20140180 Permit Pkg 06032014 ��o� T"�p,P City Of Yelm Permit No.: 20140180
,
a � Community Development Department Issue Date: 6/03/2014
(Work must be completed within 180 days)
Building Division
Phone: (360)458-8407
ELM
'".°"'"`_°" Fax: (360)458-3144
Applicant:
Name: C&E DEVELOPMENT Phone: 253-278-0343
Address: PO BOX 2983
YELM WA 98597
Property Information:
site Address: 9954 LOCUST CT SE Owner: VG INVESTMENTS
Assessor Parcel No.: 84070009400 Subdivision: WILLOW GLEN III Lot: 94
Contractor Information:
Name: C& E DEVELOPMENT LLC Phone: 253-278-0343
Address: ERIC PETERSON
PO BOX 2983
YELM WA 98597
Contractor License No.: CEDEVED942JC Expires: 8/11/2010
Project Information:
Project: NEW RESIDENTIAL BUILDING
Description of Work: LOT 94, PLAN 2565-J
Sq. Ft. per floor: First 955 Heat Type(Electric, Gas, Other): GAS
Second 1241
Third
Garage 393
Basement
Fees:
Item Contractor Fees
NEW RESIDENTIAL BUILDING C&E DEVELOPMENT LLC $13,584.08
MECHANICAL SOUND HEATING&AC $ 71.75
PLUMBING JR'S PLUMBING $ 118.00
TOTAL FEES: $13,773.83
ApplicanYs Affidavit: OFFICIAL USE ONLY
I certify that I have read and examined the information contained within the application and know the same
to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of #Sets of Prints:
Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants,
easements and restrictions of record. If applyi as a contrador, I further certify that I am currently Final Inspection:
registered in the Stat ashington.
Signature Date �j� —/y Date:
Firm C'�'G ����IKC.JVl� By�
Cit� ofi Y�lm
(36 ) 458-8402
REC#: 00152090 6/03/2014 10:27 AM
OPER: CO TERM: 001
REF#: 7059
TRAN: 33.0000 BUILDING PERMITS
20140180 13,773.83L'R
C&E DEVELOPMENT
9954 LOCUST CT SE
BLD-RES1 13,584.08CR
MECH 71,75CR
P�- 118,OOCR
TENDERED: 13,773.83 CHECK
APPLIED: 13,773.83-
CHANGE: 0.00
20(�� 0 ( �
CITY OF YELM �
RESIDENTIAL BUILDING PERMIT APPLICATION FORM
� Project Address:�?S�f GO�:��,ST (;T $� y�.r+ Parcel#:�3'�0�vtaD9�/vc�
Subdivision: �3`�' y� Lot#: q!� Plan#:�;�_ Zonin
g:_�—`/
/�New Construction Re-Model/Re-Roof/Addition Home Occupation Sign
Plumbing Mechanical : Mobile/Manufactured Home Placement Other
Project Description/Scope of Work:�(,�EU•1 �w6L1a' �i4�-r[.�/�Owt�
Project Value:�1j1'v, GCXJ 2�,�_2.� '1 -
Building Area(sq. ft) • 1St Floorqss 2"d Floorf�yl Garage 9� Deck�_
Basement Carport Patio
#Bedrooms� #Bathrooms a.� Heating: GAS/OTHER or ELECTRIC(Circle One)
Are there any environmentally sensitive areas located on the parcel? ��
/fyes, a completed environmental checklist must accompany permit application.
