .�s��.� ,se�*r5fr+5� �... � �'.�t'1t�'. 1���,���'" .. N a �
��Y. ��.��\ r���*'� r •{� w .. f , ,� e � tt���'# . -�
+� 'P � � } �
��^ q/� (�, � _ 1y�F . � {.:
R'�., i' .��'�,�' ,f / ��k�,� fST����,.,:� P�. ���'�{� t`- 1,♦..;�� }�.�*�i'"� �t
� �' - �'"�
�. �f
.. . ,
:�
s'-� �q, �_�;�•. � ,>e, � . :�" � �:.,� ,:.��,� PR TION
�,� � ,,� r +,� •�
�`y�'�� _��'`� .� ^ �"��� �' � � x� ,.� :�x.
� �'}-� �
I"+ _ .,rw �"; . « � , `.0 f « y`
'o ly� . � . s. . �'��� r�.r � �--��,,�'
�' e
�,, ' ,'�»� � K ±.�� . . � .
� ��� � s�...• , � � ^� � ,a� � �.�„v�q��,,.
�°"j�,Yty: '� �'" ✓ •-i1R +�'�. _� ()A.�'\., �� . . '�.� y W'.:�a• �, ��v!m�,,� '�n� �� ^�
�. �� ��' �"�.� �.j�'.�y � 1r�;� ..�r��yy�,�;.�i'• �� h �: �.
:� k �� �( �'.y,j i�
, �, d F- ! �'�f�'yti'r. ..��. l ti� 'Z' ��
� � 1°�d. .J �4L'� -p i. � e `' �'�'+��t
r" � ,k � z .�*y�' k�, �. �'_. L #. ��.
w^�'� A �,• ,� ' �N � �'T,,�`��°� c,�} ,
�� •� +.+k. l� a + � .,�� � �. � "'� �"�•t d
� r,+� , � . i�; _ ;�� � �"� ��.��::,�
°",� �'�� � "jk,�.��'.�M` � "" �y�$ ;, �itii+��x. r� !'�
�tss. '� . �� � i � �'�Lfi.�,.�„`��"'M. �'r"1��fi� �r�i�a ,.
, :, i f � t vk�.�J ,
,(" ''^`.,,�+� �, rt
�� '*7*,�r� � . ._ � � f��.�' + � �',� �� �+�;� „+r� * `��'*,, ��`�.��
..t.. ��� .. � .. y' � 1R� '"�� µ� �,_ �.��,~�`y � : '?i�w�^ kl
� .. ��� ' '�.�..� �'.`.:¢ ' � .�s� �.:
°a '��
, . �
� ,' �v�Ae. � '�\I` � `*, ��}{,�
+�'+ i �
: ..' ���+. r #� �1� '�'� �yl�� R",� �
' "4 � 't.�,G �'iv �+�-.... � ��.� 'ti 7�F 9� �,ti� `�'
r 3_y A(� � :,,1. �:t � 4 .. + �.� '.
4 } j. . t, A +Mi,�� P ''- : � '�N� `�ny, .�. e � 'k�'3
�
� � y �m � �" 1 �, �`i+ y�y��, �\�
� �
�:�� { r . '� "�" w. �,��. Z..-q����'�"'{.ri . � .;�4��, i`
„ �
_ . � .
` . .. . .., . ' � � �8' 'f ��.
f� '" ,�, �� �- �.� `:
•, �
� , : • �`,�,i i j ,,,.� i.:� ,�k
.. ���' �
, �
�
� Q. Q
�i}�`' ':'� � .�� a
�� ������ , ;
�',,�' -�r � <-••��, � � a�+�`r�,
:�,;,�i i �R f r i�:i.�f � #;g ,�,,,.�'�"�'4a�"'S 1'k`r,� � 3 r ����.
M , y�� .�j �`',
� T* '�'`t�" � �,�: ` , L -�''xx"�;
s �t .n ..���r� ``7�� 'A '` d' �3 C°.,'� �"':5a" ' 7
ry.'�'a 1" �� 1�4."�� �.. T �'I,� . �� R.-Z�� � �� � ' .
.t� � _ � �,�. ». ... e#3+Y���-�' ,� �r.+'�� d. ""T " y,Y «.�"+� � \ ..
� , . .,*.s A .:a���"" �y,�.�.� 6An� .i� ��`„ 5 .� � ����,.�� +� � ��''.,'.f i e�
., ° ,�► .�. � � "!/i` s°.'�wa�Mx - t�rr{� , i=�. � � ��;
R • �� F#,.? ,��.�Y`�.�...�., t., .n�r,!
i�ti`'� � sG'�'t.��'. � ,:dL`: . .. �� '�� �..,��w.-.�, �,,. .
I
�„�,.., ..
wo�nann3rouv�v3r�s mmM
605[-ZSf99£�i 599T-LSE-09f�d NOl�JNiHS7M���
Z0586 N019NIFKtlM'MdWAlO'H"9019�MS 3�IN0 39tlINtltl7 iOTZ �
$3'1/�tli5'�NINNY'IA ON\"�NItl37N1pN3 �2�d 3RIIb21d � �
��3nn��-aae� -b'3HS �� °
� � ��� � � '
�=� 1191HX3 NISdB 3J`dNIH214 � � ; ' k� �� � �
p — y e� � a R s �
3
� �
�
� __�� ��" \ / �'� I � � � �
\ � \ �1 I I�� ' �� \ ��\� ,��
� m 1 i �! m�--�--� 4� .
� � �� � C I � � � �`_��%''�
; � �� � � � �b �� �i
& t i y'� � ✓ � � �
,� �--,---1 1 .
� � > � i , �'� `1, �
' � �� i � ,, /�
a ��" ��--,!- ; '�`�' `� �
' ;. ��\ �� � i � ,�� �,`� ,
�
i �
� g �� �'`.':�'�`� !--y' rya / �
� ,� y . .. � �
� � / � e �� >�e�� ' �y ��
1 . � ��� �
�o �� ��" � "'k� ��� '@�\ �'�' �
� h �s/ .��' , \�� �X��� �1,� ��
�
� b .�" r y/ ,�'� e �„I'"���� �\� 1 ��\ � / �,
�i i
o °� � \ O�
,,� � 'U /�� /''' X��\ � //
t � .'�� f� �'� ��K� `��` '`� ��
@1 �4/ �' �•� n ' \�p/ .' \\�V�'� �,\� �/
�`.� � '\ ``� �� \ 'a\�\ � // n
� 3' � �� ,- � a�� , ,
! /� � � �a`"" ` \��•'� � ��� �� � �/ ,� •
) [� �Q \\ .� \ � /
``� ; H 3, i � �� ��J//N� /�� ��� �� `\ _
\\\ v� �
B� �+ w_ 31 �',� � ` ��o��aF�' � ,��\� ,�;� \��
, 1 '�''`' ( b �� ��t,� tA �� � � 1�p� r
� �U 3 � 1 e r Q .�\ �T' \
' " " ';�p-�, f ` �` \� '/�� m \ \�\\� ���.\\ i� ,...
F 13 M �'�j �r� �� // y�� i�
� r Q (;' p < « ��' � ��`� �1` ,�
.. � y � �,�' � �� ` � ���� .t � � "`������� ` �
dl.:
� �� ; � ` �`��pP�_�"yi11J� \ 1�1��l�j� � \��
j � & / � � \\\�jVV� V17�r�� �` ��
Z � � � ��� � �� ��%�f ��/11� \ �
h, , p��I � —_T__s-=— � \�'���� �� �� / �� �� �-� ` ► ��
� d # r,.� N \. �� l� �� ���i���i�//� �„��� �! �� �� /��
� I a / , .� Q � � �\�q��� / / ,�^a � I \ ,�
P'� y % 2 \ � \ tc�' �%i%��� � � , � `
� � 't / 3 �� S' �r Cn � \, �\�i����� '� ��� \_� � \�
� ' �E Q \ /✓ �� �
r°___..� C` �i� _�. �.«,, rci � i� � �'c�>os,��" � .- ��� � ��
U ' � �a� ���'y+� '"�� 3 ��t � `v!' ` � `� �.�����'a . c ��� � �
i1C�I' � \ \Q ". _�9 ` � \
i �j
Cn M'_,\/M.'��A. � .`M �"� & ` � t,) \\� ����/ �'�+r���/ � i °a
_ � 9 ��' ` Z \\ `\� ���/,/,I f/ \ '� �.�� \ �
N /j
� '°-.,��� �3.�^� � a�0 ) '�/(���l{�� �T � �
f � ,�y � �*,y, . 0` � / /„�t��. `� `G`
j � ` (�� !s �v. �U � .. t '� � � '� `
�., � � �:,� �:� , , ��e � � o ,
�� �� � �*' $`' �P � � ,R � -��. � 4�0
.P
�r�
l -� � � �qii ih *. ���`` �' ' �� �' �� `.�:� �o `
_--— _�— '^\��\�, <v �I�Itj�tj��h\� �� ���< �1\�`� �y/~LI� ,� �� / �Y \
o----- ---- �. �. � �I,I.l s `. -. ` � � a /O� l" . � �
s° -so-----s�-----so----soe��� �'�. �,lY'� *. @� '��'� ` ��� �+ \� �� � i � i��
-------
---� . ,� � i. i.<
____— I /;\\\ <v�``v \ / ``;�St\\`_ </v� \\ f, ,b� / �
I O\ � ♦ / '•M` �.O \\ �_ ~ �}-.� �. B `� �� // � `
� �.
� ��---- + /
<� ^ �� �'� G�� 1 �"'--es�� �` 1 o i `6r �
I � � pC� \ �*. ;P
�\ '� �� \�. ♦ � s � l � os__' �_ �v � � `
j �� � ��/ \\\�` <� `� '^ *�`��6 �^ /� o `� � �,
� >i' � \$ v � ' `��,, � _ �' � a � � \
I �i�� g ����'��� °�..� ~`� *- �'�� �� `
I ��. < > � �
I ��i� � �� �� \ " C��s\�'•. � '� 1,� � i" '� i�
l �C �i � �� � � ' i / `
�\ �\ i � � ' ` � �� / � i
�� � � �/ �� �,p�� � � �b�`� �i l
_m--�---.�-� ��%�sb �Q� �i o �\ � 1 ;\��'� \� y � \
—� �ep � ,�\ � � \ 1 .� . �� r�
\�� �; ; •.�/ � �!:�\ .. °3is a, � � � �
,��f � 0��\ u �� /\\� ,i,� p `\ � �
,�—��--� � �/� \ *• � � /
=I 'I�vc=._ml �,Q\\ � ,�i; � ���k���4F`/'./ ,� i
; ; \ � p,;y �� � �i
;I �� I .,,,,..,,T.6, �'•�� �" � � \,• ` �� � i /
'� ��� �I iiiiiiiiiiiiii iii� @�.� �✓;� �C �\ ,�� `. � � � i
iiiiiiiiiiiiiiii�ii�iiii�i�r . ./ y i �\ � , �4 �9�\.• � /�/� .
I I �? I iiiiiiiiiiiiiiiiii �iiii�iii//li � < % � ; �
;i �_� � iiiiiiiiiiiiiiiiiiii�iiii�iiioii�i Y �� �\ �. r--as.--�+ �a,,�
_�...................!ii..iii�ii.�ii..�i � �\ �.T� / '"e
__ ; s ,:y, ; �\ /�� ��
♦ 'd' � ,'J,p ' \ / /
1Nr""�y_""W'_"'W""'�y""' � :
� w"_"y�""',y�"_'Nr'""' /^� \� ��• �[ , � \ / // /
# � w-----w-��w-----w-<--w--��w-----w-', ; �� \ a., :•-\ �� � / / �
n1----as-----as----a9.---as-----as------�� �` �` � � i` �\ ���`, +. � +►,'. ��\ �i�/ � i
. /!�
} qe,__ � � � ♦ � � :y, � i i I' / �
I '-us___ �� � � �� � �� �`�� �. �\ ���� i/� /i
' I I I I I I I 1 '-as___ �`�� �� �. � / � ��, � 'r. � � / / /
�I I j � I I 1 � '-as__---E__ � �� \�� i �� e � � '•� le�--� /�/ i �;
I I I j � I I I r1 � `� \�� i�/ \\�� `� \,���, `:.�"'� ��/ �/� ��
--i�—�--I--i-- � I I I u �� y � � +�. :� / // / / �/
I I i I —+--i--F--t— �� � i � � ♦ / i � �
I I I I I I I 1 I� �, •� \�� � \` � �'�s �'�. !�, �/�/ �/ / ;
I I I � � � / � �
I i I I j �� .\ �� �� `� , � � �/� � i� i� �� i� i•
I I I I
I I I 1 I I I I i ��; �� \�� iv \�� ��� ` •� /���/ ��/�// ����/
\ �/ � �� � � / / /
� � � � \ � � / \ /
\
��, , \\ \�/ \\\ \` // // ' \ // /!
\ �Y� �� \ � � // /
\\ / /
o i i .� ``�\ ��,� \� i� ���� �
�
I I j �`,�e ��,� �� `\�� \�// �/ � ��i�/ ���/ i�
� / / / / �
I I I � � � .`,. Y / � / �i
� /
� / / /� �\
'.�.__t.._1.—J r+ �� � \ `��•.�`y� � ♦ i i �� ti
--------� 4_ ,� �� , �� `J� i� t i'/� —`
a rAS3a nrr�vea-m asnMx�mne u�rru Ar�aoi sxos�a ra�sis xur�raau rwa�a�raa ro-aev\aara�avsuvn o»\s�oud��
u•ww�n-�cc�es'ii ziot'at�
. .�...............�.»a,.__ � _.. .._._._.....«_�.w.�„„._..�._._,....,.._ .�_..,�. .,.u...,�, .�..w....,..._ .�. ._.�_ _. ....... . .. .. ._ . . . : _ -
APPENDIX A-4 -
FEMA MAP
x^� Lf. ° _1 4�� 3
�' -
/ � ROAD _ r
S�, � i I
�.� ��`�tis Z O N E X �''°o � —
V
�F
� � Z XN E
J� O
J�� 9
P ��,,� 5'�.� �,y0
��P �� `��s
Lq� y'`Q.� �
✓F�.�F9 T9�'�A �,��-�'� � ZO N E X
s
� oti Q
�QQ'� sT9
y F�
y,y O,
s
yiticTO r9�� ��,� y.
ti �Q
5
5�'GO�� ST 9�T
� -,��p�, �i� � �
" � � �
,� ��� ��, � ���
_ �
�ti� ZONE X � � ��: .,•�
4� ��,a ,¢: �,F;.
