DNS SEPA Case #201400693 .
CASE NO.: 2014100963
SEPA SEQUENCE NO.: 14 102475 XA
DETERMIlVATION OF NONSIGNIF'ICANCE
Prononent: Thurston County Public Works Deparhnent
9605 Tilley Road SW,Building C
Olympia,WA 98512
Contact: Roger Giebelhaus,(360)867-2343
Description of Proposal: This SEPA review is for two site specific amendments to Roads Section of the 2014-2019
Capital Facilities Plan of the Thurston County Comprehensive Plan.There are two proposed
amendments to the Capital Facilities Plan.The first is to replace the Littlerock Road Bridge
(L-4)over Salmon Creek that has structural failure problems.The second is reconshuction of
a section of Prather Road(PR)that has failed due to a landslide activity. Prather Road is
currently closed to motor vehicle use.
Because the proposed code amendments are sepazate from spec�c development proposal,
they are being reviewed as a Non-project Action,in accordance with the requirements of the
State Environmental Policy Act(SEPA).
Location of Proposal: Thurston County
Section/Township/Ran�e: 19-17N-2W(L-4)20-15N-3W(PR)
Tax Parcel No.: N/A
Threshold Determination: The lead agency for this proposal has determined that it does not haue a probable significant
adverse impact upon the envuonment. An Environmental Impact Statement is not requu•ed
under RCW 43.21 C.030(2)(C). This decision was made after review by the Lead Agency of a
completed Environmental Checklist and other information on file with the Lead Agency.
This information is available to the public on request.
Jurisdiction: Thurston County
Lead Agenc� Development Services
Responsible Official: Mike Kain,Planning Manager
I- Date of Issue: March 25,2014
Comment Deadline: April 8,2014
Appeal Deadline: April 15,2
Robe�Senior Planner
This Determination of Nonsignificance(DNS)is issued under 197-i 1-340. The lead agency will not act on this proposal for 14
days from the date of issue or until the appeal period has passed,if applicable. No permits may be issued,and the applicant
� shall not begin work until after the comment and any appeal periods have expired and any other necessary permits are issued.
If conditions aze added, deleted, or modified during the 14 day review period, a modified determination will be issued.
Otherwise,this DNS will become final after the expiration of the comment deadline and appeal period,if applicable.
APPEALS: Threshold determinations may be appealed pursuant to TCC 17.09.160 i£ (1)a written notice of appeal,meeting
the requirements of TCC 17.09.160(4), and the appropriate appeal fee is received by the Thurston County Development
Services Department within seven(7) calendar days of the last day of the comment period on the threshold determination and;
(2)the person filing the appeal is an aggrieved party and submitted written comments prior to the comment deadline;per the
requirements of TCC 17.09.160(2).
NOTE: The issuance of this Determination of Nonsignificance does not constitute project approval. The applicant must comply
with all applicable requirements of Thurston County Deparhnents and/or the Hearing Examiner prior to receiving permits.
� Thurston County Resource Stewardship Department,Robert Smith
° Building#1,Admimstration
2000 Lakeridge Drive SW
Olympia,WA 98502 (360)754-4023
Department of Ecology—SEPA Section WA Dept.of Fish and Wildlife
WA State Dept.of Commerce—CTED Mike Kain,Planning Manager
Chehalis Tribe Scott Clark,Planning Director
Nisqually Tribe Thurston County Development Review
Squaxin Island Tribe Washington Department of Transportation
Thurston County Regional Planning City of Tenino
Thurston County BoCC City of Yelm
Cliff Moore,Director,County Manager Town of Rainier,Mayor
Thurston Co Environmental Health Dept Town of Bucoda,Mayor
Thurston Co Public Works City of Lacey Community Development
City of Tumwater,Planning Department City of Olympia Long Range Planning
Cami Petersen,sub areas Roger Giebelhaus,Parks,Public Works
Chris Hawkins,Public Health and Social Services
\WpolloWpps\TracklPlamingWoaoda Save File�Enviroomental Checklist XA�DecisionsWns�2014100963.CFP.Amendmrnt.rs.doc
� r
Thurston County Resource Stewardship
� 2000 Lakeridge Dr. S.W.Olympia, WA 98502
(360)786-5490/(360)754-2939(Fax)
TDD Line(360)754-2933
THURSTON COUNTY Email:permit(a�co.thurston.wa.us
www.co.thurston.wa.us/permittin g
""�'�' Supplemental Application
ENVIRONMENTAL CHECKLIST (SEPA)
STAFF USE ONLY DATE STAMP
14 102475 XA
PermitType: Environmental Checklist THURSTON COUNTY
SubType: Administrative RECEIVED
Work Type: Non-project MAR r 9 �0'f�
site:
,4ssessor Property�o: DEVELOPMENT SERVICES
Owner:Thurston County Public Works
Intake b : �
This application form cannot be submitted alone.In addition to this form,a complete application package includes:
Ap Use nt SUBMITTAL CHECKLIST StaOnIIse
� Master application.
