20150117 Bldg Plan A501E
0
O
N
i
0
N
0
N
a
a
0
0
J
a
rn
3
Q
W
"A
11/2" 11/2"
3 1/2" ► 3 1/2" 3 1/2"
UNIT WALL UNIT WALL
BALLOON FRAMED
WALL
(2) LAYERS 5/8" � I I.1
"DENSGLASS GOLD"
GYPSUM SHEATHING
EACH SIDE
FIRE WALL FRAMING
SCALE 1" = I' -0"
5' -0" MIN.
"10111
NO ROOF PENETRATIONS ALLOWED WITHIN
5' -0" OF 2HR AREA SEPARATION WALL
OPT, 2' HR FIIRE' WALL: O
SEE ASSEMBLIES ON
SHEET A600 (SHEARWALL
NAILING TAKE
PRECEDENCE FOR
L (2) LAYER 5/8" TYPE 'X' GWB \
n�
ON SHEET A600
4
j �- ADD 4 MIL. VAPOR
FULL LENGTH OF TRUSS FOR
> 0.1 and </= 1.0
�,
)
' -0'"
BARRIER 6' EITHER
5' -0" MIN. EA SIDE OF 2 HR
NO ROOF PENETRATIONS ALLOWED WITHIN
5'-0" OF 2HR AREA SEPARATION
WALL
SIDE OF 2 -HR WALL
AREA SEP. WALL (TRUSS W/
I EXTERIOR
SEE ASSEMBLIES ON 6
VERT. BLK A 24" O.C.)
SHEET A6� (SHEARWAL
4
NAILING TAKE
$
PRECEDENCE FOR
Z_ (2) LAYER 5/8" TYPE 'X' GWB L-
R
FULL LENGTH OF TRUSS FOR
SEE DETAIL ABOVE
FOR FRAMING
(2) LAYERS 5/8" TYPE "X" GUS
ENTIRE LENGTH OF ROOM-
VERT. BLK • 24" O.G.)
L_ 8
(2) LAYERS 5/8" TYPE "X" GWB
DIMENSIONS
•I -HR ROOF CEILING ASSEMBLY:
,1 -HR ROOF CEILING ASSEMBLY:
CONT. MINERAL WOOL FIRE
SEE SHEET A600 FOR ASSEMBLY
REQUIREMENTS O
BLOCKING
SEE SHEET A600 FOR ASSEMBLY
NOTE: THE PLUMBER t ELECTRICIAN
MID-HEIGHT BLOCKING
ARE RESPONSIBLE FOR DETERMINING
IN WALL
REQUIREMENTS O
MATERIAL TYPES IN t IN THE VICINITY
OF 2 -HR WALLS (SEE ELECTRICAL t
PLUMBING NOTES ON G103)
6
MID - HEIGHT BLOCKING
IN WALL
OPT, 241R FIRE WALL: O
SEE ASSEMBLIES ON SHEET
A&00 (SHEARWALL
NAILING TAKE
PRECEDENCE FOR NAILING)
MID - HEIGHT BLOCKING
IN WALL
FIRESTOPPING * 10' -0" O.C.
MAX. ALONG LENGTH OF WALL
SEE 4/A502
TYP, I -HR FLR < CEIL ASSEM.
SEE ASSEMBLIES SHEET A600 4
TREATED URAETES —� I I MID- HEIGHT BLOCKING
IN WALL
4 erg.
n�
ON SHEET A600
4
PVA
with Perm rating
> 0.1 and </= 1.0
�,
K]
O2 -HR EIRE WALL:
BALLOON FRAMED 2x4 STUD WALL W/
(2) LAYERS 5/8" "DENSEGLASS GOLD"
GYPSUM BOARD EACH SIDE - EXTEND
UP TO ROOF SHEATHING
OPTIONAL 2 - HR. FIRE WALL
SCALE 1/2" = I' -0"
,_
v,
ON SHEET A600
f,.
PVA
with Perm rating
> 0.1 and </= 1.0
�,
)
' -0'"
5' -0" MIN.
INSIDE OF 2x4 WALL WHERE
NO ROOF PENETRATIONS ALLOWED WITHIN
5'-0" OF 2HR AREA SEPARATION
WALL
Ov E VERT. L 'G ® 24" O.C.
I
I EXTERIOR
SEE ASSEMBLIES ON 6
SHEET A6� (SHEARWAL
4
NAILING TAKE
$
PRECEDENCE FOR
Z_ (2) LAYER 5/8" TYPE 'X' GWB L-
R
FULL LENGTH OF TRUSS FOR
BS
V -0" MIN. EA. SIDE OF 2 HR
AREA SEP. WALL (TRUSS W/
VERT. BLK • 24" O.G.)
L_ 8
(2) LAYERS 5/8" TYPE "X" GWB
50 SIM.
ENTIRE LENGTH OF ROOM -
,1 -HR ROOF CEILING ASSEMBLY:
CONT. MINERAL WOOL FIRE
SEE SHEET A600 FOR ASSEMBLY
REQUIREMENTS O
BLOCKING
0
NOTE: THE PLUMBER t ELECTRICIAN
MID-HEIGHT BLOCKING
ARE RESPONSIBLE FOR DETERMINING
IN WALL
ACCEPTABLE PLUMBING/ELECTRICAL
MATERIAL TYPES IN t IN THE VICINITY
OF 2 -HR WALLS (SEE ELECTRICAL t
PLUMBING NOTES ON G103)
6
�5O SIM.
F
GWB (MIN., OR PER
50
L_
SHEARWALL TABLE)
2ND,
2x C,ONT.
