Loading...
20050673 Overall Redline Utility Plan Sheetsa 0 0 N N N C) 3 .D L' OO O 0 0 Ln 0 a w �--- - - _ N 8957'20" E N 89 57'20" E IX 1; �o << 6. i i / EXISTING v SEWAGE FLOW IN FERNCO COUPLING OR APPROVED EQUAL CI TY OF YELM DEPT. OF PUBLIC WORKS TYPICAL CONNECTION APPROVED DWG. N0-.. 7-7 CITY ENGINEER DATE DES. DWN. CKD. DATE PMX PMX MTO 4/11/00 FERNCO COUPLING OR APPROVED EQUAL I SW 1/49 OF THE NEW 1/4, OF SECTION 29, TOWNSHIP 17 N., RANGE 2 E., W.M. 30 15 0 30 60 ;,SCALE: 1" = 30' N VERTICAL DATUM HATTON NVGD 29 GODAT THURSTON COUNTY PANTIER BENCHMARK NO. 788 YSURFACE MONUMENT WITH BRASS CAP W 114, SECTION 29, T17N, R2E ELEV.= 350 -91 SANITARY SEWER MAIN INSTALLATION NOTES 1. All workmanship and materials shall be in accordance with City of Yelm standards and the most current copy of the State of Washington E')tandard Specifications for Road, Bridge and Municipal Construction (WSDOT /APWA). 2. All approvals and permits required by the City of Yelm shall) be obtained by the contractor prior to the start of construction. 3. If construction is to take place in the County right -of -way, the contractor shall notify the County and obtain all the required approvals and permit°. 4. A preconstruction meeting shall be held with the City of Yelfn prior to the start of construction. 5. The City of Yelm shall be notified a minimum of 48 hours in advance of a tap connection to an existing main. A City representative shall be present at the time of the tap. 6. The contractor shall be fully responsible for the location and protection of all existing utilities. The contractor shall verify all utility locations prior to construction by calling the Underground Locate Line at 1- 800 - 424 =5555 a minimum of 48 hours prior to any excavation. 7. Side sewer services shall be PVC, ASTM D 3034 SDR 35 vvith flexible gasketed or solvent weld joints. 8. All plastic pipe and services shall be installed with continuous tracer tape installed 12" to 18" under the proposed finished subgrade. The marker shalll be plastic non - biodegradable, metal core or backing marked "sewer" which can be detected by a standard metal detector. In addition, STEP systems, and force mains shall be installed with 14 -gauge direct -bury rated copper wire wrapped around all plastic pipe, brought up and tied off at valve body. Tape shall be Terra TaFpe "D" or approved equal. The tape and wire shall be furnished by the contractor. 9. All buried power for STEP systems shall be installed with cointinuous tracer tape installed 12" above the buried power. The marker shall be plastic uon- biodegradable, metal core backing marked "power". Tape shall be furnished by contractor. 10. Bedding of the sewer main and compaction of the backfill material shall be required in accordance with the above - mentioned specification (See note 1). 11. Temporary street patching shall be allowed for as approved by the City engineer. Temporary street patching shall be provided by placement and connpaction of 2- inch minimum asphalt concrete cold mix. Contractor shall be responsible for maintenance as required. 12. Erosion control measures shall be taken by the contractor during construction to prevent infiltration of existing and proposed storm drainage facilities and roadways. 13. Provide traffic control plan(s) in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) as required. 14. It shall be the responsibility of the contractor to have a copy Of these approved plans on construction site at all times. 15. Any changes to the design shall first be reviewed and approved by the City of Yelm. 16. All STEP mains shall be hydrostatically tested in conformance with the above - referenced specification for testing water mains. (See note 1). In adddition, all STEP mains shall be pigged /cleaned in the presence of the City Inspector prior to placing STEP main in service. 