Loading...
20130323 Prairie Park Stormwater Renovation Redline 1 09252013W 0 LLJ a z a 93 0 N O O Z 9 r O F5 W N I Y mod' a W CL CL 0 L " o° v � �0- EW cs' o� e� i N V C6 0O Ow az PROJECT DATA PARCELS: 64303700301 47410000100 47410000200 47410000300 OWNER /APPLICANT: C SISTERS LLC C/O DOMINIC RIVAS PO BOX 5210 YELM, WA 98597 SITE ADDRESS: 106/130/201 PRAIRIE PARK ST. YELM, WA 98597 PROJECT ENGINEER: SCJ ALLIANCE 2102 CARRIAGE DRIVE SW, BLDG. H OLYMPIA, WA 98502 PH: (360) 352 -1465 CONTACT: JIM GIBSON, PE JIMGOSCJALLIANCE.COM UTILITIES STORMWATER /SEWER/WATER CITY OF YELM: PO BOX 479 105 YELM AVENUE WEST YELM, WASHINGTON 98597 PH: (360) 458 -3244 SOLID WASTE: LeMAY ENTERPRISES, INC., 2910 HOGUM BAY RD. NE OLYMPIA, WA 98516 PH: (360) 923 -0111 ELECTRIC/NATURAL GAS: PUGET SOUND ENERGY - PSE 10885 NE 4TH ST BELLEVUE, WA 98009 PH: (425) 452 -1234 EMERGENCY SERVICE: (888) 225 -5773 CUSTOMER CONSTRUCTION 3130 S 38TH ST TACOMA, WA 98409 PH: (888) 321 -7779 TELEPHONE: CENTURYLINK 625 BLACK LAKE BLVD OLYMPIA WA, 98502 PH: (360) 786 -0190 CABLE: COMCAST 410 VALLEY AVE NW, STE 9 PUYALLUP, WA 98371 PH: (253) 261 -0945 BASIS OF BEARING: WASHINGTON STATE PLANE COORDINATE SYSTEM NAD 83/91 SOUTH ZONE BASED ON THURSTON COUNTY SURVEY CONTROL POINTS 6644 AND GPS2 VERTICAL DATUM: THURSTON COUNTY BENCHMARK GPS # 6644 FOUND CASED MONUMENT AT THE SOUTH 1/4 CORNER OF SECTION 19, TOWNSHIP 17 NORTH, RANGE 2 EAST NAVD 88 ELEV 344.93' 7miwn- C -1 CALL BEFORE YOU DIG THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT (800) 424 -5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION. klfN SEC. 19, T17N., R2E., W.M. PRAIRIE PARK STORMWATER RENOVATIONS FOR THE FAY FULLER BUILDING VICINITY MAP NTS SHEET /DRAWING INDEX d I N,TCM �` \ L SHT No DWG No DRAWING TITLE 1 CV -01 COVER SHEET i e CINEMA `� I �.� `,, �� ' �` � y� 2 GN -01 GENERAL NOTES / i I ( NOTES AND DETAILS �� ! 4 SD -01 TESC, GRADING AND DRAINAGE PLAN c I ,1���``��,�;''j' 5 SD -02 TESC, GRADING AND DRAINAGE PLAN } -_ v� l '�'� `' 6 SD -0.3 TESC GRADING AND DRAINAGE PLAN ` 1 ` \1 ! -L P` J .l -- L___ « {� b� �- `I mss. .° �C§ y FUTURE BLDG / GALLERY A GALLERY B er <( ;`y/ FUTURE '�r'i r �,' y BLDG FAY FULLER.' e.�/ EX HOTEL `y _ Y` ,,BLDG 1 ` i � may,. `•• `` \'� ,r- � ,: � \�'` � \� I ` ,, �`, %' ? y , r� �y CENTER��.��y ` i ( �`7 y may. i�/ `` •� ` \ `�"`` y / \ y `� \` •+y l /�„! � �,�, , GALLERY C e , 0 100 200 ` SCALE IN FEET NOTE TO (CONTRACTOR THESE PLANS WAVE UTILIZED PREVIOUS CONSTRUC1iON DOCUMENTS FROM PRAIRIE PARK AND FAY FULLER PROJECTS AS h BASIS FOR THE INCLUDED DESIGN. SCJ ALLIANCE HAS NOT VERIFIED NOR HAS ADDITIONAL SURVEY INFORMATION BEEN INCLUDED. CONTRACTOR TO VERIFY ALL UTILJn LOCATIONS AND SITE CONDITIONS. PROJECT SITE SE -(-/ / 2 (-/ / (3 BASIS OF BEARINGS WASHINGTON STATE PLANE GRID SOUTH ZONE VERTICAL DATUM NAVD88 BENCHMARK: THURSTON COUNTY HIGH PRECISION NETWORK GPS MONUMENT JGPS2, LOCATED SOUTHEAST OF THE INTERSECTION OF 103RD AVENUE SE AND CREEK STREET SE ELEV.- 341.71 APPROVED FOR CONSTRUCTION BY: Date: Development Services Engineer APPROVAL EXPIRES: 241 f� 0 Z M w z W J oO _ z rr^^ LL VJ w ".." 0 > CIL Li U Lu Lu 1 -L Z U IL IL SEAL ,DWARD C' � OF WA %P �P 0 " 2 z � � w az010 GISTER G1 .10 N AL DES" J IBSON DRAWN BY: - L HURTADO APPROVED BY- J GIBSON AUG 2013 490.03 DRAWING FILE No: 490.03 -CV -01 DRAWING No: CV -01 SHEET No: 1 OF s AW1 `? 3 x'013 LAY . (14 O Ln 0 0) Z W U z W Q u°, z U 3 N Q Ln ao2 W 2 0 ° (n �Mw J C) "z Z = a L, '\ V` -j W W J in mL' 3tDZ �, M U0�°� U Qa V ; cc cc U N O N Z M w z W J oO _ z rr^^ LL VJ w ".." 0 > CIL Li U Lu Lu 1 -L Z U IL IL SEAL ,DWARD C' � OF WA %P �P 0 " 2 z � � w az010 GISTER G1 .10 N AL DES" J IBSON DRAWN BY: - L HURTADO APPROVED BY- J GIBSON AUG 2013 490.03 DRAWING FILE No: 490.03 -CV -01 DRAWING No: CV -01 SHEET No: 1 OF s AW1 `? 3 x'013 LAY . .16 Y n. W d' a a M 0 L O v v, I �- EW m� 0 M � N U o °a= �i az SCJ ALLIANCE GENERAL CONSTRUCTION NOTES: 1. ALL WORK, WORKMANSHIP AND MATERIALS FOR THIS PROJECT SHALL MEET OR EXCEED THE PROJECT SPECIFICATIONS, CITY OF YELM STANDARDS AND MAY INCLUDE REFERENCES TO THE MOST CURRENT WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION. IF THERE IS A CONFLICT BETWEEN THE SPECIFICATION TYPES, THE MOST RESTRICTIVE REFERENCE SHALL BE ADHERED TO. 2. ALL GOVERNMENTAL SAFETY REGULATIONS SHALL BE STRICTLY ADHERED TO INCLUDING OSHA AND WISHA AND WASHINGTON DEPARTMENT OF LABOR AND INDUSTRY. 