Loading...
20050002 ~ ~~_Jf@li\!-'!}i\!;?-J=- C\,{'l Of 'lELtJI _ 6UILOltlG OEP AR1tJ1Etl1 RESIOEtl11AL CER11flCA 1E Of ocCUP AtlC'l ~51~ Building A.ddress ~ owner Name Owner Address Plan Number Building permit Number ~ RemarKs --- p.,\\ Code ReQuired ~ Areas Inspected special conditions None o ate Building 01hcial . . I leln.l,ona\ Residential Code (cnaplel 1nis s\lUctule is in compliance ~\I~~~: I~n st.le Building Code Council pursuanl 5~-5~ \NAC) as adopted b'/ t2h1e da 10 i2 RON ellectNe JulV \.2004 to Chapters ~9. an ' Garv carlson ~...--::.i ra ffm ~ ___@1@j@\@J@ FROM YELM SEWER DEPT ~ ~~\ TO: FAX#: FAX NO 360-458-8166 Apr 25 2005 04 56PM Pi FAX TRA,NSMISSION CITY OF YELM P.O. BOX 479 - 931 NP ROAD NE YELM, W A 98597 360-458-8411 FAX 360-458-8166 DATE: (..) - ~~$"- ~~ PAGES: J , including this Cover sheet From:~JJOl..f LSG~) SubjectHD UO;C= F I (V A L.- COMMENTS: La T 13" 1575'') I o'.rr;Jj A Vji: 65 -57 3D .00 s. (. , ** IfyOtt do not rece1ve all copIes or any copy 1S not legIble, Pleale call (360) 458-8411 assooo as possible. I \ o o City of Yelm Community Development Department Building Division Phone: (360) 458-8407 Fax: (360) 458-3144 Permit No BLD-05-0002-YL Issue Date 01/11/2005 (Work must be started within 180 days) Receipt No 34495 Apr:>licant: Name SCA Design Build Phone: 360-493-6002 Address 4200 6th Ave. SE City' Lacey State: WA Zip 98503 Property Information Site Address. 15755 104th Ave. SE Assessor Parcel No 85840007300 Subdivision. Yelm Terra Lot: 73 Contractor Information Name SCA Design Build Contact: Lee, Dan Phone' 360-493-6002 Contractor License No SCADEI1401 KM City' Lacey Expires 05/07/05127 State. WA Zip Address 4200 6th Ave. SE Business License. Pending Project Information Project: Yelm Terra Description of Work: Loutzenheiser-1458 SFR Sq. Ft. per floor' (1 st) 1458 (2nd) 0 (3rd) 0 Garage 436 Basement 0 Heat Type (Electric, Gas, Other) GAS Fees Item Item Fee Base Amt Unit Fee Unit Rate No Units Unit Desc . -----------------. -- ------ ------------- Building Permit 100-500k 1,02433 993 75 3058 5 6000 5.4600 $1,000 Building Plan Review 66581 000 000 o 0000 o 0000 Mechanical Permit 7175 000 000 o 0000 o 0000 Plumbing Permit 9000 2000 7000 7 0000 10 0000 Fixture SewerERU 5,41700 000 5,41700 5,417 0000 1 0000 ERU Sewer Inspection 14500 000 14500 145 0000 1 0000 ERU Water ERU 1 500 00 000 1,500 00 1 500 0000 1 0000 ERU Water Meter (SFD) 300 00 300 00 000 o 0000 0.0000 Water Deposit 4000 4000 000 o 0000 0.0000 Traffic Facilities Charge 757 50 000 757 50 750 0000 1 0100 Peak PM Trip Sewer Deposit 5000 5000 000 o 0000 o 0000 State Building Fee 450 450 000 o 0000 o 0000 TOTAL FEES $10,065.89 Applicant's Affadavit: OFFICIAL USE ONLY I certify that I have read and examined the information contained within the application and know the same to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of Yelm regulations including those governing zoning and land subdivision, and in addition, all covenants, easements and restrictions of record. If applying as a contractor, I futher certify that I am currently registered in the State of Washington # Sets of Prints: Final Inspection: O'le(Jj}/ By' Sig"t",e~':~~ ~~S'-- DeSiS" "Bui IJ Date 1/15Lo~ Applicant: Name SeA Design Build Address 4200 6th Ave. SE Project lriformation Project: Yelm Terra o o Permit Fees Schedule City ofYelm Community Development Department Building Division Phone. (360) 458-8407 Fax: (360) 458-3144 Description of Work: Loutzenheiser-1458 SFR Site Address 15755104th Ave. SE Fees Item Acct Code Building Permit 100-500k 032001-322-10-00 Building Plan Review 100001-345-83-00 Mechanical Permit 032001-322-10-00 Plumbing Permit 032001-322-10-00 Sewer ERU 802 412-343-50-01 