17. Prior to backfill all mains and appurtenances shall be inspected and approved by the City of Yelm. Approval shall not relieve the contractor for correction of any deficiencies and /or failures as determined by subsequent testing and inspections. It shall be the contractor's responsibility to notify the City of Yelm for the required inspections. 18. Pump control panels shall be located on garage wall or remote post, unless otherwise authorized by the City of Yelm. 19. In the event that the Department of Labor and Industries or the City should require a separate "on -off' switch controlling power to the pump control panel, said switch must be lockable or have a locking cover to hold an Olyrnpus type BP125, 30mm padlock. 20. Inspections for onsite STEP installations are required. A 24 -hiour notice to the sewer department is required prior to the inspection. Items needing inspection are: a) Tank installation, i.e., bedding and location b) Tank infiltration, exfiltration test c) S.S. pressure test d) Service line pressure test e) Final Inspection 21. All lumber (plywood, etc.) used to mount either pump control parnel or power meter must be pressure treated. EXISTING UTILITY NOTE: EXISTING UTILITY LOCATIONS SHOWN ARE FROM VARIOUS RECORDS. CONTRACTOR TO FIELD VERIFY ALL UTIILITIES PRIOR TO CONSTRUCTION. "CALL BEFORE YOU DIG" 1-800-424-5555,48 HOURS IN ADVANCE. THIS DRAWING DOES NOT REPRESENT RECORD DOCUMENT, Uf4LESS CERTIFIED BY HATTON GODAT PANTIER, MAY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE REVIEWED AND APPROVED BY HATTON GODAT PANTIER. WATER MAIN INSTALLATION NOTES 1. All workmanship and material shall be in accordance with City of Yelm standards and the most current copy of the State of Washington Standard Specifications for Road, Bridge and Municipal Construction. 2. All work in city right -of -way requires a permit from the City of Yelm. Prior to any work commencing, the general contractor shall arrange for a preconstruction meeting to be attended by all major contractors, representatives of involved utilities, and the City of Yelm. Contact the Public Works Department at (360) 458 -8410 to schedule the meeting. The contractor is responsible to have a set of approved plans at the meeting. 3. Water mains shall meet the following specifications: Polyvinyl Chloride (PVC) Pipe (under 4 inches): Pipe material shall be PVC 1120, PVC 1220, or PVC 2120, and have minimum wall thickness equal to or less than the Standard Dimension Ratio (SDR) of 21, and meet the requirements of WSDOT Standard Specifications Section 9- 30.1(5)B. Polyvinyl Chloride (PVC) Pipe (4 through 12 inches): Shall meet the requirements of AWWA C900, Class 150 wall thickness equal to or greater than the SDR of 18, and meet the requirements of WSDOT Standard Specifications Section 9 -30.1 (5)A. Polyvinyl Chloride (PVC) Pipe (14 through 20 inches): Shall meet the requirements of AWWA C905 wall thickness equal to or less than the SDR of 18. Ductile Iron Pipe (DIP): DIP shall conform to AWWA C151 Class 50 or greater, and shall be 1/16 -inch cement lined and sealed in accordance with ANSI / AWWA C104 / A21.4 -90, and meet the requirements of WSDOT Standard Specification Section 9- 30.2(1). Six -inch fire hydrant spools shall be Class 52. 4. Gate valves shall be resilient wedge, NRS (Non Rising Stem) with O -rings seals. Valve ends shall be mechanical joint or ANSI flanges. Valves shall conform to AWWA 509 -80. Valves shall be Mueller, M & H, Kennedy, Clow R/W or Waterous Series 500. Existing valves to be operated by City employees only. 5. Hydrants shall be M & H Reliant Style 929 or 129, Mueller Centurion, or Clow Medallion. Hydrants shall be bagged until system is approved. 6. All lines shall be chlorinated and tested in conformance with the above referenced specification (Note 1). 