20130186 Permit Pkg 11262013 �oF THEA,� City of Yelm Permit ►vo.: 20130186
'
� � Community Development Department Issue Date: 17/26/2013
(Work must be completed within 180 days)
Building Division
Phone: (360)458-8407
L
"".`«'""°" Fax: (360)458-3144
Applicant:
Name: YELM PROPERTY DEVELOPMENT Phone: 360-458-0544
Address: P O BOX 2950
YELM WA 98597
Property Information:
Site,4ddress: 16663 GREENLEAF AVE SE Owner: YELM PROPERTY
DEVELOPMENT
Assessor Parcel No.: 84070010100 Subdivision: WILLOW GLENN Lot: 101
Contractor Information:
Name: YELM PROPERTY DEVELOPMENT Phone: 458-0544
Address: DENNY BALASCIO
P O BOX 2950
YELM WA 98597
Contractor License No.: YELMPDL00302000 Expires: 2/20/2011
Project Information:
Project: NEW RESIDENTIAL BUILDING
Description of Work: LOT 101, PLAN 8321
Sq. Ft. per floor: First 1078 Heat Type(Electric,Gas, Other): GAS
Second 1359
Third
Garage 381
Basement
Fees:
Item Contractor Fees
NEW RESIDENTIAL BUILDING YELM PROPERTY DEVELOPMENT $16,490.59
MECHANICAL SUNSETAIR INC $ 68.75
PLUMBING TOP NOTCH PLUMBING INC $ 125.00
TOTAL FEES: $16,684.34
ApplicanYs Affidavit: OFFICIAL USE ONLY
I certify that I have read and examined the information contained within the application and know the same
to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of #Sets of Prints:
Yelm regulations including those governing zoning and land subdivision,and in addition,all covenants,
easements and restrictions of record. If applying as a contractor, I further certify that I am currently Final Inspection:
registered in the State of Washingto
Signature (��� � Date I( Z, �3 Date:
Firm BY'
YELM COMMUNITY SCHOOLS
PQ BOX 476
YELM WA 98597
Clerk: Gerber
Terminal : �
��G�a pt: 231207(Rsprint)
Manual Receipt:
YELM PROPERTY Cit� of Y�lm
YELM PROPERiY (36 ) 458-8402
YELM PROPERTY, DEVELOPMENT LLC
� REC#: 00145088 11/?.6�2p13 10:35 AM
OPER: CO TERM: 001
11/26/'1013 10:21 AM REF#: 6464
Q._ty_�.Item�,y_� Price TRAN: 33.0000 BUILDING PERMITS
1 CPF MITIGATION 3U15.00 2d13a186 16,6B4.34CR
MTTiGATION YELM PROPERTY DEVELOPMENT
07-015 Willow Glen #3 Lot tf11 BLD-R�g63 GREENLEAF AUE SE
MECH 16�490.59CR
P� 68,75CR
Subtotal; 3015.Q0 125.00CR
Total; 3015.00 T��p��En: 16,684,34 CHECK
�FP!IED; 16,684.34-
Check 3Q 15.0[�
6461 CHANGE: 0,00
Change qu�: O.QO
REPRINT R�CETPT
THANK YOU
���/�t�
�
CITY OF YELM
RESIDENTIAL BUILDING PERMIT APPLICATION FORM
Project Address: ��2,�3 �r�+� Lf�� �Z�' ,�C�- Parcel#:
Subdivision: ����6M/`����+�n..- Lot#:� Zoning; l�- �o
I�'New Construction ❑ Re-Model/Re-Roof/Addition ❑ Home Occupation Sign
o Plumbing ❑ Mechanical ❑ Mobile/Manufactured Home Placement ❑ Other
Project Description/Scope of Work: .s F � ���-'ti� �'�'Z �
Project Value: a7��.���•
Building Area (sq. ft) 15t Floor 0? SF2"d Floor/.3$ SFGarage �SSI Sf Deck
Basement ��f:. . ::�� Patio�`� . ` �`
T.° ¢ •
#Bedrooms� #Bathrooms.3 Heatin . GAS OTHER or ELECTRIC (Circle One)
A�e there any environmentally sensitive areas located on the parcel? /Lr4 If yes, a
completed environmental checklist must accompany permit application.
