Loading...
BLD-05-0194 CITY OF YEL~1INSPECTION LOG c PROJECT 71 WlhtrllfflJ /3J1JJ~ -\DDRESS 05- 01,,1 /01 hitS/" 0'1. PERMIT NUMBER SET BAChS Date Front Rear SideFbrlmg SIde FOOn~G CJ I 2"' o ] 6" ::J other 8 requIred \ ems W -\lL CJ 6" o 8"' o other FOOT 1 '\G REB \R D:J.te \\' \LL REBAR D:ile CO!::!Tl~r;!5 CO\1131;\[0 fRA'lEI L\. TERIOR SHEAR \\ \LL l\SrECTIO~ Hold downs ::J Shear ~3llmg = Frame:J Gas 'Propane :::J PluT7lblng :J ~lechanIc3.1 :::J C Comments I'\Sl L....T10' :J G2S ~ FOJm 3.nd Seal J Electflc J \'::por blTler " Other - P\'-\ Comments SHEET ROCK/SHEAR \\' \lL '\ \IL Comments OTHER Comments FI"'i ....L ~ Se\\ er Fn21 :::J ~dJress n Electrical J Insulallon J CI\ 11 Final [] SIte Dr3.lll3.f;e :J bnd5C:J.re Fm:d II C efO 'I Slde\, 3.ll Comments C o o City ofYelm Community Development Department Building Division Phone: (360) 458-8407 Fax: (360) 458-3144 Permit No BLD-05-0194-YL Issue Date. 07/0112005 (Work must be started within 180 days) Receipt No 37172 Appliclint: Name. Street, Lundgren & Foster Phone 360-249-4011 Address. 200 South First Street City' Montesano State: WA Zip 98563 Property Information: Site Address. 101 First Street Assessor Parcel No. 64400200100 Subdivision: N/A Lot: N/A Contractor Information: Name: Rognlins Inc. Contact: Phone: 360-532-5220 Address. P.O Box 307 City' Aberdeen State. WA Zip 98520-0078 Contractor License No' ROGNL **324LF Expires 08/01/07213 Business License: Project Information" Project: Timberland Bank TI Description of Work: Bank TI Sq. Ft. per floor' (1st) 2370 (2nd) 0 (3rd) 0 Garage 0 Basement 0 Heat Type (Electric, Gas, Other): OTHER Fees. Item Item Fee Base Amt Unit Fee Unit Rate No Units Unit Desc --------------------------- ------------- Building Permit 100-500k 2,001 75 993.75 1,008.00 5 6000 180 0000 $1,000 Building Plan Review 1 301 13 0.00 000 o 0000 o 0000 TOTAL FEES $3,302.88 Al?plicant's Affadlivit: OFFICIAL USE ONLY I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a contractor, I futher certify that I am currently registered in the State hington. # Sets of Prints. Date F;n.,,"w Date: By' Firm Applicant: o o City ot Yelm Community Development Department Building Division Phone: (360) 458-8407 Fax: (360) 458-3144 PAID JUi_ li 1 Zlln~ CITY OF YELM Name. Street, Lundgren & Foster City' Montesano Address. 200 South First Street Project Information. Project: Timberland Bank TI Description of Work: Bank TI Permit Fees Schedule Permit No BLD-05-0194-YL )7/-7~ Phone. 360-249-4011 State. WA Zip 98563 Assessor Parcel No 64400200100 Site Address 101 First Street Fees. Item Acct Code Item Fee Base Amt Unit Fee 2,001 75 99375 1 008.00 Building Plan Review Building Permit 100-500k 032001-322-10-00 1 00 001-345-83-00 1 301 13 000 - ---.---.- --- -'- I~;;! TllE"~~JI CITY OF ~L;?~~ YELM ;.~/ ~ PO Rnx47c) f >) ) 'reim. "VA 955i37 ~,~~ 360-453-8403 TOTAL FEES $3,302.88 000 Unit Rate No Units Unit Desc 5 6000 180 0000 $1 000 o 0000 o 0000 . . -,,~.<- --"'."~-- : . .. Q RECEIPT No.3 71 72 RECEi'J'EtJ"" "TaFEE THOUSAND THREE HUNDRED THO DOLLAES (\( E';S CENTS T nfri ?e;GS~\{rn F6Gr..1.v ..J...!.'~__jr\L..L.:.4!:.: ;""'4,'1.1\1.1.\. p () BOX hq, - - I HOQUIAM. WA q85~0 o 91}Te 1/ 0 5 REG. rt:-J9.' .::\ / L BUDGETARY tHCHELLE .~ ? L :::: D 1:" ~ '-J I:).r?l 1 -7 ~ 'L) T loT 'C. !:'"I1! 1 '") n. -1 1'-, 1 - ~..., . .. ...... ! -' t ... L.j';'~ ........;.. ........-' '____ ..... . ..... '-' j SITE 101 FIR3T Sf TIMBEPLINE BANY. BLD-05-(1194-YL ,AMOUNT j. .::\',:)2 88 CHECK 7~~9 j / '" II, ...:. !;Ii JJ Interior AlteratIons & Improvements for TIMBERLAND SAVINGS BANK Yelm, WashIngton SPECIFICA liONS PERMIT SET Street Lundgren & Foster Architects TABLE OF CONTENTS OWNER & CONSULTANTS INVITATION TO BID DIVISION 1 GENERAL REQUIREMENTS INSTRUCTIONS TO BIDDERS FORM OF PROPOSAL STANDARD FORM OF AGREEMENT BETWEEN OWNER & CONTRACTOR GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION SUPPLEMENTARY CONDITIONS SPECIAL REQUIREMENTS SCHEDULE OF DRAWINGS DIVI SION 2: SITE WO RK .......................................................................................... 1 GENERAL 1 DEMOLITION & SALVAGE 1 SITE CLEARING 3 D I V I S ION 3: CO N CRETE........... ......................... ............................................. .......... 5 GENERAL 5 CAST-iN-PLACE CONCRETE 5 DIVISION 6: WOOD & PLASTiCS............................................................................. 9 GENERAL 9 ROUGH CARPENTRY 9 FACTORY-FABRICATED WOOD TRUSSES 11 FINISH CARPENTRY 12 CUSTOM CASEWORK 14 DIVISION 7: THERMAL & MOISTURE PROTECTION .............................................19 GENERAL 19 INSULATION 19 FIBERGLASS COMPOSITION SHINGLES 20 FLASHING & SHEET METAL WORK 21 SEALANTS 22 DIVISION 8: DOORS WI N DOWS & GLASS ........................................................... 25 GENERAL 25 WOOD DOORS 25 RAIL & STILE WOOD DOORS 26 HOLLOW METAL FRAMES 27 ALUMINUM ENTRANCE DOORS 28 ALUMINUM ENTRANCE FRAMING ALUMINUM WINDOW FRAMING GLASS & GLAZING FINISH HARDWARE ERROR! BOOKMARK NOT DEFINED. 29 30 32 33 D IV ISION 9: FI N ISH ES ........................................................................................... 37 GENERAL 37 GYPSUM WALLBOARD 37 CEMENTITIOUS THIN PATCHING UNDERLAYMENT 39 L 40 42 RESILIENT FLOOR COVERING 44 CARPET & CARPET TI LE 45 RU BBER BASE 48 WALK-OFF MAT 48 PAINTING 49 DIVISION 11: EQUI PMENT .................................................................................... 55 GENERAL 55 BANK EQUIPMENT 55 ~ 56 DIVISION 16: E LECTRICAL..................................................................................... 57 GENERAL 57 RACEWAY 58 BOXES 59 WIRING 60 WIRING DEVICES 61 PANELBOARDS & BREAKERS 62 LIGHTING 62 TABLE OF CONTENTS ............................................................................................. 65 DIVISION 15 MECHANICAL (REFER TO DIVISION FOR CONTENTS) DIVISION 16 ELECTRICAL (REFER TO DIVISION FOR CONTENTS) OWNER AND CONSULTANTS OWNER. Timberland Savings Bank 624 Simpson Ave HoqUlam, WA 98550 Contact. Michael Sand, President (360) 533-4747 FAX. 533-4743 ARCHITECT Street, Lundgren & Foster Architects 200 South First Street Montesano, WA 98563 Contact: Tom Rieger (360) 249-4011 FAX 249-2645 I NVIT A TION TO 81 D Sealed bids will be received by Timberland Savings Bank at the Main Office of Timberland Savings Bank, 624 Simpson Avenue, Hoqulam, Washington 98550, until 3 00 pm, Wednesday, May 25, 2005, for a General construction Contract, which Includes general and electrical construction, for "INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND SAVINGS BANK YELM" Bids will be opened and read aloud at that time Bids received after the day and hour indicated herein will not be considered Plans, specifications, and contract documents for the Contract work may be obtained by invited prime contractors, as well as electrical contractors, at the office of Street Lundgren & Foster Architects, 200 South First Street, Montesano, Washington 98563 Two sets, maximum to each bidder, upon , which sum shall be refunded upon return of the drawings and speCifications within two weeks following the bid opening, unmarked and In good order No partial sets will be Issued Each bid must be accompanied by a certified check, cashier's check, or bid bond with a State licensed surety company as surety, In an amount not less than 5% of the base bid, made payable to Timberland Savings Bank. Should the successful bidder fall to enter Into a Contract In accordance with the bid, and furnish all documents and bonds reqUired within the time stated In the specifications, the bid deposit or bond shall be forfeited to Timberland Savings Bank. Timberland Savings Bank shall have the rlghtto reject any or all bids not accompanied by bid security or data reqUired by the bidding documents, or any bid proposal which IS Incomplete or Irregular The Owner further reserves the right to waive informalities Contract award, If made, will be to the lowest responsible bidder No bidder may withdraw his bid after the time set for the opening thereof, unless award of the Contract IS delayed for a period of time exceeding thirty (30) days Timberland Savings Bank INSTRUCTIONS TO BIDDERS GENERAL Bidding documents shall Include the Invitation to Bid, Instructions to Bidders, Form of Proposal, Standard Form of Agreement Between Owner and Contractor, General Conditions, Supplementary Conditions, Special Requirements, Specifications and all related material bound with speCifications, Drawings and Addenda Each bidder by making his bid represents that he has read and understands the bidding documents DEFINITIONS Addenda are written or graphic Instruments Issued by the Owner prior to the execution of the Contract which modify or Interpret the Contract Documents by additions, deletions, clarifications or corrections A bId IS a complete and properly signed proposal to do the Work for sums stipulated therein supported by data called for by the Contract Documents A BIdder IS one who submits a Bid for a Prime Contract with the Owner for the Work described In the Contract Documents The Owner IS Timberland Savings Bank. ADDENDA AND INTERPRETATIONS Bidders shall promptly notify the Architect of any ambiguity, Inconsistency or error that they may discover upon examination of the Bidding Documents or of the site and local conditions, or If they believe any specified products, methods or systems are Inappropriate This shall be done prior to executing the Contract. No interpretations of the meaning of Drawings, Specifications, or Bidding Documents shall be made to any Bidder orally Every request for such interpretation shall be made In Writing, addressed to the Architect and~ to be given consideration, must be received no later than 10 calendar days prior to the day of Bid Opening. Any and all interpretations and any supplemental instructions shall be In the form of written Addenda to the Drawings or Specifications All written Addenda shall become part of the Contract Documents Only written interpretations or corrections by Addendum shall be binding. Addenda shall be mailed or delivered to all who are known by the Arch Itect to have received a complete set of Bidding Documents, request for a copy from any other party shall be accompanied by a self-addressed stamped envelope. All Addenda shall be mailed INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 1 INSTRUCTIONS TO BIDDERS DIVISION II no later than 3 calendar days prior to the day of the Bid Opening, except an Addendum, if necessary, postponing the date for receipt of Bids or withdrawing the Request for Bids Each Bidder shall ascertain prior to submitting his Bid that he has received all Addenda issued, and he shall acknowledge their receipt In the space provided therefor on the Form of Proposal After acceptance of his bid and commencement of the Work, no consideration shall be given to any claim or misunderstanding of the prOVISions of the DraWings and Specifications FORM OF BI D Submit the Bid on the form furnished In the Bidding Documents, without alterations to the form or any recapitulation of the Work to be done Fill In all blank spaces In the form, manually sign In Ink. If the Bidder IS a partnership, each partner must sign, if a corporation, print the name of the State In which Incorporated, followed by the signature or signatures of the person or persons authorized to sign, and the names of the offices they hold In the corporation The bidder may retain one copy of the bid form In hiS files PROHIBITION OF ALTERATIONS Proposals that are Incomplete, are conditioned In any way, or contain erasures, alterations, or Items not called for In the proposal, or which are not in conformity to the law, may be rejected as informal Proposals shall contain no recapitulation of the work to be done, The proposal form inVites bids on definite plans and specifications Only the amounts and information requested on the furnished proposal form will be considered as the bid Each bidder shall bid on the work exactly as specified, as provided In the proposal form, and as clarified by "Form of Bid" above PROPOSAL SUMS The sum of money shown on the Proposal covering all work Included In the base bid contract documents, together with any addenda thereto and/or unit prices called for, or any alternates called for, shall Include all Items of labor, material, equipment, overhead, and compensation to complete all of the work under each particular heading. Each bidder shall rely on hiS own examination In making his proposal SUBMISSION OF PROPOSAL A copy of the Form of Proposal IS Included herein The Bid and the bid security shall be enclosed In a sealed envelope The envelope shall be Identified with the Project Name and shall Include the bidder's name Bids shall be deposited In the deSignated location prior to the time and date of the bid indicated In the InVitation to Bid Bids received after the time and date for receipt of bids shall be returned unopened No oral, telephonic or telegraphic proposals will be considered INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 2 INSTRUCTIONS TO BIDDERS DIVISION II MODIFICATION OF PROPOSAL Modification of proposals already received will be considered only If the request for the privilege of making such modification IS granted and the modification IS made prior to the scheduled closing time for the receipt of proposals All modifications must be made In writing over the signature of the bidder Modifications made orally, by FAX, e-mail, telephone or telegraph shall not be considered WITHDRAWAL OF PROPOSAL At any time prior to the scheduled closing time for receipt of proposals, any bidder may withdraw his proposal, either personally or by written request and/or telegraphic, telephonic or FAX and confirmed written request. If withdrawal IS made personally, proper receipt shall be given therefor After the scheduled closing time for receipt of proposals, or before award of contract, no bidder will be permitted to withdraw his proposal unless said award IS delayed for a period exceeding thirty (30) days Any bids received after the scheduled closing time for receipt of bids shall be returned to the bidder unopened SUBSTITUTIONS Each bidder represents that his bid IS based upon the materials and equipment desCribed In the bidding documents No substitution shall be conSidered unless a written request has been submitted to the Architect at least ten days prior to the date for receipt of bids Refer to Division 1 of the SpeCifications, Special Requirements, Substitutions TAXES The Contract Sum and any agreed variations thereof shall Include all taxes Imposed by law, except State sales tax. Sales tax shall be collected from the Owner, and shall be paid to the State by the Contractor In conformance with the law The Contractor shall furnish proof of payment of all taxes required by law BID BOND A proposal guarantee consisting of a certified check, bank cashier's check, or bid bond, made payable to Timberland Savings Bank for an amount equal to at least five percent of the base bid shall accompany each proposal as eVidence of good faith and as a guarantee that, If awarded the contract, the bidder will execute the contract within ten days after date of the written notice of said award, and shall give bond as required by the General Conditions ACCEPTANCE OF BID (AWARD) It is the intent of the Owner to award a Contract to the lowest qualified and responsible bidder, provided the bid has been submitted In accordance with the requirements of the INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 3 INSTRUCTIONS TO BIDDERS DIVISION II bidding documents and the bid does not exceed the funds available The Owner reserves the right to reject any and/or all proposals and also reserves the right to waive any Informality or irregularity In any bid or bids received and to accept the bid which, In Its Judgement, IS In the Owner's best Interest. The Owner shall have the right to accept alternates In any order or combination No Contract award shall be made until necessary investigations have been made by the Owner as to the responsibility of the bidder to satisfactorily perform the Work as specified EXECUTION OF CONTRACT The successful bidder will be reqUired to execute the Agreement bound within these specifications, and furnish a performance and payment bond together with an Insurance certificate satisfactory to the Owner within ten days after date of written documents from the Owner FEDERAL & STATE LAWS All applicable Federal and State laws, municipal ordinances, rules and regulations of all authorities haVing Jurisdiction over construction of this project shall apply to the Contract throughout and they shall be deemed to be Incl uded In the Contract the same as though herein written out In full The bidder will be reqUired to comply with such requirements at hiS expense EXAMINATION OF SITE AND CONDITIONS Before submitting hiS proposal, the bidder shall familiarize himself with the site and shall ascertain for himself all of the physical conditIOns and limitations In relation thereto Failure to take this precaution shall not release the successful bidder from entering Into contracts or excuse him from performing the Work in strict accordance with the terms of the Contract. No extra payment shall be allowed for additional work due to the failure of the Contractor to obtain this information No statement made by any officer, agent or employee of the Owner or the Architect In relation to the physical conditions pertaining to the site of the work shall be binding on the Owner or the Architect. INSURANCE The bidder's attention IS directed to the Supplementary Condition relating to Insurance The successful bidder for the Work will be reqUired to secure liability Insurance before commencing work. Such Insurance shall indemnify the Owner against any and all claims In the amount of $1,500,000 00 The Insurance shall remain In force until such time as the described Work IS deemed to be complete and accepted by the Owner INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 4 INSTRUCTIONS TO BIDDERS DIVISION II PERFORMANCE & PAYMENT BONDS A Performance and Payment Bond will be required The cost of the Performance and Payment Bond shall be paid for by the Contractor, and shall be for 100% of the Contract Amount. The cost for the bond shall be Included In the bid SUBCONTRACTORS The successful bidder shall be required to establish to the satisfaction of the Owner the rellabll Ity and responslbll Ity of the proposed subcontractors to furn Ish and perform the Work described In the sections of the SpeCifications pertaining to such proposed subcontractor's respective trades The Owner shall have the right to approve or disapprove the subcontractors to be used In the Work. If a change of any subcontractor is required, the Owner shall notify the successful Bidder In writing The Contract price shall be Increased or decreased by the difference In the cost occasioned by such change Subcontractors, other persons and organizations proposed by the successful Bidder and accepted by the Owner must be used on the work for which they were proposed and accepted and shall not be changed except with the written approval of the Owner PERMITS The general building permit shall be obtained and paid for by the Owner All other required permits, bonds and fees necessary to complete the Work shall be obtained and paid for by the Contractor and the cost of such permits shall be Included In his bid COMPLETION TIME The Contractor shall state In the Form of Proposal the number of calendar days required to bring the Work of this Contract to Substantial