� Applicable processing fees.Refer to current fee schedules. Depending on the adopted fee �
structure, additional ees ma occur i base hours/ees at intake are exhausted.
� Site plan—One copy of a site plan,drawn to scale on 8 '/2 x 11 or 11 X 17 paper,which �
de icts all items outlined in the attached site lan submittal re uirements.
� Environmental reports(wetland report,mitigation plan,geotechnical report, etc.)as required. ❑
Signature and date. ❑
Instructions for Applicants
This Environmental Checklist asks you to describe some basic information about your proposal. Governmental agencies
use this checklist to determine whether the environmental impacts of your proposal are significant,requiring preparation of
an Environmental Impact Statement(EIS). Answer the questions briefly,with the most precise information known,or
give the best description you can. DO NOT WRITE IN THE AREA THAT IS SPECIFIED FOR AGENCY USE
ONLY AND USE ONLY THE ENVIRONMETNAL CHECKLIST APPLICATION PROVIDED BY THURSTON
COUNTY.
You must answer each question accurately and carefully,to the best of your knowledge. In most cases,you should be able
to answer the questions from your own observations or proj ect plans without the need to hire experts. If you really do not
know the answer,or if a question does not apply to your proposal,write "do not know" or"does not apply." Complete
answers to the questions now may avoid unnecessary delays later.
Some questions ask about governmental regulations,such as zoning,shoreline,and landmark designations. Answer these
questions if you can. If you have problems,the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on
different parcels of land. Attach any additional information that will help describe your proposal or its environmental
effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional
information reasonably related to determining if there may be a significant adverse impact.
Form No. SA027
� � v
�
m �
� � m�
� - m � no
THURSTON COUNTY -Zi "' mz
� RESOURCE STEWARDSHIP rn � �T�
`T�l[��`�'[)1� C.E�L�N`��' � sc- pc�
'+i'r+a f cHtii
ENVIRONMENTAL CHECKLIST ^c �
♦J
m
�
USE BLACK INK ONLY vw
�� ��
1. Applicant: Thurston County Public Works 14 102475 /�/�i
Address: 9605 Tilley Road SE Permit Type: Environmentai Checklist _
Sub Type: Administrative
Olympla,WA 98502 . Work Type: Non-project —
Phone: (360)867-2343 ' site: —
Ce1L' � Assessor Property ID: —
Owner.Thurston County Public Works
E-Mail Address: 9�ebelr@co.thurston.wa.us
2. Point of Contact: Roger Giebelhaus 3. Owner: Thurston County Public Works
Address: 9605 Tilley Road S. Building C Address:
Oympia, WA 98512-9140
Phone: (360)867-2343 Phone:
Cell: Cell:
E-Mail Address: giebelr@co.thurston.wa.us E-Mail Address:
4. Property Address or location:
'The site is located near the 101 block of Littlerock Road SW where Salmon Creek runs underneath the
;�i bridge proposed to be replaced.
5. Quarter/Quarter Section/Township/Range: Section 19, Township 17N, Range 2W
6, Ta�c Parcel#: N/A
7. Total Acres: 1.1 Acres
8. Permit Type: �Nashington State Fish and Wildlife HPA
9. Zoning: R 1/20 and RRR 1/5
10. Shoreline Environment: N/A
11. Water Body: Salmon Creek
12. Brief Description of the Proposal and Project Name:
.e,._ __...e.�. T.�...e. _.._��_._ ._.._...�..._zA�... .._.._._., .. ._...__- __....... _.._... .. . .._�.. .� _.,.__ P_.... a,. ......._,...., _ ..._ �.� .,._e_„
;
'°Adopt two emergency amdendments to add Salmon Creek Bridge Replacement project and the Prether
;Road Land Side Repair Project. These two projects need to be added to the Thurston County Capitol ;''
Facilties Plan before construction can begin in 2014.The amendment will allow the replacement of a failing ;
.
bridge and a section of road the that has failed because of a landslide.
