Loading...
20130320 Plan Checklist 12032013 PLAN CHECKLIST STANDARD ITEMS: WATER, SANITARY SEWER, STORM SEWER, STREET, LIGHTING,AND SIGNALS (� Vicuzity Map (� Legend (APWA Standard Symbols) (y� North Arrow ( Scale Bar ( Datum - Bench Mark Elevation And Location (on all sheets where elevations are referenced) ( Title Block: ( ) Title: APPROVED FOR CONSTRUCTION ( D�ign By: BY: DATE: (� Drawn By: Director of Public Works (� Date: (� Checked By: APPROV,�, ( Signature Approval Block EXPIRES: (see above exarriple): ( Sheet Number of Total Sheets: ( ection, Township and Range (every plan/profile sheet) ( Engineers Stamp (signed and dated) ( Project Tit1e (cover sheet) ( Utility System Map (showing all proposed utilities on one drawing) Revision Block PLAN PORTION STANDARD ITEMS ( Centerline and Stations ( dge of Pavement and Width 'ght-of-Way and Width ( oposed Survey Monumentation Locations and Details ( Sidewalk and Width ( Roadway Sections Existing Utilities (above and below ground) Adjacent Property Lines, Ownership, Parcel Number, and Street Address Identify Street Names, Right-of-Way, Lots ( dentify Match Existing Sheet Numbers and Stations ( Easements, Width and'I�pe ( Define Survey Baselines Stations for Structures Flow Direction Arrows R\Community Development\Forms&Procedures\CivilPlanReview\CivilPlanChecklist.doc PROFILE PORTION STANDARD ITEMS ( Profile Grades (decimal FT./FT.) ( Existing Ground ( Scale (horizontal and vertical) ( Stationing ( Vertical Elevation Increments ( Existing Utilities (if available) M' Detail Sheet ( General Notes SANITARY SEWER Pl View: ravity System) ( ole ( Station Shown at Each Manhole (watch spacing) ( Manholes Numbered ( Manhole'I�pe Designation ( Flow Direction (with arrow on pipe) ( Depth at Property Line and Distance from Downhill Manhole for Side Sewer Distance from Water Lines ( Service to Each Lot ��'. View: (,�/ Manholes Numbered � ( ' Invert Elevation Showing Direction, In and Out (�'�� � Gravity -� ��� Grades Shown (decimal form FT./FT.) slopes, depths ( ) Type of Fipe ( ) Size of Pipe ( ) Length of Pipe (in L.F.) ( ) Existing Utilities Shown STEP SYSTEM ) Pipe Aligrunent, grade and offset, type and size ( I,ocation of water, utilities crossing ( Location of pigging ports ( Location of pressure sustaining valves, check valves, vacuum valves, pressure relief valves, gate valves Trench and restoration details showing depth, bedding compaction requirements R:\Community Development\Forms&Procedures\CivilPlanReview\CivilPlanChecklist.doc ) S tic (STEP)Tank Inverts elevation ( Size, type, location ( Side sewer location ( Electrical hookups ( Alann and controls ( Pump operational characteristics Pump type Detail Sheet ( Sewer General Notes WATER Pl View: System Map (1" = 300� showing existing and proposed with line size, valves, and hydrants E ' ting Utility Conflicts F' res (need horizontal and vertical control) ) Fire Hydrants (at all intersections. See Yelm Fire District #2) Blow-off(at end of line) Vacuum and Air Release Valves When Required ( ees, Crosses, Elbows, Adapters and Valves Need Coupling Type, eter Locations Valves (2 each tee, 3 each cross) ( F� e Department Connection st Blocking Required at all Fittings Including In-Line Valves ( Distance from Sewer ( Service to Each Lot (include open tracts) Pr e Uiew: Existing Utility Crossings ( how Fixtures (tees, crosses, hydrants) ( how Valves and Couplers ( ' e of Watermain ( ngth of Watermain (in L.F.) ( Cover Over Pipe ( Grades (Engineered Design Grade to F.L.) Mi ( Detail Sheet Water General Notes R:\Community Development\Forms&Procedures\CivilPlanReview\CivilPlanChecklist.doc STORM SEWER D ' age and Erosion Control Plan Report ( Cover sheet ) Table of Contents ( ection 1 - Proposed Project Description ( ection 2 - Existing Conditions ( ection 3 - Infiltration Rates/Soils Report ( Section 4 -Wells ection 5 - F�.iel Tanks Section 6 - Sub-Basin Description Section 7 -Analysis of the 100-Year Flood ( ection 8 -Aesthetic Considerations for Facilities ection 9 - Downstream Analysis ection 10 - Covenants, Dedications, Easements ection 11 - Homeowners -Articles of Incorporation ( Project Engineers Certificate ( Facility Suminary Form ( Engineer's Estimate Erosion Control Plan Report ( ) Section 1 - Construction Sequence and Procedure �� ( ) Section 2 -Trapping Sediment � ( ) Section 3 - Permanent Erosion Control and Site Restoration ( ) Section 4 - Geotechnical Analysis and Report / ( ) Section 5 - Inspection Sequence ��j D ' gs and Specification Vicinity map Project Boundaries Sub-Basin Boundaries ( ff-Site Area Tributary to Project ( Contours Major Drainage Features ( Flow Path ( ) Si ap ( Existing Topography at Least 50 Feet Beyond Site Boundaries ( inished Grades xisting Structures within 100 Feet of Project Boundary Utilities ( �asements, Both Existing and Proposed �� ( Environmentally Sensitive Area (� 100-Year Flood Plain Boundary ( , / Existing and Proposed Wells wit�lin 1,200 feet of Proposed � �/ Retention Facility ( ) Existing and Proposed �.tel Tanks Existing and Proposed On-Site Sanitary Systems within 100 Feet f Detention/Retention Facilities ( Proposed Structures Including Roads and Parking Surfaces ( Lot Dimensions and Areas ( Proposed Drainage Facilities and Sufficient Cross-Section and R:\Community Development\Forms&Procedures\CivilPlanReview\CivilPlanChecklist.doc Details to Build ( ) Pl iew- Conveyance System ( Station and Number at each Manhole/Catch Basin ( Manhole/Catch Basin'I�pe and Size anhole/Catch Basin Rim Elevation Flow Direction with Arrow on Pipe/Channel ( 'I�pe and Size of Pipe ( Length of Pipe in Lineal Feet ( ) Pr View- Conveyance System ( Station and Number at each Manhole/Catch Basin Rim Elevation Invert In and Out ( Length of Pipe(in L.F.) Grades(F'T./FT.) ( Design Velocity � ) W aP 't Areas (including Off-Site Contributing Areas) ( rcentage Impervious ( verage Slope ( timated Ultimate Infiltration Rate ( onveyance Date, Identifier (for Reference to Model Output), ngth, Slope, Inverts erland Flow Paths and Distances Soil'I�pes ( Spot Water Surface Elevations, Discharges and Velocities for the Design Event ( ) Er ' n Control Drawing ( Soil Types ( Locations of Soil Pits and Infiltration Tests ( Construction Entrance Detail ( ilt Fences and Traps ( ulching and Vegetation Plan ( learing and Grubbing Limits ( Existing and Finished Grade ( D tails and Locations of all BMPs Recommended ( cation and Details of Temporary Secliment Ponds ( ) M ' ance Report ( e uired T�pe and Frequency of Long-Term Maintenance ( ntification of Responsible Maintenance Organization ( requency of Sediment Removal ( Cleaning of Catch Basins ( Vegetation Control R:\Community Development\Forms&Procedures\CivilPlanReview\CiviiPlanChecklist.doc () Annual Cost Estimate of Maintenance ( ) Construction Inspection Report M' Detail Sheet Storm General Notes STREET Pl iew: ( low Direction Arrows at Curb Returns Showing Grade ( pot Elevations on Curb Returns ( Station PC, PT, PI, and Intersections ( urve Information Delta, Radius, Length and Tangent ( CR and ECR (Begin Curb Radius, End Curb Radius) ( Identify All Field Design Situations ( ) 'I�pical Sections ( ) Pavement Marl�ng Details With Station and Offset ( Sidewalks ( Driveway Entrances ( ) Station ( ) Width, Material (AC, PCC) Driveway Type ( Curb Ramps - Detail and'I�pe () Public Transit Facilities and Bus Stops Pr iew: ( ertical Information VPI, BVC, EVC, AP, Low Point, High Point ( Sho rades in Decimal Form with (+ or-) Slope ( S e Elevated Roadways ( Detail - Show Transitions ( Special Detail Showing Gutter Flowing Adequately M' c Detail Sheet ( Street General Notes (� AASHTO Street Design Worksheet, With Soils Report, if Applicable ILLUMINATION AND SIGNALS ( ) Lighting �( ) Station and Offset to Fixtures ��� �� ( ) Pole'I�pe, including Manufacturer �� $,��� � ( ) Mounting Height, Arm Length, Anchor Bolt Size and Pattern �� ��l ( ) Power Source � �,,�(y ( ) Wire size, Type, Conduit �` �t, ��� � R:\Community Development\Forms&Procedures\CivilPlanReview\CivilPlanChecklist.doc ( ) Line Loss Calculations ( ) Luminaire Type, Lamp Wattage ( ) Location of Service Disconnects (5% Max. Voltage Drop from Source to Farthest Luminaire) ( ) J-Box Location (include station and offset) () Signals (Follow WSDOT Specs Unless Otherwise Required by the City) ( ) Station and Offset to Signal Base, Cabinets, Ped. Lead, Loops, etc. ( } Wiring Schedule () Signal Heads and Mounting Assembly () Detection Loops ( ) Opticom ( ) Control Cabinet, Size and Layout ( ) Power Source ( ) Conduit ( ) Wire Size and Type ( ) Construction Notes ( ) J-Box Schedule ( ) Pedestrian Signal'I`ype with Push Button ( ) Controller'I�pe, Configuration, and Wiring Schematic Misc. ( ) Detail Sheet ( ) Lighting General Notes ( ) Line Loss Calculations MISCELLANEOUS ( ) Easements and/or Dedication Deeds ( ) Contract Documents/Specifications Additional Items: ( ) Sheet Index (on title sheet if required) ( ) Field Verify Note on DWG - E�ose Connection Points And Verify Fittings 48 Hours Prior To Distributing shut-Down Notices ( ) Call Before You Dig Note ( ) Signing-Temporary And Permanent ( ) Channelization ( ) Location of Cluster Mailboxes R:\Community Development\Forms&Procedures\CivilPlanReview\CivilPlanChecklist.doc