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DULY NOTIFY THE CITY IN ADVANCE OF THE COMMENCEMENT OF ANY AUTHORIZED WORK OR TO SCHEDULE REQUIRED INSPECTIONS. ANY REQUIRED INSPECTION TEST WILL BE PERFORMED AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR MAY BE REQUIRED BY THE CITY OF YELM TO PROVIDE SECURITIES BY THE CITY ENGINEER PRIOR TO COMMENCING WORK. THE CITY ENGINEER SHALL RELEASE SECURITIES UPON SATISFACTORY COMPLETION OF THE REQUIRED WORK OR ANY PREVIOUSLY SPECIFIED STIPULATIONS RELATED TO THE REQUIRED WORK. 5. NOT USED 6. THE APPROVAL OF THESE PLANS BY THE CITY OF YELM DOES NOT RELIEVE THE CONTRACTOR OR DEVELOPER OF THE RESPONSIBILITY TO COMPLY WITH THE REQUIREMENTS OF OTHER GOVERNING AGENCIES. 7. CAUTION - NOTICE TO CONTRACTOR THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON PREVIOUS PROJECT DESIGN PLANS. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. CONTRACTOR TO CALL 1- 800 - 424 - 5555 48 HOURS PRIOR TO PLANNED EXCAVATIONS. 8. THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISTING CONDITIONS. THE EXISTING CONDITIONS SHOWN ON THIS PLAN SHEET ARE BASED UPON PREVIOUS PROJECT CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING FIELD CONDITIONS PRIOR TO BIDDING THE PROPOSED WORK IMPROVEMENTS. IF CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER OR OWNERS REPRESENTATIVE. 9. EXISTING UTILITIES ARE SHOWN FOR REFERENCE ONLY. THE CONTRACTOR SHALL VERIFY EXACT LOCATION, DIA, LENGTH, CONDITION, PIPE TYPE, SLOPE AND VERTICAL AND HORIZONTAL ALIGNMENT OF THE EXISTING ALIGNMENT OF THE PROPOSED POINT OF CONNECTION PRIOR TO CONNECTION AND REPORT ANY DISCREPANCIES TO ENGINEER PRIOR TO CONSTRUCTION. 10. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL OBTAIN ALL NECESSARY LOCAL, STATE, AND FEDERAL APPROVALS AND PERMITS. 11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A COPY OF THE APPROVED PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS AT THE CONSTRUCTION SITE AT ALL TIMES. 12. A PRECONSTRUCTION MEETING SHALL BE HELD WITH THE CITY OF YELM PUBLIC WORKS DEPARTMENT PRIOR TO THE START OF CONSTRUCTION (360) 458 -8406. 13. NOT USED. 14. CONTRACTOR TO MAINTAIN EROSION CONTROL FACILITIES IN ACCORDANCE WITH DRAINAGE DESIGN MANUAL FOR THE CITY OF YELM, THURSTON COUNTY EROSION CONTROL MANUAL, DEPARTMENT OF ECOLOGY STORM WATER MANUAL AND AGC WATER QUALITY MANUAL 15. THE CONTRACTOR SHALL SAFELY MAINTAIN TRAFFIC AND CONTINUOUS ACCESS TO PRIVATE AND /OR PUBLIC PROPERTY. 16. CONSTRUCTION SIGNING AND TRAFFIC CONTROL SHALL BE PER THE CURRENT COPY OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 17. THE ROADS DESIGNATED AS CONTRACTOR ROUTES WILL BE USED BY CONTRACTORS A,4n THE GENERAL PUBLIC (ALONG PUBLIC ROADS). THE CONTRACTOR SHALL NOT INTERFERE WITH OTHER VEHICLE TRAFFIC AND SHALL YIELD TO EMERGENCY VEHICLES ALONG ANY OF THE PUBLIC ROADS. THE CONTRACTOR SHALL PROVIDE ALL FLAGGING, SIGNING, LIGHTING, ETC REQUIRED BY THE CITY OF YELM, THURSTON COUNTY, OR THE STATE. THE CONTRACTOR SHALL OBEY ALL VEHICULAR WEIGHT AND SPEED LIMITS. PERIODIC SWEEPING OF ROUTES SHALL BE DONE AS NEEDED SO ROUTES ARE KEPT FREE OF DEBRIS AT ALL TIMES. 18. ANY DAMAGE ALONG THE CONTRACTOR ACCESS/HAUL ROUTES DUE TO THE CONTRACTOR'S USE SHALL BE REPAIRED IMMEDIATELY. AT THE COMPLETION OF THE PROJECT, ALL PAVEMENTS AND SURFACES ALONG THE ACCESS ROUTES SHALL BE RESTORED TO THE ORIGINAL CONDITIONS. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO THE HAUL ROADS DUE TO HIS/HER OPERATIONS. THE CONTRACTOR SHALL COORDINATE AND MEET THE CLEANING AND REPAIR REQUIREMENTS SET BY OTHER PUBLIC AGENCIES FOR USE OF THEIR ROADS FOR CONSTRUCTION RELATED WORK. 19. ALL VEHICLES AND EQUIPMENT SHALL BE KEPT WITHIN THE WORK AREAS ESTABLISHED FOR THAT WORK SHIFT UNLESS TRAVELING TO OR FROM THE SITE. UNDER NO CIRCUMSTANCES SHALL VEHICLES BE PARKED OR EQUIPMENT BE STORED OUTSIDE OF THESE AREAS. 20. OTHER CONSTRUCTION PROJECTS MAY OCCUR NEAR THE PROJECT SITE AND MAY BE IN PROGRESS CONCURRENT WITH THE PROJECT. THE CONTRACTOR SHALL COOPERATE AS NECESSARY AND NOT INTERFERE OR HINDER THE PROGRESS OR COMPLETION OF WORK BEING PERFORMED BY OTHER CONTRACTORS. 21. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO COMPLETE THE WORK SHOWN ON THESE DRAWINGS AND TO OBTAIN ACCEPTANCE BY THE CITY OF YELM AND THE PROJECT OWNER. 22. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL 'PRE CONSTRUCTION' STATE OR BETTER. 23. DRIVEWAY ACCESS AND UTILITY SERVICE TO EXISTING HOMES OR BUSINESS SHALL BE MAINTAINED AT ALL TIMES. CALL BEFORE YOU DIG THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT (800) 424 -5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION. SEC. 19, T17N., R2E., W.M. CITY OF YELM GENERAL NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH CITY OF YELM STANDARDS, AND THE MOST CURRENT COPY OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL IN ACCORDANCE WITH MUTCD. PRIOR TO DISRUPTION OF ANY TRAFFIC, TRAFFIC CONTROL PLANS SHALL BE PREPARED AND SUBMITTED TO THE CITY FOR APPROVAL NO WORK SHALL COMMENCE UNTIL ALL APPROVED TRAFFIC CONTROL IS IN PLACE. 