�
Tq�� STR� Q�,Z, ` y � „�_� � .�.
Fp pJ/ �
Q ` ',g ;
� Y
3 0 '��iM ,
� ` v � 103RD AVENUE 33
� ,, ZONE X�-
� �
� �
�
L__J
L
I 9� .
�
�GF
` I �i
STREET �� o
CORPORATE LIMITS �
�L ' ZONE X
�
� �
J I \
I Z �
Q
>
I
� � 0��� l f} i
� �
�
APPENDIX A-5 -
SOILS REPORT and SCS SOILS MAP
Soil Evaluation Report
Prairie Park*
By William W. Parnell, P.E.
lanuary 10, 2000
*Fay Fuller Building is a part of the Prairie Park Developed. Therefore this Soil Evaluation Report covers
the area of the project.
1 '
i
SOIL EVALUATiON REPORT
FORM 1: GENERAL SITE INFORMATION
PROJECT TITLE: Prairie Park SHEET: 1 OF 2
� PROJECT NO.:00007 DA7E: 1/10/00
PREPARED BY William W. Parnell, P.E.
1. SITE ADDRESS OR LEGAL DESCRIPTION:
700 Prairie Park Lane Yelm, WA 98597
2. PROJEC7 DESCRIPTION:
To commercially develop an 18.2 acre site to support the following existing and proposed buildings and their
associated utilities,roadwork and landscaping.
Bui(ding A 8 Screen Cinema 26,000 sq.feet
Building B Retail Space 8,000 sq.feet
Office Space 3,000 sq.feet
Restaurant 5,000 sq.feet
Apartments 6,000 sq.feet
i ' -Buiiding C Library 6,000 sq.feet
6uilding D Retail 2,500 sq.feet
Building E Retail 5,000 sq.feet
; Building F Existing Conference 6,000 sq.feet
Building G Hotel Expansion 24 roo'ms
Building H Existing Hotel 24 rocims
� Resiaurant 5,000�q.feet
' Building I O�ce 7,500'sq, feet
I 3. SITE DESCRIPTION:
' The project site is currently partiaily developed. An ezisting bank building, office conference center,
and hotel reside on the south central portion of this site. Residential dwelfings occupy a smalf area
located at the northwest and the southwest corner of the site. The remaining area within the scope of
this project is used as a hay field. The topography along the northem property boundary is relatively
flat. The western portion of this site is gently rolling. A natural broad swale traverses the site in a west
to east direction and acts as a natural basin for the existing undeveloped site stormwater runoff. There
were no physical indications that standing surFace water is ever present within the confines of the
swale. The site is bounded by West Road SE to the north, 103"' Avenue SE to the southeast, Yelm
Avenue(SR 507) to the south, and the Yelm Alternative School grounds to the west. The onsite soils
were formed on a terrace out of glacial outwash.
4. SUMMARY OF SOILS WORK PERFORMED:
Eight test pits were excavated by backhoe and ranged in depth from 72"— 156"below existing grade.
Soils beyond four feet were visually and physically inspected by sampling through the use of e long
handled garden hoe andlor inspecting backhoe tailings.
Double Ring infiltration tests were completed for test pits#1,2,4,5,and 7. Test pit#7 did not pass the
10 minute pre-test due to fines in the soils texture and was subsequentiy pre-soaked for 4 hours. Test
pit#1 failed the pre-test but failure was due to the density of the soil,not to the amount of flnes present
in the soils text�re. Pre-soaking was considered unnecessary and the double ring infiltration test was
promptly completed. All other test pits passed the 10 minute pre-test and were subsequently tested.
, Test results are included in this report.
5. ADDITIONAL SOILS WORK RECOMMENDED:
Addilional soifs work should not be necessary unless drainage infiltration facilities are located
appreciable distances from those soil test pits as located on the site plan map.
6. FINDINGS:
The onsite soils for this project site were mapped by the Soii Conservation Service soils survey of
Thurston County as a Spanaway (110) series and a Nisqually (74) series. All test pits generalty
confirmed these designations. Test pit#3, located at a low point in the broad swale did reveal a high
winter water tabie at 62". None of the other test pits revealed any evidence of winter water table
presence. Double Ring infiltration tests revealed infiltration rates ranging from 14 '/, inches/hour in test
pit#7 to 144 incheslhour in test pit#2. Tests were completed between 60"-78" below existing ground
suriace in the C horizon soils.
�
;
J
� .
�
t
� 7. RECOMMENDATIONS:
� The Spanaway and Nisqually soils series are well drained with rapid permeability rates in the
� ' substratum soils. Drainage infiltration facilities should be located in the C horizon soils and not the A
� horizon soils. The presence of a high winter water level in test pit #3 make this area unsuitable for
drainage infiltration. The possibiliry of high winter water table exists for the other soil test pits but was
not evidenced at the time of soils logging. Drainage infiitration facilities installed no deeper than 96"
below existing grades in the vicinity of soils test pits 1, 2, 4, 5, 6, 7, and 8 should not be impacted by
winter water table concerns.
Suggested infiltration rates are provided in the attached soils log data sheets. They are estimations of
aptimum infiltration rates for undisturbed soils. Site conditions after construction are disturbed and the
receiving soils therefore may not infiltrate as readily as test results indicate. It is suggested to use
conservative vaiues when receiving soils have a high percentage of fine sand or finer material present,
as was the case for test pit#7.
During construction, care must be taken to prevent erosion of exposed soils. Drainage facility
infiltration surface areas must be properly protected from contamination by the fine grained upper
, horizon soils and from compaction by site construction activit(es. Soils not properly protected wili
cause infiltration facitities to prematurely fail.
I nereby certify that I prepared this report, and conducted or supervised the performance of related work. I
i certify that I am qualified to do this work. I represent my wo e complete an accurate within the bounds
j of uncerlainly inherent to the practice of soils scie ,and be itable for its intended use.
i
I SIGNED: � �=1 cz� � � < < ' �:��� ; ;
.-�� �
' ' ,�J'"�`�Z�„��'rq�°��~.••i s'7qv �
DATE: ��'�:,��.s�,r+�''��4,—�'�'���, %�'�,
�T��• ;,��,�;,� ���••�
�:,- .. �
�� '�:n 3�.3 �:
,�„�,�r
' �-o ��
��??�,�i� .`•.�'1 i s.a'°�i. .���4
";+l)�,;C{,�`��-���, �C��/
�. �_�,��•ti'se,�.,r•���
�`''r�;'o�����.a.�
"='��"� I�2 i f cc.�
..o..�....._..�...
��""'''''�''°"`�;�
[s::.s:.s�... +Y�t°r O(
�•
i
� .
�
I
� �
1
t
�
t f
� SOIL EVALUATIDN REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Prairie Park SHEET: 1 OF 8
�1 � PROJECT NO.:00007 DATE: 1/10/00
PREPARED BY: William W. Parnell,P.E.
� SOIL LOG: #1
� ! LOCATION: See Site Plan Map
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
;
Double Ring Infiltration Spanaway(110) Terrace
I
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
i Glacial Outwash GROUP: Unknown
� B
7. CURRENT WATER DEPTH: 8. DEPTH TO ►MPERVIOUS 9. MISCELLANEOUS:
� Greater than Bottom of Hole LAYER: Level
Greater than Bottom of Hole
10. POTENTIAL FOR: EROS�oN RUNOFF PONDING
� 1 Siight Slow Minimal
1 11. SOIL STRATA DESCRIPTION: See Following chart
1 "
� � ; 12. S17E PERCOLAT(ON RATE: See FSP
� �
� 13. FINDINGS & RECOMMENDATIONS: A Double Ring infiltration test at 78"below
j existing grade revealed an infiltration rate of 30 inches/hour. The CS horizon was slightfy to
' moderately dense. For design purposes, use an infilt�ation rate less than or equal to 20
�' inches/hour in the C5, C6, or C, horizons.
�
Soils Strata Description
Soil Log#1
�
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
; A 0"-14" 10YR2/1 VGrVFSaLm <20 <5 <35 1SBK ff 2-6 2
I , .w/cobbles
C, 14"-30" 10YR3/6 ExCobbtey <5 - <50 S.G. - - - ff >20 20
Sa
CZ 30"-46" 10YR4/4 FSa <10 - �10 S.G. - - _ .
>20 15
i C, 46"-56" 10YR4/6 ExFSa <20 - <5 S.G. - - - - 6-20 10
I C. 56"-60" 10YR3/6 ExGrSaLm <15 - <60 2SBK - - - - 6-20 14
�5 60"-88" 2.SY4/4 ExCobbley <5 - <85 S.G. - - - - >20 20
; CSa
; w/Some
� Stones
Ce 88"-127" 10YR4l6 VGfFSa <10 - <60 S.G. - - - - >20 20
C, 12�"-156" 10YR4/6 ExGrSa <5 - <75 S.G. - - - - >20 20
w/Cobbles
' and Stones
I
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMA710N
PROJECT TITLE: Prairie Park SHEET:2 OF 8
PROJECT NO.:00007 DATE: 1/10/00
PREPARED BY: William W. Parnell, P.E.
; SOIL LOG: #2
LOCATION: Ses Site Plan Map
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
Double Ring Infiltration Spanaway(110) Terrace
� 4. pEPOSITION HISTORY: 5. HYDROLOGiC SOIL 6. DEPTH OF SEASONAL HW:
Glacial Outwash GROUP: Unknown
B
7. CURRENT WATER DEPTH: 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
Greater than Bottom of Hole IAYER: Level
� Greater than Bottom of Hole
1�. POTENTIAL FOR: EROSIOtv RUNOFF PONDING
Slight Slow Minimal
( 11. SOIL STRATA DESCRIPTION: See Following chart
;
� 12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: A Double Ring infiltration test at 60"below
existing grade revealed an infiltration rate of 144 inches/hour, For design purposes, use a
r�te less than or equal to 20 inches/hour in the CZ horizon.
Soils Strata Description
Soil Log#2
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
A 0"-22" 10YR2/1 VGrVFSaLm <20 <5 <35 1SBK - T ff 2-6 2
w/Some
' Cobbles and
Stones
C, 22"-52" 10YR4/6 ExGrSa <5 - �85 S.G. - - - - >20 20
w/Cobbles
C2 52"-144" 10YR4/2 ExGrCSa <5 - <80 S.G. - - - - >20 20
w/Cobbles
�
i
�
� SOIL EVALUATION REPORT
j FORM 2: SOIL LOG INFORMAT►ON
� PROJECT TITLE: Prairie Park
PROJECT NO.:00007 SHEET:3 OF 8
� PREPARED BY: William W. Parnell, P.E. DATE: 1/10/00
i a SOIL LOG: #3
: LOCATION: See Site Plan Map
, 1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
� None Nisqually(74) Terrace
4. DEPOSITION HlSTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
� Sandy Glacial Oulwash GROUP: Unknown
e
7. CURRENT WATER DEPTH: 8. DEPTH TO IMPERVIOUS 9. MfSCELLANEOUS:
. 62" LAYER: Concave,TOE Bottom
Greater than Bottom of Hole
10. POTENTIAL FOR: EROSION RUNOFF PONDING
; Slight Slow High
11. SOIL STRATA DESCRIPTION: See Following chart
�
� 12. SITE PERCOLATION RATE: See FSP
� 13. FIND(NGS & REC
OMMElVDATIONS: The high winter water table in this area makes
these soils unsuitable for drainage infiltration facilities.
Soils Strata Description
j Soil Log#3
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
AP 0"-12" 10YR2/1 GrVFSaLm <20 <5 <20 1SBK
' - - ff 2-6 2
�
j A, 12"-44" 10YR2/2 GrVFSaLm <20 <5 <15 1SBK - _
- - 2-6 2
C, 44"-72" 10YR4/4 LmFSa <1S - <15 Mas - _ _ _ 6-2� 8
�
�
I
i
�
� SOIL EVALUATlON REPORT
' FORM 2: SOIL LOG INFORMATION
PROJECT TIT�E: Prairie Park SHEET:4 OF 8
PROJECT NO.:00007 DATE: 1/10J00
� PREPARED BY: William W. Pameli, P.E.
� SOIL LOG: #4
LOCATION: See Site Plan Map
1. 7YPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
Double Ring Infiltration Spanaway(110) Terrace
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
Glaciat Outwash GROUP: Unknown
B
7. CURRENT WATER DEPTH: 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
Greater than Bottom of Hofe LAYER: Level
� � Greater than Bottom of Hole
10. POTENT)AL FOR: EROSION RUNOFF PONDING
Slight Siow Minimal
11. SOIL STRATA DESCRIPTION: See Foliowing chart
12. SITE PERCOLATION RATE: See FSP
�
13. FINDINGS & RECOMMENDATIONS: A Double Ring infiltration test at 64"below
existing grade revealed an infiltration rate of 117 inches/hour. For design purposes, use a
rate less than or equal to 20 inches/hour in the CZ or C3 horizons.
: Soils Strata Description
Soil Log #4
Horz Depth Color Texture %CL °/nORG CF STR MOT IND CEM ROO <X> FSP
A 0"-28" 10YR2/1 VGrVFSaLm QO <5 <35 1SBK ff 2-6 2
� C, 28"-'4" 10YR4/4 VGrImCSa <5 - <6o S.G. - - - ff >20 20
w/Some
Cobbles
. CZ 44"-80" 10YR4/6 VGrFSa <5 - <50 S.G. - - - - >20 20
wlSome
Cobbles and
5tones
C, 80"-156" 2.5Y4/4 VGrCSa <5 - <70 S.G. - - - - >20 20
w/Many
Cobbles and
' Some
Stones
i
t
�
;
;
�
�
i
i
SOIL EVALUATION REPORT
,
FORM 2: SOIL LOG INFORMATION
i
,� � PROJECT TITLE: Prairie Park SHEET: 5 OF 8
� � PROJECT NO.:00007 DATE: 1l10/00
PREPARED BY: William W. Parnell, P.E.
� SOIL LOG: #5
� � LOCATION: See Site Plan Map
; 1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. tAND FORM:
4 � Double Ring Infiltration Spanaway(110) Terrace
,
r
p 4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
� Glacial Ouiwash GROUP: Unknown
� ' B
R � 7. CURRENT WATER DEPTH: 8. DEPTH TO IMPERVIOUS 9. MlSCELLANEOUS:
Greater than Bottom of Hole LAYER: Level
Greater than Bottom of Flole
10. POTENTIAL FOR: EROS�ON RUNOFF PONDING
� Slight Slow Minimal
i 11. SOIL STRATA DESCRIPTION: See Following chart
I
I
', 12. SITE PERCOLATION RATE: See FSP
i
(
13. FINDiNGS & RECOMMENDATIONS: A Double Ring infiltration test at 66"below
existing grade revealed an infiltration rate of 120 inches/hour. For design purposes, use a
rate less than or equal to 20 inches/hour in the CZ or C horizons.
