Loading...
20070404 Storm Drain Rpt 04012009Creek Street Mixed Use - Christensen Commercial FINAL STORM DRAINAGE REPORT Creek Street Mixed Use/Christensen Commercial Yelm, Washington Revised April 2OO9 Project Information Project: Creek Street Mixed Use SpR-07-O404-yL Prepared for: Rick ChristensenContact: Rick Christensen (360) 4s8-3602 Project Engineer Prepared by: Shea, Carr & Jewell, Inc. 2LO2 Carriage Drive Bldg. H Olympia, WA 98502 Phone: (360) 352-t465 Contact: James E. Gibson, p.E. Project Manager Project Number: 1290.01 Al.i3 0 r ?t0g Creek Street Mixed Use - Christensen Commercial CERTIFICATE OF ENGINEER : I hereby certify that this preliminary Drainage Report for the Creek Street Mixed Use/Christensen Commercial in yelm Washington has been prepared by me or under my supervision and meets theminimum standards of the 1992 Department of Ecology Stormwater ManagementManual for the Puget Sound Basin and normal standards of engineering practice. Iunderstand that the jurisdiction does not and will not assume liabitity for the sufficiency, suitability, or performance of drainage facilities designed by me. TowARo \ Z.;í.-wii,,\,\% ttr\Ti""ílii."l red by James E. Gibson, p.E. Creek Street Mixed Use - Christensen Commercial TABLE OF CONTENTS 1. STORM DRAINAGE REPORT ......... 1 1.1 PROPOSED PROJECT DESCRIPTION....,.... .........,. 1 L,2 EXISTING CONDITIONS...,. ..,,,,4 1.3 TNFTLTRATTON RATES/SOILS REPORT.... .............4 T,4 WELLS AND SEPTIC SYSTEMS ........... ...,... 5 1.5 FUEL TANKS............. ....., 5 1.6 SUB-BASIN DESCRIPTTON ,......., ................. 5 T,7 ANALYSIS OF 1OO YEAR FLOOD .,....... 5 1.8. AESTHETIC CONSIDERATIONS FOR FACILITIES....... ,...... 5 1.9 DOWNSTREAM ANALYSIS ....... ....... 5 1.10 COVENANTS, DEDICATIONS, EASEMENTS ..........5 1.11 PROPERTY OWNER'S ASSOCIATION ....... ..,......... 6 2. EROSION CONTROL REPORT. ,,,,,,,,.,7 2.L CONSTRUCTION SEQUENCE AND PROCEDURE ............ ...,......,7 2,2, TRAPPING SEDIMENT ,.,,,...7 2,3 PERMANENT EROSION CONTROL AND SITE RESTORATION...........,......... B 2.4 GEOTECHNICAL ANALYSIS AND REPORT. .......... B 2.5 INSPECTTON SEQUENCE..,, ....... B 2,6 CONTROL OF POLLUTANTS OTHER THAN SEDIMENTS ....,....... ....... 8 3. MAINTENANCE PLAN. ..,....9 3.1 REQUTRED MAINTENANCE . .........9 Appendices Appendix A-1 - Drainage Calculations Appendix A-2 - Drainage Basin Map and Preliminary Grading and Drainage Plans Appendix A-3 - Vicinity Map Appendix A-4 - FEMA Map Appendix A-5 - Soils Repoft + SCS Soils Report Appendix A-6 - AquaSwirl Data Appendix A-7 - Mounding Analysis, Landau Associates Appendix A-B - Draft Maintence Agreement Creek Street Mixed Use - Christensen Commercial 1.STORM DRAINAGE REPORT The format of this report follows the outline provided in the Drainage Design and Erosion Control Manual (DDECM) for Thurston County, 1994 Edition and meets the requirements of the 1992 Department of Ecology Stormwater Management Manual for the Puget Sound Basin. 1.1 PROPOSED PROJECT DESCRIPTION Project Proponent:Rick Christensen 11915 Clear Lake Rd S Eatonville, WA 98328 (360) 4s8-3602 64303400501 and 64303400502 A portion of Section 29, Township 17 North, Range 2 East, W.M. 6.12 acres c-2 10602 106th Ave SE Yelm, Wa. Parcel Number: Legal Description: Total Site Area: Zoned: Site Address: Project Overview: The 6.12 acre site is generally located in the eastern quadrant of the City of Yelm, Washington. This site is more specifically located to the north of State Route (SR) 507, east of Creek Street and west of Yelm Creek. The site is bisected by 106th Ave that begins at creek street and terminates at sR 507. This property and all surrounding properties are zoned C-2, The Creek Street Mixed Use project is a small portion of a larger project referred to as Yelm creek Apartments, Inc, The city of Yelm's Hearing Examiner granted approval for the project and issued the conditions of approval under City of Yelm'sproject number SPR-07-0404-YL. The multi-family portion of the project was engineered by sound Engineering Inc. and does not include tax parcels 64303400501 and 64303400502. This project will construct 3 new commercial building pads and associated parking to accommodate these uses. The proposed buildings are: a two story, 26,t6o square foot furniture store, 10,500 square foot retail building and 7,800 square foot retail building. This site already contains an 11,000 square foot building and parking lot. The developed area is to remain generally unchanged. The remainder of the site area is currently undeveloped and is mostly bare soil, sporadic brush and weedy vegetation. Shea, Carr & Jewell, Inc. April 2009 Creek Street Mixed Use - Christensen Commercial Development Coverage Summary: Proposed Building Roof Area Proposed Parking and Sidewalk Area Proposed Disturbed Pervious Area 0.69 Acres 1.43 Acres 0.41 Acres Existing Developed Right of Way 0.63 Acres Existing Developed Building Area 1.17 Acres Undisturbed Creek/Wetland Area 1.80 Acres Total Area 6.12 acres In 2004, a previous land use proposal was approved for this property. Jerome W. Morrisssette and Associates designed a storm water facility to provide adequate capacity to serve the entire 6.12 acres. The City of Yelm has since updated itsCritical Area Code and the storm water facility is no longer in conformance withcurrent codes. Given this, the project developer has elected to provide separatestorm water treatment and storage for the new buildings and associated additionalparking. These facilities have been sized to provide storm water mitigation for the additional 2.52 acres of new developed area. See Appendix A-2 for Drainage BasinMap. This project will also be replacing the existing bioswale stormwater treatmentwith an Aqua Swirl AS-3 treatment device, Stormwater Treatment: The roof runoff will be collected and conveyed directly to the stormwater conveyancesystem. Therefore, the sizing calculations for treatment were based on a total areaof 2,52 acres, 2.11 acres of impervious area and 0.41 acres of disturbed pervious area. The basin area has been divided into 2 sub-basins. These are referred to thenorth and the south basins. According to Section I-2.8 of the DOE Manual, the required stormwater treatmentflow is computed based on the 6 month storm flow. The 6 month storm is computed as 640/o of the 2 year storm. According to the isopluvial maps in Appendix AIII-1.1of the DoE stormwater manual, the yelm area has a 2 year storm of 2 inches,Therefore, the 6 months storm is 1.28 inches. Storm Shed software was used tocompute the 6 month stormwater flow. This flow was found to be 0.26 cfs in thenorth basin and 0.06 cfs in the south basin. See Appendices A-1 for Storm Shedmodel output showing this calculated flow. Stormwater treatment for the north basin will be provided by an AquaSwirl ModelAS-3 Stormwater Treatment System. This model will treat a water quality flow of upto 1.8 cfs. This will provide ample treatment for this basin. The 100 year storm forthe north treatment area was computed to be 1.57 cfs (see Storm Shed output inappendices). This is also well within the allowable flow for the unit and, therefore, an Shea, Carr & Jewell, Inc. April2O09 Creek Street Mixed Use - Christensen Commercial on-l¡ne system can be used without a bypass. see appendices for furtherinformation on the AquaSwirl system. Stormwater treatment for the south basin will be provided by an Aqua Swirl ModelAS-2 Stormwater Treatment System. This model will treat a water quality flow of upto 1.1 cfs. This will provide ample treatment for this basin. The 100 year storm forthe south treatment area was computed to be 