3. ALL CURB AND GUTTER, STREET GRADES, SIDEWALK GRADES, AND ANY OTHER VERTICAL AND /OR HORIZONTAL ALIGNMENT SHALL BE STAKED BY AN ENGINEERING OR SURVEYING FIRM CAPABLE OF PERFORMING SUCH WORK. 4. WHERE NEW ASPHALT JOINS EXISTING, THE EXISTING ASPHALT SHALL BE CUT TO A NEAT VERTICAL EDGE AND TACKED WITH ASPHALT EMULSION TYPE CSS -1 IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. THE NEW ASPHALT SHALL BE FEATHERED BACK OVER EXISTING TO PROVIDE A SEAL AT THE SAW CUT LOCATION AND THE JOINT SEALED WITH GRADE AR -4000W PAVING ASPHALT. 5. COMPACTION OF SUBGRADE, ROCK, AND ASPHALT SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. 6. SUBGRADE INSPECTION SHALL BE PERFORMED BY AN APPROVED TESTING FIRM AND FORMS SHALL BE INSPECTED FOR LINE AND GRADE BY AN ENGINEER BEFORE POURING CONCRETE. 7. CERTIFICATION AS TO CONFORMANCE SHALL BE PROVIDED TO THE CITY PRIOR TO ACCEPTANCE OF WORK,. 8. THE CONTRACTOR /DEVELOPER SHALL FURNISH AND INSTALL ALL PERMANENT SIGNING. SCJ ALLIANCE GENERAL EROSION CONTROL NOTES: 1. THE CONTRACTOR SHALL FOLLOW EROSION CONTROL PRACTICES OUTLINED IN THE WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON AND THE SWPPP. 2. EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS ON THESE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES. NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES SHALL BE ALLOWED. CARE SHALL BE TAKEN TO PREVENT MIGRATION OF SILTS TO OFF -SITE PROPERTIES. 3. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE BEGINNING OF CONSTRUCTION. THE PROJECT ENGINEER AND THE REVIEWING AGENCY SHALL INSPECT AND APPROVE THE INSTALLATION OF EROSION CONTROL MEASURES PRIOR TO BEGINNING CONSTRUCTION. A. INSTALL INLET SEDIMENTATION AS SPECIFIED AT ALL CATCH BASIN LOCATIONS IMMEDIATELY UPON ARRIVAL AT PROJECT /CONSTRUCTION SITE. B. STABILIZED CONSTRUCTION ENTRANCE SHALL CONFORM TO DETAIL ON SHEET EC -02, STABILIZED CONSTRUCTION ENTRANCE. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT ALL INGRESS/EGRESS POINTS TO CONSTRUCTION SITE. 4. ALL EROSION /SEDIMENTATION CONTROL FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL CONSTRUCTION IS COMPLETE AND THE SITE HAS BEEN STABILIZED. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION, MAINTENANCE, REPLACEMENT, AND ADDITIONS TO THE SYSTEM AS REQUIRED BY THE OWNER, ENGINEER, OR THE CITY OF UNION GAP. 5. THE CONTRACTOR SHALL MAKE A DAILY SURVEILLANCE OF ALL EROSION CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES AS REQUIRED. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY BY THE INSPECTOR AND /OR PROJECT ENGINEER. FAILURE TO COMPLY WITH ALL LOCAL AND STATE EROSION CONTROL REQUIREMENTS MAY RESULT IN CIVIL PENALTIES BEING LEVIED AGAINST THE CONTRACTOR. 6. PRIOR TO CLEARING AND GRADING THE CONTRACTOR SHALL PROTECT TREES TO BE SAVED WITH HIGH VISIBILITY FENCING AT THE ROOT PROTECTION DELINEATION OR OTHERWISE PROTECTED AS DIRECTED BY THE ENGINEER, CITY STAFF, OR OWNERS REPRESENTATIVE. CLEARING AND GRADING LIMITS SHALL BE STAKED IN THE FIELD) PRIOR TO EXCAVATION. 7 . ALL STORM DRAINAGE INLETS RECEIVING RUNOFF FROM THE PROJECT DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM. 8. ALL OFF -SITE CATCH BASINS IMMEDIATELY ADJACENT TO THE PROPOSED SITE SHALL BE PROTECTED FROM SILTATION. 9. THE CONSTRUCTION OF TRENCHES (E.G., PIPES, UNDERGROUND UTILITY LINES AND STRUCTURES) SHALL BE SUBJECT TO THE FOLLOWING CRITERIA: A. NO MORE THAN 300 FEET OF TRENCH ON A DOWNSLOPE OF MORE THAN FIVE PERCENT SHALL EE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 10. TRENCH DEWATERING DEVICES SHALL BE DISCHARGED IN A MANNER THAT WILL NOT ADVERSELY AFFECT STREAMS, DRAINAGE SYSTEMS, OR OFF -SITE PROPERTIES. 11. TRACKING OF SOIL, MUD, OR DEBRIS OFF -SITE IS NOT ALLOWED. SOIL, MUD, OR DEBRIS TRACKED ONTO A PUBLIC ROADWAY, SHALL BE REMOVED BY THE END OF THAT WORKING DAY. TO PREVENT THE TRACKING OF SOIL, MUD, OR DEBRIS ONTO PUBLIC ROADWAYS, SWEEPING OR WASHING OF THE VEHICLE'S TIRES MAY BE REQUIRED PRIOR TO ENTERING A PUBLIC ROADWAY. 12. ALL DISTURBED AREAS SHALL BE HYDROSEEDED WITH EROSION CONTROL SEED MIX. INCLUDING BUT NOT LIMITED TO ROADWAY EMBANKMENTS, SHOULDERS, UTILITY EASEMENTS, STAGING AREAS, CONSTRUCTED WETLANDS AND CUT/FILL SLOPES. 13. ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE VEGETATIVE COVERAGE IS COMPLETE. AREAS SHALL BE REPAIRED, RESEEDED, AND FERTILIZED AS REQUIRED. 