I
I Soils Strata Description
i Soil Log#5
Horz Depth Color Texture %CL %ORG CF STR MOT tND CEM R00 <X> FSP
� — — — — —
� A 0"-24" 10YR2/1 VGrVFSaLm <20 <5 <35 1SBK - - - ff 2-6 2
, C, 24"-50" 10YR3/6 ExGr�mFSa <5 - <80 S.G. - - - - >20 20
w/Cobbles
and Stones
C2 50"-84" 10YR4/4 ExGrCSa <5 - <85 S.G. - - - - >20 20
w/Co6bles
and Stones
C, 84"-144" 10YR5/2 VGrCSa <5 - <50 S.G. - - - - >20 20
�
�
! SOtL EVALUATION REPORT
� FORM 2: SOIL LOG INFORMATION
; PROJECT TITLE: Prairie Park SHEET:6 OF 8
; PROJECT NO.:00007 DATE: 1h0/00
PREPARED BY: William W. Parneli, P.E.
SOIL LOG: #6
! LOCATION: See Site Pian Map
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
None Spanaway(110) Terrace
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
Glacial Outwash GROUP: Unknown
' 8
7. CURRENT WATER DEPTH: 8. DEPTH 70 IMPERVIOUS 9. MISCELlANEOUS:
Greater than Bottom of Hole LAYER: Level
" Greater than Bottom of Hole
10. POTENTIAL FOR: EROSION RUNOFF PONDING
, Slight Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
�,
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: For design purposes, use an infiltration rate less
than or equal to 20 inches/hour in the C2 and C3 horizons.
Soils Strata Description
' Soil Log #6
Ho2 Depth Color Texture %CL °/aORG CF 5TR MOT IND CEM ROO <X> FSP
A 0"-24" 10YR2/1 VGrVFSaLm <20 <5 <35 1SBK - - ff 2-6 2
Bw 24"-36" 10YR3/2 GrVFSaLm <20 <5 �20 S.G. - - - ff 2-6 2
; C, 36"-66" 10YR3/6 VGrCLmSa <5 - <40 S.G. - - - - >20 20
CZ 66"-90" 2.SY4/4 MSa - - <20 S.G. - - - - >20 20
' C, 90"-144" 2.5Y4/4 VGrMSa - - <40 S.G. - - - - >20 20
w/Some
Cobbles
i
i
�
�
�
' SOIL EVALUATION REPORT
� FORM 2: SOIL LOG INFORMATION
! PROJECT TITLE: Prairie Park SHEET: 7 OF 8
� PROJECT NO.:00007 DATE: 1/10/00
PREPARED BY: William W. Parnell, P.E.
SOIL.LOG: #7
; LOCATION: See Site Plan Map
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. L.AND FORM:
, Double Ring In�ltration Nisqually(74j Terrace
� 4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
Sandy Glacial Outwash GROUP: Unknown
B
' 7. CURRENT WATER DEPTH: 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
Greater than Bottom of Hole LAYER: Undulating
- � Greater than Bottom of Hole
' 10. POTENTIAL FOR: EROSION RUNOFF PONDING
Slight Siow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SiTE PERCOLATION RATE: See FSP
I 13. FINDINGS & RECOMMENDATIONS: A Double Ring infiltration test at 66" revealed an
; infiltration rate of 14.25 inches/hour. The C, horizon will infiltrate at about 7 inches/hour. The
; CS and Cs horizons are most suited for draina e infiltration at a rate less than 20 inches/hour.
I
Soils Strata Description
! Soil Log #7
� Horz Depth Color Texture %CL °/aORG CF STR MOT IND CEM ROO �X> FSP
' — — — — — — — — — —
AP 0"-6" 10YR2/1 GrVFSaLm <20 <5 <15 1SBK - - - ff 2-6 2
A, 6"-24" 10YR2/2 GrVFSaLm <20 <5 <15 15BK - - - ff 2-6 2
� C, 24"-40" 10YR4/2 LmVFSa <15 - <15 1S8K - - - ff 2-6 4
CZ 40"-55" 2.5Y4/4 LmSa <10 - <5 S.G. - - - - >20 15
C, 55"-72" 2.5Y4/3 LmFSa <10 - <5 S.G. - - - - >20 10
, C, 72"-108" 2.5Y4l3 VFSa <15 - <5 S.G. - - - - >20 7
'� CS 108"-120" 2.5Y4/2 Sa <10 • <5 S.G. - - - - >20 20
C6 120"-144" 2.5Y5/1 VGrSa <5 - <35 S.G. - - - - >20 20
i
i
�
f
i �
s
: SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
s
, PROJECT TITLE: Prairie Park SHEET: 8 OF 8
PROJECT N0.:00007 DATE: 1/10/00
PREPARED BY: William W. Parnell, P.E.
SOIL LOG: #8
LOCATION: See Site Plan Map
1. TYPES OF TEST DONE: 2. SC5 SOILS SERiES: 3. LAND FORM:
None Nisqualiy(74) Terrace
� 4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
F
Sa�dy Glacial Outwash GROUP: Unknown
8
� 7. CURRENT WATER DEPTH: 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
Greater than Bottom of Hole LAYER: Level
� Greater than Bottom of Hole
10. POTENTIAL FOR: EROSiorv RUNOFF PONDING
Slight Slow Minimal
'11. SOIL STRATA DESCRIPTION: See Foliowing chart
� 12. SITE PERCOLATION RATE: See FSP
I 13. FINDINGS & RECOMMENDATfONS: The Cz, C3, and C4 horizons are suitable for
; drainege infiltration. For design purposes use a rate less than 20 inches/hour in the CZ and
; C3 horizon and a rate less than or equal to 20 inches/hour in the C, horizon.
Soils Strata Description
Soil Log#8
I
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
IAP 0"-6" 10YR2/1 GrVFSaLm <20 <5 <15 1SBK ff 2-6 2
A, 6"-24" 10YR2/2 GrVFSaLm <2� <5 <15 1SBK - - - ff 2-6 2
C, 24"-48" 10YR4/2 LmVFSa <15 - <15 1SBK - - - ff 2-6 4
C� 48"-92" 2.5Y4/3 LmMSa <5 - <5 S.G. - - - - >20 20
� C, 92"-120" 2.5Y4/3 GrLmSa <5 - <25 S.G. - - - - >ZO 20
C. 120"-144" 2.5Y4/1 ExGrSa <5 - <70 S.G. - - - - >20 20
�
i
_.
i
�
i
1
1
!
d �
� �..
` o � p a
N �� � • U
o � 01
d � w, a�i
w c
t`
Y J '�
1� � � � G �(p y � �
c9 in � � wu. oa N .� E o
�
a
� Y `�
p m J = N
�� �., f/1 � y � N 'O N
C N p
d (� m O, � U y y N LL � U
�. � U �
� ' p � � N M
a � m � � ,
m ` 7 Z 7 N
7 �9 j � � � C � �
` � V T�� �� C lL � U
O !9 fD C > O
in c9 m a � in cn '� �
C � U
� V b
E C .o
� � E x V Y o � v � w u � a
m U'� � J tn C� U > w tL � p� � � � j � U � � "o
� � a � �
U 1 , 1 1 T , � , � 1 a c 1 m c E
� � >. T N � E N N � O � O `o
� > v E � �' � ? L° Y � m m � � c o d E c
N � N p � � O N X C N '7D >� p � p -�1 � p W p J � E �0 �
F- U (n _/ (n U U � W LL � C > � (n � �- lL U � Q' � LL U � �.
'f/1 ��IC 7 �i�ll = c' .I��. I_I
m V�`
.�.
a °' . N o ^�
� , � � � � 1 �`' � ✓ _� � �� � `•.:;{, � ' _ .'' 1'
� I ` , - \� ', i ;`` •_- �-� "�1\
� � f� i r�'
' , �v � \ �' %��.-�) { �, � :
. f � ! �" J
I,�;==:: . , �_�, , �; /n
;,;•,;.: ` J,� �,� - � � �I � ..�
( } .._ '-� {i \
i ! ,-j�� 1 �/
� ._ ..- i-- —l- i �• � , '� � ��,1--'��i"/ .�•-.
, �` \ / / ����`� �h •�' + '' ������.,
' �-�� ��� l � � �l � ":�� � �� ��I �
� ��`� / ,� _`�� 1 r• ��� �
(• '.� � � �: , / � � � _ — \�
,� • I � �� \�� ^ - / / / •-,/�� � � v
�' �l. � t �
• '�:. , „ �
_ i � � � � /� �,�_1 --�' ,�:,,, . . �'� �
_ 1 — � _ (� ,�,�f '� .� �•� . �
� � '"! ' � � a �------ A��
. �, �, .-f-� �. • � _
� ` ! �, •,i-�-__'--
J y �. �,,
�:`
/� r� ° t � ` _ �' �( .�." - � .-i� � : ; �-.. ►��� _..___ ---- � ��,
;.f � r �� � ��� ^� �1."_ i "/� � ' �. {-
� � ` \ � 1 % /� �\ i �` 9�' -
:� �-� � �� � , f � , r_. -,..,: ,
:: � . --°• �• '� ,...:�,., � _
I�� ';:� ' ` �,� '`�!`>�
,� r ,
:1 � / ,�-L,j� -- �� ��` : { �'J-�
�� � �'�. ' �1 `�` '� .
.'� � \ , � t�_. ���'`� \ ` � ` \
� � .
I w � -�� •;. ` � % ' �
I.::.� � ' �a`> . .'l..��� � e��
� _.__._ . ,` �; \`\'
, I �•~ `� , 'Lys� ^ _
' :� ! � I � � '(�_' •'`��
L I�' t f �� � \ i
����'J� � � :�f-f. '__ •�- .
;� , ( ,»��:: . `1, .
J•� �� � ; ' �; ��� / �-' a y ;��.
� �C� �� : � - - � ' � ���: ��. � "�,�`�`�
,� � , --..... .__._ _� :.: ,� , ,
�� , .� � -�.. .
, ,., � ,.
� -��%
(� I: ► �-�-- --__ ; � �
.1 .�� I __ ,
_ .I/%' �.. '��`, f�. 1,�'/,�. `�t i<r!'i •��i'�,�':f� ��
.i;�`: , � _� �� `�� i i�,_�I 1/'�.\�� � .�_ / � \.. �� �Y����,
v � f I � \� l =. ir` 1-.-•rt`". .,}: .. �
1�.��.: . �--� l �LX'�t.�� �,� r>� °�x' ; �.��. . •:�j `� ,� �..�,';,• ,. _
� J 4 c �_ ��•1 1 i,. `�" � ' ''•-'' / '� . :'r '.;c✓'
. 1 � � \����"'r_`t.%' ;�,�.'�`�\.''; ,�;' N'^ ._���^:° ,�^ �' � . ;, , rr''\�i�, �.
4. ��
� � •�•� ,{ / `•� , I.;S
` , i � � � I -.� � s �� / .
'J,• �� } =� I i , / � ._ .
'� � "� '\ �: 'f " \ �
�T�, �. �+, �,� -�if� '�«�`/'..��,1� � � \ ��� ; � ���� �� ��
I �, ��.:�.. ��,: �: F � ., , �.
I �` � f--------- \ •_ , ���'�� C ;��j?::�` , � :p�.+�i��."�J.�. ►s�^ .i.. .� . ��� �' ` j,.�i• ;,� ��•, �
f I - � ••---- -..- .�.�/....-•" `+ ....... .. .. _ .__._. . ._.._. .. .. .. .. . , t � ��.� .' _ I
�� � , .y�'•� � l , :.�.a;"`: `�
, `I\�--`� i • � — � j• •�� � �'� -- � _ e .. •. `,'� ' �•.�\ � }•• , . . ..
:�r:_;:� I v � �•�......_, _�v-�j.� (��.1�� � `ti(?•Y � �`{i ' � .. � ' -�-� '``` _
�• � 1_i
�\ �� Q �- .f., .. _ _\� —.`' `! `' ••�
\��/�f:�•: � ' -- .. ___ _._ .•___-- __�•_.r.�. __._ ..' , ,'TM ,, ,
�� 1�I� , _� .... �'�.... �� . �� /�� �
N y5/�`�.. 1 '.__� .��� �.... ��':#�.� '.. �\, V Y /
v G'►1' , 1
k�'. , � r�t � �y�_.� —ti�'���� �� ��
s;�' •��.L, � _-�+- .,�_,... ( ���..__ � �r' ------ - r .� .♦
� -:�- 7�.: ?�; .._.�..._. _ ...__----- -----=`._ ---.._ �w > ' '�
�� �----- .��J --- � ���,.}--_-� .�---
'��::�.i'' I , � - ------ ------- .._..-- ---- ----'�`'i�----- ---', I^y ,� ` \—
r /,., �r
i •-- �. -�' '� ;
i !� � •; ! =�'���" °` '-. � (�.
`•:�. tI / —�. __._..._-- ' ` . �.'� •.,a, �•� -- �', ���• �•�:� '
.�.. +r ! ( �� j' �`�% � '�,� � 1 / ` -•a , '/h
�'' 1 ( '�?, :� ���� y � �i ' ' � �.: �i�``�-.-�
�;�:`ti.�., � �:��- ,���j `' ! _ S 4 .;1,!'�t:��, �
1N'•: �,.�` 1 �� . /. � �/
:'.1' I
,.� :, .\. � _ � \ _____" , ` �'� � r,t�� �;-�{ '�_ _-��,1 .
,.';. :1 � `-- . � ; /
��`.•�: I � / '` I
.z;;,: I �,� _-�-- _� �`---- � ;, I
.`����,•' ' -, r __�_.r._ .._ '
'.•`.�,' � � ` .
s� a t � ' _' � - •r � � 1 � � } .\•`;�' !
�;::v.�. � 4 `1 � %1��� ,�•-
';;.�G.: � v � , � '�'\ �'"'� ' i
:���:a�;:.� f-. � ; ' .,�° �.� � �
,a:.�;; J � � \
;�'• ��� � I i�1 �^�\ � � * _._--- -- ---�-• . .. � � % ����
� , .�; , r � 1� I;
:�: 1�.:, ( _ , � 1
tl l l __ �
" ' I�� 1 � � Y �11'� � � y .........---•'• •-..._.-._ � ,y i
' V 1 /r+ I .i � 1 � � i'
'`�. �I/�j � �`� t ` ' _._.. _.... -._� --- i `` �
.