BUILDING OWNER NAME: (�C "�rvil�cY,•�•�T
ADDRESS��j � � EMAIL
CITY STATE(,v�l ZIP9fs�9 TELEPHONE
ARCHITECT/ENGINEERiIk,,G�lu�r� I��,wz �LICENSE#
ADDRESS `Y�'tol'f i.l)9{h S`t' EMAIL
CITYG�c�-wu,,Q STATE wN ZIP�tE TELEPHONE
GENERAL CONTRACTOR C1�'� �r�,c„q�•.i-...,'u TELEPHONE360 �y�V-U1(3�,_
ADDRESS��_ �„v,� d2�t�3 EMAIL ('�'�Do)(�.ciONn.��r��,•.,q��
CITY Yc�. STATE �rv4 ZIP 9gS97 FAX �v - 5r6'3-t!�l?-
CONTRACTOR'S LICENSE# EXP DATE CITY LICENSE#
PLUMBING CONTRACTOR �.s � [[ ,..,. Tw,rs TELEPHONE��i_�ic�ay59
ADDRESS r�q�9 K�M�'t- � EMAIL
CITY yt.st,,�.._. STATE wv( ZIP 9859-7 FAX
CONTRACTOR'S LICENSE# EXP DATE CITY LICENSE#
MECHANICAL CONTRACTOR.�,,�,,,� N�arzN� TELEPHONE m?,S3-87.5=„��Sv
ADDRESSSS�.L lEH� 3`C EMAI� c(�lo_r.n �J .Sa�•� �,,�rrx,�s�s,.+��
CITY ��STATE�✓14 ZI P�r'S37S� FAX�53-��z'' daE�
CONTRA TOR'S LICENSE# EXP DATE CITY LICENSE#
Copy of mitigation agreement with Yelm rnm�»unity Schools, if applicable.
I herek a�3. Z�� - D��� °nstruction on,and the occupancy and the use of the
above s and regulations of the State of Washington and the
City of
� � �� �
.� ��� �C- t�� (,��� - � J-�-
/y
Appli � � Date
Owne - _ � ent(Please circle one.)
� �
All pe � k authorized by such permit is not begun
withir ��` �r abandoned for a period of 1 ���.��D
� +� A
`V /�
� �� �\ �.� MAY 12 2014
�
105 Yel (360)458 • ----_`
Yelm,Y /'
( (360)458-3144 FAX
www.ci
� .�
�" �"�i �� � -
ht �'�"'� ` �
� �!, � � � �
�
� !` �
( � .. �� •'_ 3-
ft �
i r ,�
,,,� r ,
� �"'�r �
,.y.�, a � d.
M
� � � H ��
•F- � �- t w �
c'� , z � .
ww
� r. � � �, �
� a
� w
,_ w
m N
�� U Q ,
o Q �
, m ,
- , w � � -
-�` `� o z c�
� ? Ya J�
�- � Q n-
w
z � �
� w o
� o z
N cn Q
1 fl
� vy
� � � � m
� � � � /� �:
_ � .,�,,/��-,,�°,
� � -= �;�,; -� o
� ;,� �
3 � -- f.
i� �i ;, ",f �� �'' /f',�f��!'
lp ,...,,.�.,,._._...,........_....__ ,�� y! � � yf,�'��
1t . 3 ..�„��
�� � � � � � �� �� i�
..� f /i�ii ,-'/ �- "7
f ^�/ �s '^^! /,. �
/'?�' �1 /�.-� �%� 'r � O
� , r -,�
s
�� : ��� .
� � � � �, _� , a , , �* �
;.�� ; —' �;� m. � �����
. J, �/f�J�� /I�,� 1�m
� ���� ���,�Q �
" �,'',, , .�- ��, _
"��� ,-
_�--- �
� --'."��� � �� .
�1_
� �.
�1.� � _� .�. �:;, � �
r ,�,� � °�-�,.
