May 13, 2009
Steve Harrington
City of Yelm
Community Development Department
SUBJECT: Yelm L.D.S. Church
10423 Clark Rd SE, Folder Sequence #09- 102963
Thurston County Project #: 2007104764
Construction Review
RE: Redline Plans dated April 22, 2009
Dear Mr. Harrington:
We have received comments from the City of Yelm and our response is as follows:
Sewer Comments:
L')-" i S As previously discussed with City of Yelm personnel in January regarding
W ,I +tJ j 1. the STEP sewer alignment, it was established that this property lies at the
gam' edge of its sewer basin. Properties to the south lie in a separate basin and
we were informed by city personnel that it was not necessary to continue
the STEP main all across the property frontage.
2' A sewer cleanout and subject detail has been added to the plans
3. The proposed connection to the existing sewer main has been detailed on
the plans.
The service connection to the property has been revised to eliminate the
45- degree bends.
.� The STEP pipeline callouts have been amended to include fabrication
specifications.
14. This specification has been added to the plans.
The proposed service connection to the STEP main has been detailed on
the plans.
The STEP Tank Sizing Calculations are included with this letter,
4200 6th Avenue SE, Suite 309 Lacey, WA 98503 (360) 292 -7230 Fax (360) 292 -7231
Seattle Everett Tacoma Lacey Portland Eugene San Francisco Sacramento Las Angel WNW San Diego Phoenix Denver St. Louis
f) (,- 1 Ci nepo
Water Usage Data for the property Y ro ert is included with this letter.
The STEP Tank Detail on sheet C4.5 has been revised.
Water Comments (Addressed Clockwise from Left):
�l The existing well is to be decommissioned as apart of this project. This
notation appears on the Existing Conditions and Demolition Plan and has
been added to the Onsite Composite Utility Plan.
xReduced Pressure Backflow Assemblies (RPBA's) have been called out
on the plan at the existing meter location.
The irrigation meter has been relocated to the planting strip between the
sidewalk and roadway and the RPBA has been called out at this location.
The City of Yelm water meter detail has been added to sheet C4.4.
,,51 The requested note concerning testing of RPBA's has been added to sheet
C4.0.
Engineering Civil Comments:
The existing 8" water main in Clark Road has been enhanced on sheet
- / C4.0 and specifically called out.
A. The STEP main has not been extended across the property frontage.
Please see the response to Sewer Comment #1.
The City of YeIm Reduced Pressure Backflow Assembly (RPBA) detail
has been added to sheet C4.5.
If you have any further questions or comments, please feel free to contact me at (360)
292 -7230 or by email at nancy.whaley@kpff.com.
Sincerely,
Nancy M. Whaley
Design Engineer