20130113 Pool Plan 06282013"A" BARS #3 ® 10' O.C. I "B" BARS 3 0 10' O.C. FOR POOLS OVER 5' -0" DEEP) D TO DRAIN PER FL. MIN. PER FT. MAX.) I "B" BARS FLOOR SLAB REINFORCEMENT #3 ® 10" O.C. (EACH WAY) a 10" O.C. —,,� #3 ® 10" O.C. !D (4) #3 CONT. PLACE STEEL ® WALL CENTERLINE FLOOR SLAB REINFORCEMENT m #3 ® 12" O.C. (EACH WAY) m 0 O NOTE: REINFORCING IIN SPA SIMILAR TO SHALLOW END OF POOL STRUCTURAL SECTION A NTS \,Z L2 LINE TILE (TYP) WATER SURFACE 0 SPRINGLIKE 1' -3" R \ MAIN DRAIN SEE mP POOL SECTION (1 NTS 2 2 9.. 10" y mill. (TYP) PRE -CAST COPING (TYP) I' 6" R #3 ® 10" O.C. (TYP HORIZ.) DEPTH RADIUS 5' -0" 1' -3" STOP B" BARS SMOOTH TRANSITION ! / CURVE N @ DEEP END & SIDES NTS r- - - - - -- ` 1" AUTO -FILL I- 0 0 I 2 -1 2 "0 < U I � I 0 - - - -� I � I I I I I I I I I ® m I 6i N N ei d r'I - cwl I N N I I I I I PROVIDE CONTRASTING I I COLOR FOR STAIR TREAD 1 I d & BENCH. (TYP) I I I I I I I I I I I I I ° A 2 "0 I I I I I I I I I I d - AQ. I SKIMMER j I I I L---------------- Am--------- - - - - -- SLEEVE FOR "SWIM LIFT" d I I C,I �I I I I BENCH I - 1 JEf I I I d° I I I O� I ml I �I I MAX. c� I I I I M.D. M.D. x l l O I I I I I I 4 "0 O n O I - I I I I I a I I O O m m o N ell U d Q z z w I JET I U I I I I I .} I I �} d - AQ. I SKIMMER j I I I L---------------- Am--------- - - - - -- SLEEVE FOR "SWIM LIFT" d I I a I I d I I d I I I d° I I I O� I ml Z_ �I Q j I O I I I I I I GI DMN w I I I SKIMMER j I I I I � I j SPA 7'X11' MAIN DRAINS (EACH) 170 GPM DESIGN 59 GPM NORMAL SKIMMERS (EACH) 40 GPM DESIGN 26 GPM NORMAL RETURNS (EACH) SPA PLAN 1 40 GPM NTS 2 2 6" TILE d 10" 8.5" (TYP) CONCRETE SPA d SHELL ° d' d d c ° R -12 INSULATION. INSTALL PER MANUFACTURER'S INSTRUCTIONS. WATER SURFACES JET 18" N PLASTER p' RETURN j�Y// /��J/ I MAIN DRAIN SEE A z a P _ SPA SECTION D NTS 2 2 PRE CAST COPING (TYP) SLOPE 1 /4 " /Fi. MIN. REVISIONS � rn M � n � 3 N O n a zo M OJ iv� N zzF- zaLJ Ed _ W _ Z N E- C7 Z W zoo a I+) N U O� Z_ a � O N O n O I m O O m m o U d U z z w U U Z J m z U Z (D C-) 1=- Q W W CL w r -d 1 Ld J W O U U CL w _j o} a DATE 05 -09 -13 DRAWN J.M.A. DESIGNED J.J.D. APPROVED J.J.D. PROJECT N0. 2131232 SHEET NO. SP 2 2 Of 4 Sheets PRESSURE GAUGE (TYP) MANUAL AIR VENT PRESSURE GAUGE FILTER PUMP RETURN TO POOL NOTE: 1. REMOVE HANDLES FROM BALL VALVES AFTER SYSTEM IS BALANCED. 2. SEE PUN FOR PIPE SIZES. 2 -1/2 "0 HEADER Y" 2 -1/2 "0 FROM SKIMMERS 2 -1/2 "0 FROM CHLORINATOR MAIN DRAIN & P VALVE BALL VALVE POOL EQUIPMENT PIPING DIAGRAM NT DEEP END SECTION NTS BACKWASH SUMP ALTERNATE NTS METER 2 -1/2 "0 RETURN #4 x V- 6" TO MATCH HOR. SIL r PRESSURE GAUGE (TYP) MANUAL AIR VENT PRESSURE GAUGE FILTER PUMP RETURN TO SPA NOTE: 1. REMOVE HANDLES FROM BALL VALVES AFTER SYSTEM IS BALANCED. 2. SEE PUN FOR PIPE SIZES. 2 -1/2 "0 HEADER Y" 2 -1/2 "0 FROM SKIMMERS 2 -1/2 "0 FROM CHLORINATOR MAIN DRAIN & P FLOW (TYP.) BALL VALVE (TYP.)— 2 -1/2 "0 RETURN SPA EQUIPMENT PIPING DIAGRAM NTS INLET FITTING DETAIL NTS RACKWASH DISCHARGE PIPE 2° AIR GAP 45' NOTCH 12" SANITARY SEWER STANDPIPE PIPE REDUCER SANITARY SEWER bJ NOTE: ANCHOR STANDPIPE SERVICE W/ TRAP TO WALL BACXWASH DISCHARGE NTS IING L UNDERWATER LIGHT DETAIL NTS 6" WHITE TILE TYPICAL DEPTH MARKER DETAIL NTS POOL DECK BRICK COPING 6" TILES POOL WALL 3 "0 -------------------------------- * JET PUMP I 2 "0 LOOP W /,TRAINER I r--T--T-' -T--T -T 15 MINUTE TIMER _ ' ' y'�' ' ' FOR HYDROTHERAPY ti �V 6-6 -c� — `: ----- PUMPS JET INLETS (6) I i SPA z , ----- ---'-----3 0 ----------- U EMERGENCY 2-1/2"0 SHUT -OFF SWITCH ALL PUMPS P4- 0 MANIFOLD J MAIN DRAIN (TYP) ° RECIRCULATION RETURNS (2) I SKIMMER PUMP J — — (TYP) W /STRAINER — 2 "0 2 -1 /2 "0 SPA PIPING SCHEMATIC NTS MAIN DRAIN HYDRO STATIC RELIEF - VALVE AND 18 "X18 "X24" GRAVEL SUMP WHERE REQUIRED. 