0.59 cfs (see Storm Shed output in appendices). This is also well within the allowable flow for the unit and, therefore, an on-line system can be used without a bypass. See Appendices A-1 for further information on the Aqua Swirl system. In August 2004 JWM&A designed the existing stormwater facilities to treat andinfiltrate the entire 4.90 acres of the site. The treatment is obtained with a grass lined bioswale. We have proposed to replace this swale with an Aqua Swirl AS-3 treatment device. We have verified JWM&A's calculations and also resized the treatment flows based on the new collected areas for the existing stormwater pond. The area contributing to the existing pond is now reduced to 1.66 Acres from 4.90 Acres. See calculations located in Appendix A-2. Stormwater Storage: Stormwater in the south basin will be conveyed from the AquaSwirl treatment system to an infiltration trench meeting the requirements of Section III-3.6.5 of the1992 DOE Manual. It will be located along side the parking area east of theproposed building and has been sized to accommodate the 100 year storm event, Inaddition, per Section III-3.6.5 of the DOE manual, it must be demonstrated that the required volume for the 10 year storm can be recovered in 24 hours and the 100yearstorm in 48 hours. According to the isopluvial maps in Appendix AIII-1.1 of the DOE stormwater manual, the Yelm area has a 10 year storm of 3 inches and a 100year storm of 4 inches. The proposed infiltration trench will be comprised of washed rock only and will not contain perforated pipe. Therefore, per the WAC 173-218-050 Exemptions from UICwell status item #4, this stormwater system will not qualify as an UIC well. Roof runoff will be conveyed to the infiltration trench. Therefore, sizing calculationswere based on a total area of 0.74 acres, 0.52 acres of impervious area and 0,22 acres of disturbed pervious area. StormShed software was used to model and size the infiltration trench. Per therecommendations of the geotechnical investigation (see appendices), an infiltrationrate of 20 inches per hour was used for design. In Storm Shed, infiltration is modeled as a rating curve. A steady rate of flow of 0.33 cfs was computed based onthe bottom area of the trench. The rate is calculated by multiplying the square footage of the trench bottom by the infiltration rate in cubic feet second. (720 sf x(2O in/hr / 43200)). Per the model, a total volume of 430 cubic feet is required toprovide storage for the 100 year storm (see model output in appendices), Theinfiltration trench will be 6 feet wide, 120 feet long and 3 feet deep. This provides atotal available volume of 713 cubic feet with an additional 1 foot of freeboard above the active storage volume. See Appendix A-1 for model output and calculations. Shea, Carr & Jewell, Inc. April2009 Creek Street Mixed Use - Christensen Commercial Stormwater in the north basin will be conveyed from the Aqua Swirl treatment system to an infiltration gallery. It will be located in the parking area south of the proposed furniture building and has been sized to accommodate the 100 year storm event. In addition, per Section III-3.6.5 of the DOE manual, it must be demonstrated that the required volume for the 10 year storm can be recovered in 24 hours and the 100 year storm in 48 hours. The proposed infiltration gallery will be constructed using washed rock wrapped in geotextile fabric. The bottom of the pond area will located in native Spanaway gravelly soils conducive for infiltration. Roof runoff will be conveyed to the infiltration gallery via the parking lot storm water conveyance system. Therefore, sizing calculations were based on a total area of 1,77 acres, 1.59 acres of impervious area and 0.18 acres of disturbed pervious area. StormShed software was used to model and