Completion LIQUIDATED DAMAGES Liquidated Damages are not applicable to thiS Contract. END, INSTRUCTIONS TO BIDDERS INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 5 o FORM OF PROPOSAL Michael Sand, President Timberland Savings Bank 624 Simpson Avenue Hoqulam, WA 98550 Gentlemen Having carefully examined the drawings, speCIfications, and other Contract Documents entitled "INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND SAVINGS BANK YELM" as well as the site and all eXisting conditions and limitations affecting the work, the undersigned, In response to the Invitation to Bid and InstructIOns to Bidders, proposes to perform all work and furnish all labor, materials, equipment and other Items required for and to complete the work called for by the above named documents for the follOWing sum BASE BID Dollars ($ ) Not including Washington State sales tax. CONTRACT If the underSigned be notified of the acceptance of this proposal by the service upon him Within thirty (30) days of the date set for the opening of bids of a written notice of award he agrees, within 1 0 days after such written notice of award is served upon him, to enter Into a contract With the Owner for the work as described In the Contract Documents and In accordance With this bid as accepted At this time the Contractor shall deliver to the Owner a performance and payment bond In accordance With the General Conditions COMMENCEMENT AN D COMPLETION The underSigned further agrees that, If he IS awarded the Contract pursuant to this bid, he will sign the Contract and immediately commence With the work under this Contract and shall bring the work to a pOint of Substantial Completion Within calendar days after execution of the agreement. (Contractor to fill In number of calendar days) ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 1 of 6 FORM OF PROPOSAL DIVISION II NON COllUSION AFFI DAVIT I, the Undersigned, an authorized representative of (Contractor to fi II In name of business), being first duly sworn on oath, do hereby certify that said person(s), firm, association or corporation has(have) not, either directly or Indirectly, entered Into any agreement, participated In any coil USlon, or otherwise taken any action In restraint of free competitive bldd Ing In connection with the project for which this proposal IS submitted I further acknowledge that by signing the signature page of this Proposal, I am deemed to have signed and have agreed to the provIsions of this non-collusion affidavIt. BI D GUARANTEE The undersigned further agrees that the certified check or bid bond payable to the City of Aberdeen accompanYing this proposal IS left In escrow with the City, that It'S amount or penal sum IS the measure of liquidated damages which the City will sustain by the failure of the undersigned to timely and properly execute and deliver the above mentioned Agreement and Bond, and that if this proposal IS accepted by service upon the undersigned within thirty (30) days of the date set for the opening of bids of a written notice of award and If the undersigned fails to properly execute and deliver said agreement and bond within ten (10) days after such service, then the check shall become the property of the City and the bond shall become null and vOid ADDENDA Receipt of Addenda No's through inclusive IS hereby acknowledged and the same has been taken Into consideration In submitting this proposal and IS Included herein SUBCONTRACTORS Subcontractors that are proposed to perform categories of work exceeding 10 percent of the Contract price must be listed below The categories of work are to be I isted below the subcontractor's name If no subcontract fits this criteria, enter "none proposed /I Subcontractor name Categories of work. ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 2 of 6 FORM OF PROPOSAL DIVISION II Subcontractor name Categories of work. Subcontractor name Categories of work. Subcontractor name Categories of work. Subcontractor name Categories of work. ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 3 of 6 FORM OF PROPOSAL DIVISION II WORK TO BE PERFORMED BY PRIME CONTRACTOR Categories of work exceeding 10 percent of the Contract price to be performed by the prime Contractor must be listed below If no categories of work to be performed by the prime Contractor exceed 10 percent, enter "none" PrI me Contractor name Categories of work. Respectfully submitted, BIDDER (Form of Bidder's business organization) (Address, including City and State) (Washington Contractor's license no ) (Federal tax I D no) BY (Name) (Title) ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 4 of 6 , FORM OF PROPOSAL DIVISION II LIST OF ADDITIONAL PARTNERS OR CORPORATE OFFICERS NAME (signature If Partner) TITLE ADDRESS END, FORM OF PROPOSAL ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 5 of 6 AlA DOCUMENT NO. Al01-1997 Standard Form of Agreement Between Owner and Contractor AlA DOCUMENT NO. A201-1997 General Conditions of the Contract for Construction The documents listed above shall be Included by reference In the Contract Documents They shall have full force and effect as If reproduced herein In their entirety Copies of these documents are available for viewing by bidders In the Architect's office Street Lundgren & Foster Architects 100 West First Street Aberdeen, Washington 98520 (360) 532-4341 It shall be the responsibility of every bidder to familiarize himself with these documents prior to submitting a proposal for the Work covered by this Contract. Failure to do so shall not entitle the successful Bidder to reimbursement for extra costs caused by compliance with the requirements ofthese documents and any supplementary conditions thereto ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 1 SUPPLEMENTARY CONDITIONS The Supplementary Conditions contain requirements that modify, clarify, and/or are In addition to the requirements of the General CondItIOns of the Contract for ConstructIon and shall be an Integral part of the Contract Documents Items that relate to a specific article In the General ConditIOns of the Contract for Construction are listed under the heading of that article ARTICLE 3 Taxes to be paid by the Contractor Include those Imposed by Federal, State, County and City governments excepting only real estate taxes on the property, and such taxes as applicable shall be Included In the proposal sums The State retail sales tax IS not permitted to be Included In the proposal sum, the Owner shall pay the sales tax proportionately With each periodic and final payment In addition to the amount allowed on the payment certificate and the Contractor shall pay such taxes to the authOrity as required by law The Owner shall pay all building permit and plan check fees required by the City ofYelm Other speCial permit and inspection fees, such as electrical, plumbing, mechanical, underground utility and street work, or fees assessed by State, County or Federal agencies, shall be paid by the Contractor and shall be Included in his bid ARTICLE 4 No later than 30 days after Award of the Contract, the Contractor shall provide the Architect With a complete list of all of the subcontractors and major suppliers he plans to use in performing the work under thiS Contract. ARTICLE 8 The work of thiS Contract shall be commenced at once after the Issuance of a written notice to proceed or a Signed Contract from the Owner and shall be completed Within the time limits stipulated In the Form of Proposal ARTICLE 9 Once each calendar month, the Owner Will make partial payment to the Contractor on the basis of a duly certified and approved estimate of the work performed dUring the ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 1 SUPPLEMENTARY CONDITIONS DIVISION II preceding calendar month A sum equal to 5% (five percent) of each such estimate shall be retal ned After the award of Contract, the Owner shall require the Contractor to exerCise, In Writing, one of the options listed below' Retained percentages shall be held by the Owner, without Interest, until 30 days following the Final Completion of the Work, or Retained percentages shall be placed In escrow with a bank or trust company until 30 days following the Final Completion of the Work, When the Contractor elects to place the amounts reserved In escrow, the Contractor and Owner shall JOintly select a bank or trust company as the escrow agent. The Owner, the Contractor, and the Escrow Agent shall then execute an Escrow Agreement on a form approved by the Owner A copy of the completed Escrow Agreement shall be provided the Escrow Agent, the Contractor and the Owner Upon receipt of an inVOice voucher requesting a progress payment, the Owner shall Issue, In addition to the check for the regular progress payment, a check made payable JOIntly to the bank or trust company and the Contractor, In an amount equal to the amount retained on each voucher This check will then be forwarded to the Escrow Agent who will negotiate the check and Invest the proceeds as required by the Contractor and approved by the Escrow Agent and the Owner A list of acceptable Investments shall be attached to the Escrow Agreement. When interest on such Investments accrue and IS paid, It shall be Invested In the escrow account In the same manner as the retained funds Investments authorized Savings accounts or certificates of deposit In any FDIC Insured State or Federal chartered bank, savings & loan or credit union Bills, certificates, notes or bonds of the United States Obligations of any corporation wholly owned by the Government of the United States Indebtedness of the Federal National Mortgage Association Upon Final Completion of the Work of this Contract, and the expiration of the 30 day period thereafter, and after receipt of satisfactory evidence that all applicable taxes and fees have been paid, and that all claims, together with a sum suffiCient to defray the cost of foreclosing the liens of such claims, and to pay attorney's fees, have been paid, the Owner shall pay to the Contractor the funds retained by him, or Issue instructions to the Escrow Agent authorizing the release to the Contractor of the funds, seCUrities or bonds held In escrow If such taxes have not been discharged, or the claims, expenses and fees have not been paid, the Owner shall Pay such taxes and fees from the funds retained and deduct such liens, expenses and fees that have been filed and pay the remainder, If any, to the Contractor ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 2 SUPPLEMENTARY CONDITIONS DIVISION II DISposition of amounts held by the Owner to settle liens, expenses and fees will be disposed of In accordance with the advice of legal counsel Order the seCUrities and bonds held In escrow to be converted to money and returned to the retalnage fund held by the Owner, who shall dispose of such funds In accordance with the paragraph above The Escrow Agent shall not make any payment from a retained percentage fund or release any retained percentage escrow account to any person, until instructions to do so have been received from the Owner ARTICLE 10 Protections Provide any speCial barricading or fencing and maintain any required lights, warning and directional signs, and other protections near and about the construction site as may be required by local authorities having JUriSdiction or as necessary to protect pedestrians, vehicles, any surrounding adjacent sites, structures, landscaping, properties and servIcing utll Itles Indefinite underground utilities or other services as may be uncovered shall not be disturbed but brought to Architect's attention for direction as to how to proceed The Contractor shall observe and comply With all Federal and State laws, and With County, City, and municipal resolutions, ordinances, and regulations that will In any way affect the work. Such information, interpretation, or representation of laws, regulations, or ordinances referenced In the Contract Documents shall not take precedence over the law, regulation, or ordinance Itself, nor relieve the Contractor from the Contractor's responsibility for determining the true current construction and content of such laws, regulations, and ordinances ARTICLE 11 The Contractor shall purchase and maintain Insurance as described In article 11 of the General Conditions The Insurance shall be written on an occurrence basIs, for not less than the follOWing, or greater If required by law' Workers Compensation State Statutory Employers Liability $1,500,000 Comprehensive General Liability (including Premises-Operations, Independent Contractor's Protective, Products and Completed Operations) Broad Form Property Damage Bodily Injury $500,000 Each Occurrence $500,000 Annual Aggregate ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 3 SUPPLEMENTARY CONDITIONS DIVISION II Property Damage $500,000 Each Occurrence $500,000 Annual Aggregate Products and Completed Operations to be maintained for two years after final payment. Property Damage Liability Insurance shall provide X, C, and U coverage Contractual Liability Bodily Injury $500,000 Each Occurrence Property Damage $500,000 Each Occurrence $500,000 Annual Aggregate Personal Injury with Employment Exclusion deleted $1,500,000 Annual Aggregate ComprehenSive Automobile Liability Bodily Injury $500,000 Each Person Property Damage $500,000 Each Occurrence Timberland Bank shall be named as an additional Insured Blanket Contract Liability $500,000 The Contractor shall carry sufficient property damage Itabll Ity Insurance for damage caused to buildings on adjacent properties as a result of construction activities The Contractor shall secure, Include costs therefore In the bid, and pay for performance, labor and material payment and maintenance bonds Issued from a bonding company licensed to transact bUSiness In the State of Washington In Statutory Form Liability under each of the bonds shall be- 100% of the Contract sum plus sales tax for' )performance, 2)labor and material payment, and 3)one year's maintenance for correction of defective work. ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 4 SUPPLEMENTARY CONDITIONS DIVISION II At the Contractor's option, he may require performance and labor and material bonds from anyone or more of his subcontractors provided the Contractor pay for such bonds, all at his own expense, not at the Owner's expense ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 5 SPECIAL REQUIREMENTS TYPE OF CONTRACT Work of this project will be performed under one contract. General Construction Contract This contract will Include all electrical work. General Contractor IS sole coordinator for proJect, IS responsible for enforcing coordinatIOn requirements, and shall maintain control at all times SPECIFICATION FORMAT SpeCification format. divIsion numbers and titles of these specifications follow CSI format. Format of each divIsion IS similar, however 5-dlglt CSI section numbers have not been used Wording of these SpeCifications These speCifications are of abbreViated or "streamlined" type and frequently include Incomplete sentences Words such as "shall", "Contractor shall" and "shall be" and similar mandatory phrases shall be supplied by Inference In same manner as they are In a note on draWings Contractor shall prOVide all Items, articles, materials and operations listed, including all labor, materials, equipment and incidentals reqUired for their completIOn DIVISion and Section Numbering Numbering of divisions In these speCifications IS merely for Identification DIVISions Included are listed In "Table of contents" Contractor shall check hiS copies of speCifications with table of contents to be sure they are complete Number of SpeCified Items required Wherever in these speCifications an article, deVice or piece of equipment IS referred to In Singular number, such reference shall apply to as many such articles as are shown on draWings or reqUired to complete Installation SpeCification by Reference Any material speCified by reference to number, symbol, or title of a speCific standard such as a CommerCial Standard, Federal SpeCification, a trade ASSOCIation Standard, or other similar standard, shall comply with requirements of latest revision thereof and any amendment of supplement thereto, In effect on date of Invitation for Bids, except as limited to type, class or grade, or modified In such references Standards referred to, except as modified In speCifications, shall have full force and effect as though printed In speCification EqUipment ReqUirement: Materials and equipment furnished and Installed shall be manufactured, fabricated, or constructed to meet safety requirements of all State of Washington Department of Labor and Industries Safety Division Codes, National Electrical Code, and requirements of National Electrical Manufacturers ASSOCIation ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 1 SPECIAL REQUIREMENTS DIVISION II SUBSTITUTIONS Mention of speCIal brands, materials and devices In Contract Documents are for purpose of establishing criterion of quality and character desired Substitutions approved In writing by Architect are allowed, Architect shall be sole Judge of acceptability of any proposed Substitution Substitution requests MUST be made In writing. Requests must arrive at Architect's office no later than 10th calendar day prior to day of Bid Opening, requests after that time shall not be considered Submittal shall use Construction speCIfications Institute's format for product approval, accompanYing technical data sheets shall Include complete Product description and all other information necessary for evaluation In respect to pOints of information covered by specifications It IS responsibility of individual requesting Substitution to indicate If and how Substitution doesn't conform to material specified If Substitution would have an effect upon Progress Schedule for work, note what that would be, If availability of maintenance service and replacement materials differs, clarify how Contractors shall be responsible for receiving Bids from only those Manufacturers approved by Architect. Disapproved or unapproved materials are not acceptable for ProJect. Only one request for Substitution of any single Item will be acceptable If Architect refuses requested substitution, Contractor must use product, material or system as specified MANUFACTURER'S DIRECTIONS Follow all printed or oral instructions and diagrams of manufacturer of products or equipment for application, installation, connection, erection, use, cleaning and conditioning of all materials, articles and equipment. SpeCIfications In conflict with manufacturer's instructions shall be called to attention of Architect for final direction SUBMITTALS Before work under thiS Contract commences, Contractor shall submit to Owner follOWing documents Signed Contract 2 Certificate of Insurance 3 Performance and Payment Bonds 4 List of Principal Subcontractors and Suppliers Before applYing for first monthly progress payment, submit to Architect for approval following documents Progress schedule 2 Cost breakdown ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 2 SPECIAL REQUIREMENTS DIVISION II As work progresses, submit to Architect shop drawings, product data and samples required by these specification sections Begin no work which requires submittals until return of submittals with Architect's stamp and initials or signature indicating review copies minimum of all shop drawings and product data. Submit sufficiently In advance to afford ample time for checking, correcting