14. DROP -IN CATCH BASIN FILTERS MAY BE USED IN PLACE OF OTHER STANDARD INLET PROTECTION PRACTICES. THIS INLET PROTECTION TECHNOLOGY CAN BE USED IN SITUATIONS WHERE RIGHT -OF -WAY FLOODING WOULD BE PROBLEMATIC. 15. TO MAINTAIN FUNCTION, THE CONTRACTOR SHALL REMOVE AND CLEAN OR REPLACE FILTERS AFTER EACH STORM EVENT. CONTACT THE JURISDICTION TO DETERMINE ITS ACCEPTANCE OF SPECIFIC FILTER PRODUCTS, PRIOR TO INSTALLATION. 16. NO MATERIAL SHALL BE STOCKPILED ON PAVEMENT WITHOUT AUTHORIZATION FROM THE PROJECT ENGINEER OR OWNERS REPRESENTATIVE WHICH WILL BE CONDITIONAL ON IMPLEMENTATION OF A PROCEDURE TO PREVENT SEDIMENT TRANSPORT. 17. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED OR AFTER THE MEASURES ARE NO LONGER NEEDED. SEDIMENT COLLECTED IN TRAPS, PONDS, OR SILT FENCE SHALL BE REMOVED AND DISPOSED IN AN APPROVED MANNER OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM SEDIMENT REMOVAL SHALL BE PERMANENTLY STABILIZED WITHIN SEVEN (7) DAYS. EROSION CONTROL NOTES: SILT FENCE: 1. FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6 -INCH OVERLAP, AND SECURELY FASTENED AT BOTH ENDS TO POST. 2. POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 30 INCHES). 3. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8 INCHES WIDE AND 12 INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 4. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY -DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE. 5. HE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND 20 INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. 6. WHEN EXTRA - STRENGTH FILTER FABRIC AND CLOSER POST SPACING IS USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF ABOVE NOTES APPLYING. 7. FILTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 8. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. TRAINGULAR SEDIMENT FILTER DIKES: 1. IF THE SLOPE EXCEEDS 10 PERCENT, THE LENGTH OF THE SLOPE ABOVE THE DIKE SHALL BE LESS THAN 50 FEET. 2. ALL DIKES SHALL BE PLACED ON THE CONTOUR AND SHALL BE PLACED IN A ROW WITH THE ENDS TIGHTLY ABUTTING THE ADJACENT DIKE. FILTER MATERIAL SHALL LAP OVER ENDS 6 INCHES TO COVER DIKE TO DIKE JUNCTION; EACH JUNCTION SHALL BE SECURED BY SHOAT RINGS. 3. IN GENERAL, EACH SIDE OF THE TRIANGLE SHALL BE A MINIMUM OF 18 INCHES. 4. NONWOVEN POLYPROPYLENE, POLYETHYLENE OR POLYAMIDE GEOTEX11LE FABRIC MAY BE USED AS FILTER MATERIAL THIS MATERIAL SHALL HAVE A MINIMUM UNIT WEIGHT OF FOUR AND ONE -HALF (4.5) OUNCES PER SQUARE YARD, MUWN BURST STRENGTH EXCEEDING 250 PSI, ULTRAVIOLET STABILITY EXCEEDING 70 PERCENT, AND EQUIVALENT OPENING SIZE EXCEEDING 40. THE FABRIC COVER AND SKIRT SHALL BE A CONTINUOUS WRAPPING OF THE FABRIC; THE SKIRT SHALL BE A CONTINUOUS EXTENSION OF THE UPSTREAM FACE. INLET PROTECTION: 1. PLACE CONCRETE BLOCKS LENGTHWISE ON THEIR SIDES IN A SINGLE ROW AROUND THE PERIMETER OF THE INLET, SO THAT THE OPEN ENDS FACE OUTWARD, NOT UPWARD. THE ENDS OF ADJACENT BLOCKS SHALL ABUT. THE HEIGHT OF THE BARRIER CAN BE VARIED, DEPENDING ON DESIGN NEEDS, BY STACKING COMBINATIONS OF BLOCKS THAT ARE 4 INCHES, AND 12 INCHES WIDE. THE ROW OF BLOCKS SHALL BE AT LEAST 12 INCHES BUT NO GREATER THAN 24 INCHES HIGH. 2. PLACE WIRE MESH OVER THE OUTSIDE VERTICAL FACE (OPEN END) OF THE CONCRETE BLOCKS TO PREVENT STONE FROM BEING WASHED THROUGH THE BLOCKS. USE HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2-INCH OPENINGS. 3. PILE STONE AGAINST THE WIRE MESH TO THE TOP OF THE BLOCKS. USE 3/4 -TO 3 -INCH GRAVEL. 4. PLACE WIRE MESH OVER THE DROP INLET SO THAT THE WIRE EXTENDS A MINIMUM OF 1 FT BEYOND EACH SIDE OF THE INLET STRUCTURE. USE HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 -INCH OPENINGS. IF MORE THAN ONE STRIP OF MESH IS NECESSARY, OVERLAP THE STRIPS. PLACE FILTER FABRIC OVER WIRE MESH. EROSION CONTROL NOTES- cont'd: 3. LOG CHECK DAMS SHALL BE CONSTRUCTED OF 4- TO 6 -INCH DIAMETER LOGS. THE LOGS SHALL BE EMBEDDED INTO THE SOIL AT LEAST 18 INCHES. 4. IN THE CASE OF GRASS -LINED DITCHES AND SWALES, CHECK DAMS SHALL BE REMOVED WHEN THE GRASS HAS MATURED SUFFICIENTLY TO PROTECT THE DITCH OR SWALE. THE AREA BENEATH THE CHECK DAMS SHALL BE SEEDED AND MULCHED IMMEDIATELY AFTER DAM REMOVAL 5. CHECK DAMS SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EACH SIGNIFICANT RAINFALL. SEDIMENT SHALL BE REMOVED WHEN IT REACHES ONE HALF OF THE ORIGINAL DAM HEIGHT OR BEFORE. CONSTRUCTION ENTRANCES: 1. MATERIAL SHALL BE 4' TO 6' QUARRY SPALLS AND MAY BE TOP - DRESSED WITH 1- TO 3' ROC(. (STANDARD SPECIFICATIONS). 