20140164 LGT SUM2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013
Project Info
Project Address Olympia Federal savings
Date 7/3/2014
Corner of Yelm Ave and Tahoma Blvd
For Building Department Use
Yelm, WA
Applicant Name: BCE Engineers, Inc.
Applicant Address:
Applicant Phone:
Project Description
New Building ❑ Addition ❑ Alteration ❑ Plans Included
Lighting Compliance
Path
Q Lighting Power Density Calculations Q Total Building Performance
(If Total Building Performance then only LGT -CHK is required.)
Interior Lighting
Compliance Option
® Building Area Method Q Space -by -space Method
Interior Lighting System
Description
Briefly describe lighting
system type and features.
LED downlight and pendants throughout with low voltage controls for
automatic shut -off.
Additions and Change of Space Use (C101.4.3 & C101.4.4)
❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project
❑ Addition area or Change of Space Use area is combined with existing building lighting systems to demonstrate compliance with all
applicable provisions
Provide Building Area Method (LTG - INT -BLD) or Space -By -Space Method (LTG -INT- SPACE) Compliance Form. Document maximum
allowed and proposed (including existing if applicable) lighting wattage of Addition or Change of Use scope. Provide applicable lighting
controls per C405.2 and commissioning of lighting controls per C405.13.
Alterations, Renovations and Repairs (C101.4.3.1)
❑ 60% or more of luminaires in space replaced
❑ Provide Building Area Method (LTG -INT -BLD) or Space -By -Space Method (LTG -INT- SPACE) Compliance Form. Document maximum
allowed and proposed (including existing) lighting wattage of project scope
❑ Less than 60% of luminaires in space replaced
Provide Space -by -space Method (LTG - INT - SPACE) Compliance Form. Document existing total wattage in space and proposed
(including existing) lighting wattage of project 'scope
❑ Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased
❑ New wiring installed to serve added fixtures and /or fixtures relocated to new circuit
❑ Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific
application controls (C405.2.3), and commissioning of lighting controls per C405.13
❑ New or moved lighting panel
❑ Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of
lighting controls per C405.13.
❑ Space is reconfigured - luminaires unchanged or moved only
❑ Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13.
❑ No changes are being made to the interior lighting and space use not changed.
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
• • • • • ' • • 111111 EM
2012 Washinaton State Enerav Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013
Project Info
Project Address Olympia Federal Savings
Date 7/3/2014
Corner of Yelm Ave and Tahoma Blvd
For Building Department Use
Yelm, WA
Applicant Name: BCE Engineers, Inc.
Maximum Allowed Lighting Wattage
Building Area
Location (plan #,
room #, or ALL)
Area Description
Allowed
Watts per ft2'
ross n erior
Area in ft2
Watts Allowed
(watts /ft2 x area)
Retail
E2.01
Bank
1.33
5830
7754
PL3- LED Decorative Pendant
3
13
39
Retail
E2.01
RLl- LED Recessed
21
22
470
Retail
E2.01
RL2- LED Arch Troffer
27
35
940
Retail
E2.01
* Lighting Power Allowances per Table C405.5.2(1) Total
5830
7754
Proposed Lighting Wattage
Areas with low LPD's. Check that all proposed fixtures are entered:
Retail
Building Area
Location (plan #,
room #, or ALL)
Fixture Description
(Include exempt equipment per Note 5)
Number of
Fixtures
Watts/
Fixture
Watts
Proposed
Retail
E2.01
PLl- LED Large Pendant
10
104
1040
Retail
E2.01
PL2- LED Pendant Cylinder
8
23
181
Retail
E2.01
PL3- LED Decorative Pendant
3
13
39
Retail
E2.01
RLl- LED Recessed
21
22
470
Retail
E2.01
RL2- LED Arch Troffer
27
35
940
Retail
E2.01
SLl- LED Wrap
8
48
384
Retail
E2.01
TLl- LED Track Head
6
13
78
Retail
E2.01
WLl- LED Display
2
18
36
Retail
E2.01
EX1- Exit Sign
2
3
6
Retail
E2.01
EX2- Egress Light
9
3
27
Retail
E2.01
SL3- LED Display
4
5
20
Retail
E2.01
UCl- LED Task
12
24
288
Retail
E2.01
PL4- LED Downlight
12
39
468
Total Proposed Watts may not exceed Total Allowed Watts for Interior Lighting Total Proposed Watts
3 97 7
Notes:
1. Proposed Wattage for each Building Area type shall not exceed the Allowed Wattage for that Building Type. Trading wattage between
Building Area types is not allowed under the Building Area Method compliance path.