�'
�� ._;.�- .,�_�,.�_�.. ���. � �
u.��: .���..� ,._,_.�-d. .r_ �. .rh,�..�..w,_. � �
- , - 1 -
��,�.� ,�..��___-- _�.w.�,.. ._ .�e� . �w... �..
Thurston County
Resource Stewardship
Environmental Checklist
13. Did you attend a presubmission conference for this project? ❑Yes QX No
If yes,when?
14. Estimated Project Completion Date: Fall of 2014
15. List of all Permits,Licenses or Government Approvals Required for the Proposal(federal,state and local--including rezones):
..� .._�_.____.��_,_..�_.._..___._.._.._.�._�..__..���_�,,._.____...________�_.�_��.�...��.�.._„_. ,___.....__ _..._.___. ____�._.._..___.__._._�......�
=Washington State Department of Fish and Wildlife Hydaulics Permit and Flood Plain Development
j Permit. �
�����„���.� .��.r�,�„xa��,�..���,.,��.w� �,��E����,J ���,��,� �..
16. Do you have any plans for future additions,expansion or further activity related to or connected with this proposal? If
yes,explain:
,... _._,_.� ...�._�__.__�,,___.. ._._�_.,,, . __�._.___..._._�..___._ ..__. _.__._�.�.___,.__....__..___.,�...�.._.m_._�.�___._��.�..,,_.__..______,�_._.____�
; No, the proposed new bridge and replacemrent road are being built to current bridge and road standards
that will not require future expansion.
�
�
�-.w ��
17. Do you know of any plans by others which may affect the property covered by your proposal? If yes,explain:
�._.�._.�..�......_�.. ,,.,�._...�._..__r�..,___._._....,______--___ ...___e��__�ww,.�_.�_.,�_._.�m_.�.._..�.._._.,_.�_.____�_.__..�
; No
�
�
18. Proposed timing or schedule(including phasing,if applicable):
�...�...��,...��....�...k,M....� �.�.. ._.......Mn...�..e_�_...��.....,..� .�.��.�......_..��, ���.�. _�...� ��_�.,.�u.�V a,_.
;The bridge project is proposed to begin July 1st and be completed by December 31, 2014.The
'' replacement road project will start the fall of 2014 with completion sometime in year 2015.
�
�
�
�
� ������
19. List any environmental information you know about that has been prepared,or will be prepared,directly related to this
proposal.
_.�._.__.a_..,,, r.__ ..__._.�..._..v.._..__._� ,�.------_. �__.W�... _.__..._ .._��..____._.�_�._�.._�.__,.._.,�.._
�-_,.,_� .___�.�.......__.,.,
;' Salmon Creek Bridge Replacement Wetland and Stream Assessment Report prepard by Acera, LLC.
�
-2 -
� , .
�' t� "�
� THURSTON COUNTY
`�` RESOURCE STEWARDSHIP
`I"E°lt��"I�f)iV t."(�LI�"��S'
��:r�R ENVIRONMENTAL ELEMENTS
Evaluation for
To be Comnleted bv Applicant Agencv Use Onlv
1. Earth
a. General description of the site(check one):
QX Flat
❑Rolling
QX Hilly
❑Steep Slopes
❑Mountainous
❑Other:
b. What is the steepest slope on the site(approximate percent slope)?
_ s..__. . �..__, _ ,r....., x..._...e _..,�.._ ,.,.,.. _...._.. .. .._... .. . ... V
30% over a 5-foot drop-off(L-4)over 50% slope for the Prather Road �;!
Project
c. What general types of soils are found on the site(for example,clay,sand gravel,
peat,muck)? If you know the classification of agricultural soils,specify them and
note any prime farmland.
'' Glacial outwash plain that are Everett very gravelly, sandy loam and
'':very sandy loam soils.
d. Are there surface indicators or history of unstable soils in the immediate vicinity?
If so,describe.
No
e. Describe the purpose,type,and approximate quantities of any filling or grading
proposed. Indicate source of fill.
wr.�._..... .. _.s_� ..�.r,�._= . s. ..._a _ �. ....., . .., .,_. .. ___F...