19214 MAIN DRAIN DETAIL NTS 9]" AUTOMATIC SKIMMER DETAIL NTS REVISIONS � rn � rn M � N uT 0 M dz°' N J � 1n ZZ IH- WW j a W W _ ZV� 0Zn- ZOO WU Z a CD Z C) N J_ m m n U) _J m a V Lwl z W - Q W c) d LLJ ¢ W Y W J W O O N O U U w W a C) m m o U d U ti z w U CD Z C) J_ m m U) _J Z a O Lwl W Q W c) LLJ W Y W J W O O U U w W a DATE 05 -09 -13 DRAWN J.M.A. DESIGNED J.J.D. APPROVED J.J.D. PROJECT N0. 2131232 SHEET NO. SP 3 3 Of 4 Sheets PARAMETER POOL RECIRCULATION SPA RECIRCULATION I SPA JETS A - SUMP OPENING (INCHES) 8 ROUND 8 ROUND D - MANIFOLD PIPE DIAMETER (INCHES) 2 -1/2 4 B - SUMP DEPTH (INCHES) 1* (MINIMUM) 1* (MINIMUM) SUMP TYPE FIELD FABRICATED FIELD FABRICATED SUCTION COVER PARAMOUNT SOX PARAMOUNT SOX COVER OPEN AREA (SO. INCHES) 43.2 43.2 NUMBER OF COVERS 2 FLOOR 2 FLOOR TOTAL COVER OPEN AREA (SO. INCHES) z 86.4 CERTIFIED MAXIMUM FLOW CAPACITY (GPM) 200 DESIGN ROW (GPM) (100% PER COVER) ZJ 80 90 APSP -7 DESIGN FLOW (100% PER COVER) (GPM) 80 + 90 = 170 MANIFOLD VELOCITY ® 50% FLOW (FPS) - -- VELOCITY AT APSP -7 FLOW THROUGH COVER (FPS) 1.26 MANIFOLD VELOCITY AT APSP -7 FLOW (FPS) 5.4 1 4.3 * MANUFACTURER DOES NOT REQUIRE A SUMP IF COVER IS CENTERED OVER THE PIPE. NOTES: 1, CONTRACTOR TO CONFIRM PUMP FLOWS AFTER COMPLETION OF WORK TO VERIFY VALUES ABOVE ARE NOT EXCEEDED. 2. MANIFOLD EXTENDS FROM COVER CONNECTION TO COVER CONNECTION INCLUDING THE TEE FITTING. NOTE: COVER MANUFACTURER DOES NOT REQUIRE A SUMP FOR ANSI /APSP -16 (2011) COMPLIANCE PARAMOUNT COVER W/ FRAME Q c < d A e a 14 as I7 oa STRUCTURE PLASTER MAIN DRAIN DETAIL A NTS 2 4 CONFORMANCE All material and construction methods shall conform to Chapter 246 -260 WAC, "Water Recreation Facilities published by the Washington State Department of Health (latest edition) as modified by the local agency having jurisdiction. WALKWAYS 4' foot minimum width, concrete, non —slip finish, sloped to drain away from pool (By Others). BARRIERS Barrier protection shall be provided to prevent unauthorized access to pool facilities including: A. A barrier of sixty inches or more in height: 1. Not allowing passage of four —inch diameter sphere; 2. If it has horizontal members that are spaced less than forty —five inches between the tops of the horizontal rr) embers, shall have spaces between the vertical members no greater than a width of one and three — quarter inches; or 3. If it has horizontal members that are spaced at, or more than, forty —five inches between the tops of horizontal members, shall have spaces between the vertical members no greater than a four —inch width. 4. Lockable gates and entrances provided with a self — closing, self — latching mechanism sixty inches or more from the ground with a clear space fifty inches deep on the latch side of door to position a wheelchair. When a latcning mechanism is provided at any lower height, the latching miechanism shall be of a type remaining continuously locked, and only opening with the use of a key or other access control systenm B. An entrance to the pool area shall not serve as a required exit from another part of a building when there is a conflict with other codes or regulations. C. The door to the equipment room shall be lockable and locked when not in use. STEPS Edge of pool steps shall be of contrasting color from body of pool. Steps shall be of non —slip tread finish. Riser shall have a rninimum unobstructed, horizontal ten —inch tread depth and a mlinimum two— hundred forty square inch surface area. Pool risers shall have on uniform height between 7.5 inches (preferred) and 10 inches, except for the bottom riser which may be plus or minus 2 inches of the uniform Iheight. Spa risers shall be similar to those for the pools, except for the bottom riser which may be less than uniform height. ENERGY CODE Provide pool /spa equipment, covers, piping insulation, anotors, etc. in accordance with the applicable portions of WSEC Chapters 11 through 20. COVERS Provide cover in accordance with WSEC Section 1454 for pool