size the infiltration gallery. Per the recommendations of the geotechnical investigation (see appendices), an infiltration rate of 20 inches per hour was used for design. In Stormshed, infiltration is modeled as a rating curye. A steady rate of flow of 1.11 cfs was computed based on the bottom area of the trench. The rate is calculated by multiplying the square footage of the trench bottom by the infiltration rate in cubic feet second. (2,400 sf x (20 in/hr / 43,200)), Per the model, a total volume of 788 cubic feet is required to provide storage for the 100 year storm (see model output in appendices), The infiltration gallery will be 40 feet wide, 60 feet long and 2 feet deep. This provides a total available volume of 1,584 cubic feet. See Appendix A-1 for model output and calculations. Conveyance: Per the attached StormShed computations, the maximum 100 year flow for the entire site (including the roof) is 1.57 cfs. The proposed storm drainage conveyance pipes will be 72 inches in diameter and will have a minimum slope of 0.5%, Per Manning's Equation, a pipe with that diameter and slope has a capacity of about 3 cfs. Therefore, all pipes have sufficient capacity to accommodate on-site flows as they will be carrying flows from smaller areas. 1..2 EXISTING CONDITIONS The project area is mostly vacant. The site slopes east toward Yelm Creek, the existing building and existing stormwater facility. Slopes are generally flat varying from 1 to 3olo. There are no significant trees or vegetation. The existing ground cover is what has naturally grown in this area following the mass grading of the site in 2004. The site is located to the west of the Yelm Creek. The site contains associated wetlands, wetland buffers and 200' shoreline buffer of Yelm Creek. All work being proposed by this phase of the project is being done outside all critical areas. 1.3 INFILTRATIONRATES/SOILSREPORT The Soil Conservation Service (SCS) Soil Survey of Thurston County classifies on-site soils as Spanaway (110) series and NisquallV QÐ series. Shea, Carr & Jewell, Inc. April 2009 Creek Street Mixed Use - Christensen Commercial Soil testing was performed on-site to establish the expected infiltration rates of thesoils and to evaluate slope stability (report located in appendices). According to thisreport, on-site soils have infiltration rates of 20 inches per hour. Each stormwater facility has been sized by multiplying the bottom area of the infiltration gallery by the infiltration rate of 20 in/hr. This infiltration capacity is therate that was entered into StormShed modeling software. See separate modelingoutput for each gallery infiltration rate. L.4 WELLS AND SEPTIC SYSTEMS No wells or septic systems are known to be on-site. The existing STEP tank systemfor the current building has been designed in conformance with the City of Yelm's sewer system. The proposed infiltration facilities are not within 100 feet of anyadjacent parcels. water and sewer services will be connected to the city of yelm systems. 1.5 FUEL TANKS No fuel tanks are known to be on-site. A review of the Department of Ecology's Leaking Underground Storage Tanks (LUST) list did not indicate any existing orabandoned fuel tanks on the project site. 1.6 SUB-BASIN DESCRIPTION Stormwater from this development is contained on-site. No stormwater will be conveyed or directed to adjacent properties. There is no off-site drainage tributary to this site. L.7 ANALYSIS OF lOO YEAR FLOOD This project is adjacent to Yelm Creek. Yelm Creek does have a mapped 100-year flood plain and a copy of the FEMA FIRM Map has been províded in the appendices.This project is not constructing any improvements within the 100 year mapped floodplain. 