2. Proposed fixtures must be listed in the building area in which they occur. Include ALL fixtures.
3. For proposed Fixture Description, indicate fixture type, lamp type (e.g. T -8), number of lamps in the fixture, and ballast type (if included).
For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information.
4. For proposed Watts/Fixture, use manufacturer's listed maximum input wattage of the fixture (not simply the lamp wattage) and other criteria
as specified in Section C405.5.1. For line voltage track lighting, list the greater of actual luminaire wattage or length of track multiplied by 50,
or as applicable, the wattage of current limiting devices or of the transformer. For low voltage track lighting list the transformer rated wattage.
5. For lighting equipment eligible for exemption per C405.5.1, note exception number and leave Watts/Fixture blank.
2012 Washington State Energy Code Compliance Forms for Commercial, G
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
R1, and > 3 story R2 and R3
Revised June 2013
Project Info
Proj Addres Olympia Federal Savings
Date 7/3/2014
Corner of Yelm Ave and Tahoma Blvd
For Building Department Use
Yelm, WA
Name: BCE Engineers, Inc.
Appl. Name
Appl. Phone
Project Description
F1 New ❑ Addition ❑ Alteration ❑ Plans Included
Lighting Zone
(as specified by Jurisdiction)
O Zone 1 O Zone 2 Q Zone 3 0 Zone 4
Compliance Option
Lighting Power Density Calculations 0 Total Building Performance
Building Grounds
(luminaires > 100 Watts)
cacy > 60 lumens/W ❑ Controlled by motion sensor
E2Eff
emption (list)
Alteration Exceptions
(check appropriate box -sec. C101.4.3.1)
❑ No changes are being made to the exterior lighting
❑ New wiring installed to serve added fixtures and /or fixtures relocated to new circuit
Provide applicable exterior lighting controls (C405.2.4) and commissioning of lighting controls
per C405.13
Tradable Maximum Allowed Lighting Wattage Base Site Allowance:
750
Tradable Surfaces
Description
Allowed a s
per ft2 or per If
Area (ft ), perimeter
(If) or # of items
Allowed Watts
x ft2 (or x If)
Uncovered Parking and drives
Parking Lot and Drive -up banking
0.10 W /ft2
7400
740
Grounds Walkways <10 wide
Site sidewalks
0.8 W /LF
222
178
Main Entry
Building Primary Entries
0 W /LF of door widt
12
360
Other Entries
Secondary Entries /Egress
10 W /LF of door widt
3
60
Entry Canopies
Entries
0.4 W /ft2
3.528
611
Total Allowed Tradable Watts:
1949
Tradable Proposed Lighting Wattage (use mfgr listed maximum input wattage for luminaire.)
Surface
Fixture Description
Number of
Fixtures
Watts/
Fixture
Watts
Proposed
Parking and Drives
ALI- LED Area Light
4
70
280
Parking and Drives
AL2- LED Area Light
2
70
140
Walkways
BLl- LED Bollard
3
18
54
Canopy
RL3- LED Downlight
6
43
260
Canopy
SL2- LED Downlight
3
43
130
Entries
WL2- LED Wall Pack
5 1
50
Total proposed tradable watts may not exceed the sum of total allowed tradable watts plus Total Proposed Tradable Watts: 915
the base site allowance. Any base site allowance not needed to make tradable watts comply
can be applied to individual non - tradable categories.
Non - Tradable Maximum Allowed Lighting Wattage Base Site Allowance Remaining:
750
Non - Tradable Surfaces
Description
Allowed Watts
per ft2 or per If
Area (ft), perimeter
(If) or # of items
Allowed Watts
x ft2 (or x If)
Bldg. Fagade (by Perim)
Planter Lighting
3.75 W /If
66
248
Non - Tradable Proposed Lighting Wattage
Surface
Fixture Description
Number of
Fixtures
Watts/
Fixture
Watts
Proposed
Bldg. Fagade (by perim)
IL1-Waterproof LED Tape
66
3
182
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Non - tradable proposed watts may not exceed allowed watts for any individual Total excess Non - Tradable watts:
surface unless the total excess watts for all non - tradable surfaces are less than the
remaining site allowance. Site Allowance Balance:
2012 Washinaton State Enerav Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013
Project Address Olympia Federal savings
Date 7/3 /2014
The following information is necessary to check a permit application for compliance with the lighting, motor, and transformer requirements
in the 2012 Washington State Nonresidential Energy Code.
Applicability
Code
Location
Building Department
(yes, no, n.a.)