Bridge approaches will be stabilized by sheet piling at the toe with soil �:'
lifts above. Rock fill behind piling walls various planting soils for lifts.
.. ,...n� _,...,:> }__._.4�, ..�.:.�r_._�- .. . n.v .z � ��
. _.� ��.. �z ,�.� . . . , s�
f. Could erosion occur as a result of clearing,construction,or use? If so,generally
describe.
m _..�..._. _......._. ._�..,.._...�_. . ._ v.._..:__ .._,..u._. .._ ..._.. ...._._� . �. ._..... n.,__..__�
Yes but best management practices will be follow in compliance with `
the Thurston County Erosion Control and Stormwater ManuaL
� _w�.,:.�.. >.�,. x, � _.,a .� ..,v�._�. ,�.. , .�:�.. .� t�.,,: ,,. . �,,.:�. :.__�.�'�
- 3 -
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Completed bv Aaalicant A�encv Use Onlv
g. About what percent of the site will be covered with impervious surfaces after
project construction(for example,asphalt or buildings)?
',Current impervious surface area is 33,568 SF.The proposal will
';increase that area by 2,589 SF for a total of 36,157 SF in area (L-4).
�� . ���.�_�.��� .�._.�,.� �, ,� �. _ ,� y .�,� , .��.. � . . __. __ ..r _.
h. Proposed measures to reduce or control erosion,or other impacts to the earth,if
any:
' BMPs from the Thurston County
2. Air
a. What types of emissions to the air would result from the proposal(i.e.,dust,
automobile,odors,industrial wood smoke)during construction and when the
project is completed? If any,generally describe and give approximate quantities if
known.
t Temporary emissions from construction equipment. �
�.
r
b. Are there any off-site sources of emissions or odor that may affect your proposal?
If so,generally describe.
..._r.._ _.._. .,....... . _. .. .. ._,.,.. .., ..__..�. .__. , ,_...__a�.
;N/A
;:
,,
,.
w,�..�,�m�,,�� �a�=,�...,.� ��,. �..�_ .a.�.� . �,.a �, ...u. t.,.,_.. � ,� .��,e. �.x.���.�
� c. Proposed measures to reduce or control emissions or other impacts to air,if any:
` Unknown
x
3. Water
a. Surface
(1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams,saltwater,lakes,ponds,
wetlands)? If yes,describe type and provide names. If appropriate,state
what stream or river it flows into.
.m.,�. _. a_.._,��_ ,,e.___...._... _..._.��,.�..,.m,_ . . .,._..._ _�.,_,., ..,._.a._ _._...�,..�
'Salmon Creek is a year-round stream classified as a type F. �
!The wetland report scored the wetland as a class 2 within a
� riverine class. Salmon Creek flow 300-feet to the west into the
' Black River.
�
- 4 -
�
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comuleted bv Applicant Agencv Use Onlv
(2) Will the project require any work over,in,or adjacent to(within 200 feet)
the described waters? If yes,please describe and attach available plans.
'The bridge deck,piers and abutments will be remove and new
"abutments and single span bridge deck installed over the creek.
(3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site
that would be affected. Indicate the source of fill material.
?275 Square Feet in area.
; �:,
(4) Will the proposal require surface water withdrawals or diversions? Give
general description,purpose,and approximate quantities if known.
;Yes, a check dam will be installed and water piped around part of ,
'.channel where overhead demolition and construction will occur. W'
�
. . .. „... , , , .,_ ,,: �, . ��.
_ . ... ...:.,. :. , ,. ,. .,s
(S) Does the proposal lie within a 100-year flood plain? If so,note location on
the site plan.
l.Yes,the flood plain runs map
(6) Does the proposal involve any discharges of waste materials to surface
waters? If so,describe the type of waste and anticipated volume of
discharge.
`. No
b. Ground
(1) Will ground water be withdrawn,or will water be discharged to ground
water? Give general description,purpose,and approximately quantities if
known.
No
�
{
� �
- 5 -
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comaleted bv Anplicant Agencv Use Onlv
(2) Describe waste material that will be discharged into the ground from septic
tanks or other sources,if any(for example: domestic sewage;industrial,
containing the following chemicals;agricultural;etc.). Describe the general
size of the system,the number of such systems,the number of houses to be
served(if applicable),or the number of animals or humans the system(s)are
expected to serve.