2. THE ROCK PAD SHALL BE AT LEAST 12 INCHES THICK AND 100 FEET LONG. WIDTH SHALL BE THE FULL WIDTH OF THE VEHICLE INGRESS AND EGRESS AREA. SMALLER PADS MAY BE APPROVED FOR SINGLE- FAMILY RESIDENTIAL AND SMALL COMMERCIAL SITES. 3. ADDITIONAL ROCK SHALL BE ADDED PERIODICALLY TO MAINTAIN PROPER FUNCTION OF THE PAD. 4. IF THE PAD DOES NOT ADEQUATELY REMOVE THE MUD FROM THE VEHICLE WHEELS, THE WHEELS SHALL BE HOSED OFF BEFORE THE VEHICLE ENTERS A PAVED STREET. THE WASHING SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK AND WASH WATER SHALL DRAIN TO A SEDIMENT RETENTION FACILITY OR THROUGH SILT FENCE. 5. PLACE 3/4 -INCH GRAVEL OVER THE WIRE MESH. THE DEPTH OF STONE SHALL BE AT LEAST 12 INCHES OVER THE ENTIRE INLET OPENING. EXTEND THE STONE BEYOND THE INLET OPENING AT LEAST 18 INCHES ON ALL SIDES. 6. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT, THE STONES MUST BE PULLED AWAY FROM THE INLET AND CLEANED OR REPLACED. EROSION CONTROL BLANKETS: 1. WHERE SOIL IS HIGHLY ERODIBLE, NET SHALL ONLY BE USED IN CONJUNCTION WITH AN ORGANIC MULCH SUCH AS STRAW AND WOOD FIBER. 2. JUTE NET SHALL BE HEAVY, UNIFORM CLOTH WOVEN OF SINGLE JUTE YARN, WHICH IF 36 TO 48 INCHES WIDE SHALL WEIGH AN AVERAGE OF 1.2 LBS/LINEAR YARD. IT MUST BE SO APPLIED THAT IT IS IN COMPLETE CONTACT WITH THE SOIL. 3. NETTING SHALL BE SECURELY ANCHORED TO THE SOIL WITH NO. 11 GAUGE WIRE STAPLES AT LEAST 6 INCHES LONG. TEMPORARY DIKES AND SWALES: 1. SEED AND MULCH SHALL BE APPLIED WITHIN 5 DAYS OF DIKE CONSTRUCTION (SEE VEGETATION). 2. THE UPSLOPE SIDE OF THE DIKE SHALL PROVIDE POSITIVE DRAINAGE TO THE DIKE OUTLET. 3. NO EROSION SHALL OCCUR AT THE DIKE OUTLET. PROVIDE ENERGY DISSIPATION MEASURES AS NECESSARY. 4. SEDIMENT LADEN RUNOFF MUST BE RELEASED THROUGH A SEDIMENT TRAPPING FACILITY SUCH AS A POND, TRAP, OR SILT FENCE AS APPROPRIATE TO DRAINAGE AREA SIZE. CHECK DAMS: 1. THE MAXIMUM SPACING BETWEEN THE DAMS SHALL BE SUCH THAT THE TOE OF THE UPSTREAM DAM IS AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 2. ROCK CHECK DAMS SHALL BE CONSTRUCTED OF 2 -TO 4 -INCH DIAMETER ROCK. THE ROCK MUST BE PLACED BY HAND OR MECHANICAL PLACEMENT (NO DUMPING OF ROCK TO FORM DAM) TO ACHIEVE COMPLETE COVERAGE OF THE DITCH OR SWALE AND TO INSURE THAT THE CENTER OF THE DAM IS LOWER THAN THE EDGES. NOTE TO CONTRACTOR THESE PLANS HIAVE UTILIZED PREVIOUS CONSTRUCTION DOCUMENTS FROM PRAIRIE PARK AND FAY FULLER PROJECTS AS A6 BASIS FOR THE INCLUDED DESIGN. SCJ ALLIANCE BIAS NOT VERIFIED NOR HAS ADDITIONAL SURVEY INFORMIATION BEEN INCLUDED. CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS AND SITE CONDITIONS. APPROVED FOR CONSTRUCTION BY: Date: Development Services Engineer APPROVAL EXPIRES: C/) Lu H Z J Lu Z UJI 0 Z_ L7 m LLI J L=L Q LL_ Q CL L11 CL z OO z Q J w OPOEDVqA 6 0" OF WASyI CjJ� /' -a a 42010 GISTEst p �~ ZONAL J GIBSON DRAWN BY: LHURTADO J GIBSON AUG 2013 JOB No: 490.03 DRAWING FILE No: 490.03 -GN -01 GN -01 2 of 6 N 0 Ln 00 rn Z W ° U Z W L°n Q ZU3N Q I ao2 W �wu `� J in �Mw u- p u `�, z =L,Q '\J V LJJ J 3 N a Z '" 3m o N ID0 0U U wa r W cc a cc w V N 0 N C/) Lu H Z J Lu Z UJI 0 Z_ L7 m LLI J L=L Q LL_ Q CL L11 CL z OO z Q J w OPOEDVqA 6 0" OF WASyI CjJ� /' -a a 42010 GISTEst p �~ ZONAL J GIBSON DRAWN BY: LHURTADO J GIBSON AUG 2013 JOB No: 490.03 DRAWING FILE No: 490.03 -GN -01 GN -01 2 of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n in a z a o: 0 N O i c� z 9 M 9 2 a 0 fn 0 N CnW Cn 3 0 N Y 4 a W o: a 0 Lo0 c j I F- EW 4 o I CALL BEFORE YOU DIG e4 a THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND o i, PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL o UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND Ir LOCATE LINE AT (800) 424 -5555 A MINIMUM OF 48 HOURS PRIOR TO ANY J, z EXCAVATION. SCJ ALLIANCE GENERAL STORM DRAINAGE NOTES: 1. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM ENGINEERING PLAN. THESE RECORDS SHALL BE KEPT ON CONSTRUCTION DRAWINGS AND TURNED OVER TO ENGINEER UPON COMPLETION OIF PROJECT. 2. THE CONTRACTfOR SHALL VERIFY DIA, LENGTH, CONDITION, PIPE TYPE, SLOPE AND VERTICAL AND HORIZONTAL ALIGNMENT OF THE EXISTING ALIGNMENT OF THE PROPOSED POINT OF CONNECTION PIRIOR TO CONNECTION AND REPORT ANY DISCREPANCIES TO ENGINEER PRIOR TO CONSTRUCTION, 3. CONTRACTOR %HALL FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT NECESSARY TO COMPLETE THIS, WORK. 4. STATIONS AND OFFSETS FOR CATCH BASINS ARE CALLED OUT TO CENTER OF STRUCTURE. 