Loading...
20120188 Email from KPRR 09232013 Karen Bennett From: Grant Beck Sent: Monday, September 23, 2013 9:30 AM To: Karen Bennett Subject: Fw: Palisades West Booster Pump Site/Building Layout Attachments: C-1 - SITE PLAN.PDF Karen, would you forward to spr for consideration this wednesday? Connected by DROID on Verizon Wireless -----Original message----- From: Clint Pierpoint <Clint.Pierpoint @kpff.com> To: Grant Beck <grantb @ci.yelm.wa.us> Cc: Ryan Johnstone <ryanj @ci.yelm.wa.us>, &apos;Dennis Groff&apos; <dennisg @hdfowler.com>, &apos;Ron Deering&apos; <rsndeering @comcast.net> Sent: Mon, Sep 23, 2013 15:46:00 GMT+00:00 Subject: Palisades West Booster Pump Site/Building Layout Good Morning Grant, Attached is the proposed building layout and site plan reflecting all known electrical equipment and pump components. The generator supplier has indicated the clearances provided are acceptable for generator service and maintenance. Please review and let us know if this complies with the City's requirements. Cordially, Clinton D. Pierpoint I Associate KPFF Consulting Engineers 4200 Sixth Avenue, Suite 309 Lacey, Washington 98503 0: (360) 292-7230 M: (360) 790-6832 F: (360) 292-7231 clint.pierpoint @ kpff.com From: Clint Pierpoint Sent: Monday, August 26, 2013 12:36 PM To: Clint Pierpoint; Grant Beck Cc: Ryan Johnstone; 'Dennis Groff'; 'Ron Deering' Subject: RE: palisades pump house lay out Grant, Please disregard the previously submitted building plan. There are additional electrical components required not reflected in this plan. I will provide a revised plan as soon as available. Cordially, 1 Clint Clinton D. Pierpoint I Associate KPFF Consulting Engineers 4200 Sixth Avenue, Suite 309 Lacey, Washington 98503 0: (360) 292-7230 M: (360) 790-6832 F: (360) 292-7231 clint.pierpoint @kpff.com From: Clint Pierpoint Sent: Friday, August 23, 2013 2:09 PM To: 'Grant Beck' Cc: Ryan Johnstone; 'Dennis Groff'; 'Ron Deering' Subject: RE: palisades pump house lay out Grant, Attached is a site plan reflecting the proposed site layout and with a building size to accommodate the electrical equipment. Please let me know if this meets the City's needs. Cordially, Clinton D. Pierpoint I Associate KPFF Consulting Engineers 4200 Sixth Avenue, Suite 309 Lacey, Washington 98503 0: (360) 292-7230 M: (360) 790-6832 F: (360) 292-7231 clint.pierpoint @ kpff.com From: Grant Beck [mailto:arantb ci.yelm.wa.us] Sent: Friday, August 23, 2013 9:26 AM To: Clint Pierpoint Cc: Ryan Johnstone; 'Dennis Groff'; 'Ron Deering' Subject: RE: palisades pump house lay out Submit a site plan so we can take a look at your proposal. Grant Beck, Director of Community Development City of Yelm 1 105 Yelm Avenue West I Yelm, WA 98597 1 www.ci.yelm.wa.us (360) 458-8408 1 (360) 458-3144 FAX I arantb @ci.yelm.wa.us From: Clint Pierpoint [mailto:Clint.Pierpoint kpff.com] Sent: Friday, August 23, 2013 9:06 AM To: Grant Beck Cc: Ryan Johnstone; Dennis Groff; Ron Deering Subject: RE: palisades pump house lay out 2 Grant, I will proceed with laying out a site plan with the required building dimensions. Given the location of the existing pipe stubs and the size of the generator and fuel tank, if we maintain the location of the generator on the east side of the pumphouse,the diagonal clearance from the northeast corner of the generator to the property line will need to be reduced to 2.75 feet. If this clearance is not acceptable the generator will need to be located on the west side of the pumphouse. Please confirm if the reduced clearance is acceptable to the City. Regards, Clinton D. Pierpoint I Associate KPFF Consulting Engineers 4200 Sixth Avenue, Suite 309 Lacey, Washington 98503 0: (360) 292-7230 M: (360) 790-6832 F: (360) 292-7231 clint.pierpoint @kpff.com From: Grant Beck [mailto:arantb ci.yelm.wa.us] Sent: Friday, August 23, 2013 8:07 AM To: Clint Pierpoint Cc: Ryan Johnstone Subject: RE: palisades pump house lay out Clint - We reviewed this at Site Plan Review and will need something a little cleaner for final approval. Nobody saw any issues, but the diagram wasn't easy to decipher. A pdf to myself and Ryan would work. Thanks, Grant Grant Beck, Director of Community Development City of Yelm 1 105 Yelm Avenue West I Yelm, WA 98597 1 www.ci.yelm.wa.us (360) 458-8408 1 (360) 458-3144 FAX I grantb @ci.yelm.wa.us From: Clint Pierpoint [mailto:Clint.Pierpoint kpff.com] Sent: Monday, August 19, 2013 1:15 PM To: Grant Beck Cc: Ryan Johnstone; Tami Merriman Subject: RE: palisades pump house lay out Grant, I think Dennis is looking for the City to approve the building size is adequate to accommodate the electrical equipment, as requested by Parametrix. If the City concurs with the building size, KPFF will work on a site plan that reflects that building footprint. Thanks, 3 Clint From: Grant Beck [mailto:arantb ci.yelm.wa.us] Sent: Monday, August 19, 2013 12:07 PM To: Clint Pierpoint Cc: Ryan Johnstone; Tami Merriman Subject: FW: palisades pump house lay out Clint - The attached was sent directly to Ryan from HD Fowler, but it appears that it is information you need in properly sizing the building. Let me know if you expected the City to do anything with the submission, otherwise, the balls in your court! Grant Grant Beck, Director of Community Development City of Yelm 1 105 Yelm Avenue West I Yelm, WA 98597 1 www.ci.yelm.wa.us (360) 458-8408 1 (360) 458-3144 FAX I grantb @ci.yelm.wa.us From: Dennis Groff [mailto:dennisa @hdfowler.com] Sent: Friday, August 16, 2013 3:29 PM To: Ryan Johnstone Subject: FW: palisades pump house lay out Hi Ryan, The pump building at Palisades is going to be pretty packed. Here's the lay out. ATS, panel board and load center are shown on the second page and would run into the pressure tank if the building were not extended. Dennis Groff I Outside Sales, Pumps HD Fowler Company I Olympia Branch Phone:(360)459-7300 Fax:(360)438-6791 1 Cell:(360)239-8480 From: Dennis Groff Sent: Thursday, August 15, 2013 3:35 PM To: Clint Pierpoint (Clint.Pierpoint kpff.com) Cc: 3OHN SON MADDOX @COM CAST.NET; josh ca pitalelectricwa.com Subject: FW: palisades pump house lay out Clint the cost of the service rated ATS is more than double the standard. We recommend the minimum inside dimensions of the building be 15'x 15'. Bigger would be better if the property could handle it. We'll size the heat pump based on that footprint with an 8' ceiling and then see if the generator can handle the extra load. Thanks. 4 Dennis Groff I Outside Sales, Pumps HD Fowler Company I Olympia Branch Phone:(360)459-7300 Fax:(360)438-6791 1 Cell:(360)239-8480 From: H D Fowler-Olympia [mailto:olycopier(a)hdfowler.com] Sent: Thursday, August 15, 2013 2:14 PM To: Dennis Groff Subject: palisades pump house lay out 5