1.8. AESTHETIC CONSIDERATIONS FOR FACILITIES All disturbed pervious area will be vegetated and landscaped. All above ground stormwater facilities will be landscaped after construction is complete. 1.9 DOWNSTREAM ANALYSIS All stormwater generated will be stored and infiltrated on-site, All retention facilities have been designed to retain and infiltrate the 100-year storm event. Therefore, downstream facilities will not be affected by this project, 1.10 COVENANTS, DEDTCATIONS, EASEMENTS On-site drainage facilities will require routine maintenance. A draft maintenanceagreement between the owner and City is attached in the appendices that will allow Shea, Carr & Jewell, Inc. April20O9 Creek Street Mixed Use - Christensen Commercial the City to access the facilities. The owner is responsible for performing regular maintenance of the storm drainage facllities. 1.1I PROPERTY OWNER'S ASSOCIATION The entire parcel is under a single ownersh¡p and will not require an association. Shea, Carr & Jewell, Inc, Aprll2009 Creek Street Mixed Use - Christensen Commercial 2. 2,1 EROSION CONTROL REPORT coNsTRucTIoN SEQUENCE AND PROCEDURE The proposed commercial development will include site grading and erosion control measures designed to contain silt and soil within the project boundaries during construction until permanent vegetation and site improvements are in place. Erosion/sedimentation control shall be achieved by a combination of structural/vegetative cover measures and construction practices tailored to fit the site. Best Management Practices (BMP's) will be employed to properly clear and grade the site and to schedule construction activities. Before any construction begins onsite, erosion control facilities shall first be installed. The planned construction sequence is follows: 1. Schedule preconstruction conference with the City, contractor, project engineer and construction staking surveyor. 2, Install rock construction entrance. use 4" to B" diameter quarry spalls with 12" minimum depth. 3. Install filter fabric fencing in the locations shown on the plans. 4, Provide inlet protection around existing catch basins. 5, Clear site (grubbing and rough grading). 6. Construct sediment trap. 7. Maintain equipment and water supply for dust control. B. Designate an area for washing concrete trucks to control the runoff andeliminate entry in the storm drainage system. 9. Install underground utilities. 10. Provide inlet protection around all new catch basins. ll.Maintain all erosion control facilities until the entire site is stabilized and silt runoff ceases. 2.2. TRAPPING SEDIMENT Filter fabric fencing will be installed to trap sediment before runoff exits the site. In addition, inlet protection will be installed around all existing and new catch basins tofilter out sediment before runoff enters the storm system. A stabilized construction entrance will be installed to prevent construction vehiclesfrom tracking soil onto roadways. If sediment is tracked off-site, it shall be swept or Shea, Carr & Jewell, Inc, November 2008 Page 6 Creek Street Mixed Use - Christensen Commercial shoveled from paved surfaces on a daily basis, so that it is not washed onto existingcatch basins or other storm drainage facilities. During the rainy season from November 1 through March 31, the contractor mustcover any disturbed areas greater than 5,000 sf in size if they will be unworked for more than 12 hours. Mulch, sodding, or plastic covering shall be used to prevent erosion in these areas. 2.3 PERMANENT EROSION CONTROL AND SITE RESTORATION All disturbed areas will be paved with asphalt, covered with buildings, or tandscapedwith grass, shrubbery, or trees per the landscaping plans, 2.4 GEOTECHNICAL ANALYSIS AND REPORT None of the storm drainage facilities are located near the top of a steep slope. Therefore a geotechnical analysis for slope or soil stability was necessary. 