and re-checklng Contractor shall review and approve all shop drawings prior to transmitting to Architect. Changes to contract documents shall be Identified by conspIcuous reference markings and be accompanied by letter setting forth reason for change. Shop drawings will be reviewed for design and appearance only Final approval of dimensions, fitting and ability to comply with contract documents shall be Contractor's responsibility Claims for extra costs will not be considered for work shown on shop drawings unless request IS noted In Contractor's transmittal letter and then acknowledged by Architect In change order form CONSTRUCTION PROGRESS SCHEDULE A pre-construction conference shall be held prior to commencement of construction work at site Representatives of Owner, Contractor and Architect shall attend this conference Coordination of Owner's and Contractor's operations shall be discussed At pre-construction conference contractor shall submit to Owner a proposed construction schedule based upon date of Final Completion Format of schedule shall be determined by Contractor and agreed to by Owner and Arch Itect. Submit revised schedules to Architect monthly as constructIOn progresses Indicate progress of each activity and highlight any changes to schedule Report any problem areas or anticipated delays and their effect on progress schedule Contractor shall keep a daily log at construction site In which to record weather and other conditions or events that may affect construction schedule INSPECTION BY PUBLIC OFFICIALS Call for all inspections required by publiC agencies having JUriSdiction In area. Final payment will not be made until appropriate offiCials have made a final Inspection and all defiCient Items noted have been corrected WATERTIGHTNESS OF BUILDING General Contractor shall be held responsible for correction of all leaks caused by rain water, ground water or surface water occurring In any part of building which was affected by Work of this Contract for a period of two years from date of Final Completion of work by Owner Unless Contractor notifies Architect In Writing, one month prior to installation of various phases of work, that In his opinion certain details or speCIfications shown on Contract ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 3 SPECIAL REQUIREMENTS DIVISION II Documents are defiCient as to watertightness, then It shall be assumed that contractor accepts said details and construction as being consistent with good practice as to watertightness and agrees to correct any defective work as described above FiElD OFFICE BUilDING General Contractor shall provide a substantial weathertlght office building on premises for JOint use by Contractor and Architect. Provide wood floor raised above ground, locked door and glazed windows EquIp with plan table, shelving, plan rack, stools and chairs Provide and pay for adequate heat, electric and Janitor services Remove building from premises on completion of Contract, or sooner If required to complete construction TOilET FACILITIES General Contractor shall provide adequate toilet facilities, separate from eXisting building facilities, for use by all those connected with Work. Toilets to be of chemical type or connected to sanitary sewer FI RE PROTECTION Provide and maintain fire extinguishers In accordance with local, state and federal regulations TElEPHONE Provide a non-coin telephone Locate adjacent to or within work area or field office building. Install Immediately after work IS started, maintain until completion of work. Pay for installation, maintenance and calls Allow all connected With work to use, provided they pay for toll calls Cellular phones shall be acceptable for this purpose. TEMPORARY HEAT General Contractor shall provide, at his own expense, suffiClenttemporary heat for proper installation of work and to protect all work and materials until Final Completion Subject to approval of Arch Itect, General Contractor may use permanent heati ng system or a temporary connection of equipment required for permanent system Equipment shall be properly installed by responsible electrical and mechanical contractors and made available for supplYing temporary heat. Contractor shall be responsible for maintaining a minimum Interior temperature of 600 F once interior finish work has commenced General Contractor shall arrange With electrical and mechan Ical subcontractors for use, operation and maintenance of eXisting and/or new system General Contractor shall pay for all connections and maintenance for temporary heating and necessary accessories such as temporary air filters when required to protect operating equipment of building Unit ventilators, fan, air handling unIts and/or duct systems used for temporary heating shall have temporary filters Installed to prevent accumulation of dust and dirt In system and ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 4 SPECIAL REQUIREMENTS DIVISION II equipment. Upon completion of temporary heating period, all filters for temporary heat shall be thrown away and new filters of type speCified shall be Installed General Contractor shall be responsible for and correct all damages or dirtYing of any part of new or eXisting heating system caused by his operations, hiS workmen or subcontractors Electrical power or natural gas used to produce temporary heat shall be paid for as deSCribed under section "Connection and Payment for Permanent Utility Services" WATER FOR CONSTRUCTION Contractor shall furnish and Install necessary temporary piping from distribution pOints to construction area where water IS necessary to carryon work and upon completion of work shall remove all temporary piping Contractor may use permanent building water distribution systems for construction work. ElECTRICAL POWER FOR CONSTRUCTION Electric power required for performance of Work shall be furnished and paid for by Owner via eXisting electrical systems at site Any alterations or extensions to eXisting electrical system required to supply power to construction areas shall be prOVided and Installed by Contractor Before Final Completion, any temporary modifications to electrical system Installed by Contractor shall be removed and electrical system shall be restored to ItS state prior to commencement of construction or as shown on draWings Temporary lighting during construction IS to be maintained by Contractor so that work can be properly and safely performed Special attention shall be given so that stairs, ladders, openings, barricades and other Similar Items and spaces are adequately lighted Lighting system shall conform to requirements of local and state safety rules All temporary and portable wIring shall be Installed and maintained In a safe and workmanlike manner In accordance with state and local requirements Electrical Contractor shall Install permanent electrical serVice, risers, and panels as soon as practicable to prOVide for use of service by other trades TEMPORARY CLOSURES AND FENCING Contractor shall erect temporary closures over openings where required to protect work In place, to secure building, to keep building watertight and/or for safety of workmen or publiC Contractor shall be solely responsible to keep building watertight at all times during construction Erect temporary construction fenCing as required to secure building and construction materials, to protect pedestrians and vehicles, and as otherWise required by authorities haVing JUrISdiction ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 5 SPECIAL REQUIREMENTS DIVISION II PROTECTION OF WORK IN PLACE Work in place that IS subject to Injury because of operations carned on adjacent thereto shall be covered, boarded up or substantially enclosed with adequate protection CONTRACTOR'S STAGING AREA All materials, equipment and supplies required for execution of Work must be stored within area defined by site boundaries as shown on site plan Contractor shall not be allowed to store materials and equipment outside area of site If space outside construction site IS required to store materials and equipment, Contractor shall make all necessary arrangements for such space and shall pay for use of space STORAGE OF MATERIALS It shall be sole responsibility of Contractor to deliver and store all construction materials In such a manner that, when Installed, materials are In new and unblemished condition Construction materials shall be delivered to site In manufacturer's unopened containers or as bundled or wrapped for shipment from place of manufacture When stored on ground, materials shall be placed on pallets or skids so that they are not exposed to earth Where materials may be damaged by exposure to weather, store In dry, protected areas Remove any damaged materials from site and replace at no cost to Owner Contractor shall be responsible for security of all construction materials Install fencing and/or provide watchmen as required Any stolen or missing materials shall be replaced at no cost to Owner up to date of Final Completion of proJect. PROJECT CLOSEOUT Architect's representative, In presence of Job superintendent, will make a final inspection and punch list. This inspection will be conducted whenever Contractor indicates he IS ready for Final Completion Newly discovered defiCienCies may be added to punch list at any time Contractor shall correct all defiCiencies until project IS accepted regardless of whether Owner has occupied project or not. Report of Building OffiCial's inspections will be sent to Contractor for those Items that are duly Within Contractor's scope of responsibility to be added to punch list. Contractor shall notify Architect when all punch list Items have been corrected Architect will conduct a final inspection With Contractor and owner's representative present. AS-BUILT DRAWINGS Upon completion and before final payment, Contractor shall turn over to Architect one set of clean prints, marked In a neat, legible manner, shOWing all deviations from original design These prints shall Include Architectural and Electrical drawings Prints shall remain at Jobslte dUring construction and shall be kept current at all times ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 6 SPECIAL REQUIREMENTS DIVISION II OPERATING INSTRUCTIONS AND MAINTENANCE MANUALS Operate all systems Installed under this Contract through a complete cycle In presence of Owner's representative Provide instructions to Owner's representative Furnish, In triplicate, typed operating and maintenance manuals for each operating Item of equipment, including manufacturer's data sheets and warranty or guarantee forms Information shall be contained In black, labeled, 8-1/2" x 11" three-ring binders Upon completion of construction, provide In letter format, name, address and telephone number of equipment servIcing organization that will provide service for mechanical and electrical equipment on a 24-hour basIs dUring one-year guarantee period In event of failure This service shall be provided and performed at no additional cost to Owner CLOSEOUT SUBMITTALS Upon completion and prior to release of retain age, Contractor shall submit following written certifications Submit a certificate that all subcontractors and material suppliers have been paid In full according to requirements of General and Supplementary Conditions 2 A letter stating that Contractor will replace all materials and work that proves defective one year after date of acceptance 3 A certification Issued by duly authorized officials of all concerned City ofYelm departments that the building has been approved for occupancy FINAL CLEANUP Prior to Final Completion, remove broken or scratched glass and replace with new glass Clean all surfaces of all glass, including eXIsting wIndows Remove paint drops, spots, stains, and dirt from finished surfaces and clean, mop and buff hard floor surfaces Vacuum carpets Hand dust hOrizontal surfaces END, SPECIAL REQUIREMENTS ALTERATIONS TO ABERDEEN TIMBERLAND LIBRARY PAGE 7 SCHEDULE OF DRAWINGS A 1 Floor plan & project Information A2 Reflected ceiling plan A3 Phasing plan & notes A4 Teller line plan & elevations AS Casework details A6 Exterior elevations A7 Interior elevations, finish schedule & details S 1 Structural general notes El Electrical power plan E2 Electrical lighting plan DIVISION 2: SITE WORK GENERAL Furnish all labor, materials, equipment and supplies required to complete all demolition and site work as shown on the drawings and speCified herein This work shall Include, but shall not be limited to, demolition, tree & shrub removal, paving and other site Improvements Contractor shall VISit site and note all eXisting conditions so as to determine character and extent of work Involved Coordinate With work of other trades Take field measurements as required to Insure accurate fit and attachment of all parts DEMOLITION & SALVAGE Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of SpeCifications shall be Incorporated as a part of th IS section Complete all demolition work as shown on drawings and as specified herein This work Includes, but shall not be limited to, the following Remove all existing suspended acoustic ceilings (except where noted), including suspension system and tile Remove existing tile floor in lobby area. Remove all eXisting carpet. Vinyl flooring In restrooms and mechanical rooms to remal n Remove all eXisting casework as noted on plans EXisting teller line to be temporarily relocated before removal (as noted on drawings), until new teller line has been Installed Remove eXisting partitions and walls where noted on drawings Create new openings In exterior walls as required to Install new Windows PROJECT NAME PAGE 1 II DIVISION SITE WORK Remove eXisting finish materials as required to access walls to Install electrical work or backing, or as required to create consistent edge against which to apply other finish materials Remove eXisting lighting fixtures where noted on electrical drawings Remove on Iy those receptacles and wirl ng speCifically called for to be removed Saw new openings In walls and slabs where noted on drawings or as required to complete work of Contract. VISit site Note all conditions as to character and extent of Work Involved Not all cabinets, doors and miscellaneous Items have been noted on drawings Contractor shall rely on his own examination to determine extent of demolition work required Contractor shall be responsible for all demolitIOn methods employed Execute all demolition Work In an orderly and careful manner with due consideration for any eXisting structures and site Improvements, including any parts of eXisting building and surrounding area, which are to remain Repair and make good any damage to building and adjoining properties or Improvements caused by operations, including any damage or loss to adjoining tenants or property owners, whether to buildings, stocks of merchandise, trade fixtures or the like Do all concrete and masonry sawing with power driven saw Disconnect as required any electric, telephone, gas, water, steam or other lines servIcing structure per rules and regulations of authorities having JUrISdiction and as required to protect workers Keep all through lanes and drives clean and clear at all times All material removed under this Contract, which IS not to be salvaged or reused, shall become the property of the Contractor and shall be promptly removed from site Contractor shall dispose of all material In approved dump site Where necessary, segregate material so that only that material which IS approved for deposit at a particular dump site IS deposited at that slte(s) for disposal of demolition debris to be removed from site. Include all dumping charges In project cost. Upon completion of demolition work, leave property and adjacent areas clean and satisfactory to local authOrities and Architect. PAGE 2 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM ~ SITE WORK DIVISION II SITE CLEARING Requirements of DIvIsion 1 as well as requirements of General Section of this DIVISion of SpeCIfications shall be Incorporated as a part of this section Complete site clearing work at South entrance as shown on drawings and as specified herein Execute all site clearing work In an orderly and careful manner with due consideration for any and all surrounding areas, planting or structures which are to remain Periodically sprinkle to allay dust. Protect adjacent property and Improvements from damage and replace any portions damaged through this operation Remove all trees and shrubs Grub entire ground surface of any grass, weeds and plants down to 12" below present grade. Remove any large rocks as well as stumps and roots larger than 1" In diameter to a depth not less than 18" below original grade level Fill and compact holes left by removal of stumps and rocks All materials cleared or grubbed shall be removed from site by Contractor and dIsposed of In a legal manner Remove all rubbish and debris resulting from work of thiS section INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 3 DIVISION 3: CONCRETE GENERAL Furnish all labor, materials, equipment and supplies required to Install all concrete as shown on the drawings and specified herein This work shall Include, but shall not be limited to, for mwork, reinforcing steel, sleeves, Inserts, acceSSOries, cast-In-place concrete and concrete pavement. Coordinate with work of other trades Obtain information and instructions from other trades and suppliers In ample time to schedule and coordinate installation of Items furnished by them to be embedded In concrete so prOVISions for their work can be made without delaYing proJect. Secure all pipe sleeves, anchors and bolts, including those for angle frames, Inserts, supports, ties and other materials In connection with concrete construction, In position before concrete IS placed Cutting and/or patching made necessary by failure or delay In complYing with these requirements shall be completed at no cost to Owner Notify Architect a minimum of 24 hours before each concrete pour Verify all dimensions shown on drawings by taking field measurements to Insure proper fit and attachment of individual sections CAST-IN-PlACE CONCRETE Requirements of DIVISion 1 as well as requirements of General Section of this DivISion of SpeCifications shall be Incorporated as a part of this section All concrete shall be ready-mixed type produced In batch plant complYing with ASTM- C94 Concrete shall be of required strength and consistency to meet structural requirements and to produce surface appearance specified herein and satisfactory to Architect. Concrete supplier shall be responSible for proportioning mix to achieve specified characterIStiCS Cast-ln-place materials and accessories shall be as follows Concrete shall be made uSing portland cement ASTM C-150 type II or type I, course and fine aggregate per ASTM C-33, and clean, potable water Ready-mix per ASTM-C94 Minimum design strength shall be f'c = 3,000 pSI Maximum water/cement ratio shall be 0.35 Add air entraining agent to all concrete PROJECT NAME PAGE 5 11 DIVISION CONCRETE exposed weather to achieve 5% :!: 1 Y:1 % entrained air by volume per ASTM C- 260 Water-reducing agents may be used at Contractor's option Slab control joints shall be sawn type with JOint filler as specified below Expansion Jomt matenal for sidewalks and concrete aprons shall be asphalt saturated felt or neoprene, Y:1" thick x depth of slab Sacking materials shall be portland cement and water, mixed to a uniform creamy paste Leveling concrete shall be Sonneborn "Thin Patch", "Sonoflow" or