20110166 Revised Civil Ltr on Bldg Footprint 01202015 �� January 20, 2015 SC..1 �LLIANCE CONSULTING SERVICES Karen T. Bennett City of Yelm 105 Yelm Avenue West Yelm, WA 98597 Re: Yelm Day Care Center—Revised Civil Plans for Building Footprint Revision SCJ Alliance Project No. 0290.05 Dear Karen: We are submitting the attached plans for your review and approval. The civil plans were originally approved by the City of Yelm in 2013. The owner has decided to change the building foot print. It is my understanding that the Building Department has a building permit showing the new building,therefore the civil plans need to be updated and submitted for a re-review. We would like to attend the SPR meeting to present the revisions and modifications in an effort that these plans will not need to be sent out for additional peer-review processing. The revisions are generally minor in nature and we hope they could be reviewed and approved by City Staff. In an effort to work toward staff approval, we have listed the revisions by sheet number for your convenience in reviewing our request. Sheet CV-01: • We updated the plan view to reflect the new building and parking lot configuration. Sheet SP-01: • We updated the plan view and relocated the construction key notes to point to the correct locations. � Sheet HC-01: • We updated the plan view and dimensions. Sheets EC-01 and EC-02: • We updated the plan view but no design changes to these sheets. Sheet CG-01: • We updated the plan view and modified the spot elevations to account for the parking lot configuration and raised the building by 0.5 feet. � 1 �,.�.:; ��r�-+�� 8730 Tallon Lane NE, Suite 200, Lacey,WA 98516 � �AN 2 0 2015 360.352.1465 � inFo(�a scjalliance.com � www.scjalliance.com � i . --------------�- Karen T. Bennett January 20, 2015 =� Page 2 Sheet CG-02: • We updated the plan view and moved two catch basins and removed one catch basin within the parking lot to facilitate acceptable grade slopes in the parking area. • No revisions have been proposed for the stormwater facility. Sheets CG-03 and SP-02: • No changes to these sheets. Sheets UT-01 and UT-02: • We updated the plan view and reconnected the water and sewer utilities based on the new building. • Sewer tank size, pump configuration, and connection point in Berry Valley Road remains unchanged. The tank location was moved to accommodate the different building shape. • Water utility connection points in Berry Valley Road remain unchanged. The fire sprinkler connections in the building were changed based on the mechanical room location. • Water usage will remain the same or be slightly less than previously approved. Sheets UT-03, UT-04, UT-05, UT-06 and UT-07: • No changes were made to these sheets. Sheets UT-08, UT-09, PP-01, PP-02 and IL-01: • No changes were made to these sheets. These improvements were previously constructed therefore no revisions are necessary. If you should have any questions or comments, please contact me at(360)352-1465 at your earliest convenience. Respectfully, SCJ Alliance G'`�� �_/`"� � Jim Gibson, PE Project Manager N:\Projects\290 Deutscher\290.05 Yelm Day Care Site\Correspondence\City of Yelm\L-20150120 Bennett.doc