sllfL.pIIVG OWNER NAM�: r'l �o r eJc c�s�v�nt �
ADDRESS S`�' EMAIL
CITY � STATE a ZIP $S ? TELEPHONE 3G0 S d
ARGHITECTlENGINEER � �'S '��+'� ;c fn LICENSE#
ADDRESS '� � : � '`EMAIL
CITY L.A�� I,�oo STATE G� ZIP TELEPHONE �53� Y- 3'd -
GENERAL CON7RAGTOR C. TELEPHONE
ADDRESS EMAIL
CITY STATE ZIP FAX
CONTRACTOR'S LICENSE# EXP DATE CITY LICENSE#
PLIJMBING CONTRACTOR ToD IVo�'� TELEPHONE e��
ADDRESS �Q�c _ EMAIL
CITY�Grr���r STATE Gr ZIP_ $57 FAX
CONTRACTOR'S LICENSE# EXP DATE CITY LICENSE#
MECHANICAL COI�TF+ACTOR �nr� �- i�( TELEPHONE i1i�S�0 " �l �
ADDRESS c� � M EMAIL
CITY��� ST �_ZIP �} ��� FAX
CONTRAC R'S LICENSE# EXP DATE CITY LICENSE#
Copy of mitigation agreement with Yelm Community Schools, if applicable.
I hereby certify that the above information is correct and that the construction on,and the occupancy and the use of the
above described property will be in accordance with the laws,rules and regulations of the State of Washington and the
City of Yelm.
,��,¢ L o�c�c� c.�c � /13 r3
Applicant's Si ature Date
Owner/Contractor/Owner's Agent/Contractor's Agent (Please circle one.)
All permits are non-transferable and will expire if work authorized by such permit is not begun
�ithin 180 days of issuance,or if work is suspended or abandoned for a period of 180 days
�
� c�zVa��
705 Yelm Auenue West (360) 58-38 ��
PO Box 479 (360) 58-3144 FAX
Yelm,WA 98597 wwm. Hd�rn.w¢.us
::li
•�,� �
. .
. _.__... _.....� ..G�r�e.�le.�' .�t,�e ._,...`.?�_ _..__.__..
� �
GOYSOR �OX � r*^� O.� .�UY� MqGt'�� ���
......._.:.� _ . '
_.._ ;_.�._...,,._..
Pc�r;�rz. .� �: .. _,._......._....__.__.. �.. ._M
�Z� '�tZt�' ` ~.Q�._ r
5, � � y. _ .----
�______ _ .�z. �.
s� � '' '` ,., �
r � ,
!�f .l- t� � + � �ro. ' �
� � !�_�__?rr zp (.,nes
�45em4t`�—% _ _ . + `
� - � ' � - ._�_ .
T"�' --..°r_ i_ro � � �'' j 1
,--- ' ' +
r ' �b� g �.a+cu I,,, �� '" ; �
�. ------�=��E---186 ;
_� � � ,
f T� j 1. �, ' � , �• i
l .G.a. � s��. � ! $c,.�l�e, � 1 Zp
�
;
, ,
� ' �.._ f �
, __ _ . � ;
p � yi'' yb ; '�1
— ' ; p..
' Front Porch Foundation�nd Step Tank
CS' ( , „ a*`�' i�b,�
��b� �` ; , , ttication Shail 8e Staked For Se# Back
\ � r� � ! (
,.—______.__. ��rD-. ._.. ..._1 � �CiS��CtiOtl.
� _ y, ..._ _, __ �.. _� y.. y
� p����� `� - ��'- Step Tank Excavati�n In Violatior�Of
� � c�� The Req�ired 5 M�nimum 5et Back To
^.�."? ;ni�xi4v'��� E:.SOr 3
' �� /3 . , � � ' ' w- � � _. Foundation Shall Be Back Filled With
,� ;� � , a�, �• T.
�. .,_ �•� �r� CE3F.
., � ; ,.
�..'""�° _ � Wc�1 �y�„
, I
�..._____�. ..._ � /
� __.... _ .-
�
.,, r
--=j� � �Y ` ` ` �r � r 1�+..t:i��� V I.:./l_J
�._i � � � ,aWr.,-a
. APR 25 2Q13
�of- /�/ �?%��� �S��.l ��:
�,��iP��'"Q�`'j:. '4'.".'",d.j/.e. „$r L.
r
r.•
�
�
� � -
�
�
^9
� .
