Loading...
Ltr on Change in Require Setback from Step Tanks / �,o� T�A�` CLty Uf leln'L �o ��, °' �' Community Deuelopment Department 105 Yelm Auenue West Yelm, WA 98597 YELM WA5MINGTON November 22, 2013 Contractors There has been a change to the required setbacks from step tanks within the City of Yelm. The current setbacks are as follows: 2 ft. from sidewalks, driveways, easements 5 ft. from any foundation or property line All new permit application site plans will be required to show current setbacks. Thank you for your cooperation. If you have any questions, or if I can be of further assistance, please contact me at (360) 458-8475. Sincerely, /� , '' ,c� U\ ;�� ,�, John Rowland Building Inspector Department of Community Development (360)458-3835 (360)458-3144 FAX www.ci.yelm.wa.us AHO Construction Yelm Property Development 5512 NE 109th Ct., Ste 101 PO Box 2950 Vancouver, WA 98662 Yelm, WA 98597 Freestone Cherry Meadows 6820 20th St E, Ste A Evergreen State Builders Fife, WA 98424 PD Box 39753 Lakewood, WA 98496 Mt Terrace Builders 14730 State Rt 507 Yelm, WA 98597 NW Family Homes PO Box 39 East Olympia, WA 98540 Puget Sound Homes, LLC PO Box 1945 Sumner, WA 98390 Sound Built Homes, Inc. PO Box 73790 Puyallup, WA 98373 Tacoma Peoples Builders 18317 151th Ct SE Renton, WA 98390 �,�'I �l/�/�� ' � b�n i t