February 10, 2015
Chris Merritt, PE
Olympic Engineering
PO Box 12690
Olympia, WA 98508
RE: Yelm Physical Therapy, 20140213
Review No. 3 of Civil Construction Document
The City of Yelm has completed the third review of the civil plans for Yelm Physical Therapy.
Your application included:
• Construction Documents
• Storm Drain Report
• Landscape Plan
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the
DOE Stormwater Manual and general standards of civil engineering practice. The following
redline comments need to be addressed before the plans may be approved for construction.
Our comments are summarized on the attached plan sheets.
Please review and revise the attached plan sheets to address the referenced comments. When
the project is resubmitted you will need to submit 2 clean complete sets of plans (i.e. including
landscaping plan, etc). Please also include a thumb drive with all the submitted documents and
return the review#3 redlines. The project engineer should include a written response with the
resubmittal, indicating how all the review comments have been addressed or responded to. If
you have any additional questions or comments please do not hesitate to call or contact me at