Loading...
20070404 Traffic Scoping Info Wrksht 01312008City Traffic Scoping Information Worksheet Project Information Project Title: Creek Road Mixed Use Project Description: 163 Apartments, 45,540 - 50,000 sf retail on Creek Road /SR -507 Parcel Nos. 64303400400, -501 Trip Generation Land Use Code & Description Quantity Units Daily Trip Generation Rate Basic Rate Pm Peak Tri s/l New Trips % New Trip Rate Multi Family (Apts) 163 dwelling 6.72 0.60 100 0.60 Retell Shopping Ctr 50 lost 42.94 7.28 55 4.00 Total PM Peak Hour Trips: 462 New PM Peak Hour Trips: 298 Total Daily Trips: 3242 Year of Occupancy (Horizon Year of Project): 2009 Phasing Plan: none Identify all intersections that are affected by 10 or more new PM Peak Hour'1'rips: Use additional sheets if necessary. 1. see next sheet 7. 2. 8. Project Developer: Sound Engineering Inc —I Commerce Street, Suite 300 Tacoma WA 98402 253 573 0040 - phone 253 573 0142 - fax Traffic Consultant Greg Heath Heath & Associates, Inc. 2214 Tacoma Road Puyallup, WA 98371 253 770 1401 -phone 253 770 1473 - fax Site Plan: Include site plan showing all existing roadways and driveways on both sides of roadway. I IA Guidelines January, 2007 ANALYSIS PROPOSED SCOPE GENERAL Project name: Creek Road Mixed Use Parcel N: 64303400400,64303400501 Location: Northeast side of Creek Read & SR -507 (see map) Land use: 163 Apartments, 45,540 sf retail Project Access: 2 accesses on Creek Road, existing access to SR -507 Horizon Year: Build out (2009) IN7ERSECTfONS WITH 10 PROJECT TRIPS Yelm Ave /Creek St Bald Hill Rd/Morris Rd Yelm Ave /Grove Rd Creek St/103rd Ave Grove Rd /103rd Ave Grove Rd /100th Ave Yclm Ave /Plaza Dr Yelm Ave /Vancil Rd Yelm Ave /103rd Ave Yelm Ave/Clark Rd Yelm Ave/4th St Yelm Ave/3rd St Yelm Ave/2nd St Yelm Ave /Ist St Yclm Ave/Railroad St Yelm Ave/Edwards St Yelm Ave/Solberg St Yelm Ave /Longmire St Yelm Ave/Ccllens Rd Yelm Ave/Killion Rd I st St/Mosman (E leg) 1stSt /Mosman(W leg) IstSbMill Rd 1st SVCarter St w = F owl m s f s al �rru I Cf "�v IL, � n Wz L kL4. �r A, -�. .E.., 0 as 00 � it DDI hT u T X11, ��LL. LJ CREEK ROAD MIXED USE a c �o �o HEATH & ASSOCIATES, INC PRI MARY TMi DOIKin UTON 'f re nsporta tio� and Civil Engineering FiGUftF 4 1\ `i TABLE2 Trip Generation Volumes —Total Volumes Creek Road Mixed Use Primary Pass -By Totals 163 Apartments Inbound 64 0 64 163 units x 0.60 Outbound 34 0 34 Total 98 0 98 Retail Inbound 96 79 175 50 ksf x 7.28 Outbound 104 85 189 45% Pass -By Total 200 164 364 Full Site Totals Primary Pass-By Total In Out 160 138 79 85 239 223 Total 298 164 462 Summary of Trip Generation Caloalation For 163 Dwelling Units of Apartments October 01, 2007 Avg. Weekday 2 -Way Volume 7 -9 AM Peak Hour Enter 7 -9 AM Peak Hour Exit 7 -9 AM Peak Hour Total 4 -6 PM Peak Hour Enter 4 -6 PM Peak Hour Exit 4 -6 PM Peak Hour Total AM Pk Hr, Generator, Enter AM Pk Hr, Generator, Exit AM Pk Hr, Generator, Total PM Pk Hr, Generator, Enter PM Pk Hr, Generator, Exit PM Pk Hr, Generator, Total Saturday 2 -Way Volume Saturday Peak Hour Enter Saturday Peak Hour Exit Saturday Peak Hour Total Sunday 2 -Way Volume Sunday Peak Hour Cnter Sa:day Peak Hour Exit Sunday Peak Hour Total Average Standard Adjustment Driveway Rate Deviation Factor Volume 6.72 3.02 1.00 1095 0.0 0.00 1.00 16 0.41 0.00 1.00 67 0.51 0.73 1.00 83 0. '_6 0.00 1.00 26 0.39 0.00 1.00 64 0.55 0.76 1.00 90 0.41 0.07 1.00 67 0.26 0.00 1.00 42 0.67 0.05 1.00 109 6.39 2.99 1..00 1042 0.00 0.00 1.00 0 0.00 0.00 1,.00 0 0.52 0.14 1.00 85 5.86 2.73 1.00 955 0.00 0.00 1..00 0 0.00 0.00 1.00 0 0.51 0.75 1.00 83 Note: A zero indicates no data available. Socrce: Institute of Transportation Engineers Trip Generation, 7th Edition, 2003. TRIP GCNEHATION BY MICROTEANS 65% INS 350 ✓7 - Summary of Trip Generation Calculation For 50 T.G.L.A. of Shopping Center October U2, 2007 Avg. Weekday 2 -Way Vd_ume 7 -9 AM Peak Hoar Enter 7 -9 AM Peak Hour Exit 7 -9 AM Peak Hour Total 4 -6 PM Peak Hour Enter 4 -6 PM Peak Hour Exit 4 -6 PM Peak Hour Total AM Pk Hr, Generator, Enter AM Pk fir, Generator, Exit AM Pk Hr, Generator, Total PM Pk Hr, Generator, Enter PM Pk Hr, Generator, Exit PM Pk Hr, Generator, Total Saturday 2 -Way Volume Saturday Peak Hour Enter Saturday Peak Hour Exit Saturday Peak Hour Total Sunday 2 -Way Volume Sur:day Peak Hour Enter Sunday Peak Hour Exit Sunday Peak Hour 'Po-al Average Standard Adjustment Driveway Rate Deviation Factor volume 42.94 21.38 1.00 2147 0.63 0.00 1.00 32 0.40 0.00 1.00 20 1.03 1.40 1.00 52 0.00 0.00 1.00 0 0.00 0.00 1.00 0 0.00 0.00 1.00 0 0.00 0.00 1.00 0 0.00 0.0C 1.00 0 0.00 0. 0C 1.00 0 49.97 22.62 1.00 2499 2.50 0.00 1.00 129 2.39 0.00 1.00 120 4.97 3.11 1.00 249 25.24 1 -1.23 1.00 1262 1.53 0.00 1.00 77 1.59 0.00 1.00 80 3.12 2.78 1.00 .b6 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trio Generation, 7t1t Edition, 2003. TRIP GENERATION BY MICROTRANS Y8 % INS 52 Z a.r