''! N/A
�
'
c. Water Run-off(including stormwater�
(1) Describe the source of runoff(including stormwater)and method of
collection and disposal,if any(include quantities,in known). Where will
this water flow? Will this water flow into other waters? If so,describe.
�
�.e u. , .�e �.,r�� ,.�w�� ���.a a�,W..v a�.�� . �,� _�x ..a.�,� __���.= o�..� _,.�,s�,��,.4�
(2) Could waste materials enter ground or surface waters? If so,generally
describe �
,�.,�s.a_�,__.,,..._..:,_.� ,.� e_.___,. ... ..y, �_ ,.e____� .. .�_,..�_�.._...,_. .....,...�._.. u�.,_..._.�
X �
i �
.
> �
�,����,�.�.� .�,Ma..� ,�.����.,�..:�.��,�:��.��..�.n�����,�,.�za �
(3) Proposed measures to reduce or control surface,ground,and runoffwater
impacts,if any:
�
}.
:. ....� � .�o,ma.�.. . . s. _r.e. ����-,..�. ... .,
4. Plants � �y� . _ � _ r,�_ � ,,.�� ..��
a. Check the types of vegetation found on the site:
�X Deciduous tree: �alder �maple � aspen Q other willow
� Evergreen tree: �fir �X cedar �pine �other
� Shrubs
� Grass
� Pasture
Q Crop or grain
� Wet soil plants: �cattail �buttercup �bulrush �skunk cabbage
other Reed Canarv Grass, Salmon Berrv, Doqwood
� Water plants: �water lily Q eelgrass �milfoil �other
Other types of vegetation
- 6 -
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comnleted bv Analicant � . Agencv Use Onlv
b. What kind and amount of vegetation will be removed or altered?
_.., , __, . ...._�...�_ .., _ __._.._ .._....._ .� . .... ............ . _,.�...,.�.,.�._ . .._.._...
;
' Red Alders, Reed Canary Grasses,some Dogwoods �
�
�
�
. .u�..�., �,.,�.�.. _,�� ._�,.��... �,.,�. .� w,s.�,., ..�.,_.. -�s.��µ,.u.��,�_ �w r r. _.,��,..x.�,���;
c. List threatened or endangered species known to be on or near the site.
;;Spotted frog (federal)but some candidate species Coho,Coastal Cutthroat
Salmon(state), Mazama Pocket Gopher(federal)and Olympic Mud Minnow �
j (state)
d. Proposed landscaping,use of native plants,or other measures to preserve or
enhance vegetation on the site,if any:
;The SW and NE sides of near abutments and road approaches will be fabric ;!
encapsulated soil lifts with riparian vegetation planting
�
5. Animals
a. Check any birds and animals which have been observed on or near the site or are
known to be on or near the site:
�Birds: �hawk, Q heron, �eagle, Q songbirds,
�other:
Q Mammals �deer, �bear, �elk, �beaver,
�other:
0 Fish: �bass, �salmon, �trout, �herring, �shellfish,
Q other:
b. List any threatened or endangered species known to be on or neaz the site.
Prarie soils associated with the Mazama pocket gopher and are
considered Critical Areas under the T.C. CAO.
,
�
t...,.. � . ,.��:��. ,.�y:, .:�., �. .�.<�.,.M. T.:� �t..�, .,.. , ..,..,, . -.��.,�,.�,,�,-.,,43,��,�,��,�.��.�
c. Is the site part of a migration route? If so,explain.
IiNo "
d. Proposed measures to preserve or enhance wildlife,if any:
' Revegetation of stream bank and road embankment with native
vegetation (willows and dogwoods). �
- 7 -
�
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comuleted bv Aaalicant Aeencv Use Onlv
6. Ener�v and Natural Resources
a. What kinds of energy(electric,natural gas,oil,wood stove,solar)will be used to
meet the completed project's energy needs? Describe whether it will be used for
heating,manufacturing,etc.
, . _.... _ _, ..,. .._ . _ . ,. . ,..... �,. ..._,
' N/A �
;::
�
b. Would your project affect the potential use of solar energy by adjacent properties?
If so,generally describe.
