Loading...
20130325 Additional Language Memo SR 09112013 Tami Merriman From: Stephanie Ray Sent: Wednesday, September 11, 2013 12:26 PM To: Tami Merriman Cc: Grant Beck Subject: Stormwater paragraph for SEPA CUP SW Yelm 1A Attachments: Stephanie Ray.vcf Additional language related to the stormwater treatment section. Please review and let me know if ok. The proposed project will have stormwater facilities installed in accordance with the DOE Stormwater Management Manual for Western Washington (SWMMWW) and the City of Yelm's municipal code. All requirements that are applicable to this project will be met. Stormwater runoff from proposed impervious areas will be collected via catch basins and on-site storm pipe and conveyed to a stormwater detention pond for flow control. The proposed detention pond will be sized using the Western Washington Hydrology Model (WWHM) to match pre-developed flows using a continuous simulation model. It is assumed that this project will not create pollution-generating impervious surfaces since the site will restrict vehicular access to maintenance staff only. The site will be infrequently used by maintenance and therefore is not considered "subject to vehicular use" according to the definition in SWMMWW Volume I, Section 2.3. The proposed building will have roofing composed of inert, non-leachable material and therefore wilt not be considered a pollution-generating impervious surface. Therefore, since the project does not propose any pollution-generating impervious or pervious surfaces, it is anticipated that minimal water quality facilities will be required. Ste�han:re Ra}� �it�;%�t'�tzlm F'rajE�t Man��er (3ct�1)�5S-��i� ';„k �t�ph�nierti ci,y�lm,;���.u� 1�?5 Y�Im r����enu�'r�dest Y�ln7r�=�'A '3�5�� Unit�d�t�tes��f�,n�erir_a v,,s�,,�,,,,�,�i,u�lm.s,asa.us 1