�- � ��,'; '� ► � 1 ---- �� ��' 1 � � '
. �- ,,
'.� �.�-��-;.-�.-,�; � �i ' � �� '�� i t .'� � i ��`�' , t
'�� ' '�� i t,.���r �+ ��'%.
';: `}� �, ; � '�� l 1 ' i � �.�•—� � {,�- �. �
�:�: ' � (/��+`3�_ 1 �Y\ i ! '� i . / �• _ � j t� .
• ;t` `�I �' �ia � � _ .._ . '� I _ _ ` ... _.._ ':� t. __ ' _.�.
i i �'' � t
J , � � i , _ � ... .;-._ . ..:; ��_,t, �:
0 1 �- !�� ,, 1 , a-, � �-- -- ; � �;�,�f (�� i_� �;,-;
x• � � r �� , i ( . ..�-... ,,}".''�, � i
. I•. ' \�'/�•/r `%r } ' ' ,\' - ,i",�' ' ,1:. f
� �.._ ; � x , I ��--_
:•�• f � _ �1 '�i ' { '1i>,� �
1 : �
� � � �i�.� ��% � �� � �\� ,� � ` t
� � ' � ` ` � � lt,•��_ � � � � � \�,
,, � ' , I �t' �r � .,! ' ; ,./i��x � .�� ����. -:d •` ` ._..__�---•-- - -------- . .i� -
; � , ��O � � � �1 ' ��-a��J9� V ..`��� �� _"� �\'� . .�.^ � �- \• :, .
F�'�,��j� ' ' J i I� � .� �,fri'.1_��♦ �O� j� �._� ,`'� ._/ �"_ !I_ � •
��y� o r � \� �' '1� ��. - ` .•-�, �-��•4_--°•..
;,;•� �i! "� x ,�� �i .� ;�,�� :.} � �ti
•r: , �� ` '� �.fl�� ...r/ -� �.r�-.z'� �I���,•��l ,��.� �
~ .�, , � Z� � � � �
�� '�`' � ' ; �� �_—{��' � � _ (�j����'��!= i � � i `
` � . i / ". �-j C\- � , l.,,.;��;-;'' �,.� � � ! I � I
� _ � ,
=
� ! - :� I
..__ _.__ � •� •
� _,' � �
i I 1 A� , ♦ \ '\ w � `Q� \
� . � � �� \ � �.
I � � ,
� � � � � \ . �
. --�', \ 'y � ., .� � `�.
Io, I o' ,c,f � �,,�/, :. _--\ ,\ � �
� _ -'', � `� � � �
.., j j ''�/ \. �';`_`.',. ,� � �
� � ��.. .. _ -�. �:��: � \.
1 � j -�� � � '� �
' ; ;��';! .� \'�� ,-��� .
I , f ,� \•.�. �
� , ; �..� �,�\\ , �
� ` :� - ' � -� ��`
( �` .�`�� ., _� , .
_ �� ��
� � � � �� �� �
� ^ \ � a. '��j��-� ��
. � ,�,;i \ � ���.:'\
� .�
�� : �� , �- .:. .,
' � I � .�" '=-:,�� \
; � -;�. ���-- �� , \
`�:�� \`�. _.,_,_ ;n
� I �I �-'.fS��� , ;�"r;i�\
� I I 1 � �:r.. - ' i�` ' ti, �
��� .. � • ���, . : t.. � \
� • � � • ���`�,�` '',;'';`, ` �\ \
. . ' ;} .1'" �` i" \\ .
. � - �`�/ •,�..i��i ' .-1"r'./ :` ' \ � .
� � _ . l ,. � , .
I�.. ( ' �'' � ,���i`�� �;~�:�' - \ .
��� r� � { �'�� .
� _ —'�` ''`., �'r_,�''\.,'� '',;,'' .r�:� �
� I••. ._.._..-_'_�- ' ` F�`'I •' / � . � . \
�� � ' �� � .
f :�._ ,.
I �\. _ ..i_y�_,.,� .....- -��`;.Y .;�:.:_ � .
�_� ._,�. � -_
I � ��� :, 1; � .�- �� '`� %� �- \� .
.� _.----f' � �" ''� .�'� ':.
. � , _ �, , ,� , .
__---- .. ����... � � . � ::=.
I .i i.. � \ / ! -- `` , ,\ ti:. \:�:::.
I - /•'' _ � �. `;�•
� J�~~�� � ��. �
� I � �_r-- � ,.�-r �-- � .� � '� �:\
.�.�.. I `�-�--- ��� � �� \`) , ` \` ,\
� �+ � .i � �-F-� �•..1_�:� � � � ,-
! �,_1-.; `� i � �
� ' , . _�, i�i�,�; ��1 ;-� ��� � -,�.� ,
� .. . '.� . ._. - r � � ;'�• / i , '
, � 1 I I /__ -�,,;.-�- �..,�� .._ , -. . , �.
� ,� '' i Y ;%'K��>� r ��� ~ � ```lyiu n �' '� / \`�
� \/_� ,y9ms�!5353,."�,fts �u�teP��' �a �,�; � �'\ � w,•
aI ;' � v�,.,.� ,� � � / �
. -�i � � l � ' 1 �.
, � I 1, ► , � , �
� � i :� , �I i ' � y �� .� , =--�
� I ° �
' } � � ,,,1 � � � ' � � �� �
� ��`•�� � � 1 � �� /
/� � I r- � � � / �-''� \
� , �� �� � � _1 ,�� , .,� , �
� - -��� . ,..
\ f !. �" � r � �;r'
� t' J ` r� � , 1� �.. � � � � yf
�\ ��' . . !e . / I '� :•� 1
� � � • �� � f � N' � �. �.. � �t'�; l:
� :� �!.. %' - 1 ' �' ' ... �,.✓�ir-f:'� �„�,+ ' � ..
� � I 1` � 1_, . ., �'�� .� / ",j 1,� ./.. I . . j��, / 1 r.�l .
, 1 � 7 _ _.. ..�`.��' �`'�+ i _ i.l i: ', T� �.
I `� i\ /, ;��_�l._ �'"' �1'����.;i�. ;} j�. . / �
I /�� � ���-�` - ----- - .. ._-- (��i'"��F�"� y �i �' /
I \ � F� .__------- --"__- 1 ��'�`_
. II ,�_� �- ; �.r ' 4�
� ► - : , __.. - , ; �� �� �_
�.: (: , � _.. _ ._ ___ _ - �� .���-�:l t—j,�
I I ._... s ...r 1 � _
�I t , . - - .,��� ` �1. , �/.` .
�I � r, _ _ .�; -, �.. .., ;,�'y',.- ^ � , ,. .. ':
, � -r; ; r.°. ,� .����!�'=� �,
, � .� �.--- �. ,� �`7:::�- 'y ��+ � �.. �:�. .,;y .,,., ,. �-�
• � i :=�� "� .�� �� �1 r� l ,���• r �/:1' ' rti_.
, 1 ��� �,,� .��_ . _ , �.�.r �, ._ _ ._�-- ----,�^ �
� ��- I , ;; ,-J ��. ., , .. ��. :
!� I � � \ t �: , __fJ�. i f '� , ; !_ . . ---_ �;t i� .
If��f: \ C ; : ' :�� ' � _ . .. _._. . �;e.:.�;�/--"'
� `� , '� 1..- :_�:3f � . �- �
� I ! �j / � � .� { + �
�� `' � � — `�� � _
I .. � `- � L =;f� , ... .._ -----"` r�-° _
� '! �___ r � ��_ ' `�. .�. �� s / � �(
'`-� ! ' .J':-
� � 1 � '� I �--�— •�_`_ �.. '�� !� ' / // ,._ -- � i :�,�`:
� r.. � `�:
/ . ' � / I �-�� i � '
` I � t O I I �.^/� �� � � ( � - ' —
. , � , � ,� �, o ��;�` .r ► � � , _, �
I ��`� 6- �'., j � -=} � - -
` . � � � , � �� _
�. � ��; t
I _`. ` ., , '� ; ` , , •
� � l _ ���J � � Cn i _ �` i ` t ' ";�; , '
, f i ��� I` � ` _,��_ .
III j . , � I __ '►; � �
I ' / ` � S �; ` � f "; ' > ;
�C^�/ \ � ' �}r V v \ b
! \ h ` �i -T• �
'I j . O� � � \ I �/ � � � ..-' , ;��-
i o , ��, �. ,� � � ;.,.
� ! ,�. � ' I ' I • y ���
� � �� � I - �, � � � ��'`
•I• � \ \` � � /; � y' ���
I � � �� J�. `\_ \ � � . ' � 1 __ � .
! I � \ `` , � _.�- '� �, _ .
�) O _ , ..� •� �1 ! '�
J , i -` 1 �; 1 f.�. `,
O . 1 i I` � ` ' � �:'t � � �, ": �
� i , ` �;�\^ \ �� � � �::.�..I �' � �� .-
� \ , \ \ ``� ` ' �� I� -'� '' "'�
i :
��;�..
,� �
Ii � i , ,\ � � -f•jJ\ \\ I/ ,; �ji �•{ t
� ,
.
� , .
. ,
1 i ,\ , / � �{ 1. . l ! . -�` _-�
� . . y _��, . , � .�,,� � .. ,. � -,
- � � . -�-- �:�- ~�.
' .L'.� ,�'.._,, ,. ^�:..<v �f�],�tr-¢`�, ,. .�_,"`y...,,�`_.., � j.y;^,�
, ", L.,% r' �, .F.'' ! � �-.' ' c . �• ,
�2" � � � ,_�.,� ��`� � l� ��. /`1�
� �r� 1 "�4f 2°}6"� ` �,,'-� � ,� �� . '`� ,.\ ` 4 j%
~' �� f\� '''" "'i�F'� ` `,$�:� . � ��t~.'� .�`� �,.i
—�_'';1,�� /•� � _ \��. ` _ �X '�0���;�. 16 ' �' .�;..: . . '� "����.�,'-
_ �L� _".{-•� ��,"`- _" --J-.�,__ � `,�-__ X.� •0 FIf l., ,I � , ,� �J•1•C
��.: �__- �� _ � —�--- - ��,.`f�..__ 1 r":�;:� . � ,
- �`— ^�� �l � --,—_ :�_ `,L%�� `�/
�. /, . ' � `'� � � \� � /
• `����� r l .( .
/1 / �� \ ` ��, �(� � �
` � / `\ � `l`� 1C� I
�(� / � � � �i� ��� r'\
, '`1____ /�•, �:� ` � \� �� \� � `.T
' � �_�"�\i�!�'J' � � •� '`` \\ \' �,, _J
(`� _ j�-.• .,/r �;- '+_.` `_, � '�� / ,�:j"•, r"'\ -� ` ...,1 �` ;!.7_ �
\,���"'.�.� ,��.-� � '1/ _ _._-.._ . !- � ` ------"'� "'' v � � :i � :
1 �`' •- -•--_. .--�--` -� ;�� � '������e • ��= --
�� '�'�` -.,1'� �/- f —�(r •.� � ` -'��-.
�� } �,.._�'/� '"�a�� � ( �!,` ` ' � ` '•�
"'��____._"'^� •. .� � � t} �'; j.
� {�:LX�._ ,. _ 1,���r I � ��`�� '�
\ � : .
`���'--�' ,-� � �
\ ' � �1 � i `� �
,� � y``-�';�— "` �f ' 1 \ `\ `` �`/`'�
7 �� \\ 7 \,�M ( ` \ '•` ', ! ``\ �/�
,r i % I ^„' .,`J i-�
`� ":��� �•-\ • _ �.� ; : _ --
'� •�. �'_ --��'`'`\`�--�. i ;�,,_ `.\• s'
'-� � � � .:.�.
'� %t� � ./ .-��,. •� '�r--�.��.._ ' ��� `` !}
N 1 / `-�. ` �/ •-; ',� L �
, � � ,. _�
.� -�� % `�' `. ;; �t
�� / � / �`�, ;'
/ ��• ` �� '�
� � ,\ / �� ' �� � i �.I
'`� `� � `\�.� ` / `- '/\,� `.1 i .` � � �� ;,
�--�•_ \ l \\ ,` *��, ;' /f /�� �,
�- '�- / ;' % /
.,. ��-�- ; � ;-�\� ; :- i. ;,
� '��, '��,� ��:i. / �' '/`' !
1 i . � ��.�1 ��' '�
� i, _` `\. ` �:^,� i' % � t•
-�. '� �'� :/"�`' /
, / `.�� �/ � ,� - . ;/:.\�\'` �
1 � ,,;a �- � '\~ .+-',J•'��� !� t�,�.'�t%i � ` ��
\ �\=,i `-, `�, �: \ '� � � _�
1 �/ / / ~` l._J.� ��.� i � �1•_� r / �/ ��'
, � / �% � �+�\1 �,� ` ,,1_�'�. \j , if � i ��; � f �� ,
�t...-- /}7 1' r. �-� +� � � . /
1 . . �/��. � �_.` •G4� ..-,. � �; � �.
./"'1• / ��� '` r�'C `, =,}��J �.. �L.' •r� '`'''_"' ..% ,� % ,.
`_, ��; � _ ._._ . _=�� ::�, ��. ��. �� : _ ...�._.,�..,.; r- �;- . r'._.-- ,�
� :�`1 /� �--<;-;-� �•. •�,. , ;�` -�, �, '� .,-���,. ;
� / � :------ -_�',�;.�". ;-: ;t .�,��•; . ���'� ' _\
,f i �, � _— t-;��•,\ •� ,� `.'��� '`-` . ~f_i}- .�
, - �� � �,�,.�.�--�., �-�,�,.��,-.
1 Y::�� , a��_.._ /— � --�-=�-,_��';'� , .,-. -r',�%;,��..' E'.:�:,:� •z� i`�'
_,�, , ; � ��,_ .,^�;.L:��; _ , ;:� �\' .
, j ��_,. .�. %1�.I /� _ _ �� _ --�;-��.:�;- �
� � � �~Y" °' 'i� � _.-----_,-`� ' -�
/ ���:' � ''1'�,'S� ' ',�� :>•-} _.� ,• !' %. ,- ``�
� ��,``!�'`?\� �.�1 i :�, / •a �.�.,,\ ;� �--� }
� 1..� ,.�. \ ' � ` '�, � l �:% � !. ;t.