V V� � � ��,� q� '�J , ""'+ ;�.2.. �
�' �—' �� �, .,
t� ��
� q � � � C`} � ,''. �r''�
3 � �' � �— �� �
� � � �- -�
r � � � c� # �,'
�"' -� O � a 2a �,
� � � '- � ,J `=y "�- ,
1� � �
� � d � � �
�EPRINT
YELM C�MMUNITY SCHOOLS
PO BQX 476
YELM WA 98597
Receipt #: 254141 Clerk: Croy
Manual #: Terminal: 1
5/7/2014 9:37 AM
NC AND E DEVELOP
NC AND E DEVELQP
C AND E, DEVELOPMENT5, LLC
17206 �MITH PRAIRIE RD SE
YELM, WR 98597
Qty._ .Ite�n .___ _ _ Price
___ _ _ ____ _--
1 CPF MITIGATI�JN 3015.00
MITIGATION
07-015/L07 94/9954 LOCUS7 CT SE; YELM
Subtatal 3015.00
Tax 0.00
Total 3015.00
Check 3015.00
7009
Change Due 0.00
THANlK YOU
�,�;�'°�"1f�,l�D
MAY 12 2014
BY:
A
� �-
0
N
� �
� � �
� C i
�
�1'
� c � c
0
!� �$ � ���
. � m d
�[�� a � ~ y C
V / � � � N W �
� m �0 �,
� W v > °
�
� � 0 � � �
\ .�-
V �
J m m � 9� Q � Q Q N Q � N Q � Q � Q ! Q
� � � � o� F � E � F � i � � � i � � � N > > >
ti
!� � a m � m �
� � m � �U �� °� o � n u u
� �-° c W c v
��� W m �C� � � � � �
� ..� 0 �N O � 0 � 9 y�j �9 � W �.s 'a jq��p �j � W � C
a� ry' � V � � � 41 O
Q � N � L p �i G V � p th Q N � a .- nj J J
G1 � �
`% � w = � q o � c W V �
✓> E c � m� � � a �( X X X X �t 1! �C X
� m ��W o `€0 =o ° o � c c
�� a m E � �° ��o m m � W m `o `o `o `o ° `o `o p` ° `o ° `o
c,F� � c �c, = m �-- ,g �- �'i o u � F'i �'v f"i m �'i �i f''iN i"i m u o�i i'i
N c a >,v �-, � � � �i w �'? a '�? a o A y w o 0 o w � w � w
o •"-' v o, h � °c � � 'a�'s F �i' ° �4' ° ur a �}' m �} 0 4r o �S' m �4 m �
� C in N a
m w � � ' � U v�i rv a' � � 7 > > > Z 7 > > Z LL Z t�
o � C o � � � 2
m e� � �
� ' c,E�S O y
� � ; �
m � mmo °7 �
E : ? >.� � � ► � ► ► ' / � ► : ►
� �b'.o �
"5¢ c �c� d �
U ' m �
� � a � n� � � 45 �
� > �
m � �a� d
•+ ' � E E �y � � � � �
N � Q
� `� v a"�i.E m � � -`� � ,'_A. � „ � ,
m
w � —° o m � � a m � `O � c '
� � c m � m °1 p m � � 3i — -� „
_ � � � o s a o = V F _ � ,
o ao � fi
a �� � �,� o � u, .s m ' � 8 t � m a
3 � W � �O� a, °d � =3 ` � � . a � a a o � p
� m o m c U . A , LL s 4 a �
.�o � � m q w cmi � S m o = m� > '� v ry � m ', � m :
m "-' v � '9 � � m m m � a a�L° � , in o�i ' z z E o�i � �' a°
N �.� o �� o� � � � a g� WQ o . ` ;'� � � :
� c�i � a� 3 �a a y C p o � � s
� � � m c a � m m t9 v
� U � � ' 0 �N w � � ' 3 � V 9 m : p � � _ C7
� N � � � m�� o N c r ..' m o ` ar a � =- p � C9 t9 m C
� m °' , �° : � �. m o
'm m � m � � m C � c � 9 ,; � � s .. '
C mIt- bo� �rn � v � :. W ._ ' �y � � � = 7 $ c � ` o . m :; e�a , w
�"' �i«1 c � —O S E � 3 � � m � C� a . Y C Q tlf � -. li m N M
� � � '� $ � ';m � = � = mp C9 N�
S � t0 �� o d W� � � d o
d � -� c� Q3 a u a >- i-
� � � � ~ � ' �
ac � m mq °� rn
tl w m l L c4i m o 0
tfl f- � 3�--oa ma`
t
� .