7. All pipe and services shall be installed with continuous tracer tape installed 12" to 18" under the final ground surface. The marker shall be plastic non- biodegradable, metal core or backing marked "water' 2- inch -wide minimum, which can be detected by a standard metal detector. Tape shall be Terra Tape "D" or approved equal. In addition to tracer tape, install 14 gauge heavy duty direct bury coated copper wire (PAIGE "UF" single conductor or equal), wrapped around the pipe, brought up and tied off at valve body. All wire connections shall use wire nuts and a DBR Splice Kit, manufactured by 3 -M or approved equal. All locator wire for service pipe shall be connected to the locator wire on the water main. 8. Provide traffic control plan(s) as required in accordance with MUTCD. 9. All water mains shall be staked for grades and alignment by an engineering or surveying firm capable of performing such work. 10. All service line locations shall be marked on the face of the curb with an embossed "W' 1/4 inch into concrete. 11. Call Underground Locate at 1- 800 -424 -5555 a minimum of 48 hours prior to any excavations. 12. The City will be given 72 hours notice prior to scheduling a shutdown. Where connections require "field verification ", connection points will be exposed by contractor and fittings verified 48 hours prior to distributing shut -down notices. 13. At any connection to an existing line where a new valve is not installed, the existing valve must be pressure tested to City standards prior to connection. If an existing valve fails to pass the test, the contractor shall make the necessary provisions to test the new line prior to connection to the existing system or install a new valve. 14. After completion of all items shown on these plans and before acceptance of the project, the contractor shall obtain a "punch list" prepared by the City's Inspector detailing remaining items of work to be completed. All items of work shown on these plans shall be completed to the satisfaction of the City prior to acceptance of the water system and provision of sanitary sewer service. 15. A copy of these approved plans and applicable city developer specifications and details shall be onsite during construction. 16. Any revisions made to these plans must be reviewed by the developer's engineer and the City of Yelm prior to any implementation in the field. The City shall not be responsible for any errors and /or omissions on these plans. ❑ 1 ■ • r r • i O O N O IL I•- 0 o 0 N II O >- 17 1 J Q m W z z >" m W Y ui U 0 w U F- Q w M A I SW 1/49 OF THE NEW 1/4, OF SECTION 29, TOWNSHIP 17 N., RANGE 2 E., W.M. 30 15 0 30 60 ;,SCALE: 1" = 30' N VERTICAL DATUM HATTON NVGD 29 GODAT THURSTON COUNTY PANTIER BENCHMARK NO. 788 YSURFACE MONUMENT WITH BRASS CAP W 114, SECTION 29, T17N, R2E ELEV.= 350 -91 SANITARY SEWER MAIN INSTALLATION NOTES 1. All workmanship and materials shall be in accordance with City of Yelm standards and the most current copy of the State of Washington E')tandard Specifications for Road, Bridge and Municipal Construction (WSDOT /APWA). 2. All approvals and permits required by the City of Yelm shall) be obtained by the contractor prior to the start of construction. 3. If construction is to take place in the County right -of -way, the contractor shall notify the County and obtain all the required approvals and permit°. 4. A preconstruction meeting shall be held with the City of Yelfn prior to the start of construction. 5. The City of Yelm shall be notified a minimum of 48 hours in advance of a tap connection to an existing main. A City representative shall be present at the time of the tap. 6. The contractor shall be fully responsible for the location and protection of all existing utilities. The contractor shall verify all utility locations prior to construction by calling the Underground Locate Line at 1- 800 - 424 =5555 a minimum of 48 hours prior to any excavation. 7. Side sewer services shall be PVC, ASTM D 3034 SDR 35 vvith flexible gasketed or solvent weld joints. 