5. PIPE LENGTHS ARE CALLED OUT FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6. INSTALL CATCH BASINS PER WSDOT STANDARD PLAN B- 10.20 -01 7. PLAN LOCATIONS OF OTHER UTILITIES ARE DIAGRAMMATIC ONLY. CONTRACTOR TO VERIFY FOR THESE SYSTEM$, VERIFY AND COORDINATE LOCATIONS WITH NEW FACILITY INSTALLATIONS IF NOT WHERE SHOWN ON EXISTING PLANS. SEC. 19, 17N., R2E., W.M. JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS OR EQUIVALENT TO ATTACH FABRIC TO POSTS FILTER FABRIC MATERIAL, 60" WIDE ROLLS, USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2 "x2 "x14 Go MARE FABRIC OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED 12.7 SILT FENCE NTS Please see accompanied Aqua -Swirl specification notes. See Site Plan for actual system orientation. Octagl Pipe coupling by Contractor. 12" long Stub -out by Manufacturer. ) Bollards shall be placed around access riser(s) in non - traffic areas to prevent Inadvertent loading by maintenance vehicles. ;.Cone ebe� • me 2" 2" GRATE.. R - 7 n FRAME TRIM GEOTEXTILE cv I� OVERFLOW BYPASS I i •.���,, �� �\ „ti`s: ` "r�;'ti `�;i.`af �i ..r \!�'`aj�:�;,� ✓/ f' • : ; ` SEDIMENT AND DEBRIS NOTES: 1. PERFORM MAINTENANCE IN =oil II _ u STANDARD SPECIFICATION BURY BOTTOM OF FILTER — MATERIAL IN 4 "X4" MIN TRENCH 4 "x4" MIN TRENCH, PROVIDE 2. SIZE THE INLET DEVICE FOR 3/4" TO 1 -1/2” WASHED 6' -0" MAX FILTERED THE STORM WATER STRUCTURE ROCK OR NATIVE BACKFILL 2 "X2" WOOD POSTS, STEEL WATER IT WILL SERVICE POST SPACING MAY BE INCREASED TO 8' IF WIRE BACKING IS USED FENCE POSTS, OR EQUIVALENT 12.7 SILT FENCE NTS Please see accompanied Aqua -Swirl specification notes. See Site Plan for actual system orientation. Octagl Pipe coupling by Contractor. 12" long Stub -out by Manufacturer. ) Bollards shall be placed around access riser(s) in non - traffic areas to prevent Inadvertent loading by maintenance vehicles. ;.Cone ebe� • me 2" 2" GRATE.. FRAME TRIM GEOTEXTILE OVERFLOW BYPASS ` SEDIMENT AND DEBRIS NOTES: 1. PERFORM MAINTENANCE IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 8- 01.3(15). 2. SIZE THE INLET DEVICE FOR FILTERED THE STORM WATER STRUCTURE WATER IT WILL SERVICE 3. THE INLET DEVICE SHALL HAVE A BUILT -IN OVERFLOW BYPASS i 4. THE RETRIEVAL SYSTEM MUST - .. ALLOW REMOVAL OF INLET TS DEVICE WITHOUT SPILLING THE W • - �' . ' COLLECTED MATERIAL • • •� •'�' • � � =' CROSS SECTION NTS N O Ln W rn RETRIEVAL SYSTEM W 0 GRATE U Z WNQ ZU3� ` Q a 00 — W � (n �^^w pU-U ttJ z : u, Q " J W J ` NLnN OVERFLOW BYPASS Z N q 0 1- m GEOTEXTILE CB FILTER, U U W a PER MANUFACTURER'S r n SPECIFICATIONS V' CC U ISOMETRIC VIEW N ° N NTS INLET PROTECTION NTS Manhole Frame and Rim elevations to match finished Cover by Manufacture 32.0000 OD-� % grade. HDPE risers can be field (See Detail) \ V cut by Contractor. C Swirl Inlet/Outlei 60.0000 I 38.0000 C Place soar amount of Oonorete to wpport and level manhole frame. DO NOT allow manhole frame to rest upon HDPE dw. Arched Baffles 12.0000 Manhole Frame & Cover Detail For Non - Traffic Areas Only NTS Section A -A �d1N� Aqua -Swirl Concentrator Model AS -2 CFD Standard Detail NOTE TO CONTRACTOR THESE PLANS IHAVE UTILIZED PREVIOUS CONSTRUCTION DOCUMENTS FRIOM PRAIRIE PARK AND FAY FULLER PROJECTS AS iA BASIS FOR THE INCLUDED DESIGN. SCJ ALLIANCE IHAS NOT VERIFIED NOR HAS ADDITIONAL SURVEY INFORIMATION BEEN INCLUDED. CONTRACTOR TO VERIFY ALL UTIILITY LOCATIONS AND SITE CONDITIONS. Varies 41.9881 APPROVED FOR CONSTRUCTION BY: Date: Development Services Engineer APPROVAL EXPIRES: C!) Q UJI M Z Q W 0 Z C� Z IZ] _J M W LU J J LL_ Q r li /� /Q LL LU 0- Z OO Z_ a J U-1 �DWARO 4kC' � OF WA N aQ O Q) Z Z P W O tti 42010 FGI ST ER�� \ SjONAL J GIBSON DRAWN BY: LHURTADO APPROVED BY: J GIBSON DATE: AUG 2013 JOB No: 490.03 DRAWING FILE No: 490.03 -DT -01 DT -01 SHEET No: 3 of 6 W 0 z a 0 N 0 a i c� Z M N W 3 O Y a W a _ CL 0 L o v r� 33 a = U EW M o� CV � N U 3 _ o� a+i a'z V(N ,, SEC. 19, T17N., R2E., W.M. - - SID I as �Fp Ak / w ' ,. / \f ----- SD SDI\ - GJ �,' �O -SD - - -- Sp - - -- 1 'w_ --- --- -- ``� O `O - SDp \- - - - SD - a 1 w, ,/ `• -,�- !�� y�` �a ', O�^� \O ,� SD - - - -SD - - - - -SD - - - -S 'W O/ / Y RESTORE CONCRETE �// O CB11 TYPE 1 PLAZA AREA TO �f O/ } (REUSE OR REPLACE AS WARRANTED) -_ 1 x� ' `O N: 592628.10 ORIGINAL GRADES, LIKE < - ' Q E: 1116012.65 - � FINISHES AND SCORE f� ,�� <,_ � ti PATTERNS. '" % SEC. 19, T17N., R2E., W.M. 'SID ............. S7�p ­_4 s7z-p S7ZIP 44� SD-----SD--- _sD( So"-- % W_ w S6 Ilk s X" I - -- .__ -- -. __.�__- -_ _,.� - -_ _. _.- ._._ _...