Loading...
20150108 Permit Pkg 02052015City of Yelm Community Development Department Building Division Phone: (360) 458 -8407 Fax: (360) 458 -3144 Applicant: Name: ADAM WOJACK Address: 302 JEFFERSON AVE NE YELM WA 98597 Property Information: Site Address: 302 JEFFERSON AVE NE Assessor Parcel No.: 64421001500 Subdivision: Contractor Information: Name: RED CAP CONSTRUCTION LLC Address: NOAH SCHOTT PO BOX 515 TENINO WA 98589 Contractor License No.: 11101 Permit No.: 20150108 Issue Date: 2/05/2015 (Work must be completed within 180 days) Phone: 661 - 333 -0859 Owner: ADAM WOJACK Phone: Expires: 12/31/2015 Project Information: Project: ROOF Description of Work: REROOF, INSULATION AND PLUMBING PROJECT Sq. Ft. per floor: First Heat Type (Electric, Gas, Other): Second Third Garage Basement Fees: Item PLUMBING ROOF RESIDENTIAL ALTERATION Lot: Contractor Fees BALD HILLS PLUMBING $ 34.00 RED CAP CONSTRUCTION LLC $ 25.00 RED CAP CONSTRUCTION LLC $ 28.00 TOTAL FEES: $ 87.00 Applicant's Affidavit: I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a contractor, I further certify that I am currently registered in the of W shing �J C Signature Date L— J —' Firm OFFICIAL USE ONLY # Sets of Prints: Final Inspection: Date: By: Cit of ge3m44 (36�) 4 2,28 PM 00185635 2/05/2015 REC #: TERM: 001 OPER : 1401 REF #: PAID BY IRAN: 33,0000 BUILDIN87 0OCR S T 20150108 ADAM oACK, 302 JEFFERSON PL ROOF 8LD -RES3 TENDERED: APPLIED: CHANGE: AVE NE 34.000R 25,00CR 28.00CR 81,00 CHECK 81,00- CITY OF YELM 2ol 'so 106 RESIDENTIAL BUILDING PERMIT APPLICATION FORM Project Address: lvT� Parcel #. (04i 1 2-1Z 1SO4Q Subdivision: l {1 Lot #: PS t Plan #: Zoning: �c S _I New Construction YRe -Model / Re -Roof / Addition Home Occupation Sign Plumbing _ Mechanical -/ Mobile / Manufactured Home Placement Other Project Description /Scope of Work: Xdve Z. 6 Project Value:_ U 7.506 .-.-_ d 4.r P/xJJg3y-1 (,7 NSrz�;�Gry Building Area (sq. ft) 1g' Floor 1/5511) 2 "d Floor _506 3rd Floor Garage -2 car >(' 3 car Covered Patio Covered Porch •3'40 Patio Deck # Bedrooms L4 # Bathrooms 1_75 Heatin : GA5 /OTHER r ELECTRIC Circle One) Are there any environmentally sensitive areas located on the parcel? p� if yes, a completed environmental checklist must accompany permit application. BUILDING OWNER NAME:i �4y;AE✓l� ADDRESS 5Z v& EMAIL CITY Jy -STATE t, TELEPHONE 644 1 - 333 - 06_5-�t ARCHITECT /ENGINEER _LICENSE # ADDRESS EMAIL _ CITY STATE ZIP TELEPHONE GENERAL CONTRACTOR TELEPHONE 4W,1 - ADDRESS P�', &' ),e Si,�5 EMAIL �c,4 a, err•cc,� CITYTrfjt ;J6 STATE CL4 ZIP 9960C) FAX CONTRACTOR'S LICENSE #iii%i�1 '7L41S EXP DATE 15 CITY LICENSE # I I Q PLUMBING CONTRACTOR S La>7' 5C7 TELEPHONE ZS9 -&9M i ADDRESS 15g3L A-E4V_- -9-1--5E EMAIL CITY yGLm STATE i:m4 ZIP Iksj 7 FAX CONTRACTOR'S LICENSE # � e6i;i r EXP DATE�CiTY LICENSE # MECHANICAL CONTRACTOR TELEPHONE ADDRESS EMAIL CITY STATE ZIP FAX CONTRACTOR'S LICENSE # EXP DATE CITY LICENSE # Copy of mitigation agreement with Yelm Community Schools, if applicable. I hereby certify that the above information is correct and that the construction on, and the occupancy and the use of the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City of Yelm. /%3 f — Z`� Owne a =ure Date Owner Contracto � /Owner's Agent /Contractor's Agent (Please circle one.) All permits are non - transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days 105 Yelm Avenue West (360) 458 -3835 Yelm, WA 98597 (360) 458 -3144 FAX www.ci.yelm.wa.us 1 I 0 2 2015 360ASM2392 CONSTRUCTION PO BOX 515 ■ TENINO, WA ■ 98589 Work description for 302 ne Jefferson Yelm, WA. Insulation: 1) We will be installing approximately 1,000 sq. ft. of R -21 insulation in the crawl hole below the house using paperless bats and metal rods for securing the insulation. 2) In the attic we will be installing roughly 1,000 sq. ft. of R30 insulation. Plumbing: 1)We are replacing the pipe from main shut off at alley to house and replacing the pipe with new 1" poly line. 2) Next we will replace all galvanized water lines with half inch pex pipe. 3) New 50 gallon hot water tank will be installed with proper hurricane strapping, pressure relief valve and set on top of drain pan. Reroof: Removing existing 3 tab roofing and installing roughly 32 squares of roofing. Noah Schott Red Cap Construction P.O. Box 515 Tenino, WA 98589 360 - 480 -2392 F � "'..TF,D 2 2015 BY