20130323 Transmittal 12112013 ��
SCJ �LLIANCE
CONSULTING SERVICES
TRANSMITTAL
To: Karen Bennett Date: December 11, 2013
City of Yelm
PO Box 479
105 Yelm Avenue W
Yelm, WA 98597
From: Jim Gibson, PE
Project Name: Prairie Park Stormwater System Revisions SU Project#: 0490.03
for Fay Fuller Building
We are transmitting the following materials:
♦ 1- Revised Construction Drawings
Comments:
Enclosed for your use are the revised construction drawings for the Prairie Park Stormwater System
Revisions for Fay Fuller Building.
� �
�'}`'✓�.o�, �_�' �i.�
Ji Gibson, PE
� J Alliance
N:�Projects�490 Margoret C/opp�q90-03 Proirie Park Stormwater System Revisions for Foy Fuller Building�Correspondence�To�T-2013-1211 Bennett.doc
2102 Carriage St SW, Suite H, Olympia,WA 98502
360.352.1465 � info(�a scjalliance.com � www.scjalliance.com