Loading...
20140213 Rev Cmt Ltr 2 01232015 / �,�F THF�'.p� Ci ty o f Ye l m O ♦ o�. e Community Deuelopment Department 105 Yelm Auenue West Yelm, WA 98597 YELM WASNINCTON January 23, 2015 Chris Merritt, PE Olympic Engineering PO Box 12690 Olympia, WA 98508 RE: Yelm Physical Therapy, 20140213 Review No. 2 of Civil Construction Document The City of Yelm has completed the second review of the civil plans for Yelm Physical Therapy. Your application included: • Construction Documents • Storm Drain Report • Landscape Plan We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. The following redline comments and peer review letter comments need to be addressed before the plans may be approved for construction. Our comments are summarized on the attached plan sheets and Stormwater Report and peer review comments are addressed in letter format. Please review and revise the attached plan sheets to address the referenced comments. When the project is resubmitted you will need to submit 2 clean complete sets of plans (i.e. including landscaping plan, etc) and 1 Stormwater Report. Please also include a thumb drive with all the submitted documents and return the review#2 redlines. The project engineer should include a written response with the resubmittal, indicating how all the review comments have been addressed or responded to. If you have any additional questions or comments please do not hesitate to call or contact me at karenb@ci.yelm.wa.us. arm Regards, � a n . B ett Community Development, City of Yelm (360) 458-8438 (360)458-3144 FAX www.ci.yelm.wa.us