approved equal Thin coat surface repair mortar or self-leveling portland cement-based floor underlayment (where used under finish flOOring) capable of spreading to feather edge Without cracking or other deterioration Patching concrete for filling floor depressions shall be Sonneborn "Screed", latex-modified concrete or approved equal Screedable mortar for use In areas where less than 2" of concrete fill IS required Use With bonding agent recommended by manufacturer Conform to methods and procedures outlined In ACI 306 1 for cold weather concrete placement and related ACI documents for gUidance In develOPing procedures for hot weather concrete placement. Place no concrete m any unit of Work until all formwork has been completely constructed, all remforcement secured In place, all Items to be built Into concrete are m place, and form ties at construction JOints tightened Before placmg, clean mixing and conveYing equipment, clean forms and space to be occupied by concrete Remove ground water until completion of Work. Carryon concreting, once started, as a continuous operation until the section of approved size and shape IS completed Make pour cut-offs of approved detail and location when section cannot be poured continuously or as shown on plan Handle concrete as rapidly as practicable from mixer to place of depOSit by methods which prevent separation or loss of ingredients DepOSit as nearly as practicable m final pOSition to aVOid rehandling or flOWing Provide expansion jomts In exterior concrete work between exterior slabs and abutting vertIcal surfaces and at 16 ft. on center In all curbs, sidewalks and aprons All jomts shall be straight and true Use specified jomt material PAGE 6 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM CONCRETE DIVISION II Carefully cure all concrete Keep forms sufficiently wet to prevent drYing out of concrete Keep all concrete surfaces wet for at least seven days after concrete is deposited Provide for cunng dunng weekends and holidays Protect slabs and exposed corners of concrete from traffic or damage After forms are removed, remove projecting fins, bolts, form ties, nails, etc, not necessary for the work or cut back one Inch from the surface JOint marks and fins In exposed work shall be smoothed off and cleaned as directed by Architect. Fill all form tie holes Repair defects In concrete work as directed by Architect. Chip VOids and stone pockets to a depth of one Inch or more as required to remove all loose matenal VOids, surface Irregulantles, chipped areas, etc, shall be filled by patching, gunlte or rubbing, as directed by Architect. Repaired surfaces shall duplicate appearance of unpatched work. Clean exposed concrete surfaces and adjoining work stained by leakage of concrete to approval of Architect. When construction work IS complete, or pnor to application of paint or floor covenng where such surface treatments are scheduled, remove remaining residue of cunng compounds and bond breaking agents from surface of all concrete slabs by washing With water and stiff brushes Apply concrete sealer to all exposed concrete surfaces In stnct accordance With manufacturer's instructions Finishes for concrete surfaces shall be as follows Extenor concrete flatwork surfaces such as sidewalks, dnveways, aprons, ramps and platforms shall receive a broom finish Stnke off and float surface then uniformly texture by drawing broom across surface of concrete INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 7 DIVISION 6: WOOD & PLASTICS GENERAL Supply and Install all rough carpentry work, finish carpentry work, casework, and plastic laminate wainscots as shown on drawings and as specified herein Verify all dimensions shown on drawings by taking field measurements, proper fit and attachment of all parts IS required Before starting Work, check all lines and levels indicated and such other Work as has been completed Should there be any discrepancies, Immediately report In writing to Architect. In the event of failure to do so, contractor will be responsible for correction of any errors Coordinate Work with all other trades (Electrical, Mechanical, Plumbing, etc) and do all cutting and patching required to accommodate their Work. Protect all adjacent Work Submit shop drawings and color samples for casework and plastic laminate to Architect for his review and color selection Drawings shall show all casework elevations, plans, cross sections and installation details Note surface finishes and equipment to be Installed by other trades or Owner Submit samples of plastic laminate and edge banding material for all casework, cabinet work and wainscots. Submit brochures or samples of hardware to be used along with finish selections Architect will select laminate colors and hardware colors or finishes All framing lumber and plywood shall bear stamp of Industry trade aSSOCiation (WWPA or APA) showing grade, speCies, mOisture content and other distinguishing characteristics ROUGH CARPENTRY Requirements of DIVISion 1 as well as requirements of General Section of this DIvIsion of SpeCifications shall be Incorporated as a part of this section Materials for rough carpentry work shall be as follows Studs, tnmmers, joists and furrmg shall be Douglas Fir or Hemlock, no 2 and better, kiln-dried, S4S PROJECT NAME PAGE 9 II DIVISION WOOD & PLASTICS Beams, ledgers, headers and other framing members shall be as indicated on drawings Glued laminated beams shall be manufactured from Douglas Fir lumber with a mOisture content not to exceed 12 % at tl me of manufacture Assemble uSing waterproof glue Surfaced all sIdes Bending stress as indicated on structural drawings Industrial appearance grade, Architectural PremIUm appearance grade where exposed Seal ends and bundle wrap Plywood roof sheathing shall be APA rated sheathing, thickness as shown on drawings, group 1 or 2 species, T & G long edges, exterior exposure classification, C-D face piles, touch-sanded faces Oriented strand board, Pelican Spruce Mills "Sturd I-Wood II IS also acceptable where not exposed Refer to structural notes Plywood to be concealed behind other materials, except roof sheathing, shall be exterior grade, C-D faces, thickness as shown on drawings Pressure treated lumber shall be Douglas Fir or Hemlock, no 2 or better, CCA or CCZA treated In accordance with applicable speCifications of American Wood Preservers Bureau Building wrap membrane shall be Tyvek housewrap, or approved equal Install per manufacturer's Instructions Felt, or building paper, shall be asphalt saturated felt paper, weight as indicated on drawings Nails shall be common wire nails, galvanized at exterior, bright or vinyl coated at interior Bolts, lag screws and other connectors shall be sizes as shown on drawings, galvanized at exterior, ZinC plated at interior Provide malleable iron washer of matching finish where bolt heads or nuts bear on wood Framing anchors and connectors shall be Simpson or approved equal, numbers and configurations as called for on drawings I C B 0 approved Galvanized finish If formed of sheet metal, prime painted If formed of welded plates Set carpentry work accurately to required levels and lines, With members plumb, level, true and accurately cut and fit. Do not splice structural members between supports Structural members shall not be cut, notched or drilled except as noted on drawings or as approved by Architect. PAGE 10 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM WOOD & PLASTICS DIVISION II Securely attach carpentry work to substrates by anchoring and fastening as shown on drawings and as required by International Building Code and other recognized standards Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials Make tight connections between members Pre-drill as required to prevent fasteners from splitting wood All wood In direct contact with concrete shall be pressure treated Install pressure treated members and sheathing elsewhere as called for on drawings Provide stud framing and fUrring where shown on drawings Space studs as called for on drawings or 16" on center, whichever results In the closest spacing. Use double top plate for all load-bearing walls and single top plate for all non-load-bearing partitions Anchor plates to supporting construction Construct intersections with not less than three studs Frame openings In stud walls with multiple studs and headers For non-load-bearing partitions, headers spanning openings up to 3'-0" Wide shall be double 2 x 4 minimUm, headers spanning openings up to 6'0" Wide shall be double 2 x 6 minimUm, headers spanning openings up to 10'-0" shall be double 2 x 8 minimum For headers over open Ings In load-bearl ng walls consu It structural drawings Provide all wood backing, fUrring, stripping or blocking indicated or required for installation and attachment of work of all other trades Cut and frame openings required by other trades Lay plywood roof sheathing perpendicular to supports and nail as noted on structural drawings Leave gap between edges of plywood as recommended on panel label FACTORY-FABRICATED WOOD TRUSSES Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of SpeCIfications shall be Incorporated as a part of this section Factory-fabricated wood trusses shall be metal plate connected wood trusses provided by a manufacturer With at least five years experience In truss deSign and fabrication Manufacturer shall be responsible for deSign and fabrication of trusses Trusses shall be deSigned by a structural engineer licensed In State of Washington Submit shop draWings for each different truss, which have been stamped and signed by structural engineer DeSigner shall follow accepted engineering practice Trusses shall span between exterior walls, beams or other bearing pOints shown on draWings and shall be deSigned to carry all live loads noted on draWings as well a dead load of truss and building materials supported by truss Trusses shall not bear on INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 11 II DIVISION WOOD & PLASTICS interior partitions unless specifically designated as bearing location on drawings Bottom chord deflection shall not exceed U360 Camber 1 X dead load deflection Truss configurations shall be as shown on drawings Web members may be arranged In any triangular pattern which most efficiently carnes design loads Provide special trusses where required to form hips, overhangs or other special roof conditions Provide double girder trusses where noted on draWings or where required to support loads supported by truss Materials for roof trusses shall be as follows Lumber for truss construction shall be Douglas Fir or Hemlock. Each piece shall bear grade mark of lumber Inspection Bureau DeSign values used for lumber shall comply with 1997 Uniform Budding Code and rules of agencies approved by American Lumber Standards Committee Lumber deSign values may be adjusted for duration of load In accordance With Uniform Budding Code Connection plates shall be not less than 20 gauge galvanized sheet steel, Fy 33,000 pSI Plates shall have Integral teeth, or marks to indicate location of separately applied fasteners Trusses shall be assembled uSing Jigs or other alignment deVices to Insure that all trusses are uniform Each JOint shall have wood-to-wood bearing for each member Steel plates shall be applied to both faces of each JOint. Double girder trusses shall be nailed together at factory lateral braCing, as may be required to reduce buckling length of individual truss members, shall be deSigned and speCified by truss manufacturer ThiS braCing shall be supplied and Installed by General Contractor Lateral braCing, If required, shall be In addition to cross braCing shown on draWings Install trusses In pattern shown on draWings, as modified by reviewed shop draWings Secure each individual truss to bearing plate or beam uSing connection detail shown on draWings Brace as shown on draWings or shop draWings, and as otherwise required to laterally stabilize each truss Trusses shall be aligned so that surfaces to receive sheathing and finish materials form uniform, flat planes Without irregularities FINISH CARPENTRY ReqUirements of DIVISion 1 as well as requirements of General Section of thiS DIVISion of SpeCifications shall be Incorporated as a part of thiS section Materials for finish carpentry work shall be as follows PAGE 12 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YElM WOOD & PLASTICS DIVISION II J,,,<;..:'.'\.V~~ . t ...:::.;,~ \.. , I..> '-' \J J ;.A'J "'" < 1..,.......t;:,.c '\'(~ ;,.t ~# L" ~j /" 'r' r"""\.s{\~:>\ l.' -( l...:'? \ t,),"; , \" t\,! III ....hl 1\ ,. I Ii i I ., l ,\..) t 1.;)( 1 -~t ~ III 11 !, ;\ A--lll., II ,I 31+;.;,.-; ,".! '('''';-1;''1''' ( n r t \ " I) \~. 1\,- \'I(}j lJIJ," \r~ tt.., 1 j d J r \ '1. (J ~~.J '^ ~ .d' i.~) ( I I, \. !1 i ;'~;'~:'0:; ; ;'.{) t' t4jl~H !~, t {iC (j \ f\ \. I u[' 1\' (OJ ! n , ~ ; ..):"' , , i .1; i , f_l -, 1-- c t , ," ') I {--it ( \I t u. , , ( [' , t i-I iilk. ii er r 'i.. L:.1 V\ It \rT h ;;,. ,. , , tJJ ~ ;e I J J reC1 h nLhl /\ jt 'L t Wood screws shall be type, size and finish required for each use. llnc plated or stainless steel (where noted on draWings) at interior, galvanized at exterior unless indicated otherWise on draWings Nails shall be finish type, galvanized, size as required for each use Specialty anchors shall be of material, type, size and finish required by each substrate for secure anchorage Provide non-ferrous metal or hot-dip galvanized anchors and Inserts for exterior installations and elsewhere as required for corrosion resistance Use "Kwlk-bolts" or cast-Jn-place anchors at concrete and masonry Back-prime all exterior solid wood surfaces inaccessible and unexposed after installation with an approved pnmer Install exterior cedar Siding over building wrap membrane on exterior walls SIding shall be Installed with same exposure and coursing as eXisting extenor wall Keep Siding dry prior to installation Install uSing galvanized box head nails placed Just above the lap (do not nail through both pIeces of SIding) and driven flush with face of Siding. Nail Siding Into studs with additional intermediate nailing at 16" on center maximum spacing. Fit Siding tight to all tnm and seal Install Siding In as long length as possible with tight-fitting, bevel cut JOints INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 13 II DIVISION WOOD & PLASTICS Install exterior cedar trim In as long lengths as practicable Bevel cut JOints In cedar trim, gap and seal JOints In hardboard trim Fasten with galvanized box nails driven flush with surface of trim Interior temperature must be 50 degrees or above prior to installation of interior finish woods Allow interior siding and trim to acclimatize prior to installation Install interior cedar siding and trim uSing galvanized finish or casing nalls, countersunk for putty Fit all JOints tight. Hammer marks not acceptable on any exposed finished surface and may be cause for reJection of Work by Architect. Fill nail holes with matching putty Prepare all interior woodwork by cleaning and sanding as required to receive finishes specified Install Work to details shown, plumb, level, true to line and securely anchored Make accurate sCribes to adJacent surfaces where required Miter corners of interior trim All JOints shall fit tightly without gap (except hardboard Siding and trim) Provide and Install other miscellaneous millwork Items and related Work required to complete Work of this Section Set nails for putty stopping In surfaced members Hammer marks not acceptable on any exposed finished surface and may be cause for reJection of Work by Architect. Make all end splices exposed In finished members bevel splices and not square butted Install members In as long lengths as possible Install Work to details shown, plumb, level and to line and securely anchored Make sCribes where required accurate Miter corners of trim All JOints shall fit tightly without gap Provide and install other miscellaneous millwork Items and related Work required to complete Work of this SectIOn Prepare all woodwork Installed hereunder by cleaning and sanding as required to receive finishes specified Putty all nail holes with filler to match surrounding wood Sand all hardwood surfaces shall be sanded to 120 grit minimum and thoroughly cleaned prior to application of finish materral CUSTOM CASEWORK ReqUirements of DIVISion 1 as well as requirements of General Section of thiS DIVISion of Specifications shall be Incorporated as a part of thiS section The "Quality Standards" of the Architectural Woodwork Institute (AWl), most recent addition, shall apply to all work under thiS section and by reference are hereby made a part of thiS speCification PAGE 14 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM WOOD & PLASTICS DIVISION II In general all work shall comply with AWl standards for "custom" grade except where another technique has been speCifically called for on the drawings or In the speCifications These standards shall apply to stock selection, JOinery techniques, level of finish and accuracy offit. Materials for custom casework shall be as follows Hardwood plywood shall be 1;2" or 3/4" thick, as shown on drawings, with medium density fiberboard or veneer core Both fiberboard and veneer core products shall be 5-ply minimum Face veneers both sides shall be Douglas Fir, plain sliced, grade 1 on good face, book matched, With square cut ends and sides Wood trim & guardrails shall be Douglas Fir, no 1 grade, clear, vertical grain, kiln dried, surfaced 4 sides (S4S), sizes as noted on drawings Plastic laminate shall be Wilson Art, Formica, Plonlte or Nevamar ARP brands as selected by Architect. Textured surface 00481/ thick General Purpose grade for horizontal surfaces, countertops and splashes 00281/ thick Vertical Surface grade for all vertical surfaces except splashes Particleboard shall be Rodman Industries or approved equal phenoliC particleboard manufactured Without urea-formaldehyde resins 45 Ib minimum density, thickness as shown on drawings or as reqUired for application Medium density fiberboard (MDF) shall be SlerraPlne Ltd Medlte II or approved equal Industrial grade, engineered wood panel manufactured from softwood fibers and formaldehyde-free synthetiC resin 48 Ib minimum densIty, thickness as shown on drawings or as required for application Sub frames and miscellaneous solid wood shall be kiln-dried Douglas Fir or Hemlock. Material for cabinet and drawer sides, bottoms, backs and shelves shall be Simpson DecoraGuard Polyester cabinet liner or Profile Polyester cabinet liner, color as chosen by Architect. Cabinet liner shall have a smooth polyester overlay on both Sides of a 45 Ib minimum density particleboard core Color as selected from manufacturer's standard colors Concealed panels and other surfaces to be completely covered by other finishes may be A-B fjr plywood or medium density fiberboard Exposed vertical surfaces shall be finIshed With vertical grade plastIc laminate as speCified above Provide plastic laminate balanCing sheet on interior face of all doors to match cabinet interior INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 15 II DIVISION WOOD & PLASTICS Countertops shall be fabricated from general purpose grade plastic laminate over %" minimum thickness plywood or medium density fiberboard Provide backing sheet at underside of all countertops Thicken front edge of countertop to create 1" vertical surface Cork shall be Nelson Adams "Naco Cork" or approved equal Color as chosen by Architect. Cork sheets shall be manufactured from pure cork blended with linseed oil and color pigments, then Impregnated with plastic under heat and pressure Sheets shall be backed with burlap and have uniform density and color throughout entire thickness Install uSing adhesive recommended by manufacturer Cab met hardware, unless shown otherwise, shall be as follows Pulls Stanley no 4484 or approved equal, 5/16" x 4" "wire" design, medium bronze finish Hinges RPC no 854 or approved equal Five knuckle, radius tipS, 2 3/4" x 095" Bronze finish Drawer Slides Accuride no 3005 or approved equal Full extension type with steel bearings. 