facilities heated to 90'F or greater. PIPING Plastic, 1 -1/2" minimum diameter unless otherwise noted; Type 1 PVC Schedule 40, solvent weld. All piping must be bedded and backfilled per the manufacturers recommendations. GENERAL NOTES HOSE BIBBS Provide bibbs with vacuum breakers adjacent to walks. (By Others) WASTE WATER To be disposed of through air gap. The air gap shall be a minimum of two times the filter waste pipe diameter. FLOOR DRAIN Zurn #3245 floor sink or equal, backwash line to terminate above grate, as noted above. MAKE —UP WATER If not otherwise provided for in the drawings, make —up water shall be provided by hose bibb located in pool deck area by Owner. Vacuum breaker protection shall be provided. Provide water supply to equipment room protected with state approved reduced pressure backflow prevention device. HEATER Install in accordance with the National Electrical Code and the Uniform Mechanical Code, as applicable. Locate so any starting pilot and on /off switch is readily accessible. Conform to Tables 14 -1A through 14 -1G as applicable. Provide controls to regulate temperature from maximum design setting down to 65' F. Locate controls in area inaccessible to users. Lock out after setting. LIGHTING Provide not less than 30 foot — candles intensity measured at the surface of indoor pools and spas; 10 foot — candles for outdoor facilities; 10 foot — candles for pool deck; 20 foot — candles for locker rooms, equipment rooms and restrooms. Provide protective shielding. Indoor pools shall have emergency lighting per UL 924. (By Others) VENTILATION (As Applicable) Provide ventilation conforming to the ASHRAE pool facility standards for indoor facilities. (By Others) SHOWER FACILITY Provide means to prevent maximum temperature from exceeding 110' F. (By Others) EMERGENCY EQUIPMENT (By Others) During the period the facility is open for use, the following is required: A. Telephone within one minute access. B. Standard 16 unit first —aid kit and blanket reserved for emergency use. C. Provision of a clearly marked emergency shut off switch for turning off all pumps. Switch shall be equipped with an audible alarm to alert others at the area of the facility. The switch shall be accessible to the public and located within 20 feet of the spa. SIGNAGE AND TESTING EQUIPMENT Provide signage and testing equipment in conformance with applicable regulations. (By Others) EQUIPMENT Proper housing to protect equipment shall be provided (By Others). CHEMICAL STORAGE Store chemicals in accordance with the manufacturer's requirements to minimize health and safety risks. Provide separate room from pool equipment room when feasible. (By others) OPERATION OF POOL It is the owner's responsibility to operate in compliance with rules and regulations of the Washington State Department of Health. DISABILITY ACCESS Provide "person with disability" access per applicable regulations. (By Others) NOTE: See Architectural Plans for Building, Fence, Electrical, Ventilation and Mechanical Details. BACKFLOW PREVENTION Provide non — atmospheric backflow prevention devices on plumbing fixtures connected to the potable water system which serve the pool related facilities. INSULATION Provide insulation on exposed recirculation system within the contained space per Washington State Energy Code (WSEC) Section 504.7 for pool and facilities heated to greater than 105'F. REVISIONS u) � M � n N o � � J V7 X Zoo M CJ h-- Z_Z� �aUO Ly WD= Zoe (jZ of ZOO WUZ a QD Z _J Cn m Z O 1— W Of U W Of Y W W U J W J W N W H O Z V) J IRA 15 DATE M DRAWN J. M.A. DESIGNED J.J.D. APPROVED n J.J.D. PROJECT N0. 2131232 ci rn z O N O I 0 n p n an O O an m o N CD Q V 2 U z w U QD Z _J Cn m Z O 1— W Of U W Of Y W W U J W J W N W H O Z V) J IRA 15 DATE 05 -09 -13 DRAWN J. M.A. DESIGNED J.J.D. APPROVED J.J.D. PROJECT N0. 2131232 SHEET NO SP 4 4 Of 4 Sheets