� 7. '`�; 1 " �/�t � :�l „"� �i 1� �� ��.. ��. t� -t
� l �� {-��.: ���" 1 ; .=�� �. ..� ,� , .., ,.::�` , _�.,�y: �.:
\��:— �`lf��; � ,�; ; 1. i� � -�`�r. . -�Xt,_ �) •�{�
�1 1 ' --�. i � S l-�\ _i.�j` �i.;t
, � , ���- , � — — '�.� � :a�. - j � ,��:'� ��:�
, � � � � ; r:�� ���-�-�.� , �
� . , � ��.. � �,t tlf �,,,;1 , �� __ .,
� � '� �� � t•:�`' . 1 7� '� ;
�� 1 ' �����J ' � ��`� � ��'l�; �`;ti.� � , 't `. `,' _,
1 � �/I`' � � ' '1�") �� —i— —
♦ �• ' � � � � rY 4j����� .��.,.5.-�l 1 � , ( 4, � ,r��
( -��� , .� _ - .:" '"� -, �a � ', t:' ; , '•�:.
\ '� .� r' %- :'_.'J `b. .r------- � � !' ( -��'. i
t C�' .�:i�� r`, �, �•����~ y - '--��' _ �' � '.t•-
.�, _� , � ,���. � � _ / :. '�
1 � � �' __-`--- i . I -�� _ •(� �-:
ri " '�!; \_� ` ��' ,� 1t.� �T.'�x�J�� ..\ .y,' �ji�i"��' .
\ - , ,- �1;;� •.;!J; ' _ `�J� �,
{� � t - :���•.�� `,,�--�-��' -- _ .
� � '� � �,��_i,'� _ _ '•'/�
{.���� ,' ��'� � ' `�4, � i^•,
�i` ) �� ,' ; � ��---•--� .t-�^--- �`r•,.�
,rr, ' 7 _ - -
. � , �, , � -,;t j '' � -�
� ; �� � � ' j \
.� � .y-• / �. �
. , ...+�N ' 1 � � 1 / �,�•\S ���� . i`
. J , S � / �, � �. � �
/ 1 � � � 1\ %j�I `, /
�� ,`, � 1; � �f � ,,``� ��
. , ' ` �I
. j� �'`'
i � ��,•,� �' , 1y�ti_i
i ' .�1� � //� // ,��/ �.
i
� i .ti-J �• / ��! /' � �•
' / ' , ' ' / �, �/
� y � r
� � �� ' l ,I
i r1' ' � � /.` / %. +) 1 % ^ ��
1` � �I \ ��
�{ i/ /'�''' \�
/ � � • �'-,.7�' . ` ' �..�:� � / ' � % ( i � ,�. l
/ '�-� ��'i �' 1 �-�'�•-. � � �� � �� f;'��, � /
f= �'� / - ` ` � ,
�� �. �%� � �� .� ` Y �L-y �:'
if ' �1�_{-t� �I, •�� �� � ����1 '��
�� '� � � . �r�� � � � � ��"w`
.. : .� 1_ � ;, :, � t, ,' �
s ' \ ' « � ��i � � �
- / / , i � i �.�_:�•ti �4 % ��/ i�^l�� J//
4<�J ' ` — ,�'( ,
1 /� ,t Y—� \�-L. �;�� / �=��. � / f\ 1� `; = � � � ` '`
/ � • � _� ` �y _ ' �- f � -
_ � �' ` '�II 7 � _ �`� � �. '�)�,;/ �� "�,�
r � �, ���� � . � � �� � :
� � i � � �; / i
� ♦ i /' �.
�( i
.�� ••,� � ..l• .`...y \\ � /
� � �" \ 1\ � �����<. � / /
i � / , �` \ ` �:
� ``'`�{'� % " �., ` /
� � � ��'\ / / ` !�j'�i ., �
� ` �.. r
, �� \� ,•��,C� / / r'G=\'�� � �,�j�� y�� ,�;��;
� � /
� ' � . � '✓ l\ �`� jf � � '"`'� �,!i:>(3� _� V� / �� f-i•,.
;i •` �' , r �� `.�/ r� / � ';. =JG:� / \ �
! ` / � . � /rt"!.`�/ v .e~ . �i.��/` � / i�.._ y_�•� �`,\'� \\ �%
� . � ':r•� . . ,
— _—._ ___ -----
-._. __
� _.__... -��... ._ ..
�
SOIL EVALUATION REPORT
� FORM 2: SOIL LOG INFORMATION
a
' PROJECT TITLE: Praine Park SHEET: 1 OF 3
4 PROJECT NO.: 00007 DATE:4/7/QO
PREPARED BY: William W. Pamell, P.E.
SOIL LOG: #A
LOCATION: See Site Plan
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
Double Ring Infiltration Spanaway Terrace
�
4. DEPOSI710N HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
GROUP: Unknown
7. CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
DEPTH: LAYER: Concave,Toe
90" Greater than Bottom of Hole
� 10. �OTENTIAL FOR: EROSION RUNOFF PON�ING
Slight Slow High
11. SOIL STRATA DESCRIPTION: See Following chart
i
12. SITE PERCOLATION RATE: See FSP
I
13. FINDINGS & RECOMMENDATIONS: A double ring infiltration test at 54" below existing
; grade revealed an infiltration rate of 45"/hour. For design purposes, use a rate less than or
j equal to 20"/hour in the C� horizon. Due to high winter water table at 90", infiltration surface
� area•should be located no deeper than 54"below existing grade.
I .
I Soils Strata Description
� Soil Log#A
� Horz De�th Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
A 0"-30" 10YR2/1 VFSaLm <20 <5 <15 1SBK - - - ff 2-6 2
BC 30'-48" 2.5Y4/4 LmVFSa <15 - <10 S.G. ff 6-20 8
i - - -
C� 48"-106" 10YR4/6 VGrC-MSa - - <55 S.G. - - - - >20 20
i
!
I
i
�
;
�
,,
� SOIL EVALUATION REPORT
� FORM 2: SOIL LOG INFORMATION
�
� PROJECT TITLE: Praine Park SHEET:2 OF 3
PROJECT NO.: 00007 DATE:4/7/00
PREPARED BY: William W. Parnell, P.E.
SOIL LOG: #B
LOCATION: See Site Plan
E 1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
r
� Double Ring Infiltration Spanaway Terrace
I
4. DEPOSlTION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
GROUP: Unknown
7. CURRENT WATER 8. DEPTN TO IMPERVIOUS 9. MISCELLANEOUS:
DEPTH: LAYER: Levei
Greater than Bottom of Hole Greater than Bottom of Hole
� 10. �POTENTIAL FOR: EROS�oN RUNOFF PONDING
Slight Slow Minimal
11. SOIL STRATA DESCR(PTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
�
13. FINDINGS & RECOMMENDATIONS: A double ring infiltration test at 96"below�xisting
� grade reveaied an infiltration rate of 76"/hour. For design purposes, use a rate less t�an or
equal to 20"/hour in the C,, C2, or C, horizons.
�i
; Soils Strata Description
�; � Soil Log#B
i
, Horz De�th Co�or Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
, � A 0°-30" 10YR2/1 VFSaLm <20 <5 <20 1SBK - - - ff 2-6 2
C, 30"-80" 10YR4/6 ExtGrC-MSa - - <80 S.G. - - - - >20 20
� C2 80"-120" 10YR4/6 MSa - - <15 S.G. - - - - >20 20
C3 120"-156" 10YR5/1 Ext.Cobbley - - <75 S.G. - - - - >20 20
C-MSa
�
i
i
�
i
'1
�
1
,
l
� ; SOIL EVALUATION REPORT
, FORM 2: SOIL LOG INFORMATION
;
� PROJECT TITLE: Prairie Park SHEET:3 OF 3
�; PROJECT NO.: 00007 DATE:4/7/00
PREPARED BY: William W. Pamell, P.E.
SOIL LOG: #C
LOCATION: See S(te Pian
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
` Double Ring Infiitration Spanaway Terrace
�
" 4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
� GROUP: Unknown
e
u
" 7. CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
DEPTH: LAYER: Level
Greater than Bottom of Hole Greater than Bottom of Hole
10. POTENTIAL FOR: EROSIOrv RUNOFF PONDING
' Slight Slow Minimal
11. SOIL STRATA DESCRIPTION: See Foilowing chart
12. SITE PERCOLATION RATE: See FSP
� ..
; 13. FINDINGS & RECOMMENDATIONS: A double ring infiltration test at 96 below existing
; grade revealed an infiltration rate of 160"/hour. For design purposes, use a rate less than or
; equat to 20"/hour in the C� horizon.
i
Soils Strata Description
�, � Soil Log#C
Horz Depth Color Texture %CL °oORG CF ST$ MOT IND CEM ROO <X> FSP
A 0"-30" 10YR2/1 VFSaLm <20 <5 <25 1SBK - - - ff 2-6 3
C, 30"-156" 10YR4/6 ExtGrC-MSa - - <70 S.G. - - - - >20 20
I '
i
i
i
I
�
i
i
r
i
�
� (Abbreviations)
�
�
;
Textural Class Structure Grades of Structure
�
Gravell - Gr Granular -Gr Stron - 3
Sand - Sa Block - Blk Moderate - 2
Loam - Lm Plat - PI Weak - 1
Siit - Si Massive - Mas
" Cla e - CI Sin le Grained - SG
� Coarse - C Sub-An ular Block - SBK
Ve - V
Extremei - Ex
Fine' - - F
Medium - M
induration & Cementation
,
j Weak -.Wk
f Moderate - Mod
� Stron - Str
j Mottles
i1 Letter Abundance 1st Number Size 2nd Letter Contrast
; Few - F Fine - 1 Faint - F
' Common - C Medium - 2 Distinct - D
' Man - M Coarse - 3 Prominent - P
, i
i �
�
i
� ROOtS
! 1st Letter Abundance 2nd Letter Size
Few -f Fine -f
Common - c Medium - m
Man - m Coarse - c
j
i
(f:ltextlformslsoil.tbl)
I
I ,
I
I
I
i
't
!
PRAIRIE PARK
DOUBLE RING INFILTRATION TEST
" Test Date : 4/7/00
�
Completed By : William Pamell, P.E.
� � SCA#00007
�
G
c Special Note : Pre-test not nessary due to coarse texture of soils.
s
c DOUBLE RING INFILTRATION TEST RESULTS
I Test Hole#A (Test run 54" below Existing Ground Surface )
Start Sto Ela sed Time Total Dro Infiltration Rate
( Min ) Min ) ( Min ) ( Inches ) ( In/Hr)
! 0 10' 00" �0 g
10'QO" 19' 30" 9' 30" 6
19' 30" 29' 00" 9' 30" 6
' 29' 00" 38' 00" 9' 00" 6
38' 00" 46' 00" 8' 00" 6
46' 00" 54' 00" 8'00" 6
54' 00" 1 h 2m 8' 00" 6 45
���� i Special Note : Pre-test not nessary due to coarse texture of soils.
DOUBLE RING INFILTRATION TEST RESULTS
Test Hole# ��
B (Test run 96 below Existin ro
G und Surface
` 9 )
Start Sto
I I Ela sed Time
Total Dro Infiltration Rate
I ; Min ) Min ) ( Min ) ( Inches j (In1Hr)
,I i o 2� 15�� 2� 15'1 6
2' 15" 5� 30�� 2� 45�� g
5' 30" 9' 00" 3' 30" 6
9' 00" 12' 15" 3' 15" 6
12' 15" 15' 00" 2' 45" 6
' 15' 00" 18' 30" 3' 30" 6
18' 30" 22' 15" 3' 45" 6
22' 15" 25' 45" 3' 30" 6
25'45" 29' 15" 3' 30" 6
29' 15" 33' 00" 3' 45" 6
33' 00" 36' 30" 3' 30" 6
36' 30" 40' 30" 4' 00" 6
40' 30" 44' 30" 4' 00" 6
44' 30" 49' 00" ' "
4
30
6
49' 00" 53' 15" 4' 15" 6
53' 15" 57' 45" 4' 30" 6
57' 45" 1 h 02m 30s 4' 45" 6
1 h 02m 30s 1 h 07m 15s 4' 45" 6 76
i
1
I
I
�
i
' , i
e �
s
�
PRAIRIE PARK
DOUBLE RING INFILTRATION TEST
Test Date : 4/7/00
� Completed By : Wiliiam Parnell, P.E.
SCA#00007
Special Note : Pre-test not nessary due to coarse texture of soils.
DOUBLE RING INFILTRATION TEST RESULTS
Test Hole#C (Test run 96" below F�cisting Ground Surtace)
Start Sto Ela sed Time Total Dro Infiitration Rate
.
; ( Min ) ( Min ) (Min ) tnches) ( In/Hr)
� �� � .,
0 2 00 2 00 6
2' 00" 4' 15" 2' 15" 6
4' 15" 6' 15" 2'00" 6
6' 15" 8' 15" 2' 00" 6
8' 15" 11' 00" 2'45" 6
11' 00" 13' 00" 2' 00" 6
13' 00" 15' 00" 2'00" 6
15' 00" 16' 45" 1'45" 6
16' 45" 19' 00" 2' 15" 6
I,, � 19' 00" 21' 00" 2' 00" 6
21' 00" 23' 00" 2' 00" 6
; 23' 00" 25' 00" 2' 00" 6
25' 00" 27' 15" 2' 15" 6
�' I 27' 15" 29' 30" 2' 15" 6
' ' 29' 30" 31' 45" 2' 15" 6
I 31'45" 33' 45" 2' 00" 6
! 3 � �� , �� , ��
I � 3 45 36 00 2 5
1 6
! 36' 00" 38' 15" 2' 15" 6
! � 38' 15" 40' 30" 2' 15" 6 160
I
i
�
� ..
�
. - -..._. , / . � .
, , ',�,- 1�,� / .
�,, / , � .
�r� � �',. / . '
��r ' , ��j , � .
�`` , � '/ � ,/ / _ �
!� / i�/ . f _ £ _ -
� / � / � -
� Q�� 5� •
i � � / �
k / '�%� � � �. .
� �`,�n�`L . 'y°��"�` �,y"�' ^� �, ►�
, / 'y :� 3
/ //'� / , /19� \ v��, �,
� , � Mi
/ / + F, � � � �'�Y
� � ,/', �"1� � ` O � � .
r �� �.h ►� /
� �' , � � �
�, / / y ,,
� �7Gj a0 // �h
'/ � • � �
�
/ . -
� / , ` � � ;
�� / � ' �� �
� � . '� ' � �`'� .