__ __ soy'`` �, `,, ' , 4, 0 10 20 SCALE IN FEET \eslo it 'p Iu Loll CB#2 TYPE I (REUSE OR REPLACE AS C:) WARRANTED) 10 LF 8 P N: 592555.64 4.097. E: 1116149.46 SAWCUT LINE (Typ), RIM: 345.8 - RESTORE PAVING TO IE SW. 343.0 ORIGINAL GRADES,, SEE PLUG EXISTING NORTHWEST PIPE X, PAVING SECTION DETAIL INSTALL DOWN TURNED PVC ELBOW (SEE DETAIL ON THIS SHEET) Av 20' X 10' X 3' x uj INFILTRATION GALLERY 4 N uj SEE DETAIL B THIS SHEET 0#1 10 LF 8m PVC 0 1.0% k "K_ C3 04 C) v LU 1> .0, 0#1 9 AS#2 AS-2 AQUA SWIRL m .00 N: 592549.84 E: 1116138.80 346.70 (MATCH EX FINISH GRADE) i r:r..i=kin Al 1. THE PLAN SHOWN IS REPRESENTATIVE OF THE MINIMUM TESC MEASURES BASED LLJ ON THE FINAL GRADING PLAN. AS CONSTRUCTION OF THESE IMPROVEMENTS TYPE 11 CATCH BASIN OCCUR IT IS EXPECTED THAT THE CONTRACTOR WILL PROVIDE EROSION AND �A SEDIMENTATION CONTROLS AS NECESSARY TO PREVENT OR MANAGE TURBID 8m PVC SD PIPE FLOWS PER THE REQUIREMENTS OF THE CITY OF YELM, THURSTON COUNTY; AND —13—E3-13-13— THE DEPARTMENT OF ECOLOGY. Kl0TPNZ- PROPOSED STORM DRAIN 1. THE PLAN SHOWN IS REPRESENTATIVE OF THE MINIMUM TESC MEASURES BASED LLJ ON THE FINAL GRADING PLAN. AS CONSTRUCTION OF THESE IMPROVEMENTS TYPE 11 CATCH BASIN OCCUR IT IS EXPECTED THAT THE CONTRACTOR WILL PROVIDE EROSION AND U SEDIMENTATION CONTROLS AS NECESSARY TO PREVENT OR MANAGE TURBID 8m PVC SD PIPE FLOWS PER THE REQUIREMENTS OF THE CITY OF YELM, THURSTON COUNTY; AND AS-2 AQUA SWIRL THE DEPARTMENT OF ECOLOGY. W 2. STRUCTURES STATIONED AT CENTER OF STRUCTURE INFILTRATION TRENCH 3. STORM PIPE SHALL BE PVC PER WSDOT/APWA STANDARD SPECIFICATIONS. INLET ;SEDIMENT PROTECTION SILT FE -NCE SAWCUT r'vi.--njLi^ t in I flD DOWN TURNED PVC ELBOW NTS Lu En CD cn 2- WASHED DRAIN ROCK _N IE 342.9 (IN) IE 342.9 (OUT) cn _k SEE DETAIL SHEET DT 01 0 bo in c) woo C4 CD Co e_. ce 0 En ,cgilm CALL BEFORE YOU DIG e4 cl THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND s PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL Q b " UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND 0� c" w- LOCATE LINE AT (800) 424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION. INFILTRATION GALLERY B �� Z, py"14_ I V\ v4'l TO INFILT. GALLERY EN MOUNTED OVER END OF THE INLET BASIS OF BEARING: WASHINGTON STATE PLANE COORDINATE SYSTEM NAD 83/91 SOUTH ZONE BASED ON THURSTON COUNTY SURVEY CONTROL POINTS 6644 AND GPS2 VERTICAL DATUM: THURSTON COUNTY BENCHMARK GPS 16644 FOUND CASED MONUMENT AT THE SOUTH 1/4 CORNER OF SECTION 19, TOWNSHIP 17 NORTH, RANGE 2 EAST NAVD 88 ELEV 344.93' 2' CLASS B • elr%l I A I 'r 0 Ultit; PAVEMENT RESTORATION NTS CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE SURFACE IS BELOW ANY EXISTING FILL MAirERIAL AND 6' BELOW NATIVE SOIL LAYER. ALL CONTAMINATED SOIL HAS BEEN REMOVED BIEFORE INSTALLING NEW STORMWATER GALLERY INFILTRATION GALLERY B NOTE TO CQNTRACTOR THESE PLANS HAVE UTILIZED PREVIOUS CONSTRUCTION DOCUMENTS FROM PRAIRIE PARK AND FAY FULLER PROJECTS AS A BASIS FOR THE INCLUDED DESIGN. SCJ ALLIANCE HAS NOT VERIFIED NOR HAS ADDITIONAL SURVEY INFORMATION BEEN INCLUDED. CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS AND SITE CONDITIONS. MIRAFI 140N FILTER (OR FINISH APPROVED EQUAL) ON GRADE TOP AND SIDES. MIN. 2' OVERLAP. TOP ELEV. 343.5 20' —BOTTOM ELEV. 340.5 CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE SURFACE IS BELOW ANY EXISTING FILL MATERIAL AND 6* BELOW NATIVE SOIL LAYER. ALL CONTAMINATED SOIL HAS BEEN REMOVED BEFORE INSTALLING NEW STORMWATER GALLERY APPROVED FOR CONSTRUCTION BY: Date: Development Services Engineer APPROVAL EXPIRES: M 0 LLJ CL M Ln 00 U LL_ 8m PVC SD PIPE cn C.D Q z W cn P u z :_r cn W n Z g C-V4 MIRAFI 140N FIL-TER (OR 0= U-) -FINISH APPROVED EQUAL) ON TOP �l 2_1 2' WASHED GRADE AND SIDES. MIN.. 2' / � , , I DRAIN ROCK z OVERLAP. uj 10 _J < P, —TOP ELEV. 343.!5 Z L2 0 ,6 �_ IMD to 0 0 U) Yl cc IE 34:255 � cc cc 6 cl= C4 CD BOTTOM ELEV. M0.5 v-, 10, CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE SURFACE IS BELOW ANY EXISTING FILL MAirERIAL AND 6' BELOW NATIVE SOIL LAYER. ALL CONTAMINATED SOIL HAS BEEN REMOVED BIEFORE INSTALLING NEW STORMWATER GALLERY INFILTRATION GALLERY B NOTE TO CQNTRACTOR THESE PLANS HAVE UTILIZED PREVIOUS CONSTRUCTION DOCUMENTS FROM PRAIRIE PARK AND FAY FULLER PROJECTS AS A BASIS FOR THE INCLUDED DESIGN. SCJ ALLIANCE HAS NOT VERIFIED NOR HAS ADDITIONAL SURVEY INFORMATION BEEN INCLUDED. CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS AND SITE CONDITIONS. MIRAFI 140N FILTER (OR FINISH APPROVED EQUAL) ON GRADE TOP AND SIDES. MIN. 2' OVERLAP. TOP ELEV. 343.5 20' —BOTTOM ELEV. 340.5 CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE SURFACE IS BELOW ANY EXISTING FILL MATERIAL AND 6* BELOW NATIVE SOIL LAYER. ALL CONTAMINATED SOIL HAS BEEN REMOVED BEFORE INSTALLING NEW STORMWATER GALLERY APPROVED FOR CONSTRUCTION BY: Date: Development Services Engineer APPROVAL