20140213 Rev Cmts #3 02182015 c
` �.
0 LY M P 1 C Po eoX,Zs90
Olympia,WA 98508
360.705.2474
ENGINEERING 360.705.2443fax
February 18, 2015
Karen Benett
City of Yelm Community Development Department
105 Yelm Ave. W.
Yelm, WA 98597
Re: Yelm Physical Therapy
Reply to 3rd Review CommEnts
OE No. 14009
Dear Ms. Bennett:
This letter is in response to your- letter dated February 10, 2015 and to the red-lined plans.
Attached for the city's further review are two full-size revised plans sets. We have addressed the
review comments in the order received as foilows:
Sheet C2.1
1. Construction Note #11 was revised to call out for a 6"inlet into the STEP tank.
2. Stainless steel tapping sleeves are already called out on city detail 6-10 shown on Sheet C2.2;
however, we have added°stainless steel"to Construction Notes #1 and #5.
3. As indicated in the note on the left side of the sheet, according to utility locates, there are two
water mains in Solberg and the contractor is to pothole them for the city inspector to inspect.
The as-builts will reflect wht�t is found.
4. A note was added to the existing 4"AC water main for it to be abandonc�d in-place.
5. A note was added to the I�ft side of the sheet discussing how the existing valve may be an
end of line valve and, if so, for it to be removed and for the existing line to be capped. The
existing valve location is based on an actual survey and is accurate; however, the water main
in the alley is based on locak:es and may be off by a couple of feet.
6. The comment regarding plants/bushes that may get overgrown and ne�ding to be trimmed or
removed for access to the tank is noted and wiil be conveyed to the owrier.
Sheet C2.4
1. The refuse enciosure design has been revised to a CMU enclosure with a solid metal gate.
If you have any questions or additianal comments, please call me at (360) 705-2474 or e-mail me at
chris@olyeng.com. Thank you.
���-�'",�.�"�.T�'�r
FE6 ],9 2015
�3Y:
�
Ms. Bennett
2/18J15
Page 2
Sincerely,
Olympic Engineering
t- --
Chris Merritt, PE
Principal Engineer
encL• (2) Civil Plans
Original Red-Lined Plan Set
CD with Civil Plans
cc: Sean Sipe
G:1File CabinetlBusiness101ympiclProjects�2014114009-inspire Physical TherapylBennett Response Letter 0�1815.doac