20070404 Creek Rd Mixed Use Project 11042008 Hey, on that 24 rainfall distribution numbers. It appears that the Christenson project used: 100 yr 24 hr rainfall = 6.15" 6 mo 24 hr rainfall (treatment flow) = 1.79" It is almost imposible to get a value off the Isopluvial maps provided within the manual. This values are also consistent with the Thurston Co. requirements. Can you verify with some other reports, or standard practice within Yelm if these are the acceptable values? I would also like to note, that as we discussed I beleive the correction factor based on impervious surfacing is not applicable to infiltration facility BMP's. Due to the fact that the runoff is not contributing to surface flows. Can you verify that information as well and shoot me back an email. Thanks again. Jamey Barr Project Engineer Sound Engineering, Inc. 1102 Commerce St., Suite 300 Tacoma, WA 98402 Ph. (253)-573-0040 Fax (253)-573-0142