` N/A
M
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts,if any
�N/A #;
7. Environmental Health
a. Are there are any environmental health hazards,including exposure to toxic
chemicals,risk of fire and explosion,spill,or hazardous waste,that could occur as
a result of this proposal? If so,describe.
; None �'
(1) Describe special emergency services that might be required.
�.,.__ .�._..m_.,._. ,. .._. ,.�,._ . n...r. _� , _..__ _,..._.,._ _.s..._ ..__ _v.�.,._._....�.,�,. ,
k
� f,
: `
�a.vu'.wa+ . .�sR nN'�aenwaaa:..vca��ronnvvrzsum�a�vmvna.a,es'zro...�... .p.,ee->..._.,auuwm��. w.,uaumazserrmsa�u.,
(2) Proposed measures to reduce or control environmental health hazards,if
any:
t
Y r
�
g t":
� %�.��.,��.nn,.ax-�,��.:�_ .,,.�.�, w....�.�..,_ ,.,.�, ,_„��.��.�.�a.�..����-.3�.,,�.�r-�.�.�,�.�. .y._��a...-�.m.,o.,��
� � _
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comnleted bv Aaulicant A�encv Use Onlv
b. Noise
(1) What types of noise exist in the area which may affect your project(for
example: traffic,equipment,operation,other)?
'"Construction equipment for bridge replacement
(2) What types and levels of noise would be created by or associated with the
project on a short-term or a long-term basis(for example: traffic,
construction,operation,other)? Indicate what hours noise would come
from the site.
Construction noise related to the removal of existing bridge and
installation of new structure.
(3) Proposed measures to reduce or control noise impacts,if any:
':The noise will be temporary and limited hours of operation.
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
�County roadway and bridge.The adjacent properties are residentiaL
b. Has the site been used for agriculture? If so,describe.
No
c. Describe any structures on the site.
' Existing concrete bridge and existing road.
d. Will any structures be demolished? If so,what?
"Concrete bridge will be demolished and replaced with a new bridge.
e. What is the current zoning classification of the site?
;R 1/20 and RRR 1/5(L-4) RRR 1/5(Prather Project)
�
- 9-
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comnleted bv Aaalicant Aeencv Use Onlv
f. What is the current comprehensive plan designation of the site?
�Rural Residential
g. If applicable,what is the current Shoreline Master Program designation of the site?
' N/A
h. Has any part of the site been classified an"environmentally sensitive"area? If so,
specify.
'Yes, Salmon Creek, associated wetlands and 100-year flood plain. ;
!The Prather Road Project is located on a landslide area. s!
i. Approximately how many people would reside or work in the completed project?
N/A &
�
j. Approximately how many people would the completed project displace?
""; N/A
i�l
k. Proposed measures to avoid or reduce displacement impacts,if any?
' Use of sheet piling at and along the toe of bridge approaches to
minimize slope fill into wetland area (L-4).
l. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans,if any:
�The bridge is part of a designated rural arterial Prather is a rural
=collector in the Thurston County Transportation Network. f
9. Housing
a. Approximately how many units would be provided,if any? Indicate whether
high-,middle-,or low-income housing.
�N/A
#
,
EJ��:�,�,��,��:�,�����.�,,�.,�.�,«�� `
- 10-
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Completed bv Applicant . Agencv Use Onlv
b. Approximately how many units,if any,would be eliminated? Indicate whether
high-,middle,or low-income housing.
B.,. �... _ . ... ._ . . _. . .. .. .. . .. .. ... . .
' N/A
� ;
c. Proposed measures to reduce or control housing impacts,if any:
, N/A
10. Aesthetics
a. What is the tallest height of any proposed structure(s),not including antennas;what
is the principal exterior building material(s)proposed?
"54-inch railing along each side of the bridge(L-4).
b. What views in the immediate vicinity would be altered or obstructed?
' The view from the bridge of Salmon Creek will not be obstructed.
c. Proposed measures to reduce or control aesthetic impacts,if any:
` None
11. Lieht and Glare
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
N/A
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
:N/A
- 11 -
Thurston County
Resource Stewardship �
Environmental Elements
Evaluation for
To be Comnleted bv Auulicant Aeencv Use Onlv
c. What existing off-site sources of light or glare may affect your proposal?
' None
d. Proposed measures to reduce or control light and glare impacts,if any:
` N/A
12. Recreation
a. What designated and informal recreational opportunities are in the immediate
vicinity?
