Loading...
20150117 Bldg Plan A501E 0 O N i 0 N 0 N a a 0 0 J a rn 3 Q W "A 11/2" 11/2" 3 1/2" ► 3 1/2" 3 1/2" UNIT WALL UNIT WALL BALLOON FRAMED WALL (2) LAYERS 5/8" � I I.1 "DENSGLASS GOLD" GYPSUM SHEATHING EACH SIDE FIRE WALL FRAMING SCALE 1" = I' -0" 5' -0" MIN. "10111 NO ROOF PENETRATIONS ALLOWED WITHIN 5' -0" OF 2HR AREA SEPARATION WALL OPT, 2' HR FIIRE' WALL: O SEE ASSEMBLIES ON SHEET A600 (SHEARWALL NAILING TAKE PRECEDENCE FOR L (2) LAYER 5/8" TYPE 'X' GWB \ n� ON SHEET A600 4 j �- ADD 4 MIL. VAPOR FULL LENGTH OF TRUSS FOR > 0.1 and </= 1.0 �, ) ' -0'" BARRIER 6' EITHER 5' -0" MIN. EA SIDE OF 2 HR NO ROOF PENETRATIONS ALLOWED WITHIN 5'-0" OF 2HR AREA SEPARATION WALL SIDE OF 2 -HR WALL AREA SEP. WALL (TRUSS W/ I EXTERIOR SEE ASSEMBLIES ON 6 VERT. BLK A 24" O.C.) SHEET A6� (SHEARWAL 4 NAILING TAKE $ PRECEDENCE FOR Z_ (2) LAYER 5/8" TYPE 'X' GWB L- R FULL LENGTH OF TRUSS FOR SEE DETAIL ABOVE FOR FRAMING (2) LAYERS 5/8" TYPE "X" GUS ENTIRE LENGTH OF ROOM- VERT. BLK • 24" O.G.) L_ 8 (2) LAYERS 5/8" TYPE "X" GWB DIMENSIONS •I -HR ROOF CEILING ASSEMBLY: ,1 -HR ROOF CEILING ASSEMBLY: CONT. MINERAL WOOL FIRE SEE SHEET A600 FOR ASSEMBLY REQUIREMENTS O BLOCKING SEE SHEET A600 FOR ASSEMBLY NOTE: THE PLUMBER t ELECTRICIAN MID-HEIGHT BLOCKING ARE RESPONSIBLE FOR DETERMINING IN WALL REQUIREMENTS O MATERIAL TYPES IN t IN THE VICINITY OF 2 -HR WALLS (SEE ELECTRICAL t PLUMBING NOTES ON G103) 6 MID - HEIGHT BLOCKING IN WALL OPT, 241R FIRE WALL: O SEE ASSEMBLIES ON SHEET A&00 (SHEARWALL NAILING TAKE PRECEDENCE FOR NAILING) MID - HEIGHT BLOCKING IN WALL FIRESTOPPING * 10' -0" O.C. MAX. ALONG LENGTH OF WALL SEE 4/A502 TYP, I -HR FLR < CEIL ASSEM. SEE ASSEMBLIES SHEET A600 4 TREATED URAETES —� I I MID- HEIGHT BLOCKING IN WALL 4 erg. n� ON SHEET A600 4 PVA with Perm rating > 0.1 and </= 1.0 �, K] O2 -HR EIRE WALL: BALLOON FRAMED 2x4 STUD WALL W/ (2) LAYERS 5/8" "DENSEGLASS GOLD" GYPSUM BOARD EACH SIDE - EXTEND UP TO ROOF SHEATHING OPTIONAL 2 - HR. FIRE WALL SCALE 1/2" = I' -0" ,_ v, ON SHEET A600 f,. PVA with Perm rating > 0.1 and </= 1.0 �, ) ' -0'" 5' -0" MIN. INSIDE OF 2x4 WALL WHERE NO ROOF PENETRATIONS ALLOWED WITHIN 5'-0" OF 2HR AREA SEPARATION WALL Ov E VERT. L 'G ® 24" O.C. I I EXTERIOR SEE ASSEMBLIES ON 6 SHEET A6� (SHEARWAL 4 NAILING TAKE $ PRECEDENCE FOR Z_ (2) LAYER 5/8" TYPE 'X' GWB L- R FULL LENGTH OF TRUSS FOR BS V -0" MIN. EA. SIDE OF 2 HR AREA SEP. WALL (TRUSS W/ VERT. BLK • 24" O.G.) L_ 8 (2) LAYERS 5/8" TYPE "X" GWB 50 SIM. ENTIRE LENGTH OF ROOM - ,1 -HR ROOF CEILING ASSEMBLY: CONT. MINERAL WOOL FIRE SEE SHEET A600 FOR ASSEMBLY REQUIREMENTS O BLOCKING 0 NOTE: THE PLUMBER t ELECTRICIAN MID-HEIGHT BLOCKING ARE RESPONSIBLE FOR DETERMINING IN WALL ACCEPTABLE PLUMBING/ELECTRICAL MATERIAL TYPES IN t IN THE VICINITY OF 2 -HR WALLS (SEE ELECTRICAL t PLUMBING NOTES ON G103) 6 �5O SIM. F GWB (MIN., OR PER 50 L_ SHEARWALL TABLE) 2ND, 2x C,ONT. FIREIBLOCKING TYPICAL 24R FIRE WALL: O SEE ASSEMBLIES ON SHEET A600 (SHEARWALL MINERAL WOOL FIREBLOCKING NAILING TAKE TYP. PARTY WALL ASSEM. 