� � � � �
m � � m m
�r � o m o � �
� N � o m cc i� m v
N N � k�`'� �
� '' o E
a
LL
� �� m�
� � a �� �' a
v � � es'LL�
� � om0' ��
v g o � o� g�
W J
O ,0 J �� � v'iE Xk
N
� � � aom �i � �=�a
° G J k= F'a W..,..
m qac �o � $ ��
� � � � o'o'
�w * a o kv m +�c ° �S a ro
O Q y k 01 o C �w c � � m �
Z � C�Y k OI z Ol � � 7 a a
'" O 10 m C w C '- � c c
° c e
� m � m �9 `� £
J
tll W �a >m QmOO� r$m'
< ►
E
;':. :J
�
� :
4
� t
�
8
�
9
+1 � �
� y
�1� �
O
_ `.'
O
«
A
_. V _.
J �
3
rn
. IL.
� �
, L�&E,Calc'-l.xlsx Page 1 of 5
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Pro ect Information Contact Mformation
C&E Homes Sound Heatin and A/C
Plan 2565-J 253-875-3350
Yetm,Wa.
This project wiil use the requirements of the Prescriptive Path below and incorporate thE
the minimum values listed.In addition,based on the size of the structure,the appropriat
number of additional credits are checked as chosen by the permit applicarrt.
Authorized Representative Date
All Climate Zones
R-Valuee U-Facto�
Fenestration U-Fado�' n/a 0.30
S li ht U-Factor n/a 0.50
Glazed Fenestration SHGC �B n/a n/a
Ceilin 4� 0.026
Wood Frame Wall9� • 21 int 0.056
Mass Wall R-Value' 21/21 0.056
Floor 3�9 0.029
Below Grade Wall°� 10/15/21 int+TB 0.042
Slab R-Value 8�Depth 10,2 ft Na
'Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2.
Each dwelling unit in one and twafamily dwellings and townhouses,as defined in Section 101.2 of the
International Residerrtial Code shall comply with sufficient options from Table R406.2 so as to achieve the
following minimum number of credits:
1.Small Dwelling Unit: 0.5 poirrts
Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of
fenestration area. Additions to existing building that are less than 750 square feet of heated floor area.
2.Medium Dwelling Unit: 1.5 poirrts
All dwelling units that are not included in#1 or#3,inGuding additions over 750 square feet.
3.Large Dwelling Unit: 2.5 points
Dwelling units exceeding 5000 square feet of conditioned floor area.
Table R406.2 Summary
Option Description Credit(s)
1a E�cientBuildin Envelo 1a 0.5
1b EfficientBuildin Envelo 1b 1.0
1c Efficient Buildin Envelo 1c 2.0
2a Air Leakage Control and Efficient Ventilation 2a 0.5
2b Air Leaka e Control and Efficient Ventilation 2b 1.0
2c Air Leaka e Control and Efficient Ventilation 2c 1.5
3a Hi h Efficienc HVAC 3a 0.5 0.5
3b Hi h Efficien HVAC 3b 1.0
3c Hi h Efficienc HVAC 3c 2.0
3d Hi h Efficienc HVAC 3d 1.0
4 Hi h Efficienc HVAC Distribution S stem 1.0
5a Efficient Water Heatin 0.5
5b Efficient Water Heatin 1.5 /,�
6 Renewable Electric Ener 0.5 "1200 kwh 0.0
Total Credits 0.50
*Please refer to Table R406.2 for complete option descriptions d. Go
�v,ww.e .wsu.edu Documents 2012%20Res%20Ener . df
Table R402.1.1 Footnotes
https://dm2-excel.officeapps.live.com/�16.0.2731.1010/ layouts/xlprintview.aspx?&sessi... 5/16/2014
, C&E;Calc'-l.xlsx Page 2 of 5
For 51: 1 foot.=304.8 mm,ci.=continuous insulation,int.=intermediate framing.
a R-values are minimums.U-factors and SHGC are maximums.When insulation is installed in a cavity
which is less than the label or design thickness of the insulation,the compressed R-value of the
insulation from Appendix Table A101.4 shall not be less than the R-value specified in the table.
b The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed
fenestration.Exception:Skylights may be excluded from glazed fenestration SHGC requirements in
Climate Zones 1 through 3 where the SHGC for such skylights does not exceed 0.30.