'"��
/2 c ��✓� o�r�
` r�, .�.o
c_...-
s� � �''�. ,==1` �. �'�
� �, r`' - ,
� °� '�
� --� s_ _
4
s s_ ,,,
�- -
�
�
�
<
er
P ,�
D
\.
. � �_
� � o
�--� 0
�. � _ y-�r;,o
� � � o � .
� r_�
��-w
^ �
e0 ��
O � � �'�
-� _ / i
�
r
�
°� �-``..�..��' ��TEI�
\�z�
c� APR 23 Z013
� � � �
� � ->�r. __
T0 94Z'ON CZ698SV09ErHd� smae� xoo� �h1 FT�TT ZTBZ/tiZ/7.T
Prescriptive Energy Code Compliance for Single Family and Duplex Housing:Zone 1
Project information Contact lnformation
' Yelii�Pro e DeVelb ri�ent. Yelm:R�o e�t D2v�:tc3 menE
_ _
_ . : f�enn Balascio
.
t'l�r� $32i < ;:. ` 45$'b54d .
This set of forms has been developed to assist permit applicants documenting compliance with the
Washington State Energy Code, (2009 edition). This set is for structures built under the IRC and located
in Climate Zone 1.
The foilowing forms provide much of the required documentation for plan review. The details noted here
must also be shown on the drawings(WSEC 104.2).
This form is not a substitute for the energy code itself. To obtain a copy of the energy code,
go to the following web address, http://www.energy.wsu.edu/code
Glazing Wall�Z Wall•int° Wall•ext° Slabb
lo Glazing U-Factor poor 9 Vaulted
Option Area : CeilingZ 3 Above Below Below Floors on
%of Floor Vertical Overhead" U-Factor Ceiling Grade Grade Grade Grade
R-49 or R-21 R-21 R-]0
�I 13% 034 0.50 0.20 R-38 R-38 Int.� TB R-10 R-30 2,
Adv.
R-49 or R-21 R-21 R-10
OO II 25% 0.32 0.50 0.20 R-38 R-38 Int.' TB R-10 R-30 2,
Adv.
R-49 or R_21 R-21 R-10
O III Unlimited 0.30 0.50 0.20 R-38 R-38 Int� TB R-10 R-30 2,
Adv.
See WSEC table 6-1 forfootnotes
Glazing Schedule Attached to Document
O Does not apply. (SEE INSTRUCTIONS) Usin� Prescriptive Option I11. All glazing and
doors meet maximum U-factor. Alternate heating size method submitted.
0 Option I or II,Gtazing to floor area limit(WSEC 602.7.2)
� Area weighted window, skylight or door U-factor(WSEC 602.7.2)
� As part of the heating system sizing calcufation (IRC M1401.3 &WSEC 503.2.2)
Radiant slab:
❑ R-10 foam insulation, continuous with thermal break(WSEC 502.1.4.9)
Chapter 9 Options Total of 1 Credit Required
O t. O t. Descri tion
1a Hi h Efficienc HVAC E ui ment 1 � 1.0 �
1 b Hi h Efficienc HVAC E ui ment 2 � �i�'�r. ❑
1c Hi h Efficienc HVAC E ui ment 3 ❑
2 H+ h Efficienc HVAC Distribution S stem ❑
3a Efficient Buildin Envelo e 1 ❑
3b Efficient Buildin Envelope 2 /���� �E� ❑
3c Su er-Efficient Buildin Envelo e 3 �y `� ❑
4a Air Leaka e Control and Efficient Ventilation ❑
4b Additional Air Leaka e Control and Efficient Ventilation '� ❑
5a Efficient Water Heatin �� ❑
5b Hi h Effiecienc Water Heatin ❑
6 Small Dwellin Unit ❑
7 Lar e Dwellin Unit ❑
8 Renewable Electric Ener "`1200 kwh ❑
Total Credits -;� '- "-�' ` ' '~ ; . ; 1.00
, ._.
,_ ...__, _. . ,,
�_. ._ '��
{,�+
WSEC Prescriptive Worksheet(2010 edition)Zone 1 �,:; WSUEEP10-010 Copyright 2010
F3�Y:__.____-��-----------
Glazing Schedule
� Project Information Contact Information
Yelm Pro e Develo ment Yelm Pro e Develo ment
Denn Balascio
8321 Floor Plan 458-0544
Conditioned Floor Area:::: :::: :::2�67 Sum of UA for Heating System Sizing 100.9
Sum of All Glazing Areas From Below 281
Glazing to FloorArea Ratio 13.61% 602.7.2 Exception Ratio(not to exceed 1%)�
Exterior poors
Plan Component Door Percent Width Height Glazing Door poor
ID Descri tion Ref. U-factor Glazed Qt. Feet �"°n Feet '"`n Area Area UA
. .
; b�or :
>:.f12d 1 � 6: 6 16.7 3.3
Dooc : fl_2Q 1 2 e 6.:::8 17.8 3.6
One Exempt Swinging Door<24 Square Feet fl,�0:: '�:. 3 $.::8 20.0 4.�
Sum of Glazing Area, Door Area, and UA (do nof inc/ude exempt door) 34.4 6.9
Area Weighted U= UA/Area 0.20
Sum of Area and UA for Heating system size only(include exempt door) 54.4 10.9
Vertical Glazing (Windows, Glazed doors using Exception 602.6#1)
Plan Component Glazing Width Height Glazing
ID Description Ref. U-factor Qt. Feet �"°n Feet'"`h Area UA
1Ni ndouv 13:32..:: 2. 5: 5. 8 55.0 17.60
iNindow `:. 0;3� 2 . 4 5 44.0 14.08
s ::
1Mindow. El�2 ;: $ ... 2: � .. 36.0 11.52
_..... .. . ...... _. ............... ... .. .. __
Window �... .. 0:32: .: :3 ..: 5 4 60.0 19.20
V1lindow E1:3Z :: 1 3: 3 9.0 2.88
_..
Vllindow `... Q:32 : : 2... 2: 6 4 s 22.5 7.20
Window Q.32 . 1 3. 6 A� 14.0 4.48
1Nindow b;32 2 �# 4 32.0 10.24
11Vindow 0.32 1 .: 2:. 3 $ 8.8 2.80
Sum of Area and UA 281.3 90.00
Area Weighted U= UA/Area 0.32
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEPIO-010 Copyright 2010
Overhead Glazing
Plan Component Glazing Width Height
ID Descri tion Ref. U Qt. Feet �"°n Feet '"°h Area UA
Sum of Area and UA
Area Weighted U= UA/Area
Doube Glazed Garden Windows Section 602.7.2 Exception
Plan Component Width Height
ID Descri tion Qt. Feet 10On Feet �"°n Area UA
_.. .. ..
Sum of Area
Sum of Area X 3 (This total is automafrcally included in the glazing area fotal.)
Glazing UA for Heating System Size Only=Area X 0.63
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEP10-010 Copyright 2010
Simple Heating System Size: Climate Zone 1
Project lnformation Contact Information
Yelm Propert Develo ment Yelm Pro ert Develo ment
Denn Balascio
8321 Floor Plan 458-0544
Indoor Design Temperature 70
Outdoor Design Temperature 17
Design Temperature Difference (oT)
�T=Indoor-Outdoor Design Temp 53 ,
Conditioned Floor Area 2067
Conditioned Volume 18603
Glazing
Copy Sum of UA from Glazing Schedule 101
Attic U-Factor X Area = UA
R-49 0.027 1313 35_5
R-38 Advanced 0.026
Single Rafter or Joist Vaulted Ceilings
U-Factor X Area = UA
R-38 Vented 0.027 � �
Above Grade Walls U-Factor X Area = UA
R-21 0.056 2624 146.9
Floors U-Factor X Area = UA
R-30 0.029 1394 40.4
Below Grade Walls U-Factor X Area = UA
2'Depth Walls 0.042
3.5'Depth Walls 0.041
7'Depth Walls 0.037
Slab Below Grade F-Factor X Len th = UA
2' Depth 0.59
3.5' Depth 0.64
�7'Depth 0.57
Slab on Grade F-Factor X Len th = UA