8. All plastic pipe and services shall be installed with continuous tracer tape installed 12" to 18" under the proposed finished subgrade. The marker shalll be plastic non - biodegradable, metal core or backing marked "sewer" which can be detected by a standard metal detector. In addition, STEP systems, and force mains shall be installed with 14 -gauge direct -bury rated copper wire wrapped around all plastic pipe, brought up and tied off at valve body. Tape shall be Terra TaFpe "D" or approved equal. The tape and wire shall be furnished by the contractor. 9. All buried power for STEP systems shall be installed with cointinuous tracer tape installed 12" above the buried power. The marker shall be plastic uon- biodegradable, metal core backing marked "power". Tape shall be furnished by contractor. 10. Bedding of the sewer main and compaction of the backfill material shall be required in accordance with the above - mentioned specification (See note 1). 11. Temporary street patching shall be allowed for as approved by the City engineer. Temporary street patching shall be provided by placement and connpaction of 2- inch minimum asphalt concrete cold mix. Contractor shall be responsible for maintenance as required. 12. Erosion control measures shall be taken by the contractor during construction to prevent infiltration of existing and proposed storm drainage facilities and roadways. 13. Provide traffic control plan(s) in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) as required. 14. It shall be the responsibility of the contractor to have a copy Of these approved plans on construction site at all times. 15. Any changes to the design shall first be reviewed and approved by the City of Yelm. 16. All STEP mains shall be hydrostatically tested in conformance with the above - referenced specification for testing water mains. (See note 1). In adddition, all STEP mains shall be pigged /cleaned in the presence of the City Inspector prior to placing STEP main in service. 17. Prior to backfill all mains and appurtenances shall be inspected and approved by the City of Yelm. Approval shall not relieve the contractor for correction of any deficiencies and /or failures as determined by subsequent testing and inspections. It shall be the contractor's responsibility to notify the City of Yelm for the required inspections. 18. Pump control panels shall be located on garage wall or remote post, unless otherwise authorized by the City of Yelm. 19. In the event that the Department of Labor and Industries or the City should require a separate "on -off' switch controlling power to the pump control panel, said switch must be lockable or have a locking cover to hold an Olyrnpus type BP125, 30mm padlock. 20. Inspections for onsite STEP installations are required. A 24 -hiour notice to the sewer department is required prior to the inspection. Items needing inspection are: a) Tank installation, i.e., bedding and location b) Tank infiltration, exfiltration test c) S.S. pressure test d) Service line pressure test e) Final Inspection 21. All lumber (plywood, etc.) used to mount either pump control parnel or power meter must be pressure treated. EXISTING UTILITY NOTE: EXISTING UTILITY LOCATIONS SHOWN ARE FROM VARIOUS RECORDS. CONTRACTOR TO FIELD VERIFY ALL UTIILITIES PRIOR TO CONSTRUCTION. "CALL BEFORE YOU DIG" 1-800-424-5555,48 HOURS IN ADVANCE. THIS DRAWING DOES NOT REPRESENT RECORD DOCUMENT, Uf4LESS CERTIFIED BY HATTON GODAT PANTIER, MAY ALTERATIONS TO THE DESIGN SHOWN HEREON MUST BE REVIEWED AND APPROVED BY HATTON GODAT PANTIER. WATER MAIN INSTALLATION NOTES 1. All workmanship and material shall be in accordance with City of Yelm standards and the most current copy of the State of Washington Standard Specifications for Road, Bridge and Municipal Construction. 2. All work in city right -of -way requires a permit from the City of Yelm. Prior to any work commencing, the general contractor shall arrange for a preconstruction meeting to be attended by all major contractors, representatives of involved utilities, and the City of Yelm. Contact the Public Works Department at (360) 458 -8410 to schedule the meeting. The contractor is responsible to have a set of approved plans at the meeting. 