�"10/15/21.+TB"means R-10 continuous insulation on the exterior of the wall,or R-15 on the
continuous insulation on the interior of the wall,or R-21 cavity insulation plus a thermal break
between the slab and the basement wall at the interior of the basement wall."10/15/21.+T6"shall be
permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5
continuous insulation on the interior or exterior of the wall."10/13"means R-10 continuous insulation
on the interior or exterior of the home or R-13 cavity insulation at the interior of the basement wall.
"TB"means thermal break between floor slab and basement wall.
d R-10 continuous insulation is required under heated slab on grade floors.See R402.2.9.1.
e There are no SHGC requirements in the Marine Zone.
f Basement wall insulation is not required in warm-humid locations as defined by Figure R301.1 and
Table R301.1.
g Reserved.
h First value is cavity insulation,second is continuous insulation or insulated siding,so"13.+5"means
R-13 cavity insulation plus R-5 continuous insulation or insulated siding.If structural sheathing covers
40 percent or less of the exterior,continuous insulation R-value shall be permitted to be reduced by
no more than R-3 in the locations where structural sheathing is used to maintain a consistent total
sheathing thickness.
'The second R-value applies when more than half the insulation is on the interior of the mass wall.
�For single rafter-or joist-vaulted ceilings,the insulation may be reduced to R-38.
k Int.(intermediate framing)denotes standard framing 16 inches on center with headers insulated
with a minimum of R-10 insulation.
�Log and solid timber walls with a minimum average thickness of 3.5 inches are exempt from this
insulation requirement.
Table R402.1.3 Footnote
a Nonfenestration U-factors shall be obtained from measurement,calculation or an approved source
or as specified in Section R402.1.3.
�
https://dm2-excel.o�ceapps.live.com/�16.0.2731.1010/ layouts/xlprintview.aspx?&sessi... 5/16/2014
�
�
m
, ; , . . . . , � � �- . � . . • : �
• J... .W . ... ,
.. . . . .... :.., .. . � � Q
i �
U
CRAWL SPACE �
"�e go ��here vou don't want ro" �
� Z°'�y�/��
CLEA � � PROS
Duct Leakage Affidavit
House address or lot number:_ �qS�� �o C,uS'�' C�' S�
CitY: — �2 �. Zip: 9 g S �(,
Cond. FloorArea (ft2): �1 �(� Source(circle one): la^s Estimated Measured
❑ Duct tightness testing is not required for this residence per exceptions listed at the end of this document
Air Hand�er in conditioned space?�yes �no Air Handler present during test? [�y s❑ no
Circle Test Method: Leakage to Outside otal Leakage
Maximum duct leakage:
Post Construction,total duct leakage: (floor area x.08)_ � 6 CFM@25 Pa
Post Construction, leakage to outdoors: (floor area x.06) = CFM@25 Pa
Rough-In,total duct leakage with air handler installed: (floor area x.06) = CFM@25 Pa
Rough-In,total duct leakage with air handler not installed: (fioor area x .04)= CFM@25 Pa
Test Result: «�' GFM@25Pa
Ring (circle one if applicable): Open 1 � 3
Duct Tester Location:_ I'�fic�.rYi Pressure Tap Location: !��ja�' T� �.�,
I certify that these duct leakage rates are accurate and determined using standard duct testing protocoi.
Company Name: C�.J� Sjoa �I{Gn,��,�, 'f'�ecl�ryr�n;� �h .y s�,,�/
Technician Signature: Date: 12-I 6`��/ Phone Number: o�S3• 507- 7(o fS o�
Washington State Energy Code reference:
503.10.3 Sealing.Ail ducts,air handlers,filter boxes,and building cavities used as ducts shall be sealed.Joints and seams shall comply
with Section M 1601.3 of the International Residential Code or 603.9 of the lntemational Mechanical Code. Duct tightness testing shall be
conducted to verify that the ducts are sealed.A signed affidavit documenting the test results shall be provided to the jurisdiction having
authority by the testing agent.When required by the building official,the test shall be conducted in the presence of department staff.