:.... .. .. . .... ... . ..___.,, . .._... � _.�. . . __�._ , .._ ,. .,.,..., _. ..
t;
?z None `
b. Would the proposed project displace any existing recreational uses? If so,describe.
No ''
c. Proposed measures to reduce or control impacts on recreation,including recreation
opportunities to be provided by the project or applicant,if any:
" None
z
x
13. Historic and Cultural Preservation
a. Are there any places or objects listed on,or proposed for,national,state,or local
preservation registers known to be on or neat to the site? If so,generally describe.
;No, this according to SRI, Inc. Cultural Resources Survey for the
;Littlerock Road L-4 Bridge Replacement Project Report(L-4) i
b. Generally describe any landmarks or evidence of historic,archaeological,
scientific,or cultural importance known to be on or ne�ct to the site.
'' None
� . �
- 12 -
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comnleted bv Aaalicant Aeencv Use Onlv
c. Proposed measures to reduce or control impacts,if any
'`Should significant cultural resources be uncovered by limited ;
�excavation activities will stop until and consult with DAHP for next step;'
14. Transaortation
a. Identify public streets and highways serving the site,and describe proposed access
to the existing street system. Show on site plans,if any.
!�Littlerock Road and Prather Road
b. Is site currently served by public transit? If not,what is the approximate distance
to the nearest transit stop?
`; No
c. How many parking spaces would the completed project have? How many would
the project eliminate?
`None
�
d. Will the proposal require any new roads or streets,or improvements to existing
roads or streets,not including driveways? If so,generally describe(indicate
whether public or private).
' The bridge approaches will be widened and repaved to match new ;
`bridge. The Prather Project is the replacement Road to existing width. _,
e. Will the project use(or occur in the immediate vicinity o fl water,rail,or air
transportation? If so,generally describe.
_,_ .._...a... _ ....., . __ ....._ ., ._ ..
.. t
No `
�
f. How many vehicular trips per day would be generated by the completed project?
If known,indicate when peak volumes would occur.
n
'-The volumes should not change significantly but current peak is
;
- 13 -
Thurston County
Resource Stewardship
Environmental Elements
Evaluation for
To be Comnleted bv Apulicant A�encv Use Onlv
g. Proposed measures to reduce or control transportation impacts,if any:
"The new bridge will be wide enough to accomadate pedestrians and �
cyclists. �
15. Public Services
a. Would the project result in an increased need for public services(for example: fire
protection,police protection,health care,schools,other)? If so,generally describe.
No
�
r
b. Proposed measures to reduce or control direct impacts on public services,if any.
. �_._..... ._.....__._�.e..�__. �,..n,__..... ,.., __.�,. _ �.,.. : ._..� „..m. .._ .,_��,._ .__...�F_F:
k
'i N/A
� �_�,.. . �t,,�:�.���-�, �.,.y,,� . ..��.��e..y �� . .LLu ...__.� ,�.:. a_,,,.. , ,� ._. �,., .,., .,.
16. Utilities
a. Circle utilities currently available at the site: electricity,natural gas,water,refuse
service,telephone,sanitary sewer,septic system,other.
i electricity, natural gas,telephone and refuse �
service. `"
b. Describe the utilities that are proposed for the project,the utility providing the
service,and the general construction activities on the site or in the immediate
vicinity which might be needed.
,.. _ ...... .,_..�.,__.. _.__ .__.__�,. .,_. ....� . _. ._ _ ._____s .._ ._...... ... ._m;
t
None `
&
17. Si�nature
a. The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Print Name
Date Submitted Signature:
- 14 -
�
� � .
��-a THURSTON COUNTY
� - '��� SUPPLElV1ENTAL SHEET FOR NONPROJECT ACTIONS
___ f �.,.-, (Do not use this sheet for project actions)
7`F�1�:���I`()ti C'C)[�A3`�`Y
�;�:;.;��
Non-project proposals are those which are not tied to a specific site,such as adoption of plans,policies,or ordinances.
Because these questions are very general,it may be helpful to read them in conjunction with the list of the elements of
the environment. When answering these questions,be aware of the extent the proposal,or the types of activities likely
to result from the proposal,would affect the item at a greater intensity or at a faster rate than if the proposal were not
implemented. Respond briefly and in general terms.