100 Ibs per pair minimum load rating Magnetic catches shall be minimum 7 pound pull, color champagne or greystone to match cabinet interior Shelf Clips Plated steel with angle support and plug for 1/4" holes Minimum 4 per shelf Cabinet locks National Lock numbers N8102, N8106 or N8108 Brass construction, key alike Cord grommets shall be Doug Mockett & Co type "TG" or approved equal, 2" diameter hole, plastic cable grommets with elongated slot for cords and flip-top cover Color as selected by Architect. Power & commUnication grommet shall be Mockett & Co (800-523-1269) no PCS3 or approved equal Provide complete with 4 electrical and 3 data modules U L listed Provide with reversible cap and 6 ft. cord All casework construction shall be flush overlay type complYing with AWl standard 4008 for laminate clad cabinets PAGE 16 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM WOOD & PLASTICS DIVISION II Exposed exterior surfaces (except where indicated otherwIse on drawings), including door and drawer fronts, face rads, exposed ends and elsewhere as noted on drawings, shall be covered wIth high pressure plastic laminate both sides Interior face of doors and drawers may be covered wIth liner grade plastic laminate SemI-exposed surfaces, including shelves, partitions, drawer sides and interior face of cabinet ends and backs, shall be covered polyester overlay Exposed edges of doors and drawers shall be covered with high-pressure plastIc laminate, color to match cabinet face All shelves shall be adjustable by means of pegs and holes, 4 per shelf Shelves less than 36" wide shall be 3/4" thick. Shelves over 36" wide shall be 1" thick minimum Shelf edges shall be finished with PVC "T" moulding or pvc edge banding, color to match shelf finish Cabinet tops and splashes shall be fabricated from 3/4" high-density partIcleboard Front edge of top shall have minimum 1 1/4" face Splash shall be 4" hIgh unless noted otherwise on drawings Cover all exposed surfaces with general purpose grade high pressure plastic laminate Provide backing sheet at undersIde of all countertops SCribe fit splash to wall Create plastic laminate chamfer at edges of tops and hoods where indicated on drawings Chamfer strip shall be mitered and fit tightly along both edges so that surface color and texture IS continuous around all faces of chamfer without exposed edges Employ expert cabinet makers to carefully fabricate cabinets true, square, without warp and all parts In perfect alignment. FIt JOints flush and to haIrline Fit movable parts such as doors to close tolerance Shop fabricate cabinetwork In whole units or In partial Units as most practicable for handling and transportation Assemble partial Units In place In such manner that each cabinet becomes a unIfied whole visually and structurally Make all cuts requIred to accommodate work of other trades and Owner's equipment. Incorporate Owner's metal bank cabinets and other bank equIpment Into casework as shown on draWings Verify all dimenSions wIth bank equipment manufacturer or by measuring actual units ProvIde cutting and fitting as necessary to accommodate mechanical and electrical work bUIlt into casework units ProvIde alterations to casework to keep deVices accessible when they are covered by casework. ThiS Includes mechanical and electrical sWitches, receptacles, panels, access doors and other deVices Glue and natl or staple JOints of cabinets JOin edges of flat panels with continuous spline or bISCUitS Blind natl or otherwise conceal all exterior exposed face fastenings INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 17 II DIVISION WOOD & PLASTICS of cabinets Set nails In finish wood surfaces to receive putty Do not use exposed nails In plastic laminate or polyester overlay matenal Make cuts for hardware neat and true and fit to prevent looseness Make all shelving permanently straight, true and free from warp and waves Fit all drawers snug and without binding Warped or out-of-allgnment cabinet doors or drawers not accepted Maintain a uniform clearance between cabinet doors and drawers and cabinet frame not to exceed 1/16 Inch Fit drawer hardware snug and allow adequate space at edges of drawer fronts so that they do not contact adjacent drawers or doors when closing Set drawer bottoms In rabbets In sides, front and back. JOin sides to front and backs with lock JOints Glue and fasten all JOints Adjust all drawers, doors and movable parts to operate easily and smoothly without binding. On completion of work, touch-up all abraded areas on exposed finish work and wherever required to complete the Work for Architect's approval In addition, dust and wipe clean all finlshed surfaces inside and outsIde of casework, use no harmful solutions PAGE 18 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DIVISION 7: THERMAL & MOISTURE PROTECTION GENERAL Supply and Install all waterproof membrane, building Insulation, flashing and sheet metal work and sealants as shown on drawings and speCified herein and as otherwise required for a complete and watertight Job Submit to Architect for review samples, brochures, and shop drawings covenng all types of roofing and roof accessories Coordinate with work of other trades Examine all subsurfaces to receive work and report In writing to General Contractor, with a copy to Architect, any conditions detnmental to the work. Commencement of work will be construed as acceptance of all subsurfaces, and shall make roofing contractor responsible for all future corrections Do work only In dry weather and apply In stnct accordance with manufacturer's wntten speCifications or instructions INSULATION Requirements of DIVISion 1 as well as requirements of General Section of thiS DIVISion of SpeCifications shall be Incorporated as a part of thiS section Insulation matenals shall be as follows fiberglass insulation for stud walls, fUrrl ng and ceil i ngs to be covered With finrsh matenals shall be CertalnTeed Fod Faced Building Insulation Non- combustible fiberglass With aluminum foil vapor barrier on one Side Vapor barrier shall have stapling flange each Side Unless shown otherWise, "R" values shall be as follows for 3 'Y2" stud walls, use R-13, for 5 'Y2" stud walls use R-19 For all other spaces use maximum thickness wall or ceiling will accommodate, R-19 maximum Width as required to fit between framing members Acoustic insulation shall be CertainTeed Sound Control Batts Unfaced fiberglass batts, 3 1/2" thick (R-11), Width as required for friction fit between framing members PROJECT NAME PAGE 19 II DIVISION THERMAL & MOISTURE PROTECTION Install foil-faced fiberglass insulation In exterior stud walls, in fUrring at exterior walls, between rafters, trusses or roof JOists and elsewhere as called for on drawings Insulation shall extend from finished floor to underside of floor or roof deck above Install With vapor barrier on warm Side of insulation Fill all VOids and completely cover any steel or wood framing members Staple flanges to studs and plates at 12" maximum Install unfaced fiberglass acoustic insulation In stud walls where indicated on drawings Insulation shall extend from floor to ceiling, except where wall extends above finished ceiling insulation shall be Installed full height of wall to underside of floor or roof deck above Fill all VOids and spaces between steel JOiSts and framing members FIBERGLASS COMPOSITION SHINGLES Requirements of DiviSion 1 as well as requirements of General Section of this DIVISion of Specifications shall be Incorporated as a part of this section Materials for fiberglass composition shingle roofs shall be as follows Fiberglass composition shingles shall be Celotex "Presidential Shake", color as selected by Architect. Class "A", type I, self-sealing, laminated composition shingle With sculptured tab design 360 Ibs per square minimum Shingles shall have Class A fire rating and UL Wind rating of 85 mph Underlayment shall be 15 Ib asphalt saturated felt. Nalls shall be hot-dipped galvanized, 11-12 gauge roofing nails With oversized, 3/8" diameter minimum heads, length as required to penetrate sheathing 3/4" Plastic cement shall be Celotex "Elastlgum" Roofers Cement or approved equal, plastic asphalt type With mineral fiber components Install felt underlayment over clean deck surface, lapping each sheet 19 Inches Lap ends 4 Inches minimUm, stagger end laps Seal around all roof openings and penetrations With plastic cement. Place one ply of roll roofing, 36 Inches Wide, In all valleys, centered on valleys Install shingles over 15 Ib felt underlayment In strict accordance With manufacturer's directions Double first course of shingles and project beyond fascia 3/8 In Fasten shingles With minimum of 5 nails per shingle Do not staple shingles! Cap hips and ridges With individual ridge shingles, maintaining 5 Inch weather exposure Fasten to avoid exposed naris Valleys shall be "closed cut" type PAGE 20 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM THERMAL & MOISTURE PROTECTION DIVISION II Incorporate all flashings as work progresses Refer to other sections of this divIsion for description of flashing materials Roofing contractor shall provide to the Owner a written 40 year manufacturer's limited warranty covering both material and labor FLASHING & SHEET METAL WORK Requirements of DIVISion 1 as well as requirements of General Section of thiS DIvIsion of Specifications shall be Incorporated as a part of thiS section Materials for flashing and sheet metal work shall be as follows Stainless steel sheet metal shall be type 304 stainless sheet, no 20 (dull) finish, gauge as noted on drawings Factory-painted galvanized steel shall be sheet steel, 24 gauge unless noted otherwise on drawings, With Zlncalume coating and finished With PVF2 paint system or approved equal Color as selected by Architect. Solder shall be type as recommended by producer of sheet metal material to be soldered Screws for all exterior work shall be stainless steel of Size, type and number to produce secure and permanent fastenings Where exposed, screws shall be Installed With neoprene washer under head 1/4" stainless steel mesh hardware cloth screen shall be installed at each downspout nipple location at all gutters and water dlverters Fabricate With cylindrical base to securely fit Into nipple. Sheet steel for other miscellaneous work shall be mild steel, gauge as noted on draWl ngs Fabricate sheet metal flashing to shapes and sizes detailed Make surfaces free of waves and buckles, With lines, arises, and angles sharp and true Form In strict accordance With detailed DraWings No raw, exposed edges permitted Conform to quality, procedures and methods recommended by Sheet Metal and Air Conditioning Contractors National ASSOCiation (SMACNA) Where draWings do not deSCribe a specific detail, use standard detail from SMACNA Architectural Sheet Metal Manual, Third Edition INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 21 II DIVISION DOORS, WINDOWS & GLASS Hollow metal door and relight frames shall have section and profile as shown on drawings or as required by adjacent wall conditions Corner jOints shall be mitered, reinforced and fully welded Grind all welds smooth Install angle spreader between base of door Jambs for shipping and installation Provide masonry, concrete or stud anchors as required for attachment to adjacent construction Provide stops for glass where indicated on drawings Make cutouts, reinforce, drill and tap for all hardware specified under Finish Hardware section Drilling and tapping for surface hardware to be performed In field Drill three holes In strike stops of all frames for installation of rubber silencers Provide mortar guard boxes around locations of all mortised hardware Clean frames of all oil, grease and dirt. Fill Imperfections with body putty to produce flush and flat surface Finish with baked on coat of metal primer Package and protect to prevent damage dUring shipping. Install frames plumb, level and rigidly secured In place Anchor to adjacent construction Properly brace until built In Backs of frames Installed In masonry or concrete walls shall be filled solid with mortar or concrete ALUMINUM ENTRANCE DOORS Requirements of DIvIsion 1 as well as requirements of General Section of this DIVISion of Specifications shall be Incorporated as a part of th IS section Aluminum door shall be Kawneer 190 "Narrow Stile" entry door with 4" bottom rail, or equal approved by Architect. Materials for aluminum entrance door shall be as follows ExtrusIOns shall be 6063-T5 alloy and temper Minimum nominal thickness of door stiles shall be 0 125" and minimum nominal thickness of glazing stops shall be 0 050" Finish shall be Architectural Class I Anodic Coating Color #40, dark bronze Fasteners, where exposed, shall be aluminum or stainless steel, finish to match surrounding material Glazing gaskets shall be EDPM elastomerlc extrusions Hardware for aluminum entrance doors shall be as follows PAGE 28 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DOORS, WINDOWS & GLASS DIVISION II DOOR NO 1 Top offset pIVOt. Kawneer top offset pivot Bottom offset piVOt: Kawneer bottom offset piVOt Deadlock Adams Rite MS-1850A Cylinder See Finish Hardware section Concealed closer LCN 2030 Push/pull Kawneer CP-II/CO-9, back-to-back (#40 dark bronze) Threshold See Finish Hardware section Weatherstrip Kawneer "Sealair" weathenng system In door and frame EPDM sweep In door bottom Doors shall be assembled uSing mechanical clip fastening and welding Glazing stops shall be hook-In type with EPDM glazing gaskets Install continuous door stops 3 sides of frame where required to make door single-acting All exposed surfaces shall be free from scratches and other senous blemishes Surfaces shall receive a factory applied anodic coating. Install doors where shown on drawings Completed Installation shall be level, square, plumb and In alignment with other work. Doors shall have uniform reveal all sides Test and adjust hardware as required for smooth operation and secure closing Protect installation from damage dunng remainder of construction penod Door operatIon shall be In strict accordance wIth the current ADA Title III ProvISIons ALUMINUM ENTRANCE FRAMING Requirements of DivIsion 1 as well as requirements of General Section of this DIVISion of SpeCifications shall be incorporated as a part of this section Extenor aluminum entrance framing which forms any part of extenor wall of building shall be Kawneer 451 T thermally Improved aluminum framing system or equal approved pnor to bidding Refer to DivIsion 1, SpeCial Requirements, Substitutions Matenals for extenor thermally Improved aluminum entrance framing system shall be as follows Extrusions shall be 6063-T5 alloy and temper Thermal barner shall consist of two-part, chemically cured, high density polyurethane INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 29 iii DIVISION DOORS, WINDOWS & GLASS Finish shall be Architectural Class I Anodic Coating Color #40, dark bronze Fasteners, where exposed, shall be aluminum or stainless steel, finish to match surrounding material Perimeter anchors may be either aluminum or steel, provided steel IS properly Isolated from aluminum Glazmg gaskets shall be elastomerlc extrusions Aluminum framing systems shall provide for flush glazing on all sides with no projecting stops Vertical and hOrizontal framing shall be shear block system (thermally Improved) or stick system (non-thermally Improved), center glazed Thermally Improved aluminum framing system shall Incorporate In all framing members a thermal barrier which eliminates all direct contact between interior and exterior aluminum sections Provide all miscellaneous sections, including jamb channel for solid glazing, flashings and fasteners of same material and finish as framing system as called for on drawings or as required to complete installation All exposed surfaces shall be free from scratches and other serious blemishes Surfaces shall receive a factory applied anodized finish Install framing In location and configuration shown on drawings Use concealed fasten I ngs throughout. Allow for weepage of Infiltrated water and condensation from within members Allow for expansion and contraction due to temperature variation and building movement. Connect to supporting structure to properly carryall vertical and horizontal loads Design hOrizontal members so as to carry the vertical load tributary to them Protect all work from corrosion or galvanic action that may be caused by any material adjacent thereto Any steel supporting work shall be prime coated before installation Provide shims and anchors as reqUired so work IS plumb, level, true, firmly fastened and fully operable at completion Protect installation from damage dUring remainder of construction period ALUMINUM WINDOW FRAMING Requirements of DIVISion 1 as well as requirements of General Section of thiS DiVIsion of Specifications shall be Incorporated as a part of thiS section PAGE 30 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DOORS, WINDOWS & GLASS DIVISION II Furnish all labor, materials and equipment for installation of all aluminum window framing shown on drawings and specified herein Coordinate with work of other trades to Incorporate all structural reinforcing which IS to be concealed within aluminum Window framing members Include all fasteners required to rigidly attach system to bu lid Ing structure Submit complete shop drawings and product data sheets for review by Architect. Aluminum window framing contractor shall design, manufacture and Install Window framing to withstand a horizontal wlndload of 100 mph, exposure "B" per 1997 UBC Maximum deflection under full load shall not exceed 1/175 of span Safety factor shall be 1 65 minimum Window framing at main entry shall be fabricated uSing Kawneer EnCORE Thermal Framing System, screw spline type, center glazed or approved equal Perimeter framing members shall have a face dimension of 1 3/4" Overall depth shall be approximately 4 1/2" All framing members shall incorporate a thermal barrier which eliminates all direct contact between Interior and exterior aluminum sections Framing system shall be capable of being formed Into smooth curve to fit surface of eXisting concrete vault. Materials used to fabricate system components shall be as follows Extrusions shall be 6063-T5 aluminum alloy and temper Fasteners shall be aluminum, stainless steel or ZinC plated steel In accordance with ASTM A 1 64 Glazmg gaskets shall be extruded EPDM rubber Perimeter anchors shall be aluminum Where steel anchors are used, provide insulation between steel material and aluminum material to prevent galvaniC action Thermal barrier shall be high strength engineered polymer clips placed intermittently to separate exterior and interior components of framing system Sealant shall be as deSCribed In sealant section of speCifications Class shall be as speCified In glaZing section of speCifications Finish for all aluminum window