20140213 Rev Cmt Ltr 2 01232015 / �,�F THF�'.p� Ci ty o f Ye l m
O ♦
o�. e
Community Deuelopment Department
105 Yelm Auenue West
Yelm, WA 98597
YELM
WASNINCTON
January 23, 2015
Chris Merritt, PE
Olympic Engineering
PO Box 12690
Olympia, WA 98508
RE: Yelm Physical Therapy, 20140213
Review No. 2 of Civil Construction Document
The City of Yelm has completed the second review of the civil plans for Yelm Physical Therapy.
Your application included:
• Construction Documents
• Storm Drain Report
• Landscape Plan
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the
DOE Stormwater Manual and general standards of civil engineering practice. The following
redline comments and peer review letter comments need to be addressed before the plans may
be approved for construction. Our comments are summarized on the attached plan sheets and
Stormwater Report and peer review comments are addressed in letter format.
Please review and revise the attached plan sheets to address the referenced comments. When
the project is resubmitted you will need to submit 2 clean complete sets of plans (i.e. including
landscaping plan, etc) and 1 Stormwater Report. Please also include a thumb drive with all the
submitted documents and return the review#2 redlines. The project engineer should include a
written response with the resubmittal, indicating how all the review comments have been
addressed or responded to. If you have any additional questions or comments please do not
hesitate to call or contact me at karenb@ci.yelm.wa.us.
arm Regards,
�
a n . B ett
Community Development, City of Yelm
(360) 458-8438
(360)458-3144 FAX