FIREIBLOCKING
TYPICAL 24R FIRE WALL: O
SEE ASSEMBLIES ON SHEET
A600 (SHEARWALL
MINERAL WOOL FIREBLOCKING
NAILING TAKE
TYP. PARTY WALL ASSEM. 3
SEE ASSEMBLIES ON SHEET O
PRECEDENCE FOR NAILING)
B
A&00
MID - HEIGHT BLOCKING
IN WA4LL
MID - HEIGHT BLOCKING IN WALL
6
`70 SIM.
F
6
O.C. ALONG LENGTH OF
5 0
WALL - SEE 9/A600
(1) LAYER 5/8" TYPE 'X'
1ST,
NOTE: (3) 2XIO'S LOCATED
GWB EA. SIDE (MIN., OR
ABOVE EACH STUD MAY BE
PER SHEARWALL TABLE)
?VW
USED IN LIEU OF EXTENDED
#?m
2x CONT
G.W.B. THRU JOIST SPACE
FIREt3LOCKING
FIRESTOPPING s 10' -0" O.C.
JT,
MINERAL WOOL FIREBLOCKING
MAX. ALONG LENGTH OF WALL
A600
SEE 4/A502
(I) LAYER 5/8" TYPE 'X'
TYP, I -HR FLR < CEIL ASSEM.: 4
GWB EA. SIDE (MIN., OR
SEE ASSEMBLIES SHEET A600
PER SHEARWALL TABLE)
2x4 PRESSURE
0
TREATED PLATE
01
TYP. BASEMENT FLOOR ASSEML
MID- }4EIGHT BLOCKING
FINISH FLOORING (SEE RM.
IN WALL
FIN. SCHED.) OVER 4"
BASEMENT
ASSEMBLY: FIN. FLOORING
CONC. SLAB OVER
(SEE RM. FIN. SCHED.) OVER
RECOMMENDED 2" SAND
4" CONC. SLAB OVER
OVER II VAPOR
RECOMMENDED 2" SAND
BARRIER OVER 4" FREE
OVER &MIL. VAPOR BARRIER
DRAIN MATERIAL
OVER 4" FREE DRAIN
55M T.
MATERIAL
4°
REFER TO SOILS
REPORT FOR FOUNDATION
REFER TO SOILS 5
1 I - HR. PARTY WALL
REPORT FOR FOUNDATION 50
BEARING PREPARATION.
Q 2 2 - HR. FIRE WALL
SCALE 1/2" = 1' -0"
Fj
Casey Group Architects Architecture And Planning
MLL:u
CD J H
N
N
ILI
o
LLUU
�W !J>
U11!
Z
0_
Lo
a
N
aaaa
�I
A
1I'
A
0
C�
TYPICAL ROOF /CEILING
ASSEMBLY: SEE ASSEMBLIES
ON SHEET A600
I -HOUR SEPARATION W/ ( I ) LAYER
5/8" TYPE "X" GWB EA. SIDE — F___A
TRUSSES OR 2x4 * 24" O.C. BLOCKING I
I ADJUST TRUSS LOCATION TO
- FRAMER t TRUSS SUPPLIER TO I
INSIDE OF 2x4 WALL WHERE
COORDINATE WHERE TRUSSES USED
WALL IS EXTENDED TO
Ov E VERT. L 'G ® 24" O.C.
I
I EXTERIOR
CONT. 2x4 FIRE
4
aH
$
BLOCKING
50
MID - HEIGHT BLOCKING IN WALL
0
01
(1) LAYER 5/8" TYPE 'X'
6
GWB (MIN., OR PER
50
SHEARWALL TABLE)
2ND,
L
MINERAL WOOL FIREBLOCKING
TYP. PARTY WALL ASSEM. 3
SEE ASSEMBLIES ON SHEET O
B
A&00
o�
MID - HEIGHT BLOCKING IN WALL
FIRESTOPPING AT 10' -0"
6
O.C. ALONG LENGTH OF
5 0
WALL - SEE 9/A600
(1) LAYER 5/8" TYPE 'X'
1ST,
GWB EA. SIDE (MIN., OR
PER SHEARWALL TABLE)
?VW
#?m
W t
TYP. I -HR FLR ! CEIL. ASSM: 4 >
SEE ASSEMBLIES ON SHEET
JT,
MINERAL WOOL FIREBLOCKING
A600
(I) LAYER 5/8" TYPE 'X'
GWB EA. SIDE (MIN., OR
PER SHEARWALL TABLE)
0
01
MID WALL BLOCKING
2x4 PRESSURE TREATED
TYP. FLOOR
PLATE
BASEMENT
ASSEMBLY: FIN. FLOORING
(SEE RM. FIN. SCHED.) OVER
4" CONC. SLAB OVER
5
RECOMMENDED 2" SAND
OVER &MIL. VAPOR BARRIER
50
OVER 4" FREE DRAIN
55M T.
MATERIAL
c y
REFER TO SOILS
REPORT FOR FOUNDATION
BEARING PREPARATION.
1 I - HR. PARTY WALL
I/2 I 0
Casey Group Architects Architecture And Planning
MLL:u
CD J H
N
N
ILI
o
LLUU
�W !J>
U11!
Z
0_
Lo
a
N
aaaa
�I
A
1I'
A
0
C�
0
N
d"
X
Ln
N
Q�
Q�
00
Q�
(1
0
N
N
501
0
�
0
�
N
A
4
aH
0
N
d"
X
Ln
N
Q�
Q�
00
Q�
(1
0
N
N
501