framing shall be Kawneer Permanodlc anodized Class 1 finish, color #40 dark bronze. Framing shall be Installed, glazed and adjusted by experienced workmen In accordance With manufacturer's Installation instructions and/or approved shop draWings Use framing sections called for On drawings or as appropriate for job INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 31 . II DIVISION DOORS, WINDOWS & GLASS situation and in keeping with other design elements All framing members shall be erected level, plumb, true to line and rigidly secured to surrounding structure All JOints shall be tight and fit to hairline Provide separation of aluminum materials from sources of corrosion or electrolytic action contact pOints Install sill members In bed of sealant or with JOint filler or gaskets to proVide weathertlght construction Coord mate installation with wall flashmgs and other components of construction Install glass in accordance with glass & glaZing section of these specifications After installation all metal surfaces shall be cleaned to remove mortar, plaster, paint or other contaminants Replace framing members where the finish has been damaged and protect until final acceptance of work. GLASS & GLAZING ReqUirements of DIVISion 1 as well as requirements of General Section of thiS DIVISion of SpeCifications shall be Incorporated as a part of thiS section Provide 10 year written warranty for all insulatmg glass Units Glass types and materials shall be as follows Glass m exterior aluminum window framing shall be sealed, insulating glass units configured as follows Outboard Lite clear tempered glass Air Space as required to produce unit of 1" overall thickness Use bronze anodized spacers at perimeter of glass Inboard Lite clear tempered glass Glass in tempered glass doors, interior tempered glass sidelights and automatic tempered glass entry shall be fully tempered, clear glass, 1/4" thick unless noted otherWise Units shall be without defects Settmg blocks shall be hard rubber, size and placement as recommended by glass manufacturer Glazmg tape shall be 3M or approved equal, black closed-cell foam with adheSive both Sides 1/16" x 1/2" minimum Refer to DIVIsion 7 for sealants PAGE 32 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DOORS, WINDOWS & GLASS DIVISION II Glass thickness shall be as required by applicable codes to withstand force created by 80 mph wind, but In no case shall be less than minimum thickness noted above All insulating glass units shall be supplied with breather tubes Have surfaces receiving glass clean, dry, and free of foreign matter Prepare, clean and prime (as required) surfaces to which sealant IS to be applied, per sealant manufacturer's recommendations Install glass types at locations shown on draWings and according to glass manufacturer's recommended maximum size limitations and placement of any setting blocks Make all adjacent glass In same glazed areas consistent In type and thickness unless otherWise noted or directed On completIon of work and Just prior to Job completion date, clean and wash all glass thoroughly Replace any scratched, defective or broken glass caused by Improper installation at no cost to Owner FINISH HARDWARE ReqUirements of DIVISion 1 as well as requirements of General Section of thiS DIVISion of Specifications shall be Incorporated as a part of thiS section Work in thiS section shall Include the furnishing of all Items of finish hardware as hereinafter specified, or obViously necessary to complete the building, except those Items that are specifically excluded from this section of the speCification Hardware has been specified herein by manufacturer's name, brand and catalog numbers for the purpose of establishing a baSIS for quality, finishing, deSign and operational function To Insure a uniform basis of acceptable materials, It IS the intention that only manufacturer's Items specified as "Acceptable and Approved" be furnished for use on thiS proJect. Items specified "NO SUBSTITUTIONS" shall be provided exactly as listed In thiS speCification The finish hardware supplier shall, after award of a formal contract, submit to the Architect, four (4) complete typewritten copies of the proposed finish hardware schedule for approval This schedule shall be prepared using the "Sequence and format for the Hardware Schedule" as approved and recommended by the Door and Hardware Institute (DHI) INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 33 II DIVISION DOORS, WINDOWS & GLASS The hardware supplier shall provide necessary templates and/or physical hardware to all trades requIring them In order that they may cut, reinforce or otherwise prepare their material or product to receive the hardware Item If any manufacturer requires physical hardware, the hardware supplier shall ship to them such hardware via prepaid freight In sufficient time to prevent any delay In the execution of their work. All Items of hardware to be delivered to the Job site shall be completely packaged with all necessary screws, bolts, miscellaneous parts, and instructions and, where necessary, installation templates for manufacturers' suggested installation They are to be clearly labeled so as to conveniently Identify them and their Intended location In the budding ReqUirements for deSign, grade, function, finish, size and other distinctive qualitIes of each type of finish hardware are indicated In the hardware schedule at the end of this section Items listed are taken from the following manufacturers' catalogs and represent specificatIOn standards SpeCified Acceptable Substitution Butts - Hager Locks - Schlage Closers - Russwln Miscellaneous - BBW McKinney Corbln-Russwln None Ives Quality Finish of all hardware Items shall be as follows 613 (011 rubbed bronze) Spray closers to match All cylinders shall be set to master key system Mount hardware unIts at heights IndIcated In "Recommended Locations for Builders Hardware" by the Door and Hardware Institute (DHI), except If otherWise specifically Indicated or to comply with requirements of governing regulations, requirements for the handicapped, or if otherWise dIrected by the Architect. Degree of opening for doors with overhead holders, closers, etc., shall be Included In the hardware schedule for the Architect's approval Tradesmen skilled In the applicatIon of commerCial grade hardware shall Install all hardware Install each hardware Item In compliance with the manufacturer's instructions and recommendations Securely fasten all parts to be attached FIt faces of mortised parts snug and flush Make sure all operating parts move freely and smoothly without binding, sticking or excessive clearance Wherever cutting and fitting IS required to install hardware onto or Into surfaces which are later to be painted or finished In PAGE 34 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DOORS, WINDOWS & GLASS DIVISION II another way, the hardware shall be removed and stored prior to the painting or finishing Items shall then be reinstalled only when the finishes have been completed on the surface to which the hardware IS to be applied Adjust and check each operating Item of hardware to ensure correct operation and function Units, which cannot be adjusted to operate as Intended for the application made, shall be replaced Final adjustment: Whenever hardware installation is made more than one month prior to building acceptance or occupancy of a space or area, the Installer shall return to the work during the week prior to acceptance or occupancy and make final check and adjustment of all hardware Items Hardware shall be cleaned as necessary to restore correct operation, function and finish Door control devices shall be adjusted to compensate for final operation of heating and ventilating equipment. The following IS a general listing of hardware requirements and IS not Intended for use as a final hardware schedule Any Items of hardware required by established standards or practices, or to meet state and local codes shall be furnished whether or not speCifically called out In the following listed groups ,~L \; " i<' i\{ )~ I I n, r It I l H..H' I I, II, j\ ]( 1 i, jl A j I h j ~~( r ~ Hut" \. ""{ t,i' Ii 1 i (' to. \; 11 \ \,.\ + ( l "i j I i' '.. H I r S I. !..., d \. ~_~ (, ,I l INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 35 II DIVISION DOORS, WINDOWS & GLASS f ( PAGE 36 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DIVISION 9: FINISHES GENERAL Supply and Install all finish materials as called for on the drawings and as specified herel n Submit to Architect for review samples, brochures and color chips Submit 12" x 12" sample on cardboard of each paint color chosen before ordering. Coordinate with work of other trades Each Contractor applYing a finish material shall examine all subsurfaces to receive work and report In writing to General Contractor, with a copy to Architect, any conditions detrimental to the work. Verify compatibility of finish materials with substrate Commencement of work will be construed as acceptance of all subsurfaces, and shall make contractor applYing finish material responsible for all future corrections DUring installation of all Interior finish work, ambient temperatures within the building shall be maintained at not less than 550 Comply with all fire resistance ratings for finish materials as speCified herein and as required by applicable codes Where called for, provide materials, accessories and application procedures that have been tested and approved by a certified testing laboratory CYPSUM WAllBOARD Requirements of Division 1 as well as requirements of General Section of this Division of Specifications shall be Incorporated as a part of this section Materials for gypsum wallboard work shall be as follows Gypsum wallboard shall be Gold Bond Fire-Shield wallboard or approved equal, type X core with tapered long edges 5/8" thick unless otherwise noted 4 ft. wide by maximum practicable length Moisture resistant gypsum wallboard where called for on drawings shall be gold Bond MR Board or approved equal, type X core with tapered long edges 5/8" thick unless otherwise noted Light green face, 4 ft. wide by maximum practicable length PROJECT NAME PAGE 37 . II DIVISION FINISHES Nalls shall be specifically designed and approved for use In drywall construction, of type and size recommended by drywall manufacturer for specific applicatIOn Screws shall be bugle head type, self-drilling, of type and size recommended by drywall manufacturer for specific application Corner bead shall be gold Bond Standard Corner Bead or approved equal Galvanized sheet steel with perforated flanges and rigid nose Casing bead shall be Gold Bond no 100 Casing Bead or approved equal Galvanized sheet steel, "J" shape with rigid corners and perforated flanges Casing bead with reveal edge shall be Trim T ex no 5810 or approved eq ual PVC edge trim with 12/1 extension to create continuous reveal Joint tape shall be Gold Bond JOint Tape or approved equal Buffed paper tape manufactured specifically for taping drywall JOints JOint fimshlng matenals shall consist of two separate compounds, one for bedding tape and other for finish coats on JOints and fasteners Bedding compound shall be Gold Bond Ready-MIx JOint Compound or approved equal, vinyl-based product designed specifically for tape application Finishing compound shall be Gold Bond Ready-MIx Topping Compound or approved equal designed specifically for finishing JOints If framing members are out of alignment, bowed or warped, correct to make true surfaces before application of gypsum board Apply boards with long dimenSion to framing members with all abutting ends and edges over supports Neatly fit and stagger all end JOints Make jOints occur on different studs at opposite sides of partition Cut and fit neatly around all outlets and sWitches Space fasteners 8" on center along vertical edges, and 12" on center at midpoints, 3/8" from edge of board Use drywall screws or nails If nails are used, "double nail" by driving second nail 2" to 2 1/2" from first nails (in field of board only) Restrike first nails which appear loose Erection techmque shall result In plumb and straight surfaces with no waves or buckles, free of unevenness at JOints Install galvanized trim at all outside corners and exposed edges as well as those locations where wallboard abuts different materials PAGE 38 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II Finish all JOints and trim at gypsum wallboard Center tape over JOint and embed In uniform layer of bedding compound of suffiCient width and depth to provide firma complete bond Apply skim coat while embedding tape Allow compound to thoroughly dry for at least 24 hours Over JOint compound and tape apply coat of finishing compound Spread evenly and feather out beyond edge of board After first finishing coat IS thoroughly dry (at least 24 hours) cover With second coat With edges feathered out slightly beyond preceding coat. Give all dimples at fastener heads and all marred spots on surface of board one coat JOint compound and two coats finishing compound, applied as each coat IS applied to JOints Conceal flanges of metal trim With at least two coats compound When completed compound shall extend approximately 8 Inches to 10 Inches on each side of metal nosing. After each application of JOint or finishing compound has dried, lightly sand all JOints Leave all board and treated areas uniformly smooth and ready for painting or application of other finish materials Level of finish required at gypsum wallboard shall be as follows Level 1 ("fire-taping") Use for all wallboard surfaces not exposed to vIew All JOints and Interior angles shall have tape embedded In JOint compound Surface shall be free of excess JOint compound Tool marks and ridges are acceptable Level 4 Use for all gypsum wallboard except where concealed or where noted otherWIse All JOints and interior angles shall have tape embedded In JOint compound and three separate coats of JOint compound applied over all JOints, angles, fastener heads and accessories All JOint compounds shall be smooth and free of tool marks and ridges DO NOT APPLY TEXTURED COATING to wallboard Installed on vertical surfaces Where patching existing ceilings With textured surfaces, match eXisting texture on all new wallboard surfaces CEMENTITIOUS THIN PATCHING UNDERLAYMENT Requirements of DIVISion 1 as well as requirements of General Section of thiS DIVISion of Specifications shall be Incorporated as a part of thiS section Apply cementltlouS thin patching underlayment to surface of existing wood and concrete floors as required to prepare surface for finish flOOring and as required to INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 39 .11 DIVISION FINISHES make a height transition from areas of underlayment or eXisting flooring to areas of subfloor Refer to drawl ngs Matenals for cementltlous thin patching underlayment shall be as follows Cementltious thm patchmg underlayment shall be Ardex SD-F "Feather Finish" or approved equal trowelable, Portland cement-based thin patching and sklm- coating matenal designed for Intenor floor preparation pnor to installation of finish floor covenng. Minimum thickness = feather edge, maximum thickness = 1 I n or more Maintain building temperature at 50 degrees or above before and dunng installation and cunng of concrete floor topping. Clean all surfaces to receive topping. Remove loose or scaling concrete, form release agents and solvents Re-nall loose wood underlayment and remove all foreign matenal that will adversely affect bond of underlayment to substrate Apply pnmer recommended by manufacturer to all surfaces pnor to I nstallatlon of tOppl ng. MIX topping compound In stnct accordance with manufacturer's instructions to achieve maximum strength and bonding capaCity Apply 6 In wide stnp of fiberglass tape or other crack-bndglng matenal to all JOints between dissimilar types of subfloor matenal and over all cracks or open Ings wider than 1/8 In Trowelable concrete repair mortar shall be poured onto prepared subfloor surface and troweled to form flat and uniform surface Make transitIOns between subfloor levels flat and uniformly sloped to pitch not to exceed 1/16 In In 12 In Finished surface shall have a steel trowel finish Provide mechanical ventilation as needed to aid In cunng floor topping. Allow topping to dry a minimum of 5 days prior to installing finish floonng matenals Cover as required to protect finished surface from construction traffic. L h , s~, It ( I. lit.} I c, [. j\ H.i fC (,1 ( , '\ ~ ~ l. 1.1 i\'.{ t " I Hi, f n <( ,ilHJe \! '" 1" PAGE 40 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II %/:i er ~ ~.,> ,-, di. j{ " '! ;I f. , " u 1 ~ 't '.,. " t~ i \ J , lin "",~c i. j; JU n j t....' iff; , II ~ l (~ I ) I tt.; ; I r I iH <, lIT\ \1 P Ii' ; , .\ ~ t; 'I ul! 1..') 11 ! , 1j ,..,,1 ~ i t----j ~ r~ "'~f:>" n '1f,. d I f iI )~ 1 I j HI I 1 t.." lif'i \ , Hi If , 1 (; t..l ) \, I -1 r Ii i , i u I 1 '\ I I rt I., ( I ( it! I I n \.c' I l f'i lllur il ! I I t' 'I \, P rt.)! "'\. fl (,(Tlt ! ') \, , .r " t)i I I ! <.J) 1 if C< ;j 1 1 U I \.., \}~ ) ( i ~. i' i II "'fi; 1--\ " , !f in .r:.'i >, d: j ~ rH:>"t t .J it (' i n 1 ') 1 1 CH I j " j{ \. ~/"'>. h \.lj '1 " I", II f .J 1 I f \ ~ ~ ~ f"~ j " , I i < }"-:t:'U ,? )1 \, 'I , I INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 41 .11 DIVISION FINISHES I j! i, jf II H H u II I I t"'" ii d n u 1("<.., 1 t ~ \ u Ii! I " n ii! Iii () .1' r.. d , Ii }(-., II ~ ~C..t I" I ti \,., ~ \ 1 ,( :\ ~.jt l 11 in '<, \ h. 1 ,j \ !i f \. [ r >'\1. u ; I d 1'" l! Ij d I j ",1..:"' \ I 'I' 1 L) p ( ll)i "', , , If' , 1 ,~ II I J ( 1 "\~ ~~ ( , ~r ;t, ! t " f-; I j (1.2 1 r ~..;( 1\. 1<; ') l~' , It ,I ) i'\ i 1 H ~C:; I ) ,,; ! I i.l j'" i('j 1. 1 ( (. "! { II c: i'l j n h ,'< '" (\ j ;.,;. < >... "')' l ~"~ III ;,;.~ t..l ," u L ....~ I l. t: {'.! \ \.J ,it <:d 1. j i } I j Z L~:.~ i t:-f i I I L) I \; I j t~, '1 { I'" ~, ;t' v' ~ l i ~~ i j{ \..~ I . PAGE 42 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM ~ FINISHES DIVISION II ! r t' V~ "iffj ,( j ) { i { [I l.d. ~' ;". n .\ I ~, ~ j \ '( e.:' t.. ') f' ~ i. h'''' (:1 I i '^\ ){J Hj {) l t-i L nl lLd {"A, I \ >( ~ l' i i l ( ~ i j ( t; K~r j c \' lnH' l fit: )1..1 ~, [ 11 i' L\ " ?i lu ; Ii tn \ f " , j ~; \. i J \.. U .\I! j \j l.. I , ; (. ( I f' 'l (. !i " 'iU U1 t I u d ..~{ .; r l11d ! I 'i ! r 0..; 1) q INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 43 .IJ DIVISION FINISHES <; ~,,'i "l. ,~ d, ' {,< " I 1 j I ! i "j [)l n n; , 1 e;;.; JI ! t l..