I Section
Component
Information Required
on Plans
Notes
LIGHTING CONTROLS (Section C405.2)
Yes ®
C405.2.1
Manual lighting
Lighting control schedule with type, locations served, 50%
E2.01
controls
lighting reduction method
Yes
Lighting systems automatic shut -off capability - indicate
C405.2.2.1
Automatic time
method and location served on plans. Note locations where
E2.01
switch controls
automatic shutoff is provided by other method (occupancy
sensor, daylight controls, etc)
Yes
Override switching
Schedule with locations served - no single override switch
E2.01
exceeds an area of 5,000 SF
Yes
C405.2.2.2
Occupancy sensors
Schedule of locations served
E2.01
Yes
C405.2.2.3
Daylight zones
E2.01
Yes
Vertical fenestration
Primary and secondary daylight zone areas indicated on
E2.01
plans
Yes
Skylights
Skylight daylight zone areas indicated on plans E2.01
405.2.2.3.
Daylight zone
Lighting control schedule with dimming method and locations
E2.01
controls
served - no single daylight control zone exceeds 2,500 SF
Yes
Specific application lighting controls are independent of
C405.2.3
Specific application
general area lighting and controls for other lighting E2.01
controls
applications
Yes
Means of egress
Lighting control schedule with method and locations served. E2.01
lighting
Note luminaires that function as both normal and egress.
Yes
Display lighting
Lighting control schedule with type and locations served E2.01
Yes
Accent lighting
Lighting control schedule with type and locations served E2.01
N.A.
Hotel /motel guest
Lighting control schedule with type and locations served
rooms
Yes
Supplemental task
Lighting control schedule with type and locations served
E2.01
lighting
Yes
Non - exempt lighting
Lighting control schedule with type, applications served and
E2.01
equipment
locations
N.A.
Non - exempt lighting
Lighting control schedule with type, applications served and
equipment
locations
C405.2.4
Exterior lighting
Lighting control schedule with type, features and location
E2.01
controls
served
INTERIOR LIGHTING POWER (Section C405.5)
Yes
C405.5.1
Total connected
Schedule with fixture types, lamps, ballasts, watts per fixture
Eo . 01
lighting power
N.A.
Space exceptions
Space exceptions taken noted on plans or compliance form
Lighting equipment
Equipment exceptions taken noted on plans or compliance
N.A.
exceptions
form
Yes
C405.5.2
Lighting power
calculations
Method
Compliance form completed — proposed wattage per building
Yes
Building Area
area does not exceed maximum allowed wattage
Space -By -Space
Compliance form completed —total proposed wattage does
N.A.
Method
not exceed maximum allowed wattage
Yes
C405.4
Exit signs
All internally illuminated exits sign are < 5 watts per side
EO.01
EXTERIOR
LIGHTING POWER (Section C405.6)
C405.6.2
Total connected
Schedule with fixture types, lamps, ballasts, watts per fixture
EO.01
lighting power
Exterior application
Exterior application exceptions taken noted on plans or
exceptions
compliance form
Lighting power
Compliance form completed — proposed wattage for exterior
EO.01
calculations
lighting plus base site allowed does not exceed max. allowed
C405.6.1
Exterior building
1grounds
Schedule with fixture types, lamps, ballasts, watts per fixture;
I
E0.01
lighting
lumens per watt for fixtures > 100 watts
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
• • 1 • • • •
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013
Project Address Olympia ympia Federal Savings
7/3/2014
The following information is necessary to check a permit application for compliance with the lighting, motor, and transformer requirements
in the 2012 Washington State Nonresidential Energy Code.
Applicability
Code
Location
Building Department
(yes, no, n.a.)
Section I
Component
Information Required
on Plans
Notes
ELECTRICAL POWER SYSTEMS (Sections
0405.7 ,C405.9, C405.12, C409.2.1)
N.A.
Electrical energy
C409.2.1
consumption — whole
Meters provided for whole building electric energy usage
building
N.A.
Electrical energy
C405.7
consumption —
Individual dwelling unit electricity meters provided
dwelling units
N.A.
C405.9
Transformers
Indicate transformer size and efficiency on plans
N.A.
Variable speed
C405.12.1
escalators and
Variable speed controls provided
moving walks
N.A.
0405.12.2
Regenerative drives
Variable frequency regenerative drives provided for escalators
COMMISSIONING (Sections C405.13, C408.3, 0409.4.4
Yes
C405.13
Commissioning
Commissioning procedure developed for all applicable
systems
Yes
C408.3
Lighting controls
Commissioning plan and functional test procedure developed
EO. 01
N.A.
0409.4.4
Electrical energy
Commissioning plan and functional test procedure developed
consumption meters
N.A.
Escalators & moving
Commissioning plan and functional test procedure developed
walks
If "no" is circled for any question, provide explanation: