Ltr on Change in Require Setback from Step Tanks / �,o� T�A�` CLty Uf leln'L
�o ��,
°' �' Community Deuelopment Department
105 Yelm Auenue West
Yelm, WA 98597
YELM
WA5MINGTON
November 22, 2013
Contractors
There has been a change to the required setbacks from step tanks within the City of
Yelm.
The current setbacks are as follows:
2 ft. from sidewalks, driveways, easements
5 ft. from any foundation or property line
All new permit application site plans will be required to show current setbacks.
Thank you for your cooperation.
If you have any questions, or if I can be of further assistance, please contact me at
(360) 458-8475.
Sincerely, /�
, '' ,c� U\
;��
,�,
John Rowland
Building Inspector
Department of Community Development
(360)458-3835
(360)458-3144 FAX
www.ci.yelm.wa.us
AHO Construction Yelm Property Development
5512 NE 109th Ct., Ste 101 PO Box 2950
Vancouver, WA 98662 Yelm, WA 98597
Freestone Cherry Meadows
6820 20th St E, Ste A Evergreen State Builders
Fife, WA 98424 PD Box 39753
Lakewood, WA 98496
Mt Terrace Builders
14730 State Rt 507
Yelm, WA 98597
NW Family Homes
PO Box 39
East Olympia, WA 98540
Puget Sound Homes, LLC
PO Box 1945
Sumner, WA 98390
Sound Built Homes, Inc.
PO Box 73790
Puyallup, WA 98373
Tacoma Peoples Builders
18317 151th Ct SE
Renton, WA 98390
�,�'I �l/�/��
' � b�n i t