20070404 Water Cmt 3 01082010Plan review for Creek Street Mixed Use Phase 2
________________________________
From: Deonne Hardy
Sent: Friday, January 08, 2010 2:39 PM
To: Edward Smith
Creek Street Mixed Use Commercial
________________________________
Creek Street Mixed Use Commercial
8 January 2010 Water Department
1. The water main should be an eight inch main and the 45 degree
bend needs to be an eight inch bend too. Note 3
2. After note eight, the main size say's six inch and should be
eight inch water main.
3. On note ten, need to add thrust block.
4. Make sure at note 14 and 15 the Double Detector Check Valve
Assembly is installed to the fire main and not the FDC.
5. Need to field locate existing water meter box's and see if they
are plumbed for one inch meters. If the meter box's exist.
6. Need to put in an eight inch gate valve at the end of main at
note 12 and a thrust block. We don't know when the next project will be
done.
Reviewed by,
Edward Smith
John I.
Tim R.