Evaluation for
To be Comaleted bv Annlicant A�encv Use Onlv
1. How would the proposal be likely to increase discharge to water;emissions to air;
production,storage,or release of toxic or hazardous substances;or production of noise?
, _ _ _ .._...._ . _
V
The construction has closed the roadway and reduced air emissions with
minor temporary emissions from construction equipment.All storage of
;hazardous substances will be stored off site.
�:
Proposed measures to avoid or reduce such increases are:
a,,.... . _ ...._ _�,_,_._. .. .. . � _...... . _... ., � . ._ . /`
� BMP used based on Thurston County Erosion Control and Stormwater r/
!'Manual.
k
.n-0,... �. ,. ��,.::.. r�g�W �,� ..�. �.... ,v��.��... ,�.� .. r.�.,.,F� ,.....�...... .. ...... .��. . ,r��,.,...�'
2. How would the proposal be likely to affect plants,animals,fish,or marine life?
I Project will provide a wider channel and enhancements to fish and wildlife
; habitat(L-4). The Prather Project will replace Culvert and re-engineer slide f'
' slope to prevent future slide activity.
Proposed measures to protect or conserve plants,animals,fish,or marine life are:
_, .. .._ . v.. _. ,._. :_: ., ,.. . _,..
4
N/A
3. How would the proposal be likely to deplete energy or natural resources?
`N/A
,.
�a ..-:�, ,.�..,.,. ..�.�..�.� .�;�t�..� . ,�.r:�.�.,�..���.,,,.,,��,�.,.,-�.� .,-� �����,����»,.�.u�,��.
Proposed measures to protect or conserve energy and natural resources are:
'N/A
S
P
2
ee�pys . . . . . y.s.<a€mu[amps�vaveasrsn�manw�.�'tt?n's . ..aav F� .
- 15 -
, ; .
Thurston County
Resource Stewardship
Supplemental Sheet for Nonproject Action
Evaluation for
To be Comnleted bv Applicant Agencv Use Onlv
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated(or eligible or under study)for governmental protection;such as parks,
wilderness,wild and scenic rivers,threatened or endangered species habitat,historic or
cultural sites,wetlands,flood plains,or prime farmlands?
;The project will improve the overall stream flow with a new wider channel � /
"that may reduce up stream flooding (L-4). Will reopen the Prather road and � �/
allow normal traffic flow.
p
Proposed measures to protect such resources or to avoid or reduce impacts are:
?The project will have a longer bridge span and remove mid-stream pier walls
:that will enhance stream flows and improve salmon habitat(L-4). A steep r
;slope will be stabilize to protect sedimentation of nearby stream (Prather pr�) s;
5. How would the proposal be likely to affect land and shoreline use,including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
. .__ ..�,. .�. , ._. . „..._ ._.. .,... . .,�._,._..., .. _. .. ,.,.__. _,..,.. _ . __.. .,. , ,..:.
The project will make the roadway safer for motorists with a wider lane and �
,
i'for cyclist and pedestrians with new 8-foot shoulders (L-4). N/A for Prather �'
;Project. '
�
Proposed measures to avoid or reduce shoreline and land use impacts are
w_......,._,_ .._. s��.,__�x . .,z_.__. _v�..,... .�.._._,_. ..�,__,..._ _ .,.....�.�_..�.a..�...e... .. ...... ..... . ��., V
Ultimately the new bridge will enhance stream flows(with wider channel). In ;
'addition, habitat enhancements are included in the design for mitigatio�. '
;!
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
� .._.. . .. �. , .. _ .._.._ �.. ,_,,. . . ._.� . , .._. .._,....,. ..a. ,,, .... .,, ✓
Level of service will remain the same and will improve safety for motor �
vehicles, bicyclists and pedestrians.
y
Proposed measures to reduce or respond to such demand(s)are:
':None
�;
, ��,��.�,�.>.,.�. . ..u�a� . ��w�.� �oe,.� ..�_.�. �,.���,�� �-.� �
7. Identify,if possible,whether the proposal may conflict with local,stafe,or federal laws
or requirements for the protection of the environment
_..�. �.__... , . �.. ,. �,_ ._,._.....� .,, . .,.a_ ,._� _�., .�_, ._. ,...,.. _. ...,. .._ �
the project will utilize Local, state and Federal funds and will comply with all `.
associated laws and requirements. "