� � � � /
✓ �. '
�
� ��^`1 -- _. ,
� \p `.1 � _.� �� �/
i ��—�,``._-T— � �i
/ - '��� ���'�/ %
- - / ,
_ , 0�'8�, 9,��, - ,�.��
. , -� �
. � ,- .
� � ,
i '� �'
, � � ,� �� \\ _ -
��, � , . ,,
,�
,, .
,� ,
,
. ,
;
� . - -.-,
.
I ; �,
. , ,
� ; —' ___ � .__ _ _ _
"� r��" , 3 q.0 "
� `�� '� � � 4 \.` /
/
APPENDIX A-6 -
AQUA-SWIRL DATA
�#
Aqua-SwiriTM Concentrator
� Stormwater Treatment
<: Introduction
�: System Operation
�� Retrofit Appiications
�- Installation
� Buoyancy
� Traffic Loading
� Inspection and Maintenance
� Aqua-Site Worksheet
� Aqua-SwirlT"' Sizing Chart
�. Aqua-Swirl T"'Sample Detail
� Aqua-Swirl TM'Specifications
f�44.
1
ze '��
a
��a���;��
►�i.l�,,;:
- '"''t`1�1+•�
�ij � ��.
K C}`='�S�
O y
��„•���,��. .A` �:�'
1 ��k�.1�',�+t�'+e.i '�� . , �,,,r.
�a.a.y�'=�._ � , �«. -
�� . 'R, �, 5:; .,� - ,.�
"' �
�� . ' • 1�t„t:,a,� `,, '� +� ,,x �W ��x ^`�
,:
�\� - � >� � ` �.���
5 � t
� � � ���
�� �� :� � � � �� �� �r
�,��' •�R� �� a; °�'��� �i> � a �.� t� � ¢v r Ax k�
.�'. .�,_ � �} �-�" � ' 1 � �_. �3u. r`' .,�e�
'f��''*`� .'E`� �'-�.� �'f't=�+ .�# ,� �� i:: �� a.... . �_� � �.�- ��i � .: � ,� rr �r6.a
�"t 3 °�.( 6" � 'f ".�{�y�'� �s i p. � -.� y}.
� �'�� ` *` } } •.�- 9 .f'f('� � �J`° '�a'�i,;�, "� a* � �".�*1*�` �� ��
�Y`�iL"_ ;L�4 e ��" , � I `Ed ,,�y1�F�. ' y� y;�.A*$ �,'p.yrt�' �, +!q 3
. d��Y.._.- !" ) t�s'"'� �'�'' �a`: � � y,r � .'�p �� ��it�i�'. ^+;��€"` �s%i,a�' �� ; t }�' �-j� �+�ir �"�s .}i'4;,�?
-.> s� h ' r d a"�,n"`a tl'�±. � . Y. r�
T
�.�ti� - � ' �Z.,l Y�� 'h L ,JM.f ..'M A�Ln _ � �
,�' '�'�'�C'rn} M` �+ ,' -`� � ` r" j �w , '� ��� � . '" e y� � .,���
� ... } ,,�� `�,s 'i� . �'� �� r.�� t A" "�" { � �� f �Ft u�
t, t��� � . �..�� Y. � ���3: � 'b4. .' 47 rS� � f M
w S' t k , y�v f�, :t 'k .� . ��y� • s ' f � . '� � �° � .
�'
I�:�.^�S "1� 1 :. a � ti".., �. .. e�....a,, � g '�.w„,� .�.:� r a ; � ���� i: r��. J�„•.
6 . �,A S3 •x 1 . • +'4 ' :. 4'°� � ! r.t,p+' 's 1 .. w � � k z�`' '�'1'aII r� .,w��
}.'y�� � � '�`^•r"'Y,,� �� �.•� {� r . ."� �f � ..�r' �'�r:,;�� r,� �.,•� '�:"�'�., �.- �� ��� ���sa �'�
'; -} � ` �'� ����� - ��;;�.
�*i�h.'.
���y c�iC���`-y1+.F� `k� rqj r,y.1 � �?�.«. ,,�• � � �' �^ ;,�a(.� y�..w� $ ,� '�Y_ " �P�
?� -_ �i �`�1l.�i A '� ... i . }�. y;�� .•}� i �.� f4't� :�:"l
� �-�'T f: a3."" � d �j. .=r x y «��. .aF �YM � �S�
���� � ..,�F{ � , 4{" � N �Y? � '� '�� f�q, k ��`��.6`�'A'� �',� b���� ri
t
����, � . �' ,w a�v' ; �s �. � �'° r a7c2+�' �'� I�''��i ;�. � � �� ... y K{ ,��
4�j, � �-.
�`�-"s. sr �! ;. t b°+- + �� n +A�7 t : a. �i;� �, R
ti��q� f :;.+, ` n �"; i�gp '�' y s' a`l"m �,4� i�.'� t,,,. x.-����' +` ; ,�.�
v tiT-y . .'_ . .+ . � � S` '� v ..`�4tt.�di ?g:... ..
.��uA J.1� fi A ; 4{, . If Y .. L�wi '�•r { . „ � � �e
�[*�",�. A� .��"'14� s r� �� 9 1� i i �e i� "� -r x�:�*`�'� `&+3�.�'Pw4 ���..��'�� �. � ... x .+.�.� ^iR ,i,/ :<. t"F�9as .
��-.����`���7.� . v�Y�'lx����,�� ,:t � -a: " t ��.:j`� „�* i�os ,,�„��"�S;�i�., ���ky��'�' �^ .� �r�. : '� �.:� `, �; w�� ,��,�.t`,��: .
x
i ht. �� .. � > � F'� 7P� a �•.
- . .
� k'���1� .�'..� �t s _... : . .�w ... .�.:,.�.'r i ,aF. .�:++c �u�-r � � _ � �.�- �
' .�. �� . . � _.......... ... ,....�.,...-,.,.,.�..�,�,.�� ��
(' .; ,� ��` �a � �;:+ � - �'K�r�.�' [ . +r� ;,.
t t . � �
�� ` . . .a. � ..s-�}a'! �,. K
��� c 1'�YN}� ��13��� ^^�`da { j A:' v .' _ � .... � , {i� f .R
� � 4 `1 ,-�� � �� s� �t .i 'b' s -� 2 � ti Y�� .
.��,ti�' �� '.. fi�` . . _._ �a $ �+e+�w �,5 �d+� . �'z��''� . k,J y�y •
��C. rw= � ..�� a �"�;,:—.. 5-„+` �,y.� i � at:� �
�Y '�,.� �°r'�'`�: �.. _ ... s 4a�.r 't +�. *"�' �, r�
_j•�; i �"` = x" w.K V�,t s -.�, ' •
'�f�E�(,�i��''. , �• � . '..'�-`�, -v•... �`��w ,y� �'r„_: a �i� .� a � '��a
l�'' i1�� ` .'. .--"" ,_,:,;� .`��� g���� ��. , �' . _y.{� t�.
�kr � n
ro:, ,_, t �J '"&st.�,� ��,,������-a�--r*" �
� :. 'is.i" � ry ... .. ` . .� � i�iwf P �!�/ y��yrl
� , �
-4 RR � !�: ^,"+"rti^ �.4"..�*aa „ �, :
n 1
�.� �-�. � �....�, „� . �, ?� ' '
� r.�
�...� . ..- . �:y' .�..rVfr°` � btn..� ''f--c. -« ..., �.} �
f
. "n�ru..N-+4';Mf4'lt�t .. ;w,'� `" �.> .""' R..w-... �� .���„
. � �
�ii�r�
_..�. : . �yN
..
�° . 1 �. .�:���
_ .,: , . . _,. _�-.
�.., __:��.� __ .,�
�' ■ �� TM
�
��
STO R M WATE R TR EATM E NT S O LUTI O N S
Table of Contents
AQUA-SWIRLTM 2
STORMWATER TREATMENT SOLUTIONS 2
System Operation Z
Custom Applications 4
Retrofit Applications 4
Installation 5
Buoyancy 5
Traffic Loading 6
Inspection and Maintenance 6
Aqua-Site Worksheets 7
Aqua-Swirl•'"Sizing Chart (Eng/ish) g
Aqua-SwiriTM Sizi�g Chart (Metric) g
� Aqua-SwirITM Sample Detail Drawings 13
i Aqua-SwirlT"'Specifications 15
! General
15
� Scope of Work 15
' Materials 15
Performance 16
; Treatment of Chamber Construction 16
INSTALLATION 1�
i Excavation and Bedding 17
Backfill Requirements lg
I' Pipe Coupiings 18
I� DIVISION OF RESPONSIBILITY lg
� Stormwater Treatment System Manufacturer 18
Contractor 1 g
SUBMITTALS ' - lg
QUALITY CONTROL INSPECTION 19
�
� 2733 Kanasita Drive, Suite B . Chattanooga, Tennessee 37343
Phone (888) 344-9044 . Fax (423) 826-2112
www.aauashieldinc.com
I
t'���'F� i :? �. -. _ tl _ . �_
�� Aqua-SwirITM
� �
� Stormwater Treatment System
The patented Aqua-Swirl'"'Stormwater E ��
Treatment System provides a highiy effective � � �
means for the removal of sediment, � �
floating debris, and free oil. Swirl """'"" __ _ _ _
technology, or vortex separation, is a �� `� _��� � ���. Y,x ��
proven form of treatment utilized in ;w, � �*�� .{ �W
' the stormwater industry to accelerate -}' ��"� � << �� �<�.;�
gravitational separation. Independent � � � ` '�����
� . .�R �� �'
� university laboratory performance ----�- " �
evaluations have shown the Aqua-SwirITM ��`,��.;G � ` ,� :-��- "
achieves a TSS (Total Suspended Solids) fy��:� � "` �`
��� <.-A ���. �*'
r e m o v a l o f 9 1% c a l c u l a t e d o n a n e t �� �r ���A
annual basis. See the "Performance and ��= �-,,� ���;<
; Testing"Section for more detai/s '� � z �_ �'�
i �� ,, -�.�# ,,.:M..= ��" �;:
Each Aqua-SwirlT"' is constructed of
lightweight and durable materials, eliminating the need for heavy lifting
equipment during installation. Inspection and maintenance are made easy, with
oversized risers that allow for both examination and cleanout without entering
the chamber.
�
�
� System Operation
The Aqua-Swir1T"', with a conveyance flow diversion system, provides -full
treatment for the most contaminated "first flush", while the cleaner peak storm
flow is diverted and channeled through the main conveyance pipe. Many
regulatory agencies are in the process of establishing "water quality treatment
flow rates" for specific areas based on the initial migration of pollutants into the
storm drainage system.
�
_
- li . _'��i,,l. .,.
"s'�"' v _ . „ �y�,._ �.,.,—�
The treatment operation begins , �,' x�`�. � '� ; �,}:�
when stormwater enters the a�� � �� . ' � .
A qua-SwiriTM throu gh a { � yf '���= 1 ` + � ��
�? � -u. - S..'�°�.' .•a''�'4 ,g+°.._; 4��ti
tangential inlet pipe that ' ;''" ° � °�� *{�, �'�
x � � ¢�
produces a circular (or vortex) { ` ` �. A '� � .:�
; flow pattern that causes ° ;, �� '��-� _ ,; � � ` ��. �� �
i contaminates to settle to the : �- ���"� � .. c� �.��`�Y �'� ���
'� ' �' r ,� r., !
; base of the unit. Since '_� .. � # ��
I stormwater flow is intermittent : ►;r � � ;� � t#' �,,'�� �
by nature, the Aqua-SwirITM �����_ {� ' ,_z,��� `
retains water between storm P M `'�� �~ ���`�� `
!r,�� R'1 iy_ �`dkk-[�'-} ,�
� events providing both "dynamic � V��. *'�;���� '��� ��� �} �
;�' �:. ;"`�
� } � �,�„ _ �� i
I and quiescent" settling of solids. � � r ;- �.�. �,� ,�
�-���,.
The dynamic settling occurs j ., Y '. _ �-�`� , �w{�
during each StOf�'1 event WhI�E Floatable debris in the Aqua-SwirlTM
the quiescent settling takes place
between successive storms. A combination of gravitational and hydrodynamic
drag forces encourages the solids to drop out of the flow and migrate to the
center of the chamber where velocities are the lowest, as shown from extensive
j CFD modeling. See "Performance and Testing"for more
details
A large percentage of settleable
� �
solids in stormwater are �� ��=���� �, �W, " �< � ��,� �� �.; �
«�.�;a�'°�:�, �'
re orted to be small and "� A , � �����'�� �` �`
P .� .�,�.,s.. �,.;���.��..._�=_.��.�_ � ,�
have low settling ` �:° ��'�'"""� '
_-� ��...
—_.�._ - :,
velocities. �
.�
� Therefore, � �������° °�
.�r��.
the volume � � ��°A� ��?
of water �Ut�et � � �
retained in '" � - � ' " � � .�
the Aqua-SwirITM ` '�"�` _ �"r Inlet
provides the quiescent settling � ��, A�� ;
� .
that increases performance. ' ��,' ' �� >
Furthermore, due to finer ; �
sediment adhering onto larger i , � �
particles (less than 200 F
microns), the larger particles ` F
� settle, rather than staying ������ ��' ,
suspended in the water. Sediment Storage ` �
�, ~ �
� ��� � �_��,, ��.� ,
�.� �`�'�g� �; ,� ",�`" ,� �� �° �
�. �
� ..,.,4,�� �r,..,� +° x �t �.�' �� ;��- ti a�a.
i y �.:�,�, _:�s����`;
i
3
The treated flow then exits the Aqua-SwirlT"' behind the arched outer baffie. The
top of the baffle is sealed across the treatment channel, thereby eliminating
floatable pollutants from escaping the system. A vent pipe is extended up the
riser to expose the backside of the baffle to atmospheric conditions, preventing a
siphon from forming at the bottom of the baffle.