R-10 2' perimeter 0.54
R-10 Full- Heated 0.55
Sum of UA 324
Envelope Neat Load 17157 Btu/Hour
Sum of UA X�T
Air Leakage Heat Load 10648 Btu/Hour
((Volume X 0.6)X�T)X.018))
Building Design Heat Load 27805 Btu/Hour
Air Leakage+Envelope Heat Loss
Building and Duct Heat Load 1.15 31976 Btu/Hour
If ducts are located in unconditioned space:Sum of Building Heat Loss X 1.15
If ducts are located in conditioned space:Sum of Building Heat Loss X 1
Maximum Heat Equipment Output 150% 47964 Btu/Hour
Building and Duct Heat Loss X 1.50
WSEC Prescriptive Worksheet(2010 Edition)
WSUEEP10-010 Copyright 2010
U
�
�
� �
� � �
N o �n .,�
� N i �
00 _ � �
� � Q �
N �
ca �
� � c U °-o�
� � � ."-
� � V N
'� � � C �
� � � ai Uo >,
� � � � � -v N
q � Z � � �
� � � � � � �
ti � 0 � � � �
� � �
� cmv
� .o
a � � �
O � a c � cv
� � � � � �
q �, � o �
�
� � w � �'�
,� � ._ �
� � W � � N
'� '� > �� � �
� Q � � �
� � � �
N Q } � � �
� � J � ~ � � �� �
p�> Z WZoao � � � ..c
� � �w � � � � = o � U
� � Q �
C� � 0 0 � °�° r. � Z ,cn � o
� � j 0° � ° � w O � �
� � � � � N Q O U �
J �.`".
� � Q � t/�
� � L
� O �
� � N
� � Z � "� O
i�' ��3� N � � � (�
F �,4` m � N N � —� U "p �U
� u � � � � � � �
� �i Q � � � �- � �
� 1-�s � Z Q � Y � V
wQ � � � N � (B f� (6 �
C C � � (B V "�
��f�d � m � � m � Q U) m
� � �< � � ld�'�
Duct tes�ing���a/culator (New Construcfvon���`"�
House address or lot#: /(663 S'u� el G�4
Conditioned F{oor Area: 2p�
Duct tester location:
Pressure tap location: /"��\
Ring(if applicable): Open 1 2 3
At Rough-' Total Leakage)
Test Method & Test2 Caiculated
Sta nda rdl CFM ZS Ta rget
Air Handler Present .06 X CFA 5 CFMzs
5 6 CFMZS per 100 sf of CFA
Air Handler not Present .
.04 X CFA 5 CFM25
<_4 CFMZS per 100 sf of CFA
Post Construction
Test Method & Test2 Calculated -
Standardl CFMZ� Target ,
Air Handler Present(Total leakage) _pg X CFA< CFM2;
<_8 CFMZS per 100 sf of CFA
Air Handler Present(Leakage to Exterior) .06 X C�A<_ CFM25
5 6 CFMZS per 100 sf of CFA
l. Test results must comply with one of the Standards options.
2. Test CFM25 must be equal to or less than the;calculated target. _ �
Air Leakage testing Calculator(Blower poor Test)
Tested
Standard CFM Calculated Test R�sult
50
((_ Z CFM�O X 0.055)=(??.�bZCFA X 144)) =SLA
�66�
0.00030 SLA
9/ S</ divided by 297b = SLA
SLA=��LY.7�30
���—�we � � ;�
Glossary (�Q.G� �/t�t� =���-- ��
`��/ . Allows for
Rough-In: After installation of the complete air distribution system but before installat�on of msulation and sheet rock
access to all duct seams and connections for re-evaluation of seal integrity if standard is not met in intitial test.
Post Construction: At or near final inspection. The home must be complete enough to pressurize the home to 25 pa.
Total leakage: Aggregation of the entire systems duct leakage in a duct test. /�
leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. �, s"'
CFA: Conditioned floor area --
�
C�Mu: Cubic feet per minute of air leakage at 25 pascals of pressure
CFM�: Cubic feet per minute of air leakage at 50 pascals of pressure
Pascal(pa): Unit of pressure
SLA: Specific leakage area