2.5 INSPECTTON SEQUENCE In addition to required Cíty inspections, the project engineer will inspect facilitiesrelated to stormwater treatment, erosion control, storage, and conveyance duringconstruction. At a minimum, the following items shall be inspected at the time specified: 1. The erosíon control facilities shall be inspected before the start of clearing andgrading to ensure the following structures are in place:a. Construction Entranceb. Filter Fabric Fencec. Inlet protection of existing catch basins.2. The conveyance systems will be inspected after construction of the facilities,but before project completion to ensure the following items are in working order:a. Pavement Drainageb. Catch Basinsc. Conveyance piping 3. The stormwater treatment and storage systems shall be inspected during andafter construction to ensure:a. The facility is constructed to design specifications and that protection from sediments in place.4, The permanent site restoration measures shall be inspected after landscapingis completed. A final inspection shall be performed to verify final grades, settings of controlstructures and all necessary information to complete the Engineer's ConstructionInspection Report Form. This form must be completed prior to final public works construction approval. 2,6 CONTROL OF POTLUTANTS OTHER THAN SEDIMENTS The contractor will be required to designate a washdown area for concrete trucks aswell as a temporary stockpile area for construction debris. Vehicle fueling, washing,or maintenance shall occur in designated areas only. Shea, Carr & Jewell, Inc. November 2008 Page 7 Creek Street Mixed Use - Christensen Commercial 3. MAINTENANCE PLAN 3.1 REQUIRED MAINTENANCE The following pages contain maintenance needs for most of the components that arepart of the project's drainage system, as well as for some components that theproject may not have. The checklist should be competed for all system components on the following schedule: M. Monthly from November through April A. Once in late summer (preferably September). S. After any major storm event (use 1" in 24 hours as a guideline) items markedttS" only. Using photocopies of these pages, check off the problems investigated each time aninspection was performed, Add comments on problems found and actions taken. Keep these "Checked" sheets in the files as they will be used to rite an annual report(due in May). Some items do not need to be looked at every item an inspection isdone. Use the suggested frequency at the left of each item as a guideline for theinspection, The jurisdiction may be called for technical assistance. Please do not hesitate to call, especially if it is unclear whether a particular situation may be a problem. Shea, Carr & Jewell, Inc, November 2008 Page 8 APPENDIX A-1 - DRAINAGE CALCULATIONS Page I of3 Appended on: Thursday, March 26,200910:06:00 AM LPOOLCOMPUTE [North Basin Level Pool] SUMMARY using Puls, 24 hr Storm Event Start of live Summary Report of all Detention Pond Data VOL(JM€ èluug,c¡¡ seô \^/A'rg Fa €LeV. Project Precips BASLIST2 [North Basin lNorth Basin LSTEND 100-year prel Using ITYPEIA.RAC] As [00 year] 124.01 100-year postl Using ITYPEIA.RAC] As [00 year] Í24.01 0.0181 BasinID Event Peak Q (cfs) Peak T lhrsl Peak Vol lac-cfl Area lacl Method/Loss Raintype North Basin 100- year Dre 100 vear 0.7443 8.01 0.2686 1.7753 SCS IYPEIA.RAC North Basin 100- | LeaL post I I roo I y.ut 1.573 8.01 0.s23 1.7753 SCS TYPEIA.RAC BASLIST [North Basin 10O-year pre] fNorth Basin 1O0-year post] LSTEND Record Id: North Basin 100-year pre TYPEIA.RAC 10.00 min 1.7753 ac file:/Al:\Projects\1290 Rick Ch¡istensen\1290.01 l06th Ave. Commerical-Retail Develop... 312612009 Record Id: North Basin 100-year post Page2 of3 HYDLIST SUMMARY [00 year out] LSTEND STORLIST fNorth Basin Pond - 1O0-year Storm] fi le ://Ì.,1 :\Proj ects\ I 290 Rick Chri stensen\ I 290. 0 1 Pervious CN Calc Sub cn 1.7753 ac Pervious itcd CN ( AMC 2 Pervious TC Calc 5.00 min Pervious TC 5.00 min Design Method SCS Rainfall type TYPElA.RAC Hyd Intv 10.00 min Peakine Factor 484.00 Storm Duration 24.00 hrs Abstraction Coeff 0.20 Pervious Area 1.7753 ac 0.00 ac Perryious CN 9s.89 0.00 Pervious TC 5.00 min 0.00 min Pervious CN Calc Description SubArea Sub cn Pervious Landscape Area 0.1785 ac 77.00 Impervious Parkine Area 1.0829 ac 98.00 I Impe*ious gldg er.a 0.5139 ac 98.00 Pervious Composited CN (AMC 2)9s.8885 Penious TC Calc Type ll Description Length ll Stope fc".ff-l[-vri*TT sheet I t- o.oo ft-l[.r'z,I 5r lfgoo-'5.00 min Pervious TC 5.00 min Peak T (hrs eak Vol (ac-ft l06th Ave. Commerical-Retail Develop... 3126/2009 Page 3 of3 LSTEND Record Id: North Basin Pond - 100-year Storm DISCHLIST fNorth Basin 40x60 Gallery] LSTEND Record Id: North Basin 40x60 Gallery Staee-Discharse Ratine Curve Descrip: llPrototype Structure ffit o.roft Start El. ll 348.00 ft Max El. ll 350.00 ft 348.00 0.00 348.10 1.1I 3s0.00 r.l I Licensed to: Engenious Systems, Inc. fi le ://1.,1 :\Proj ects\ 1 290 Rick Chri stensen\ I 2 90. 0 I l06th Ave. Commerical-Retail Develop... 3/26/2009 INFILTRATION SIZING - NORTH GALLERY PROJECT: Creek Street Mixed Use - Christensen Commerclal PROJECT NO.: 1290.01 TE: 4lI7 lnfiltration Pond Design: 40 feet wide 60 feet long 2 feet tall TotalVolume Provided = 4,800 cf TotalVolume Provided = Minus Rock Volume (33%) 1,584 cf For StormShed lnput, need the following information: Area = TotalVolume/Total Depth Elevation Area Volume Volume Summary02400001 2400 2400 24002 2400 2400 4800 INFILTRATION RATING CURVE PRoJECT: CREEK STREET MIXED usE - cHRrsrENsEN coMMERcTAL PROJECT NO.: 1290,0L ,TE: 4lI7 Ftow=kiA=k(y/d)A Jç = infiltration rate (in/hr)i= unity[ = gallery bottom area (square feet) y = feet above high ground water elevation 6l = 3 feet (minimum distance to groundwater) North Drainage Basin lnfiltration Gallery: ft = 20 in/hr[ = 2,400 sfy=3ftd=3ft Q = 1.11 cfs Flow from infilhation gallery. Use for outlet control in StormShed Model. Page I of3 Appended on: Friday, October 24,200811246:46 AM LPOOLCOMPUTE [South Basin Level Pool] SUMMARY using Puls, 24hr Storm Event Start of live stora :344.5fit V ocL/ /Ø €Summary Report of all Detention Project Precips Event Precip (inl 5 month - treamenl 1.28 2vr24fu 2.00 l0 year 3.00 I 00 year 4.00 Pond Data Pc ,t.-r r) p.r=G. (ì e eì \./ A*n o^./ BASLIST2 [South Basin [South Basin LSTEND 1O0-year prel Using ITYPEIA.RAC] As [100 year] t24.0)100-year postl Using ITYPEIA.RAC] As [100 year] t24.01 0.3143 0.3333 0.3143 EIA.RAC Basin 100- BASLIST [South Basin 1O0-year pre] [South Basin 1O0-year post] LSTEND Record Id: South Basin 100-year pre TYPEIA.RAC 10.00 min Pervious CN file://C:\Documents and Settings\JimG\Desktop\Christensen Comm Pond Verfication.html 10/24/200g Page 2 of 3 0.00 min Pervious CN Calc Pervious Composited CN (AMC 2 Pervious TC Calc Pervious TC Record Id: South Basin 100-year post Desien Method SCS Rainfall tvne TYPEIA.RAC Hvd Intv 10.00 min Peakins Factor 484.00 Storm Duration 24.00 hrs Abstraction Coeff 0.20 Pervious Area 0.7496 ac DCIA 0.00 ac Pervious CN 91.60 DC CN 0.00 Pervious TC 5.00 min DC TC 0.00 min Pervious CN Calc Description SubArea Sub cn Impervious Parking Area 0.3426 ac 98.00 Impervious Area Blde 0.1786 ac 98.00 Pervious Landscaping Area 0.2284 ac 77.00 Pervious Composited CN (AMC 2)9r.6014 Pervious TC Calc Type ll Description ll Leneth ll Slope c*ff-_lt Mir.TTsJ ll ooo t"5.00 min Pervious TC 5.00 min HYDLIST SUMMARY [00 year out] LSTEND HydID llPeak Q (cfsl Peak T (hrs)llPeak Vol (ac-ftl Cont Area lacì I 00 year out 0.3333 7.s7 0.1926 0.7496 STORLIST [South Infrlt Gallery - 1OO-year Storm] file://C:\Documents and