Exceptions: 1.Duct tightness test is not required if the air handier and all ducts are located within conditioned space.
2.Duct testing is not required if the furnace is a nondirect vent type combustion appliance installed in an unconditioned space.
A maximum of six feet of connected ductwork in the unconditioned space is allowed.All additional supply and retum ducts
shall be within the conditioned space.Ducts outside the conditioned space shall be sealed with a mastic type duct sealant and
insulated on the exterior with R-8 insulation for above grade ducts and R-5 water resistant insulation when within a slab or
earth.
-� �°� Y ���o
Duct testing Calculator (New Construction)
House address or lot#: q�(,S �UL;��� [;t S' '
Conditioned Floor Area: 2�y6
Duct tester location: �,�;,�.,-
Pressure tap location: �r,- (��/,z;�,,�
Ring (if applicable): Open 1 3
At Rough-in (Total Leakage)
Test Method & Test2 Calculated
Standardl CFM25 Target
Air Handler Present
.06 X CFA<_ CFMzs
<_ 6 CFMZS per 100 sf of CFA
Air Handler not Present
.04 X CFA 5 CFMzs
<_4 CFM25 per 100 sf of CFA
Post Construction
Test Method & Testz Calculated
Standard1 CFM25 Target
Air Handler Present(Total Leakage) .08 X CFA<_ CFM25
<_8 CFM25 per 100 sf of CFA
Air Handler Present(Leakage to Exterior) .06 X CFA<_ CFM25
<6 CFMzs per 100 sf of CFA
1. Test results must comply with one of the Standards options.
2. Test CFMZS must be equal to or less than the calculated target.
Air Leakage testing Calculator (elower poor TestJ
Standard CFM d Calculated Test Result
50
((�_CFM50 X 0.055)= °(>1�i� CFA X 144)) =SLA
0.00030 SLA � �
�.�3 divided by S'l��= SLA
SLA= .U�Z.3
Glossary
Rough-In: After installation of the complete air distribution system but before installation of insulation and sheet rock. Allows for
access to all duct seams and connections for re-evaluation of seal integrity if standard is not met in intitial test.
Post Construction: At or near final inspection. The home must be complete enough to pressurize the home to 25 pa.
Total Leakage: Aggregation of the entire systems duct leakage in a duct test.
Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CfA in a duct test.
CFA: Conditioned floor area
CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure
CFMso: Cubic feet per minute of air leakage at 50 pascals of pressure
Pascal(pa): Unit of pressure
SLA: Specific leakage area
U
d- j
O >
� N �
� Cfl �
� � � �
N � N �
� Q �
� � �
� � � � � O
� � � U �o
� � 0 �•UN
� � � �
� � � � U O >.
� � U �
� �
� � Z � � � >
q � � � �
� � � ��
ti � � � � � �
�y � �' cmV
� O .� � � �
� �, .� � ''-' o?
� '� N � o
� � � � � �
�
•N � � � � c
V � � �
,� � � � N
.,� •,� �� � �
� �
� �' W � U � v�
� p) (n Z c � `-
W � 0 � ��
� .� V � � W 'Q� �
� � � � � � �
0 4� ~ � � rn � o � U
�
� �j � wa' Q wC� .c o°
O W X � o°o ? � Z �n �
� � m � � � � O � �
� �ts O W p N O � �
rn U � >- cv Z U Q �
� � J U N
N a Q U' v�
�
� � �n ~
cn Z I— � . .
�/ � � "� � � O
� ;+_ (a
f 4'����fc e � � � � J U � U
�� u � � � � � � `�
Z Q O
� Q (Lf � � � �
�- a� � z Q � � � � �
� � a� a� � c`� �n � c
°�, � � c c � � c� '� �
�'`���'� m O O m � Q v� m