As recommended by the Center for Watershed Protection and several
municipalities, the Aqua-Swir1T"" can also operate in an offline configuration
providing full treatment of the "first flush." However, this orientation requires the
installation of additional manhole structures to diverge the flow to the Aqua-
SwirlT"' for treatment and conveyance back to the existing main conveyance
storm drainage system.
t
,
-.- Custom Applications
�I, -__ , ,�:. The Aqua-SwirITM system can
�-- ���� "��j �--� �� be modified to fit a variety of
�������� � � � �' ���'� � � purposes in the field, and the
''3 , "" � �� a : { angles for inlet and outlet lines
�� '� �
��° ��F f *.� _ �� " - ° =�' can be modified to fit most
,
� ` � `���''""`���+ a p plications. The photo on the
� �
��I j,,.,�u` _-�,�y�.�,"�,,,.ar -`. .�:a�s." Y�#" --- �k� A.,�. 1'.;.,:
_ . � �"''r �� s�" y�� ° � left demonstrates the flexibility
�,�., § ,y -• w��-= �,� y'';;' of Aqua-SwirlT"^ installations.
i _ ��YS t -" , ':� ._ ;�,� � a���. t � `. ;. Two Aqua-SwirITM units were
'� �� � ��� ' �".�� �"� � placed side by side in order to
�§���, {��k�„� •'•?' Ck�, ��^wjY.N�+�qkt
�.� .�,,� �y � treat a high volume of water
�� �� �� "� ��°i'�� ��� � �` "���`� � while occupying a small amount
� - . :��:� .
�` � � `r'��=::'` • r of space. This configuration is
Custom designed AS-9 TYnin,Aqua-Swirl'" an example of the many WdyS
AquaShieldTM can use _our
products to adapt to a variety of applications.
�.� .
-�— Retrofit Applications
The Aqua-SwirITM system is designed so that it can easily be used for retrofit
applications. With the invert of the inlet and outlet pipe at the same elevation,
the Aqua-SwirITM can easily be connected directly to the existing storm
conveyance drainage system. Furthermore, because of the lightweight nature
and small footprint of the Aqua-SwirlT`", existing infrastructure utilities (i.e.,
wires, poles, trees) would be unaffected by installation.
4
�
� .
— Installation
The Aqua-SwirITM system is designed and fabricated as a modular unit with no
moving parts so that no assembly is required on site. This facilitates an easy
installation of the system.
.�
Since all AquaShieldT"' systems are fabricated from '�� � � �
��
high performance materials, the Aqua-SwirITM is �;
lightweight, and can be installed without the use of �(',
heavy lifting equipment. Lifting supports or cables `� ` "r
are provided to allow easy offloading and ��,_..__ `�
installation with a trackhoe. Compared to concrete n � �, �';
systems, using an Aqua-SwirITM can significantly �*��- k �'
.� �., �'�
reduce installation costs. _�� '. ��� "�',-�
4< 1
� Yy" f
� x� . ,.
In addition, manufactured stub-outs for the inlet � �,�:� r;f ���- �'
and outlet are provided. This allows the contractor ��' ',� ���'�� 1�� � a ��
to simply attach the Aqua-SwirlT'" directly to the � ��
' �..:�
main conveyance storm pipe with rubber couplings. � ' �
T y picall y, an A quaShieldTM re presentative is present ��'�-'-���-� �• -�''=' '�
on-site to assist in the installation YOC25S. 1'he Aqua-SwirlTM installed using
I p a trackhoe
Buoyancy
All Aqua-SwirITM systems are supplied with an octagonal base plate that extends
a minimum of 6 inches beyond the outside diameter of the swirl chamber. The
; function of the extension on this base plate is to provide additional surface area
! to counter any buoyant force exerted on the system. The forces created on the
'� base plate by the weight of the surrounding fill material offsets the buoyant force
generated within the system. If needed, concrete can be poured directly onto'the
base plate to provide additional resistive force. The AquaShieldTM engineering
�� staff can provide buoyancy calculations for your site-specific conditions.
�
'
li
i
�
,
I
5
�
Tra�c Loading
.��„���" �'. ��; � " When installed in traffic areas, the system wili
�`�';� ' � be designed to withstand H-20 loading. In
. � � :; � R ,�
'', order to accomplish this, a reinforced concrete
��� � �� ��� � �� � �� pad shall be poured in place above the
��--�=-- - --- . ��.:.
,� :� ,�,. system.
«�;; a � � a;�
� ri .�' See Ifie '7nstallation and Fabrication"section
� I `� F x� � for sample concrete pad detai/s and further
�� '� details on installation.
Concrete pad protects the Aqua-SwiNTM
from impact loading
�
� .
� Inspection and Maintenance
�,=�l����" Inspection and cleanout of the Aqua-SwirITM is simple. The
i ;.� .� � � chamber can be ins ected and maintained com letel
: �t ,. P P Y
,__ from the surface. Free-floating oil and floatable debris can
���
be directly observed and removed through the provided
j service access.
�
: Cleanout of accumulated solids is needed when the usable
storage volume has been occupied. The depth of solids
�" can easily be determined using a stadia rod or tape to
� ` �'�� measure the top of the solids pile and calculate the
Sediment i�spection distance to the water's surface.
using a stadia rod
�"';#���
9 � .�,� - .
A vacuum truck can be used to remove the accumulated ��j , i
li sediment and debris. Disposal of the material is typically �'.. 'Y� z
treated in the same manner as catch basin cleanouts ����.' > %�"+
AquaShieldT'" recommends that all materials removed be � ��`=�� �A $_�"' ' � �
' `' ; " ,��,:�
' handled and disposed of in accordance with local and state ��;F �y;� �� � �,,.�
, t
I'� requirements. :,� �. �::- � � . �
����±:�� ^ �
for further detai/s on inspection and c%anout p�ocedures, �;�°Y �`'��--���;
please see the "Maintenance"section. Vacuum truck cleans the
Aqua-Swirl•"
6
,
�I
� ti ' i;; i . �.. , - )j .r,;;.,
� �
�- Aqua-Site Worksheets
Aqua-Site worksheets are provided as an example of the information that
AquaShieldTM wili need to customize an AquaSwirlTM to a specific work site.
• 1 completed example
• 2 b/ank worksheets
�
.
i
;�
�
',
-
7
i
I
. ,M AquaShieidT"", Inc.
A���S h i e i d�+ Z�33 Kanasita Drive,Suite B • Chattanooga,TN 37343
STORMWATER TREATMENT SOLUTI�s Phone: (888) 344-9044 • Fax: (423)826-2112
; ��� �� �: l�;i ��_ , ;,�� www.Aqua5hieldInc.com
Aqua-Site Worksheet
Project Information Specifier Information
Project Name: ��,/F.,��pyr� Designer's Name: (��.���//nc
) ��f.� �.r.
Location(Clty,scace�: AnyTAM7, V�7`i Design Firm: �'I/ncE�.Y7��.�1�
r.�� ..y
Site Use(circfe one): Residential Commerical industrial Other Address: 123 M�n�rQ�
Site Pta�Attached: � ves ❑ No c�ty,state,Z+P: AnyTanm, V.�
Pollutants(T55,Floatable
Dehris,oils/9rcase,TG,etc.j: � D�'/$ Phone: A�O D7/1 DODD
�r svi�rc���c�c�
AutoCAD Version: 4 o Fax: 42�cJGCl2��2
Date Submitted: 3/1y� E-mai�: �.��II'��.17
i
!i
Specifications
Design Flow Rate �Inlet/Outlet Pipe R�m Drainaqe Area Info Troffic Loads
Elevation
Unitlabel Water ty
AquaSbield'"� Quali pipe Estimated Is[he system
or Manhole Peak Design Invert Finlsh Grade Incoming Runoff
Model Treatment Z Size(ID) Material Area Groundwater su6ject to H40
Number � Flow Elevation Elevation Slope Coefficient
Flow Type Eleva[io� loadings7
�i� (ch-L/s) (ch-L/s) (in-mm) (R-m) ((t�m) (acres-ha) (%) C (ft-m) Yes a No
A-1 A�6 �3 15.9 18 73&2 R�0° 745�6 �2 0.74 0.9 N/A Yes
Special Site Co�ditions or Requirements:
Ple��p nrovide coov of Site Pians showina orientation_
How did you leam
about Aqua-ShieidT"'? w�te (I)Water Quality Treatment Flow is presribed by laal regulatory agencies to
achieve full treatment of specific amount of stormwater.
(2)Peak Design Plow refers to maximum cal[ulatetl flow for an outfall or
recurrence in[erval(10-yr,25-yr event)
Specifier's Signature: S�ari �l�c2Pi�i� Date: 12-Mar-04
�q��S h i e I d�'M AquaShieldT~, Inc. _
2733 Kanasita Drive,Suite B •Chattanooga,TN 37343
� Phone: (888)344-9044 • Fax: (423)826 2112
STORMWATEi7 TREATMENT SOLUT�ONS
.,�. t-.{i..,,�'���;;.i�.;���� j ;, �; www.AquaShieldInc.com
Aqua-Site Worksheet
Project Information Specifier Information
Project Name: Designer's Name:
Location(City,SWte): Design Firm:
Site Use(circle one): Residential Commerical Industrial Other Address:
Site Plan Attached: � YES � NO Ciry,State,Zip:
Pollutants(TSS,Floatable Phone:
Debrb,oils/qrease,TP,etc.):
AutoCAD Verofon: Fax:
Date Submitted: E-mail:
Specifications
Oesign Flow Rate Inlet/OuNet Pipe R�m Drai�age Area Into Tnifio Loads
Unit Label Elevation
Aqua5hieldT'" Water Quality pipe Estimated [s the system
or Manhole Peak Design Invert Finish Grade incoming RunoN
Number M��� Treatment � Size(ID) Matenal Area Groundwater subject[o H40
Flow� Flow Elevation Type Elevation Slope Coefficient Eievation loadings?
(cn-�/s) (ch-l/s) (in-mm) (ft-m 7 (n�m) (acres-na) (%) C (tt-m) ves or No
Special Site Conditions or Requirements:
Please nrovide coov of Site Plans showina orientation
How did you leam
about A ua-Shieldn'"? (1)Water Qualiry Treatment Flow I5 presribed by laal regulatory agencies to
q achieve full treatment of speciFlc amount of stormwater.
(2)Peak Oesign Flow refers ro maximum calculated Flow for an outfall or
recurrence fnterval(10-yr,25-yr event)
Specifier's Signature: Date:
■ T„ AquaShieldTM,Inc.
Aq u a S h�e I d�+ 2�33 Kanasita Drive,Suite B •Chattanooga,TN 37343
� Phone: (888)344-9044 • Fax: (423)826-2112
STORMWATEF7 TREATMENT SOLUTIONS
t',,:,,��_� ;� ��.Inc . ;�, www.AquaShieldInc.com
Aqua-Site Worksheet
Project Information Specifier Information
Project Name: Designer's Name:
Location(City,State): Design Firm:
Site Use(circle one): Residential Commerical industrial Other Address:
Site Plan Attached: � YES � NO City,State,Zip:
Pollutantr(TSS,Fbatable Phone:
Debris,oils/qreau,TP,etc.):
AutoCAD Version: Fax:
Date Submitted: E-mail:
Specifications
Desi n Flow Rate Inlet OuNet PI e Rim
Unit Label
9 � P Elevafion Drainage Area Info Tnffic Loadn
AquaShieldT'" Water Quality Pipe Estimated Is the s
or Manhote Peak Design invert Finish 6rade Incomin Runoff ystem
Number Model Treatment Size ID Material Area 9
� FlowZ � � Elevation Elevation Slope Coefficient Groundwater subjec[to H-20
Flow TyDe Elevation loadings?
(ch-L/s) (ch-Us) (in-mm) (R-m) (ft-m) (acres-ha) (%) C
(R-m) Yes or No
Special Site Conditions or Requirements:
Please orovide coQy of Site Plans showina orientation
How did you leam
about Aqua-Shieldtt'? (I)water quality Treatment Flow is presribed by I«al regulatory agentles to
achieve full treatment of specific amount of stormwater.
(2)Peak Design Flow refers to mazimum calculated flow for an outfall or
recurrence interval(30-yr,ZS-yr event)
Specifier's Signature: Date•
� A Uc'�-SW11'�TM Sizin Chart En �ish
� q 9 ( 9 )
�
• � . - � - �
.,, � �
s . • � • . - . . . • . . . -
r � � � . . . � .
' ;
`,a���,' '
On(Offline CFDi
AS-2 2.50 $ lZ 1.1 37 10
AS-3 3.25 10 16 1.8 110 20
AS-4 4.25 12 18 3.2 190 32
AS-5 5.00 12 24 4.4 270 45
AS-6 6.00 14 30 6.3 390 65
AS-7 7.00 16 36 8.6 540 90
AS-8 8.00 18 42 11.2 710 115
AS-9 9.00 20 48 14.2 910 145
AS-10 10.0 22 54 17.5 1130 180
AS-12 12.0 24 48 25.2 1698 270
AS-XX Custom -- -- >26 -- --
*Hiqher water quality treatme�t flow rates can be designed with multlple swfrls.
1 The A ua-Swir1T"" Conve ance Flow Diversion CFD rovides full treatment of the
q
) Y
( ) p
"first flush," while the peak design storm is diverted and channeled through the main
conveyance prpe. Please refer to your local representative for more informa#ior�
2) Many regu/atory agencies are establishing "water quality treatment flow rates"for therr
areas based on the initial movement of pollutants into the storm drainage system. The
treatment flow rate of fhe Aqua-SwirlTM' system is engineered to meet or exceed the
loca/ water quality treatment criteria. This "water quality treatment flow rate"
typically represents approximately 90%to 95% of the totaf annual runoff volume.
The design and orientation of the Aqua-FilterTM generally entails some degree of customization. For
a ' TM
ssistance in desi n ' Id
and s ecific sizin usin historical rainfall data lease refer to an A uaShie
9 P 9 9 , P q
re re n �v
p se tati e or visit our website at www.AquaShieldlnc.com. CAD details and specifications are available
upon request.
� A ua-5�/�r�TM SIZICI Chal't Metric
_ q g < �
. . . • , - ,
�
� . • . • � • . . . • � . . -
� � -
� • � . � . . .
OoJOffline CFD'
AS-2 762 203 305 31 140 0.28
AS-3 991 254 406 51 416 0.57
AS-4 1295 305 457 91 719 0.91
AS-5 1524 305 610 125 1022 1.27
AS-6 1829 356 762 178 1476 1.84
AS-7 2134 406 914 243 2044 2.55
AS-8 2438 457 1067 317 2687 3.26
AS-9 2743 508 1219 402 3444 4.11
AS-10 3048 559 1372 495 4277 5.10
AS-12 3658 610 1219 713 6427 7.65
AS-XX Custom -- -- >713 -- --
'Higher water quality treatment flow rates wn be desig�ed with multipie swiNs.