3. Water mains shall meet the following specifications: Polyvinyl Chloride (PVC) Pipe (under 4 inches): Pipe material shall be PVC 1120, PVC 1220, or PVC 2120, and have minimum wall thickness equal to or less than the Standard Dimension Ratio (SDR) of 21, and meet the requirements of WSDOT Standard Specifications Section 9- 30.1(5)B. Polyvinyl Chloride (PVC) Pipe (4 through 12 inches): Shall meet the requirements of AWWA C900, Class 150 wall thickness equal to or greater than the SDR of 18, and meet the requirements of WSDOT Standard Specifications Section 9 -30.1 (5)A. Polyvinyl Chloride (PVC) Pipe (14 through 20 inches): Shall meet the requirements of AWWA C905 wall thickness equal to or less than the SDR of 18. Ductile Iron Pipe (DIP): DIP shall conform to AWWA C151 Class 50 or greater, and shall be 1/16 -inch cement lined and sealed in accordance with ANSI / AWWA C104 / A21.4 -90, and meet the requirements of WSDOT Standard Specification Section 9- 30.2(1). Six -inch fire hydrant spools shall be Class 52. 4. Gate valves shall be resilient wedge, NRS (Non Rising Stem) with O -rings seals. Valve ends shall be mechanical joint or ANSI flanges. Valves shall conform to AWWA 509 -80. Valves shall be Mueller, M & H, Kennedy, Clow R/W or Waterous Series 500. Existing valves to be operated by City employees only. 5. Hydrants shall be M & H Reliant Style 929 or 129, Mueller Centurion, or Clow Medallion. Hydrants shall be bagged until system is approved. 6. All lines shall be chlorinated and tested in conformance with the above referenced specification (Note 1). 7. All pipe and services shall be installed with continuous tracer tape installed 12" to 18" under the final ground surface. The marker shall be plastic non- biodegradable, metal core or backing marked "water' 2- inch -wide minimum, which can be detected by a standard metal detector. Tape shall be Terra Tape "D" or approved equal. In addition to tracer tape, install 14 gauge heavy duty direct bury coated copper wire (PAIGE "UF" single conductor or equal), wrapped around the pipe, brought up and tied off at valve body. All wire connections shall use wire nuts and a DBR Splice Kit, manufactured by 3 -M or approved equal. All locator wire for service pipe shall be connected to the locator wire on the water main. 8. Provide traffic control plan(s) as required in accordance with MUTCD. 9. All water mains shall be staked for grades and alignment by an engineering or surveying firm capable of performing such work. 10. All service line locations shall be marked on the face of the curb with an embossed "W' 1/4 inch into concrete. 11. Call Underground Locate at 1- 800 -424 -5555 a minimum of 48 hours prior to any excavations. 12. The City will be given 72 hours notice prior to scheduling a shutdown. Where connections require "field verification ", connection points will be exposed by contractor and fittings verified 48 hours prior to distributing shut -down notices. 13. At any connection to an existing line where a new valve is not installed, the existing valve must be pressure tested to City standards prior to connection. If an existing valve fails to pass the test, the contractor shall make the necessary provisions to test the new line prior to connection to the existing system or install a new valve. 14. After completion of all items shown on these plans and before acceptance of the project, the contractor shall obtain a "punch list" prepared by the City's Inspector detailing remaining items of work to be completed. All items of work shown on these plans shall be completed to the satisfaction of the City prior to acceptance of the water system and provision of sanitary sewer service. 