Settings\JimG\Desktop\Christensen Comm Pond Verfication.html 1012412008 Page 3 of3 LSTEND Record Id: South Infilt Gallery - 100-year Storm DISCHLIST [South Basin Infiltration Gallery] LSTEND Record Id: South Basin Infiltration Gallery 5 Gallery Sizing for 10O-year and Bl Type Node Staee-Discharse Ratins Curve 344.51 0.3333 347.s0 0.3333 Licensed to: Shea, Carc &, Jewell Inc. fìle://C:\Documents and Settings\JimG\Desktop\Christensen Comm Pond Verfication.html ly/24/200g Page I of I Appended on: Friday, November 2102008 llz2l:24 AM South Basin 6-month storm Event Summarv Record Id: South Basin 6-month storm Hvd Vol (acft 8.0117 2 vr 241'r 8.01 l7 0.1373 All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the duration. If some design event precipitations are for different duration storms, those results are Desien Method SCS Rainfall tvne TYPEIA.RAC Hyd Intv 10.00 min Peakine Factor 484.00 Storm Duration 24.00 hrs Abstraction Coeff 0.20 Pervious Area 0.571 ac DCIA 0.00 ac Pervious CN 89.60 DC CN 0.00 Pervious TC 5.00 min 0.00 min Pervious CN Calc Description t@ Sub cn Pervioius Landscape Area t@ 77.00 Impervious Parkins Area l@ 98.00 Pervious Composited CN (AMC 2)89 60 Pervious TC Calc rype ll oes."iption --_]l- L"rsrh-lt-Stñ;l Tc*rr ll--ivli..-TT sheet I [qloft ll-o0%5.0 ll 0.00 in ll 5.00 min Pervious TC 5.00 min Licensed to: Shea, Can &. Jewell Inc. fì le :/Atr :\Proj ects\ I 290 Rick Chri stensen\ 1 290. 0 I 106th Ave. Commerical-Retail Develop. .. 11121/2008 INFILTRATION TRENCH PROJECT: Creek Street Mixed Use - Christensen Commercial ECT NO.: 1290.01 DATE: LUz4l2OOg lnfiltration Gallery Design: 6 feet wide 120 feet 3 feet tall TotalVolume Provided = 648 ,cf (Assumes 30% void space in gallery rock) Volume 1 foot below top = _ 492 cf Allows for 1 foot of freeboard For StormNet lnput, need the following information: Area = TotalVolume/Total Depth Elevation Area Volume Volume Summarv0162001 162 162 1622 162 162 3243 162 162 486 INFILTRATION RATING PROIECT: creek street Mixed use - christensen commercial ECT NO.: 1290.01 DATE: ttlz4tzÙO9 Ftow=kiA=k(y/d)A Jç = infiltration rate (in/hr)j= unity{ = pond bottom area (square feet) y = feet above high ground water elevation çl = 3 feet (minimum distance to groundwater) Drainage Basin #1 lnfiltration Gallery: Q = 0.33 cfs Flow from infiltratíon trench. Use for ouflet control in StormShed Model. ft = 20 in/hrfi= 720 sfy=3ftd=3ft Page I of I Appended on: Wednesday, April 22, 2009 10:55:09 AM EX POND AFTER DEVELOPMENT Event Summary \-TPE¿\-rI4€MT ÞeslRecord Id: EX POND AFTER DEVELOPMENî Hvd Vol lacft 0.1475 0.7383 1.1325 0.3837 0.s2t9 All results based oÀs duration. If some luration of 24.0 hours. This is ok if all precipitations are appropriate for the ign event precipitations are for different duration storms, those results are TYPElA.RAC 10.00 min bstraction Coeff Pervious TC 0.00 min 0.00 min Pervious CN Calc Pervious Composited CN (AMC 2 l.bt *c AF.FER -TÐ Nl e, Licensed to: Engenious Systems, Inc. A¿e? To g:}- Po¡-t Þ P-en¡ ò u r r,r 5 +-2:E7. Pô q TÈ_l) w c>ALLæ-tes. file ://1.,1 :\Proj ects\ I 290 Rick Chri stensen\ I 290. 0 I l06th Ave. Commerical-Retail Develop... 412212009 Page 1 of I Appended on: Wednesday, April 22,200910:16:33 AM EXISTING POND Event Summary BASED oM Jt z^¿ A PeFaz} ktçzø* Record Id: EXISTING POND Peak T (hrs 0.1916 8.01 l7 0.4195 8.01 l7 1 .1 534 I results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate forire rrm duration. If some design event precipitations are for different duration storms, ihosé results are TYPElA.RAC 10.00 min kins Factor traction Coeff Pervious CN Calc SubArea Impervious Area Pervious Composited CN (AMC 2 Licensed to: Engenious Systems, Inc. fi le :/AI :\Proj ects\ I 290 Rick Chri stensen\ I 290. 0 I 106th Ave. Commerical-Retail Develop... 412212009