EXPIRES: M �f 0 N 0 CL M Ln 00 M LL_ 0) Q z W P u z :_r cn W n Z g C-V4 > U-) w 2 uo rn J>5 LLj 0 LL / � , , I Z z <40 uj 10 _J < P, Z L2 0 ,6 �_ IMD to 0 0 U) cc cc cc 6 rq �f 0 < CL M Lu M LL_ Lu Q m 0 m 0 U) Lu DW A� RD Of WASH 0 LLJ cl CL M Lu M LL_ U) UJI ej LL 0 m 0 U) Lu DW A� RD Of WASH 0 < cl CL Lu 0 cr_ U) UJI ej LL m 0 U) Lu DW A� RD Of WASH 0 J GIBSON L HURTADO APPROVED BY- I J GIBSON AUG 2013 JOB No: 1 490.03 490.03-SD.02 SD-02 SHEET No: 5 OF 6 42010 GI 10tv F_ L J GIBSON L HURTADO APPROVED BY- I J GIBSON AUG 2013 JOB No: 1 490.03 490.03-SD.02 SD-02 SHEET No: 5 OF 6 Ju 5 W LLJ O Ld z —9 M =D U- V) z 0 A Ix V) P CK U) NC cr_ CL w ix o- n C) 01 CL E o C> i az C3, r SEC. 19, T17N., R2E., W.M. 4/ I/ C3 r *14 FAY FULLER BUILDING 0 EXISTING CB N: 592510.70 0 10 20 E: 1115949.55 > RIM: 346.2 SCALE IN FEET IE S: 340.5 i Pr.pmn No (( ffi_l '11�i G-A A —0-13-0-0— IL M (r-A): 3I0.3 X PLUG EXISTING WEST PIPE ' x 5) INSTALL DOWN TURNED PVC ELBOW v U K (SEE DETAIL ON THIS SHEET) F= Ko 5 7< LLj 0 2' WASHED 0 DRAIN ROCK x, SD ---- / __ SD / ISO, C"- -4 '/Su 12 LF 12" PVC 01.2% r CBJ3 TYPE 1 5 LF 120 PVC 01.0% cr_ _j N: 592499.66 'N t J E: 1115940.64 9 LF 12" PVC 0 1.2% C) RIM: 345.8 IE: 340.36 L 4b, 1 AS13 AS-2 AQUA SIMRL----- b, N: 592496.04 �J E: 1115945.00 A RIM 345.0 (MATCH EX FINISH GRADE) IE 340.31 (IN) IE 340.31 (OUT) 7C, SAWCUT LINE (TYP), RESTORE PAVING TO ORIGINAL GRADES, SEE PAVING SECTION DETAIL _4 '5( 45" X 15' X 4.5' INFILTRATION TREN4H SEE DETAIL IC THIS SHEET CALL BEFORE YOU DIG THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT (800) 424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION. INFILTRATION GALLERY C 15' PROPOSED STORM DRAIN TYPE 1 CATCH BASIN AS-2 AQUA SWIRL INFILTRATION TRENCH INLET SEDIMENT PROTECTI%4 SILT FENCE SAWCUT 8" PVC SD PIPE MIRAF1 14ON FILTER (OR FINISH APPROVED EQUAL) ON TOP GRADE AND SIDES. MIN. 2' 1 OVERLAP. TOP ELEV. 341.2 IE = 340.2 —BOTTOM ELEV. 336.7 CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE SURFACE IS BELOW ANY EXISTING FILL MATERIAL AND 6" BELOW NATIVE SOIL LAYER. ALL CONTAMINATED SOIL HAS BEEN REMOVED BEFORE INSTALLING NEW STORMWATER GALLERY DOWN TURNED PVC ELBOW NTS NOTES: 1 THE PLAN SHOWN IS REPRESENTATIVE OF THE MINIMUM TESC MEASURES BASED ON THE FINAL GRADING PLAN. AS CONSTRUCTION OF THESE IMPROVEMENTS OCCUR IT IS EXPECTED THAT THE CONTRACTOR WILL PROVIDE EROSION AND SEDIMENTATION CONTROLS AS NECESSARY TO PREVENT OR MANAGE TURBID FLOWS PER THE REQUIREMENTS OF THE CITY OF YELM, THURSTON COUNTY, AND THE DEPARTMENT OF ECOLOGY. 2. STRUCTURES STATIONED AT CENTER OF STRUCTURE 3. STORM PIPE SHALL BE PVC PER WSDOT/APWA STANDARD SPECIFICATIONS. BASIS OF BEARING:_ WASHINGTON STATE PLANE COORDINATE SYSTEM NAD 83/91 SOUTH ZONE BASED ON THURSTON COUNTY SURVEY CONTROL POINTS 6644 AND GPS2 VERTICAL DATUM: THURSTON COUNTY BENCHMARK GPS # 6644 FOUND CASED MONUMENT AT THE SOUTH 1/4 CORNER OF SECTION 19, TOWNSHIP 17 NORTH, RANGE 2 EAST NAVD 88 ELEV 344.93' ui Lu En F= Lu CR 3< .1 INFILTRATION GALLERY A NTS TO INFILT GALLERY EN MOUNTED OVER END OF THE INLET NOTE TO CONTRACTOR THESE PLANS HAVE UTILIZED PREVIOUS CONSTRUCTION DOCUMENTS FROM PRAIRIE PARK AND FAY FULLER PROJECTS AS A� BASIS FOR THE INCLUDED DESIGN. SCJ ALLIANCE HAS NOT VERIFIED NOR HAS ADDITIONAL SURVEY INFORMATION BEEN INCLUDED. CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS AND SITE CONDITIONS. M= 12 2' WASHED MIRAFI 14ON FILTER (OR DRAIN ROCK —FINISH APPROVED EQUAL) ON GRADE[ TOP AND SIDES. MIN. 2' OVERLAP. TOP ELEV. 341.2 IE = 340.2 0-11 X z: C'4 0 —BOTTOM ELEV. 336.7 Ln 00 45f CTI CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE uj z 0 z x a, SURFACE IS BELOW ANY EXISTING FILL MATERIAL W 'Ln AND 6' BELOW NATIVE SOIL LAYER. ALL 0 CONTAMINATED SOIL HAS BEEN REMOVED BEFORE > C14 Ln INSTALLING NEW STORMWATER GALLERY w too ou C" J (1) 0 LL; 0 - uz �, _j Z 3� Ln < C ?I- /) < < LL_ 5 Cq Ln CA in Z 3� Ln u0 V V) Lu a- (n cc 0 cc U U) LLJ F_ ri X z: (D —BOTTOM ELEV. 336.7 45f M CONTRACTOR TO VERIFY THAT NEW INFILTRATIVE uj 0 SURFACE IS BELOW ANY EXISTING FILL MATERIAL CID AND 6' BELOW NATIVE SOIL LAYER. ALL Z CONTAMINATED SOIL HAS BEEN REMOVED BEFORE U INSTALLING NEW STORMWATER GALLERY 0 J F- 0 M LL_ 3: < C ?I- /) < < LL_ 0 1 2p—p Neoo W < M 0 uj U) LLJ F_ fij CL 41 2" CLASS B • f Ma A • a - 0 LOM6 PAVEMENT RESTORATION NTS APPROVED FOR CONSTRUCTION BY: Date: Development Services Engineer APPROVAL EXPIRES: �VVVA Ro 4 w k k► 0 0 42010 GI EW10- AV A Sj�NAL I-- — 0 ON J GIBSON DRAWN BY: I L HURTADO J GIBSON AUG 2013 JOB No. 490.03 DRAWING FILE No: 490.03-SD.03 SD-03 SHEET No: 6 OF 6