< '-;. j ('; II i , J ( I RESILIENT FLOOR COVERING ReqUirements of DIVISion 1 as well as requirements of General Section of this DIVision of Specifications shall be Incorporated as a part of thiS section Materials for resilient floor covering shall be as follows t1 :j )Ii ., i. ,~('t r 1 Adhesives for sheet vinyl flooring shall be recommended by sheet vinyl manufacturer Rubber strmgers at stairs shall be molded from solid rubber with solid color extending through thickness of stringer Smooth surface 080 gauge thickness, 10" wide, length as required Flexco, color to match adjacent base No Substitutions without prior approval of Architect. Rubber base shall be Flexco 4/1 high cove base No Substitutions without prior approval of Architect. Base shall have smooth surface, 1/8" nominal thickness. Provide In 50 ft. rolls to minimiZe JOints Color as selected by Architect. AdheSives for installation of rubber products shall be as recommended by manufacturer Provide matching tranSitions or reducers where rubber or Vinyl products abut different flOOring materials ProVide latex underlayment recommended by floor covering manufacturer over all areas of floor to be covered which are so rough or uneven that they are unsuitable for covering Fill all depreSSions Bring floors to true, even surface, free of lumps, ridges and depreSSions and flat to a tolerance of 1/8" In 10ft. PAGE 44 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II Spread adhesive uSing technique and coverage rate recommended by floor covering manufacturer Lay sheet vinyl and rubber floors In accordance with manufacturer's Instructions Strictly follow directions regarding seaming technique and special adhesives required at seams Any door opening between spaces having different types of flooring at which no threshold occurs, shall have change of material made under door In closed position Install reducer stripS where floor covering terminates at exposed concrete floors Lay base against dry, well cured walls only Hold top edge to straight and true line Press toe against floor at vinyl floors Conceal bottom edge of base below top of carpet at carpeted floors Use as long lengths as possible Install base around all fixed cabinets, columns and other permanent fixtures Make all JOints tightly butted Miter and tightly fit corners Install stringer against walls on each side of stairs to receive carpet. Terminate stringers to match height of base at landings Butt carpet on treads and risers tight against stringer material and fully adhere to substrate After installation, sweep floors of particles and other foreign material harmful to flooring Near completion of the project clean and buff sheet Vinyl flooring per manufacturer's printed instructions Use no aCids or caustic solutions Use high-speed buffer CARPET & CARPET TilE ReqUirements of DIVISion 1 as well as requirements of General Section of this DIVISion of Specifications shall be Incorporated as a part of this section Refer to draWings and finish schedule for areas to receive carpet and carpet tile Submit samples of each type of carpet and carpet tile to be installed under this Contract. Broadloom carpet samples shall be 24 In square minimum Submit minimum of two full size tiles for each type and color of carpet tile speCified For each type of carpet and carpet tile specified submit manufacturer's product data listing phYSical characteristics, durability, fade resistance and fire testing results Submit samples of manufacturer's warranties PrOVide manufacturer's printed warranty for each type of carpet and carpet tile stating that manufacturer wil I replace unsatisfactory work caused by defective materials Warranties shall be full term, not pro-rated Lifetime warranty shall cover delamination, edge ravel, dimensional stability and resiliency In addition, prOVide manufacturer's written 15 year warranty stating that carpet will not loose more than INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 45 .11 DIVISION FINISHES 15% of original pile fiber weight during first 15 years of service Chair pads shall not be req u I red for warranty coverage Deliver to Owner usable carpet scraps In excess of 4 ft. square at end of Job Carpet and shall be manufactured by Mannlngton Commercial as described below Products of other manufacturers will be considered only prior to bidding Materials for carpet and carpet tile installation shall be as follows p H i ~"t ~ I ; t l..i i , !) t !]1 <., ~ 1 'Y I ~ ~ I. (' i (~ \; I \ ,\" ~.J(: i ~ I t~ i o JIJ , ' ~ f- ~ II 1 ...i. I {) lct i ! f' j Ii ~'\ \. ) '>/' \. C:~ L n .., <.... -~ Li lL' '01 i u; (JUU Ie i""+, it E r fl t, j c.! f H () \ i... PAGE 46 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II Concrete slab primer shall be type recommended by manufacturer, non- stain Ing. Trowelable underlayments and patchmg compounds shall be latex type as recommended by manufacturer Carpet edge guard and transition stripS shall be manufacturer's standard or equal by Burke or Roppe Profile and size as required for condition encountered Color as selected by Architect. Installation adhesives shall be as recommended by manufacturer Releasable type, zero (0) VOC, non-flammable, low odor, anti-microbial, non-toxIc Adhesive for carpet tde must allow for approximately 90% glue free application Inspect eXisting floors and stairs to receive carpet or carpet tde Report to General Contractor and Architect any conditions, including excess mOisture or alkalinity, which wdl be detrimental to installation of carpet products according to speCIfications Commencement to carpet installation Implies acceptance of all subsurface conditions Remove any remaining tde flooring, adhesive, carpet and base from eXisting floor surfaces and walls Fdl vOids, cracks, depressions and uneven areas of floor uSing latex underlayment and patching compound approved by manufacturer At all transitions between carpet and another flooring material of different height, build up underlayment material so that finished surface will be flush on both sides of transition Vacuum subfloor surfaces to receive carpet. Apply concrete slab primer where recommended by manufacturer Deliver materials to site minimum of 24 hours prior to installation Unroll broadloom carpet and lay flat to relax for minimum of 24 hours Carpet Installer shall meet with Architect prior to installing carpet tde Each area of budding shall be examined to determine best layout of tdes within that space Carpet tde patterns and placements agreed to at meeting shall be strictly followed dUring Installation process Install carpet In strict accordance with manufacturer's printed installation Instructions Use installation and adheSive coverage techniques that prOVide maximum resistance to shifting or movement resulting from wheeled traffic (furniture and book carts) FollOWing completion of installation, remove all rubbish and debriS Restrict traffic In carpeted areas for 24-48 hours follOWing installation Protect carpet as needed from damage from other trades, including shelving and furniture installations to be INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 47 .11 DIVISION FINISHES completed under separate contracts Use non-staining building paper or other matenal recommended by manufacturer Do not cover with plastic sheeting Replace any defective carpet. Remove vIsible adheslve, seam sealer and other surface blemishes uSing cleaner recommended by carpet manufacturer Remove protruding yarns from surface Vacuum all carpeted surfaces RUBBER BASE Requirements of DIVISIon 1 as well as requirements of General Section of this DIVISion of SpeCificatIons shall be Incorporated as a part of this section Matenals for rubber base shall be as follows Rubber base shall be Flexco 4" high rubber base wIthout toe (straight base) or approved equal Base shall have smooth surface, 1/8" nominal thickness Provide In 50 ft. rolls to minimize JOints Color as selected by Architect. Adhesives for installation of rubber products shall be as recommended by manufacturer Lay base against dry, well cured walls only Hold top edge to straight and true line Conceal bottom edge of base below top of carpet at carpeted floors Use as long lengths as possible Install base around all fixed cablnets, columns and other permanent fixtures Make all JOints tightly butted Miter and tIghtly fit corners Remove excess adheSive WALK-OFF MAT ReqUIrements of DIVISion 1 as well as requirements of General Section of thiS DiVISion of SpeCifications shall be Incorporated as a part of thiS sectIOn Matenals for walk-off mat shall be as follows Walk-off mat shall be Pacific Mat (800-345-6287) "Metropolltan", color Castle Gray No Substitutions without prior approval of Architect. Non-skid rubber backlng, 100% solution dyed polypropylene, 85 oz Available In 6 ft. or 12 ft. Wide rolls AdheSive shall be as recommended by mat manufacturer Transition strips shall be solid vinyl or rubber, thickness and taper as requlred, color as selected by Architect. Provide at all edges of mat where mat surface IS not flush with top of surrounding floor finish PAGE 48 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II Install walk-off mat where shown on drawings Orient ribs as Indicated on plans Fully adhere to substrate Coordinate with General Contractor to set subsurface of substrate material at height that will allow top of mat to be flush with surrounding finish materials Where this IS not possible due to eXisting substrates that are not being removed as part of Work of this Contract, Install transition stripS between edges of mat and adjacent floor finishes Clean mat after installation and protect from soiling or damage until Final Acceptance by Owner PAINTING Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of SpeCifications shall be Incorporated as a part of this section Paint and finish all interior and exterior exposed surfaces as scheduled herein and as indicated on Drawings, excepting Work which may be specified elsewhere as being the particular responsibility of another section However, all surfaces left unfinished by the requirements of other Sections (Trades) shall be painted or finished as part of the Work of this Section Surfaces to be painted shall Include all ductwork, piping, conduit, air handling units and other exposed mechanical and electrical Items The following surfaces shall not be painted Unless otherwise indicated, all concealed surfaces such as furred spaces, foundation spaces, pipe spaces, duct shafts, utility tunnels and the lIke Any concealed rough hardware, miscellaneous metal In unfinished spaces Any moving parts of operating units Plumbing fixtures, toilet room accessories lighting fixtures except as noted on Drawings or specified herein Any factory finished metal surfaces, paneling, equipment or other materials with complete factory-applied finish, unless specifically dIrected herein Any labels or equipment nomenclature, Identifications and the like Finish hardware, unless primed for paint finish Any acoustical, glass, plastic, tile, flooring unless otherWise speCified INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 49 .11 DIVISION FINISHES Any areas indicated "Unfinished" on Finish Schedule or DraWings Shop prime coats on ferrous metal Comply with standards and procedures and all applicable requirements of Painting and Decorating Contractors of America Manual unless otherWise particularly specified herel n Submit complete list of all Items proposed for the Work, including manufacturer's speCification sheets for each product. Colors shall be selected by Architect, who reserves right to select 2 or more colors for each product speCified or for each Item to be painted Up to 8 different accent wall paints may be selected and shall be applied by Contractor without additional cost to Owner Following Architect's selection of colors, prOVide two samples of each color and each gloss for each material on which the finish IS speCified to be applied Unless otherWise directed by Architect, samples shall be approx 12" square ProVide finish coats compatible With prime coats ReView other Sections (Trades) as reqUired, verifYing prime coats to be used and ensuring compatibility of the total coating system for the various surfaces PrOVide barrier coats over noncompatlble primers, or remove primer and reprlme as reqUired Notify Architect In writing of anticipated problems In uSing speCified coating systems over any primer supplied under other spec. Sections PrOVide the best quality grade of the various types of coatings regularly manufactured by paint materials manufacturers listed below or approved by the Architect. Materials not displaYing manufacturer's Identification as the standard best-grade product are not acceptable Do not use paint materials which will not Withstand normal washing as reqUired to remove pencil marks, Ink, ordinary soli and Similar material Without shOWing discoloration, loss of gloss, staining or other damage Painting coats speCified are Intended to cover surfaces perfectly If additional coats are reqUired to secure perfect coverages, painter shall apply extra coats Materials and paint finishes for exterior surfaces shall be as follows t. i {j !( ~%. i df}e{)U~~ )L i (i. ) i~ 4; 4;() ~t,J i1 (1 ~ PAGE 50 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II 111 Xl '1' ",'~ f hH "tel' i i.d j t '-~ ., p li' i{ 1 'I'll r 1 ,,' 1 0; eln C iil ~ '';: ~,); p} H ,,'Ill' .Ii liil I') p ,,~..l ! \. de I l({'{HH *V U \,~ ;::'1 1 tt~~! '.' , \ (.'1" ~ ()i ~ II :;::"\ tn I n n <; d il r' 1 A 1 Materials and paint finishes for interior surfaces shall be as follows New interior gypsum wallboard (walls and ceilings) 1 coat Pro Prime (Parker Paint) 2 coats Satin Glow 100% acryliC paint, satin (Parker Paint) Intenor miscellaneous steel, doors and and relight frames, factory-primed Touch-up primer as required 2 coats Satin Glow 100% acryliC paint, satin (Parker Paint) INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 51 II DIVISION FINISHES Existing interior gypsum wallboard (walls and ceil Ings) Clean and prepare eXisting surface Fill all holes and Imperfections 2 coats Satin Glow 100% acrylic paint, satin (Parker Paint) Existing interior wood doors to be painted Sand and prepare eXisting surface 2 coats Satin Glow 100% acrylic paint, semi-gloss (Parker Paint) ! j Lti ~d .j t { WiL' r' 11 I I 'I i- tdt I \ (. ~' \.,} .\ \ t ! i 1. i h"~~') ((, \. n h JOfi J i ~ ,d t i i 1 r n il....i v ~F IH' l"L,lt'i ~ tu tn ( t j{H"\'.,j j ~ u " ~ ! ( t)j 1.( ~ t: <..~ 1 1-, i ! Ii r.l li PAGE 52 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM FINISHES DIVISION II Clean bare metal down to bright metal surface Remove rust, grease and dirt by washing with minerai SpiritS and wipe dry with clean cloth Wire brush If necessary Clean and touch-up scratches or scars on primer metal Patch and resurface nicks, gouges, etc, In eXisting walls which are to be repainted as required to provide an acceptable palntable surface Match texture of eXisting wall or ceiling surface Fill nail holes, JOints and defects after prime coat IS applied Do not apply paint In snow, rain, fog or mist; or when relative humidity exceeds 85%, or to damp or wet surfaces, unless otherWise permitted by manufacturer's printed instructions. Remove or protect all Items not schedu led to receive paint prior to painting. MIX and prepare materials as per manufacturer's recommendations as approved by Architect. Store materials not In actual use In tightly covered containers Maintain containers used In storage, mixing and application In clean condition, free of foreign material and residue Brush and roller application Brush-out and work all coats onto surfaces In an even film Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness and other surface Imperfections are not acceptable. Spray Application Confine to metal framework, doors and Similar surfaces where hand brush work would be inferior Wherever spray application IS used, apply each coat to provide the equivalent hiding of brush-applied coats Do not double back With spray equipment for the purpose of building up film thickness of two coats In one pass The condition and protection of all finishes IS the responSibility of the painter until final acceptance The painter shall touch up as required after other trades have finished Remove all paint, varnish and stained spots from floors, glass, hardware and other surfaces upon completion of work. Remove rubbish and materials and leave work clean and orderly Deliver to Owner at completion of work all opened cans of paints and finishes used on thiS Job Label containers to Identify surfaces where finish was applied INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 53 DIVISION 11: EQUIPMENT GENERAL Provide and Install all equipment as shown on drawings and as specified herein Submit shop drawings and brochures of all equipment Items for Architect's review Show Sizes, materials, methods of construction, electrical requirements and mounting techniques Provide color samples for selection by Architect. Verify all dimenSions shown on drawings by taking field measurements Proper fit and attachment of all parts IS required Coordinate with work of other trades to insure proper location and size of backing, openings, structural supports and electrical and mechanical connections Examine all areas to receive Items speCified under thiS section and report In writing to General Contractor, with a copy to Architect, any conditions detrimental to the Work. Commencement of work will be construed as acceptance of all existing conditions, and shall make contractor installing equipment responsible for all future corrections BANK EQUIPMENT Requirements of DIvIsion 1 as well as requirements of General Section of thiS DIVISion of SpeCifications shall be Incorporated as a part of thiS section All bank equipment shall be purchased and Installed by Owner under separate contract. Contractor shall coordinate his work with that of bank equipment Installer Provide Installer with construction schedule indicating installation dates for all equipment that IS to be permanently attached to or enclosed by building structure Notify Installer of any schedule changes Contractor shall cooperate with bank equipment Installer by prOViding adequate working space for his crews and suffiCient access for his workers and equipment. PrOVide construction power to installation area. In addition, Contractor shall perform the following work In conjunction with installation of bank equipment. Incorporate Into casework Owner's steel cabinets, Video surveillance equipment and other Items as shown on drawings PROJECT NAME PAGE 55 .11 DIVISION FURNISHINGS o Provide electrical, data, telephone and conduit connections to all pieces of equipment where shown on electrical drawings Verify rough opening Sizes, exact positiOning, electrical requirements, conduit requirements and other relevant information prior to construction of areas to receive bank equipment. Connect required services to bank equipment, grout In place and enclose as shown on drawings or as otherwise required for a complete Job Protect bank equipment after installation until final acceptance of Work. Contractor shall pay for repair or replacement of any bank equipment damaged dUring construction j j 1") T ~ I <( \", I ( (' ".. d v1., (Ii 1'1 I) " ., , I dZ ~: , , it i I) ,,'( ;" A I c:' Ii Ii nr , i"-,, t' W{ ~.J ~ I; j( II I ( ! ! j(' Cd! i .1. u ,_ )'1 t'i u f li j l t l t., t} (. PAGE 56 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM DIVISION 16: ELECTRICAL GENERAL Perform all electrical work as shown on drawings and as specified herein Provide all materials, labor, fixtures, appliances, connectors and appurtenances required for a complete and operating electrical system, whether or not specifically noted on drawings or called for In specifications Equipment and devices provided and Installed under other divISions of specifications, or by Owner, shall be connected to electrical system under Work of this divISion All work shall comply With requirements of National Electrical Code, latest edition If any part of deSign does not meet requirements of thiS code, such discrepancy shall be called to attention of Architect prior to bidding. Take out, pay for all reqUired permits, and call for all required inspections Electrical contractor shall be responSible for submitting draWings and specifications to State Electrical Inspector for plan reView, If required, and shall pay all State permit fees and Include same In bid Provide shop draWings and/or submittals for