15. A copy of these approved plans and applicable city developer specifications and details shall be onsite during construction. 16. Any revisions made to these plans must be reviewed by the developer's engineer and the City of Yelm prior to any implementation in the field. The City shall not be responsible for any errors and /or omissions on these plans. ❑ 1 ■ • r r • i O O N O IL I•- 0 o 0 N II O >- J Q m W z z >" m W Y ui U 0 w U F- Q w N D I z Z Q 24193 p--�SS ANAL I EXPIRES 1_ -27 -09 I W 0 ZW� Q i N CL 4r0 >�CO 0 UJ LL +-1 � C Q mW0) 4 �3Vo _ Q�� r Z � morn 0 W z Q Z � W W �- T o o z U) W O 0 U U >­1 J U)l a a W 0 En Z a � a J 00 0 J m J W <,r. tD W O > O AGENCY NO. 5PR -05- 0673 -YL SHEET: 8 OF 13 E: /dgn /05- 000/05 -055 INDEX: 05- 055util.dwg ■ JOB: 05 -055 1 SW 1149 OF THE NEW 1/4, OF SECTION 29, TOWNSHIP 17 N., RANGE 2 E., W.M. 20 10 0 20 40 SCALE: 1" = 20' VERTICAL DATUM NVGD 29 a?� THURSTON MAR COUNTY NEW HOSE BIB BENCHMARK NO. 788 SURFACE MONUMENT WITH BRASS CAP W 1/4, CONTROL SECTION 29, T17N, R2E �- ., ...�. ELEV.= 350.91 OD co (q ti ap fA r C4 c4; I t� N M M in fV W) co) f'7 M +1 +1. W 360.00 _ CD W U C9 W Z;Z ol m J,W 355.00 o aif Q m W ~ _ + _ Q -------------------------- Q le O 0'D 1Z (q ti ap fA r N M N- I t� N M M in fV W) co) N N 04 N fV N 04 fV A U) U) LA U) Lf) IA Lf) N � (14 N LA LA Lc) Z O o M' M fh co) fh M c7 M Lry U r) 350.00 Q CONNEC'rTO'EXISTING W TOP OF PIPE 348.80 } 0 _ > Q w z Q Q' Q ol (A W Z W W/ WET TAP c Q�� L FW- m � m 7 +00, 16.74' LT 't oo MIN. 1898 LOW Z W PROVIDE F Q�Q — EXISTING GRADE 326 LF 4" 1 OF o 3 +73.60, 16.74 LT Ot: t9 @ PROPOSED GRADE -END o I& in PROVIDE 4 ano L�cs�n ] C) �f �@ FLOW LINE LINE CLEANOUT M fh BLOCKING 360.00 355.00 HORIZONTAL SCALE: 1"=20 FEET VERTICAL SCALE: 1"=5.00 FEET a ID 0 c 0 0o 0 0 N N N N O m 3 CL V1' c 0 O 0 0 0 m W APPFRIOV�:,l I EXISTING UTILITY NOTE: EXISTING UTILITY LOCATIONS SHOWN ARE FROM VARIOUS RECORDS. CONTRACTOR TO FIELD VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION. "CALL BEFORE YOU DIG" 1-800-424-5555,48 HOURS IN ADVANCE. THIS DRAWING DOES NOT REPRESENT RECORD DOCUMENT, UNLESS CERTIFIED BY HATTON GODAT PANTIER. ANY Al TERATIONS TO THE DESIGN SHOWN HEREON MUST BE REVIEWED AND APPROVED BY HATTON GODAT PANTIER. C O N iD 24193 O� FCISTERF N II II 3 +23.60, 60.34' RT o 8" WATER :�— EXPIRES11 -27 U r) 350.00 Q CONNEC'rTO'EXISTING m p w z TOP OF PIPE 348.80 } 0 _ > w ol w z Q 4" FORCEMAIN Q ol (A Z 350.00 W/ WET TAP c Q�� L Z � z 't oo MIN. 1898 LOW Z W W F- F 50 LF 4" FORCEMAIN 326 LF 4" FORCEMAIN T 345.00 _.. 3 +7160, 60.34' RT _ . PROVIDE 345.00 O 1 - 900 BEND BLOCKING O N M O N C{J _ 00 CO CO CS t!7 +ti> co N tf) IQ � C°1 ti !1� � r co tf) cl V LU C3 tr3 d et N C"! (>� m m M N �i M c� vi m ch ri ri r) m un U) c+a M ri c i G a� r� ch M 340.00 Un �n u� c7 ! M M U3 er) �n U) U) L0 U) � ,� 340.00 tD M M M M M M M co M t*) M 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 it HORIZONTAL SCALE: 1"=20 FEET VERTICAL SCALE: 1"=5.00 FEET a ID 0 c 0 0o 0 0 N N N N O m 3 CL V1' c 0 O 0 0 0 m W APPFRIOV�:,l I EXISTING UTILITY NOTE: EXISTING UTILITY LOCATIONS SHOWN ARE FROM VARIOUS RECORDS. CONTRACTOR TO FIELD VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION. "CALL BEFORE YOU DIG" 1-800-424-5555,48 HOURS IN ADVANCE. THIS DRAWING DOES NOT REPRESENT RECORD DOCUMENT, UNLESS CERTIFIED BY HATTON GODAT PANTIER. ANY Al TERATIONS TO THE DESIGN SHOWN HEREON MUST BE REVIEWED AND APPROVED BY HATTON GODAT PANTIER. C O N iD 24193 O� FCISTERF N II II G� O >_ :�— EXPIRES11 -27 U r) Q Q Co m p w z m z } 0 _ > w ol w z Q U ol Q ol (A �N c� ui 24193 O� FCISTERF 00 0 N SS /ONAL G� w -09 I EXPIRES11 -27 U r) c� ui L� f 00 0 N w I D U r) Q Co > 0) 0 Lu L Z mu ul 0) c Q�� L Z � z 't oo LOW Z W W F- F T 0 Q � N U) F— z W z 0 O U) U w !}- � U a a (n (n a� d J W 0 U) J �0) O LL J co .0) Cb o z m (L Io w IM V. J. W O W !n iENCY N0. SPR- 05- 0673 -YL SHEET: 9 OF 13 E: /dg n /05- 000/05 -055 N D EX: 05- 055swr -pp. dwg JOB: 05 -055 6