3 SEE ASSEMBLIES ON SHEET O PRECEDENCE FOR NAILING) B A&00 MID - HEIGHT BLOCKING IN WA4LL MID - HEIGHT BLOCKING IN WALL 6 `70 SIM. F 6 O.C. ALONG LENGTH OF 5 0 WALL - SEE 9/A600 (1) LAYER 5/8" TYPE 'X' 1ST, NOTE: (3) 2XIO'S LOCATED GWB EA. SIDE (MIN., OR ABOVE EACH STUD MAY BE PER SHEARWALL TABLE) ?VW USED IN LIEU OF EXTENDED #?m 2x CONT G.W.B. THRU JOIST SPACE FIREt3LOCKING FIRESTOPPING s 10' -0" O.C. JT, MINERAL WOOL FIREBLOCKING MAX. ALONG LENGTH OF WALL A600 SEE 4/A502 (I) LAYER 5/8" TYPE 'X' TYP, I -HR FLR < CEIL ASSEM.: 4 GWB EA. SIDE (MIN., OR SEE ASSEMBLIES SHEET A600 PER SHEARWALL TABLE) 2x4 PRESSURE 0 TREATED PLATE 01 TYP. BASEMENT FLOOR ASSEML MID- }4EIGHT BLOCKING FINISH FLOORING (SEE RM. IN WALL FIN. SCHED.) OVER 4" BASEMENT ASSEMBLY: FIN. FLOORING CONC. SLAB OVER (SEE RM. FIN. SCHED.) OVER RECOMMENDED 2" SAND 4" CONC. SLAB OVER OVER II VAPOR RECOMMENDED 2" SAND BARRIER OVER 4" FREE OVER &MIL. VAPOR BARRIER DRAIN MATERIAL OVER 4" FREE DRAIN 55M T. MATERIAL 4° REFER TO SOILS REPORT FOR FOUNDATION REFER TO SOILS 5 1 I - HR. PARTY WALL REPORT FOR FOUNDATION 50 BEARING PREPARATION. Q 2 2 - HR. FIRE WALL SCALE 1/2" = 1' -0" Fj Casey Group Architects Architecture And Planning MLL:u CD J H N N ILI o LLUU �W !J> U11! Z 0_ Lo a N aaaa �I A 1I' A 0 C� TYPICAL ROOF /CEILING ASSEMBLY: SEE ASSEMBLIES ON SHEET A600 I -HOUR SEPARATION W/ ( I ) LAYER 5/8" TYPE "X" GWB EA. SIDE — F___A TRUSSES OR 2x4 * 24" O.C. BLOCKING I I ADJUST TRUSS LOCATION TO - FRAMER t TRUSS SUPPLIER TO I INSIDE OF 2x4 WALL WHERE COORDINATE WHERE TRUSSES USED WALL IS EXTENDED TO Ov E VERT. L 'G ® 24" O.C. I I EXTERIOR CONT. 2x4 FIRE 4 aH $ BLOCKING 50 MID - HEIGHT BLOCKING IN WALL 0 01 (1) LAYER 5/8" TYPE 'X' 6 GWB (MIN., OR PER 50 SHEARWALL TABLE) 2ND, L MINERAL WOOL FIREBLOCKING TYP. PARTY WALL ASSEM. 3 SEE ASSEMBLIES ON SHEET O B A&00 o� MID - HEIGHT BLOCKING IN WALL FIRESTOPPING AT 10' -0" 6 O.C. ALONG LENGTH OF 5 0 WALL - SEE 9/A600 (1) LAYER 5/8" TYPE 'X' 1ST, GWB EA. SIDE (MIN., OR PER SHEARWALL TABLE) ?VW #?m W t TYP. I -HR FLR ! CEIL. ASSM: 4 > SEE ASSEMBLIES ON SHEET JT, MINERAL WOOL FIREBLOCKING A600 (I) LAYER 5/8" TYPE 'X' GWB EA. SIDE (MIN., OR PER SHEARWALL TABLE) 0 01 MID WALL BLOCKING 2x4 PRESSURE TREATED TYP. FLOOR PLATE BASEMENT ASSEMBLY: FIN. FLOORING (SEE RM. FIN. SCHED.) OVER 4" CONC. SLAB OVER 5 RECOMMENDED 2" SAND OVER &MIL. VAPOR BARRIER 50 OVER 4" FREE DRAIN 55M T. MATERIAL c y REFER TO SOILS REPORT FOR FOUNDATION BEARING PREPARATION. 1 I - HR. PARTY WALL I/2 I 0 Casey Group Architects Architecture And Planning MLL:u CD J H N N ILI o LLUU �W !J> U11! Z 0_ Lo a N aaaa �I A 1I' A 0 C� 0 N d" X Ln N Q� Q� 00 Q� (1 0 N N 501 0 � 0 � N A 4 aH 0 N d" X Ln N Q� Q� 00 Q� (1 0 N N 501