each specified Item and submit to Architect for review Coordinate With work of other trades Verify measurements at jobsite Block out openings or core drill walls or slabs as required to Install work of thiS DIVISion Perform all required excavation and trenching or arrange for thiS work to be completed by others Temporary use of any portion of electrical system shall be under superVISion of Electrical Contractor General arrangement and location of wIring and equipment IS shown on draWings and shall be Installed In accordance thereWith, except for minor changes required by conflicts With work of other trades or bu lid Ing structure DraWings Ind Icate, generally, routes of all branch C1rcu ItS Maintain "as-budt" draWings shOWing location of fixtures and feeders Installed under thiS Contract. Indicate numbering of each branch Circuit. PROJECT NAME PAGE 57 ,,11 DIVISION ELECTRICAL Arch Itect reserves right to make any reasonable change In location of outlets or light fixtures, prior to roughing-in, at no extra cost to Owner RACEWAY Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of Specifications shall be Incorporated as a part of this section All feeder and branch Circuit wiring shall be Installed In raceway with appropriate Junction boxes and fittings Install empty raceways for communications and data wIring where called for on drawings Raceway and fittings shall be as follows Raceways installed in concrete shall be galvanized rigid steel condUit (GRS) or intermediate metal condUit (IMC) Raceways m frame construction and attic spaces shall be electrical metallic tubing (EMT) or, where allowed by code, armored bushed (BX) cable With 12 gauge minimum wire, unless noted otherwise on drawings Empty raceways for communications and data wirmg in masonry, frame construction and attic spaces shall be electrical metallic tubing (EMT) unless noted otherwise on drawings Flexible raceways for dry locations shall be galvanized, flexible steel Couplmgs for GRS or IMC conduit shall be galvanized malleable Iron couplings or watertight spilt couplings Indentor or set screw type couplings shall not be permitted Couplings for EMT condUit shall be compression ring type, Steel City or equal Indentor or set screw type couplings shall not be permitted Couplmgs for dry location flexible metal raceway shall be Thomas & Betts "squeeze" type or approved equal Exposed raceway for branch Circuit wIring shall be Wiremold nos 200, 500 or 700 as required by number of conductors and eXisting conditions Provide matching Wlremold fittings Size condUits In accordance With requirements of National Electrical Code and other applicable codes PAGE 58 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM " ELECTRICAL DIVISION 1m .' All raceway shall be Installed within building structure or behind finish materials In attic or chases unless specifically noted otherwise on drawings. Fasten raceway to building structure as required to stabilize or support conduIt. Cut ends of raceway square and Install appropriate fitting for application Position and tighten fitting as recommended by manufacturer Flexible raceway shall only be used for connection to motors or light fixtures above accessible ceiling spaces All empty raceways (condUit only) shall be provided with pull wires EXisting raceway may re utilized for new WIring, where applicable, providing raceway compiles with requirements of current electrical codes Exposed raceway (Wlremold) shall only be Installed where called for on drawings Set parallel to building lines Coordinate with adjacent casework and other finishes BOXES Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of SpeCifications shall be Incorporated as a part of this section Outlet and pu II boxes shall be as follows Boxes installed m interior spaces shall be zinc-coated or galvanized die-formed steel, Steel City, Raco or equal Sizes and depths as required to comply with codes, 4 In size minimum Provide extension rings as required by finish materials PrOVide plaster ring where required Large pull and junction boxes shall be fabricated from sheet steel, ZinC coated or factory-painted With baked enamel PrOVide With matching removable cover fastened With ZinC coated screws Boxes for surface raceway shall be provided by raceway manufacturer Configurations as required for function served and Job conditions Exterior boxes above grade shall be cast or malleable Iron, galvanized or factory-painted, with gasketed, weathertlght cover Size boxes In accordance With requirements of National Electrical Code and other applicable codes INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 59 ..1m DIVISION ELECTRICAL .) Install boxes where required to accommodate sWitches, receptacles and other wIring devices as well as where required for use as pull and Junction boxes All boxes shall be accessible after installation of finishes Provide access panels where needed to access Junction boxes after construction IS complete In general, boxes shall be mounted so that front edge of box or plaster ring IS flush with finished surface of wall or ceiling. Mount boxes where wIring devices are indicated on drawings Unless shown otherwise on drawings, mount sWitches 48" above finish floor to centerline of sWitch, mount receptacles 18" above finish floor to centerline of receptacle, mount telephone and data devices 18" above finish floor to centerline of device Where sWitches and receptacles are grouped together on plan, gang together In single. Coordinate installation of boxes In cabinets, casework and equipment with trade supplYing cabinets or equipment. WIRING Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of SpeCifications shall be Incorporated as a part of this section WIring shall be as follows Above grade wiring shall be type THW or RHW Type THWNfrHHN or XHHW may be used at contractor's option, subject to Code requirements Stranded or solid No 12 AWG minimum for power and lighting branch circuits Where allowed by code, armored bushed (BX) cable with 12 gauge minimum wire may be substituted for EMT conduit and wire Underground wirmg in condUits shall be type THW, THWN or XH HW In raceway, subject to Code requirements Stranded or solid No 12 AWe minimum for power and lighting branch Circuits Wire splices for wire sizes no. 10 AWG and smaller shall be solderless type Wire splices for wire sizes no. 8 AWe and larger shall be bolt-on compression type with insulating cover of preformed material, heat-shrinkable plastic tubing or plastic insulating tape Cable ties shall be nylon locking-type All wIring shall be Installed In raceway Wire sizes shall be as required by National Electrical Code for loads, wire material, conduit size and length of run In no case shall branch Circuit wiring be smaller than no 12 AWG size PAGE 60 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM ., ELECTRICAL DIVISION III 'p Pull wires through conduits using powdered soap stone or approved spray cream as lubricant. Wire sizes no 8 AWG and smaller shall be pulled by hand Leave ample length of wire at each end for splicing and terminations Use wire stripper to remove wire insulation for splices and terminations Exposed conductors shall be completely captured by termination blocks or screws, or otherwise protected and Insulated by wire nut, insulating tape or other code-approved insulating material Conductors In panels shall be neatly grouped and formed to fan Into terminals with even spacing Leave adequate slack In each wire to allow repositioning of terminations and breakers without splicing on extra wire WIRING DEVICES Requirements of DIVISion 1 as well as requirements of General Section of this DIVISion of SpeCifications shall be Incorporated as a part of th IS section Wiring devices shall be as follows SWitches shall be specification grade, qUiet type, side wired with plastic handle SWitch rating shall be 277 volts, 20 amps minimum Provide single pole, double pole, 3-way or locking type sWitches as required and as indicated on drawings All exposed parts shall match eXisting devices Receptacles shall be speCification grade, duplex type, side wired, 5-20R configuration unless noted otherwise. Receptacle rating shall be 120 volts, 20 amps minimum All exposed parts shall match eXisting devices Ground fault circuit mterrupter receptacles (GFCI) shall be specification grade, duplex type, side wired unless noted otherwise Receptacle rating shall be 125 volts, 20 amps minimum All exposed parts shall match eXisting devices Provide for all exterior receptacles and elsewhere as required by National Electrical Code Interior device plates shall be formed from plastic, size and configuration as required to accommodate wIring device and box Provide single plate where receptacles and/or sWitches have been ganged together Into a single box Match color of wiring device being enclosed Exterior device plates shall be weatherproof type with heavy, sPring-loaded, self-closing cover and gasket. Galvanized or factory-painted gray finish INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 61 .11I DIVISION C> ELECTRICAL Orient sWitches so that handle operates vertically with up position "on" Orient receptacles vertically with ground slot down WIring devices may be oriented hOrizontally only If required to fit within limited space In casework or restricted wall space Fasten each wiring device to box with two screws minimum Devices shall be plumb and positioned within box so that face of device will be flush with device plate when installation IS complete Install bare grounding wire between receptacle grounding terminal and box Install appropriate device plate for each wiring device Cover empty boxes, including unused data and telephone boxes, with blank device plate PANELBOARDS & BREAKERS Requirements of DIVISion 1 as well as requirements of General Section of this DIvIsion of SpeCifications shall be Incorporated as a part of this section Connect CIrcuits to eXisting panelboards PrOVide new breakers as required for connection of all new loads Breakers shall be as follows, refer also to panel schedule on drawings CircUit breakers shall be same brand as panel board manufacturer, size and type as required to fit panel and protect branch circuits In compliance with National Electrical Code 10,000 AIC minimum Provide common trip for multiple-pole breakers Half space breakers shall not be permitted Install new breakers where required to connect new loads or transfer loads from another eXisting panel PrOVide typewritten panel schedule mounted on inside of panelboard door listing all circuit breakers and corresponding loads LIGHTING ReqUirements of DIVISion 1 as well as requirements of General Section of thiS DIVIsion of SpeCifications shall be Incorporated as a part of thiS section Refer to lighting fixture schedule on draWings for deSCription of each lighting fixture All fixtures shall be U L labeled Fixtures shall be prOVided With follOWing components, where applicable PAGE 62 INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM o ELECTRICAL DIVISION II Metal components for interior fixtures shall be steel or aluminum with factory- applied, baked enamel finish or brushed aluminum with clear lacquer' finish Color shall be white unless noted otherwise Lenses shall be glass, virgin acrylic or polycarbonate as called out In fixture schedule If not specified, provide manufacturer's standard lens Lamps shall be Phillips, Sylvania or General Electric or approved equal Provide number and type required for each fixture Fluorescent lamps shall have color temperature noted on fixture schedule Sockets shall porcelain, type and size as required for lamps speCified Fluorescent ballasts shall be electronIc type by Advance, EBT, Motorola or Osram/Sylvanla. Each ballast shall be U L labeled Ballasts shall be high power factor type with" A" sound rating. All fixtures shall be UL listed for location and application where Installed PrOVide fixtures complete with lamps, ballasts, lenses and all required accessories and fasteners speCified or otherwise requIred for complete installation Mount fixtures where shown on draWings and as called for In lighting fixture schedule Refer to architectural draWings for heights of wall-mounted fixtures Where fixture locatIon shown conflicts With building structure of mechanical apparatus, contact Architect for direction Attach fixtures to structure as required by applicable codes Recessed fixtures shall be fastened to structure by means of Integral slide bars or tabs prOVided by manufacturer PrOVide two safety chains for fixtures Installed above or In suspended acoustic ceilings Runs of multiple fixtures shall tightly butted and aligned With walls of room Install trim around all recessed fixtures and all exposed ends of surface-mounted fixtures Trim shall fit tightly to other parts of fixture or against wall or ceding surface Prior to final acceptance by Owner, replace any parts of fixtures that have been damaged, including defective or burnt-out lamps, and clean all fixture lenses INTERIOR ALTERATIONS & IMPROVEMENTS FOR TIMBERLAND BANK YELM PAGE 63 CITY OF YELM COMMERCIAL BUILDING PERMIT APPLICATION FORM Project Address 101 $ 'I ei...M kJe Parcel #. "'*L1 00'2,.00' 00 Zoning; ~D Current Use 8Ar-J~ Proposed Use. eAN\'- o New Construction )( Re-Model / Re-Roof / Tenant Improvement o Plumbing 0 Mechanical 0 Fire Prevent/Suppress/Alarm 0 Other Project Description/Scope of Work: 1,...rrell,JofZ,.. AL.Tf:fieAl1~ t- IMP~'\l EMf.lJTS Project Value ~ zeo, 000 Building Area (sq. ft) Parking Garage IJ A 151 Floor 2.no 2nd Floor IJA 3'd Floor ~ Building Height e~16T7NC::f Piece · MAY 1VSd (J 2005 Are there any environmentally sensitive areas located on the parcel? lJo completed environmental checklist must accompany permit application. If yes, a I3iJJr~IDfNGOWN6RzmENANJ.ifiJ;;gM6: e s AD5RESSt;Z&.l'"5IMpe.;of;;r~ A"e-: EMAIL CITY J.lO&tJl AM STATE WA ZIP Qes50 TELEPHONE -;~o-5~"O-47L/7 AROm{l:mg~ill/ENGINggi3S'-'" ~ AF.UtI~ LICENSE # ~SCD5 ADDRESS2eo S: 1='1pc.~,.. ~TP.Fe.-r EMAIL 5....F @ +~lne.. ~~ CITY M~ANO STATE zIPQS'5("':b TELEPHONE ~c;O- 2.&lQ-'IOi, GENg~~!!1r@~f';JTR;A[~ill~i3 ADDRESS CITY STATE CONTRACTOR'S LICENSE # ZIP TELEPHONE EMAIL FAX EXP DATE CITY LICENSE # ~~iJJMBIN@l~@~illRA~~i3 ADDRESS CITY STATE CONTRACTOR'S LICENSE # ZIP TELEPHONE EMAIL FAX EXP DATE CITY LICENSE # MEoiji~NI~~~i\cdNm~~[L@R ADDRESS CITY STATE CONTRACTOR'S LICENSE # ZIP TELEPHONE EMAIL FAX EXP DATE CITY LICENSE # Copy of City Mitigation documentation (TFC). I hereby certify that the above infonnation is correct and that the construction on, and the occupancy and the use of the above described property will be in accordance with the laws, rules and regulations of the State of Washington and the City of Y m. MA'I '" I '2a:>5' Date (Please circle one.) All permits are non-transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days 105 Yelm Avenue West PO Box 479 Yelm, WA 98597 (360) 458-3835 (360) 458-3144 FAX www.ci.yelm.wa.us Look Up a Contractor, ElectncIan or Plumber LIcense Detail Page 1 of3 '" " Topic Index I Contact Info _~_____V'-s~~~~~. C~i~~ ~}~;~;~~~ ~_-w;;~i~~e~~!hts '. ~. Trades & licensing , I Find a Law or Rute! I Get a Form or Publication! Look Up a Contractor, Electrician or Plumber -_. =.,-."..,.._.,._---""'""'-,-----"'-'-'.._""-""''''''''''~"-'-~- General/Specialty Contractor A business registered as a construction contractor with Lal to perform construction work within the scope of its specialty A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance ,L , '- ~_"_~....,. . ' . -"'''''_~".,..'''o".~.''''____,.,.._'''_w..'''''''''''''' [Licens~ I~fo;matio~~'~- I License ROGNL**342LF I Licensee Name ROGNLlNS INC Licensee Type CONSTRUCTION CONTRACTOR I UBI 141005883 Verify Workers Comp Premium s.tatJJs. I Ind. Ins. Account Id I Business Type CORPORATION I Address 1 PO BOX 307 NC ~ Address 2 ! I City ABERDEEN County GRAYS HARBOR \ State WA I Zip 985200078 I Phone 3605325220 I Status ACTIVE ! Specialty 1 GENERAL i Specialty 2 UNUSED I Effective Date 6/6/1966 I Expiration Date 8/112007 Suspend Date I Separation Date Parent Company Previous License Next License Associated License -".-""- "-"----...-........--=."..."'...., ----~~._._---...--~.,,~---~ s~ J:- MSP --. 'L:-- JJJ I r;;; .." .~.."----"..."'-.=,.""..._"-,,,#,-,-""'-,-.----,...----'-,! " Business Owner Information i ~ II I Ii https'//fortress.wa.gov/lm/bblp/Detall.aspx?LIcense=ROGNL * * 34 2LF 6/23/2005 Look Up a Contractor, ElectncIan or Plumber LIcense DetaIl Page 2 of3 i Name Role Effective Date Expiration Date i I ROGNLlN, RANDY W 01/01/1980 I I i I ROGNLlN, WAYNE W 01/01/1980 I ! ROGNLlN, SCOTT W 01/01/1980 I ---.""..'~'.",....^ _._.,-,,-----~'"'---".~~'"-=-~,=-,-,-~ ~-- ~-"'~~-_.,---_. Bond Information ! Bond Bond i Company Account Effective Expiration Cancel Impaired Bond Received I I Bond Name Number Date Date Date Date Amount Date i SAFECO I INS CO 1#2 OF Until $12,000 00 08/01/200111 AMERICA 916429 04/30/2001 Cancelled I ~ SAFECO $6,000 00 ,04/30/2000 I INS CO 916429 10/20/1982 04/30/2001 --.' . w =.. -..." ...~-.... ~l! r:==:-=-"=~=~"'~="~ ,.~ ~-""""""."-' ==~ ,- '~~~"-"'"=~~~"'~"'''=''''-''-'''''''' ! Savings Information II ~ , No Mat:~~ng l_nf~!"~~____",.~,,_,__~,,JI " -- "=='__"""_"'-'-''=''"'_~'-;O--'''''''''~~''''''''''''''"''''''':=''~:''''''''''''':)'.''i'.""_"~""'~"""'"=""""""'="",,,,,,,,,,__~,,,,,, --.,..."'" ="'-~ Insurance Information Effective Expiration Cancel Impaired Insurance Company Name Policy Number Date Date Date Date Amoun #17 TRANSCONTINENTAL INC C2077836807 06/30/2004 06/30/2005 $1,000,00 #16 ZURICH INS CO COP3992201 06/30/2003 06/30/2004 $1,000,00 Until ~ #15 CHARTER OAK FIRE INS CO C034K085900 06/30/2000 Cancelled 1#14 Until ST PAUL GUARDIAN INS CO KK08400124 06/30/1999 Cancelled 1#13 Until US FIDELITY 8: GUARANTY 1 MP301158451 03 06/30/1998 Cancelled 1#12 USF8:G 1 MP301158451 01 06/30/1996 06/30/1998 ~ #11 USF 8: G 1 MP301158451 00 06/30/1995 06/30/1996 ;. 1#10 CRAVENS PACIFIC INS SERV SMP53483 06/30/1994 06/30/1995 CISCO 31002CA500200000 06/30/1993 06/30/1994 ,,#9 ~#8 CRAVENS PACIFIC INS SERV 0957091/133 06/30/1992 06/30/1994 II CRAVENS/GENERALI /LLOYDS 1#7 UNWR 095709110 06/30/1991 06/30/1992 ~ UNITED PACIFIC SPEC 1#6 RISK/REllA SJ1654649 06/06/1989 06/06/1991 II #5 NEW HAMPSHIRE GROUP GL9526907 06/06/1988 06/06/1989 #4 AETNA CASUAL TY 81 GL665003CCA 09/03/1986 08/01/1988 ~#3 USF8:G MP056499092A OS/29/1986 06/07/1987 ~#2 USF8:G MP758846 06/07/1983 06/07/1986 ~ #1 USF&G MP50803 09/30/1981 06/07/1983 I ....- -___.......""'.""'.,.,o-=-.,'=,,...,""~_=__.,.,......__==__o.___=""""'~_..,,,.."'~'"""""~".,,.."".,_~..,,..""'=__=.=,=,- . r"~~- -~,.--~==.~~===""',.,~""''''',.".,,'"'---,.,-==----_._,-.,"-,.",-,-_.,,-~~-* ~ Summons I Complaints Information ~ I I I I I https.//fortress.wa.gov/lm/bbIp/DetaIl.aspx?LIcense=ROGNL * * 34 2LF 6/23/2005 Look Up a Contractor, ElectncIan or Plumber LIcense Detml Page 3 of3 .. b Tax Summons / Cause Warrant Dismissal Complaint Complaint Judgement Judgemen Complaint Number Id Plaintiff County Date Date Amount Date Amount UNITEK SYSTEMS #1 922008308 INC THURSTON 04/13/1992 $109,76700 $000 Start a New Search Printer Friendly Version About L&I I Find a job at L&I I Informacion en espariol I Site Feedback I 1-800-547-8367 ,0 Washington State Dept. of Labor and Industries. Use of this site is subject to the laws of the state of Washington Access Agreement I Privacy and security statement I Intended use/external content policy I Visit access.wa.gov Staff only link https.//fortress.wa.gov/lm/bblp/Detml.aspx?Llcense=ROGNL * * 342LF 6/23/2005