20070404 Water Cmt 3 01082010Plan review for Creek Street Mixed Use Phase 2 ________________________________ From: Deonne Hardy Sent: Friday, January 08, 2010 2:39 PM To: Edward Smith Creek Street Mixed Use Commercial ________________________________ Creek Street Mixed Use Commercial 8 January 2010 Water Department 1. The water main should be an eight inch main and the 45 degree bend needs to be an eight inch bend too. Note 3 2. After note eight, the main size say's six inch and should be eight inch water main. 3. On note ten, need to add thrust block. 4. Make sure at note 14 and 15 the Double Detector Check Valve Assembly is installed to the fire main and not the FDC. 5. Need to field locate existing water meter box's and see if they are plumbed for one inch meters. If the meter box's exist. 6. Need to put in an eight inch gate valve at the end of main at note 12 and a thrust block. We don't know when the next project will be done. Reviewed by, Edward Smith John I. Tim R.