1) The Aqua�SWl/ITM Conveyance Flow Diversion (CFD) provides full treatment of the
"first flush," while the peak design storm is diverted and channeled through the main
conveyance pipe. Please refer to your local representative for more information. •
2) Many regulatory agencies are establishing "water quality treatment flow rates" for their
areas based on the initial movement of po/lutants into the storm drainage system. The
treatment flow rate of the Aqua-SwirlTM' system is engineered to meet or exceed the local
water quality treatment criteria. This "water quality treatment flow rate" typica/1y
represents approximately 90% to 95% of the total annual runoff vo/ume.
The design and orientation of the Aqua-FilterTM' generally entails some degree of customization. For
assistance in design and specific sizing using historical rainfall data, please refer to an AquaShieldTM
representative or visit our website at www.AquaShieldlnc.com. CAD details and speciflcations are
available upon request.
�
V •
� Aqua-SwirITM Sample Detail Drawings
Sample Aqua-SwirITM detail drawings are provided as examples of the type of
systems that AquaShieldTM can offer for a specific work site.
_ __--------- —___
�
- ' .�.�.�.x .. ,�,.,aa••, ., � •-� t
...., ...� �
.,. , ' '
�' .. a+�[CO.��.`r ��t' . •r� '
, S. . „ �1. ;, L �-� �
� .- ` „
_ __.
• . .. n -- _
.: !. _ ___ ,��.
, __ �, �
- ��._.._._.._ ,_.. +. �
:. i --="---r" °" I--�3 J .�"... .�., �h �
o I i ---�,---- I �.�._ _�— '--i 1 �
- 1 �j:� ❑�
1 �� ������— � � ^ 1_! "'�
� .,., � _...,I i_ .j K:_J . � �. {
= � L— �, r 1
� � _ "�� � _ --.� ��
�--- ' - > , ' u;
i ^ " � , ;
� a:
- i ��.».,• i_ 1 �_ � � • ;
' ' � L . -�, �,+,'
. Vwrr� T—.� ' .' S 2. .
; s:�.�.t-�; �=��j ,�6
; �=�_>.,� �.'
�„� '� !•;
'y�"�`nkwY.._�
ti
;, �� . _-_-__kw•sw�l c«Ka,earor�rodd as•2 Cfp se"'O"Ay1 � �
---- -------------ShndardDetail
,v.tis;.•hc . ,. -��
_.� -.�.'i ::.�:,-z . . '
, �
- r ,�.:*�� �� . $pncfdasttry113f �:
_ €, ..a"' :..�.
. . ..__. . ... .
I �
�`_ �
i5°':
� . . .a. .. ...... . . - ,
.
s z
r�a Z'"" 'Et'-� v .
'y�Mw,��...r..�a.w ,_.. .;k
s .
. .,.. . .. . .
,t'. .
'�ek.e xs..
,,y
'�
,:?g
° - _
�
� .'—r--+.:.. � -
- -'i. . :.<r��
.,
�.
�
xta,���„�_.:.._, - �.. .., . , .
' -.
�
��, — �..... '..•�
, .... ..._.
'_'_ ..._,J .
m . �
_._-- "'. . .__ ,..�...
13
I
� *
_�. �9s f��� -�'1
3��� ta N y �=�n �
_�� � ��A g�,�� Z
i � o n� ro �, � �3" v
'�y �y a m
��'o'' � ` „ ° � �^�g �
�;.m;� � � � n o a o� �
I�`.��? � � � � �� �n'� �� Z
��.',-` � � � � .�'y �� :a �
iiW-.� � 3 c 7 � �40 —�
� D � a „ � R1
� r a SC � m
� � � o
c g y $
�G 0 � �
�°0�'� 3 � 1
- ��� �o � S v
��o ��, � n
�� � �
o a O
v� a .-,,.. aJ N —'—'— ' I
i; � � = � !
(9 ; � t'.�:. ,� �
� ) D
�� � �.� 1,,.��.. � n Y p (� g D
�� :...� � �° � �
(° „d ;+,;: 3�;
;� �.... � � �v� D i
Z g �» � �
D �� s »� Y n
�
� -+�. � °� � � o
Q) v�i�p� � Q�� � n�i
>� s „ a
L ^� � y � Y � ~ � 'O
1 �G N�G �
�� C� "o� 3 n r°
� __.__
5� ��...: �va > > ? ^o
� � � L . 01 1 V C � C
n = � ,:�� � � � �, �, � �
O � '' •,'t : � n � � � co �
� � " ' „ � � tO �
n � j �° � l
r� ` ..' •., � �.
r�-r ',_T�- ��
O ����� i
3 ����� �
o ��g� ��
� �g �
rn � � s
D � � �
� �
� _��...�...�. � T
� � i O N � v� �
7
IV � C N
C7 i `�����'? � � `� a
, ' �
�-4�� �
5
� �.. tII66q���,..' j �
� I � '����Qyi"�,.'-.' w �L" � .
r�'h � � ���� �^ � � � O �
� O�� �C_
� � � � � ► � f
n. r"*, �- - --=! _
�, o = _ N
Q � � � WD =
� D N �� � o
-
�-°,- a �
�
� _ - , �
_ a � �
� .�P �.�� �� �� n in F
a n. < � .+ y 3
o - - ,o��� �'�fD—� � ro ° m �c
_ �, , N �n � n = <
� - � o a
� ' � � O �
° a m �
� � N
- O � p
1 � �
A d
o� n
� � 3
Q �
(D �
� N
N �
O.
I
!``. ��`'I i ' J i.,.r �- ., .(�7'- ,.. ,
� ■
�- Aqua-SwirITM Specifications
GENERAL
This specification shall govern the performance, materials and fabrication
of the Stormwater Treatment System.
SCOPE OF WORK
• .The Aqua-SwirtT"" shall be provided by AquaShieldT'", Inc., 2733 Kanasita
Drive, Chattanooga, TN (888-344-9044), and shall adhere to the following
material and performance specifications at the specified design flows and
storage capacities.
MATERIALS
A. Stormwater Treatment System shall be made from High-Density
Polyethylene (HDPE) resins meeting the following requirements:
1) HDPE Material — The HDPE material supplied under this
specification shall be high density, high molecular weight as
supplied by manufacturer. The HDPE material shall conform
to ASTM D3350-02 with minimum cell classification values of
345464C.
2) PHYSICAL PROPERTIES OF HDPE COMPOUND
a) Density - the density shall be no less than 0.955 g/cm3 as
referenced in ASTM D 1505.
b) Melt Index - the melt index shall be no greater than 0.15
g/10 minutes when tested in accordance with ASTM D
1238- Condition 190/2.16.
c) Flex Modulus - flexural modulus shall be 110,000 to less
than 160,000 psi as referenced in ASTM D 790.
d) Tensile Strength at Yield - tensile strength shall be 3,000
to less than 3,500 psi as referenced in ASTM D 638.
e) Slow Crack Growth Resistance shall be greater than 100
hours (PENT Test) as referenced in ASTM F 1473 or
greater than 5,000 hours (ESCR) as referenced in ASTM
D 1693 (condition C).
t5
�tr��i-i'.7rll .�r��_� �riil'fll�l�l�t:�f' �I"�?c1Cmt'71� '7�J�,1�!0(1�
� Hydrostatic Design Basis shall be 1,600 psi at 23 degrees
C when tested in accordance with ASTM D 2837.
g) Color — black with minimum 2% carbon black.
B. REJECTION - The Stormwater Treatment System may be rejected
for failure to meet any of the requirements of this specification.
PERFORMANCE
A. The Stormwater Treatment System shall include a =inch inner
diameter (ID) circular hydrodynamic flow-through treatment
chamber to treat the incoming water. A tangential inlet shall be
provided to induce a swirling flow pattern that will cause
• - sedimentary solids to accumulate in the bottom center of the
chamber in such a way as to prevent re-suspension of captured
particles. An arched baffle wall shall be provided in such a way as
to prevent floatable liquid oils and solids from exiting the treatment
chamber while enhancing the swirling action of the stormwater.
B. The Stormwater Treatment System shall have a sediment storage
capacity of_ cubic feet and be capable of capturing gallons
of petroleum hydrocarbons. The Stormwater Treatment System
shall have a treatment capacity of cubic feet per second
(cfs). The Stormwater Treatment System shall be capable of
removing floating trash and debris, floatable oils and 80% of total
suspended solids from stormwater entering the treatment chamber.
C. Service access to the Stormwater Treatment System shall be
provided via 30-inch inner diameter (ID) access riser(s) over the
treatment chamber such that no confined space entry is required to
perform routine inspection and maintenance functions.
TREATMENT CHAMBER CONSTRUCTION
A. The treatment chamber shall be constructed from solid wall HDPE
ASTM F 714 cell class 345464C. For sizes above 63-inch OD, the
treatment chamber shall be constructed from profile wall HDPE
ASTM F 894 RSC 250 pipe or solid wall HDPE.
B. The bottom thickness of the treatment chamber will be determined
in accordance with ASTM F 1759. Calculations must be provided to
justify the thickness of the bottom.
� '
16
1 �
Fti����3���i': ?I�.j�r,��� _`i_,f��l�;`.�i�c'I� �i�'��fT�r���(' ��:ii1!'l::(1�
C. The iniets and outlets shail be extrusion welded on the inside and
outside of the structure using accepted welding methods.
D. The arched baffle wall shail be constructed from HDPE and shall be
extrusion welded to the interior of the treatment chamber using
accepted welding methods with connections made at 180 degrees
of each end.
E. HDPE lifting supports may be provided on the exterior of the
Stormwater Treatment System in such a way as to allow the
prevention of undue stress to critical components of the
Stormwater Treatment System during loading, off-loading, and
moving operations. The lifting supports shall be constructed as an
. . integral part of the treatment chamber and extrusion welded using
accepted welding methods.
F. The top of the treatment chamber shall be built to the
requirements of the drawings. Deep burial applications shall require
a reinforced HDPE top.
Reinforced concrete pads spanning the treatment chamber will be
required with traffic rated frames and covers when the Stormwater
Treatment System is used in traffic areas. A professional engineer
shall approve the design of the concrete pad and the calculations
must be included in the submittal.
The manufacturer, upon request, can supply anti-flotation/
buoyancy calculations. In addition, typical drawings of the
AquaShieldT'" Stormwater Treatment System with concrete anti-
flotation structures can also be provided. Anti-flotation structure
design and approval are ultimately the responsibility of the
specifying engineer. The contractor shall provide the anti-flotation
structures.
INSTALLATION
A.
Excavation and Beddin
9
The trench and trench bottom shall be constructed in accordance
with ASTM D 2321, Section 6, Trench Excavation, and Section 7,
Installation. The Stormwater Treatment System shall be installed
on a stable base consisting of 12 inches of Class I stone materials
(angular, crushed stone or rock, crushed gravel; large void content,
containing little or no fines) as defined by ASTM D 2321, Section 5,
Materials, and cornpacted to 95% proctor density.
l7
:\,'l�- t3��fli���_� j''� `.�COi f".14'l�r�l� �(�, r�Crl}s'lf ��i]�;_�"�!jf1S
All required safety precautions for the Stormwater Treatment System
installation are the responsibility of the contractor.
B. Backfill Requirements
Backfill materials shall be Class I or II stone materials (well graded
gravels, gravelly sands; containing little or no fines) as defined by
ASTM D 2321, Section 5, Materials, and compacted to 90% proctor
density. Class I materials are preferred. Backfill and bedding
materials shall be free of debris. Backfilling shall conform to ASTM
F 1759, Section 4.2, "Design Assumptions." Backfill shall extend at
least 3.5 feet beyond the edge of the Stormwater Treatment System
for the full height to sub grade and extend laterally into
undisturbed soils.
� -C. Pipe Couplings
Pipe couplings to and from the Stormwater Treatment System shall
be Fernco°, MissionT"' or an equal type flexible boot with stainless
steel tension bands. A metal sheer guard shall be used to protect
the flexible boot.
DIVISION OF RESPONSIBILITY
A. Stormwater Treatment System Manufacturer
The manufacturer shall be responsible for delivering the
Stormwater Treatment System to the site. The system includes the
treatment chamber with debris bafFle, inlet and outlet stub-outs,
lifting supports, 30-inch ID service access riser(s) to grade with
temporary cover(s), and manhole frame(s) and cover(s).
B. Contractor
The contractor shall be responsible for preparing the site for the
system installation including, but not limited to, temporary shoring,
excavation, cutting and removing pipe, new pipe, bedding, and
compaction. The contractor shall be responsible for furnishing the
means to lift the system components off the delivery trucks. The
contractor shall be responsible for providing any concrete anti-
floatation/anti-creep restraints, anchors, collars, etc. with any
straps or connection devices required. The contractor shall be
responsible for field cutting, if necessary, and HDPE service access
risers to grade. The contractor shall be responsible for sealing the
pipe connections to the Stormwater Treatment System, backfilling
and furnishing all labor, tools, and materials needed.
I8
;'�_;u�3S'r,�,�ld�. � r,,,;:;;;r�_,� x , � ' �;;�i r�
C�,r � rr=�.?,`.���,C >. �..i �r��
SUBMITTALS
The contractor shall be provided with dimensional drawings; and when
specified, utilize these drawings as the basis for preparation of shop
drawings showing details for construction and reinforcing. Shop drawings
shall be annotated to indicate all materials to be used and all applicable
standards for materials, required tests of materials, and design
assumptions for structural analysis. Shop drawings shall be prepared at a
scale of not less than �/a inch per foot. Three (3) hard copies of said shop
drawings shall be submitted to the specifying engineer for review and
approval.
QUALITY CONTROL INSPECTION
A. Materials
The quality of materials, the process of manufacturing, and the
finished sections shall be subject to inspection by the specifying
engineer. Such inspection may be made at the place of
construction, on the work site after delivery, or at both places. The
sections shall be subject to rejection at any time if material
conditions fail to meet any of the specification requirements, even
though sample sections may have been accepted as satisfactory at
the place of manufacture. Sections rejected after delivery to the
site shall be marked for identification and shall be removed from
the site at once. All sections, which are damaged beyond repair
after delivery will be rejected; and, if already installed, shall be
repaired to the specifying engineer's acceptance level, if permitted,
or removed and replaced entirely at the contractor's expense.
B. Inspection
All sections shall
be inspected for general appearance, dimensions,
soundness, etc.
C. Defects
Structural defects may be repaired (subject to the acceptance of
the specifying engineer) after demonstration by the manufacturer
that stron and ermanent re airs will
be made. The s eci in
9 P
P P fY 9
engineer, before final acceptance of the components, shall carefully
inspect repairs.
19