Sewer Inspection 805 412-343-80-00 Water ERU 712401-343-80-01 Water Meter (SFD) 712401-343-80-01 Water Deposit 740402-389-00-00 Traffic Facilities Charge 420120-344-85-00 Sewer Deposit 742402-389-01-00 State Building Fee 160001-386-00-00 TOTAL FEES Permit No BLD-05-0002-YL Phone 360-493-6002 City' Lacey State WA Zip 98503 Assessor Parcel No 85840007300 Item Fee Base Amt Unit Fee Unit Rate No Units Unit Desc ------------- 1,024 33 99375 3058 5 6000 5 4600 $1,000 66581 000 000 o 0000 o 0000 71 75 000 000 o 0000 o 0000 9000 2000 7000 7 0000 10 0000 Fixture 5,41700 000 5,41700 5,417 0000 1 0000 ERU 14500 000 145 00 145 0000 1 0000 ERU 1,50000 000 1,50000 1,500 0000 1 0000 ERU 300 00 300 00 000 o 0000 o 0000 4000 4000 000 o 0000 o 0000 757 50 000 757 50 750 0000 1 0100 Peak PM Trip 5000 5000 000 o 0000 o 0000 450 450 000 o 0000 o 0000 $10,065.89 Yelm School District ATTN SUSAN CROY PO BOX 476 YELM, I'JA 98597 360-458-1900 Sold to YELM TERRA 16767 YELM TERRA YELM TERRA 4200 6TH AVE SE STE 301 LACEY, ViA 98503 # 5669 16 01(13(05 Reg #1 SalesPerson SUSAN Item # 2900/MITIGATION MITIGATION OR TVF 1 @ 1,711 00 1,711 00 CK #1228 FOR LOT 73 SubTotal 1,711 00 Total Due Check 1 ,711 00 1.711,00 Thank you, PLEASE KEEP THIS RECEIPTI I I o o ... " 0 o o Received DEe 2 0 2004 (I' CITY OF YELM RESIDENTIAL BUILDING PERMIT APPLICATION FORM Project Address r5755 WI+jh.../w'e.. se. Parcel #. Subdivision 'Ie-1M.. -re.v-r.:t- lot #. 73 Zoning, ..:5'i'1j Ic.>~ ~a--"\'\,;I~ X New Construction [J Re-Modell Re-Roof 1 Addition [J Home Occupation Sign ~ Plumbing ~ Mechanical [J Mobile / Manufactured Home Placement [! Other Project Description/Scope of Work: ~!nV\. ~+ i"rJ.bt- "'-<" I.A3 t -gq Lf- sf i'''","_5 j de.t1.,c~e.. Project Value ~ "0 I ()oo..oo /'IOSl)~O Building Area (sq ft) 1st F;oor 'f*5~ /2nd ~Ioor Garage 43(, Basement Carport Patio # Bedrooms~ # Bathrooms 2.. Heating@OTHER or ELECTRIC (Circle One) Are there any environmentally sensitive areas located on the parcel? If yes, a completed environmental checklist must accompany permit application Deck :GENE~J..,C6NIR.~gJQB Sf'!, />;$ i ~ ' ~"-i~,, ADDRESS +WO ~.~ AW ~. ~E f:#: ~ Q I EMAll CITY LtJ..e.ej,J STATE WA ZIP If 3.5'0:3 FAX CONTRACTO~S LICENSE #S"~DiWtDI't-j<lJ;. EXP DATE PlUMBING'COl'-ttRt.CTOJL$~I.l\tMt ~Il H'.k~bifAd TELEPHONE' ;>.{? ' - ~ ADDRESS 5"'627 :.z.t.,~Ln,^,,- 'NiW :J EMAll . CITY(jl~WI.~Ia.... STATE \AlA. ZIP t::fg."f.)~ FAX (360) '$106- 2!f-:3lf- CONTRACTdR'S LICENSE # SiiAPJ.PCr.:7'!&E.EXP DATE CITY'L1CENSE # BUilDING OWNER NAME. 0 u.:.tz.e. ADDRESS 'i0:33Q-' ~';.!:9. ~+. ~F. EMAll CITY 'Ie-1M.. STATE WA ZIP ~g5q7 TELEPHONE ~RCHITECT/ENGfNEER i t2. H,,, ~ f.Ul\t A50RESS";:+2.:oo t,;':iia. Ave... :SE: ! .it :3 61 CITY i-o.L.e.l STATE Wit ZIP &f8SfJ3 ,,~ 2.. . TELEPHONE 2.5"3 "2'1 '!1' - 3-:::'5"0 ADDRESS-I':-.,.. --~-~ . f3, ., 'e,. A EMAll CITY 1>IlCltd\lA...~ STATE 1\ ZIP <{JI,3If'S FAX (.z.S3) '87S-02.SlS CONTRA OR'S ICENSE # SOu..HDttA06"1Bh'\ EXP DATE_CITY L1CENSE# Copy of mitigation agreement with Yelm Community Schools, if applicable I hereby c ify that the above information is correct and that the construction on, and the occupancy and the use of the above scr bed property will be in accordance with the laws, rules and regulations of the State of Washington and the City 0 YelmJ ,... . /d./Vid'/ "_, DatlY t 1 Contractor's Agent (P ease circle one) App cant's Signature Owner 1 Contractor I Owner's Ag All permits are non-transferable an work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days 105 Yelm Avenue West POBox 479 Yelm, WA 98597 (360) 458-3835 (360) 458-3144 FAX www.ci.yelm.wa.us o o ~EIVED ~:::::) l~\ ~ q..o \ \ c.z.. \0~_ ~-~p ~~~ ~; YELM I POBox 479 "') 4 2 8 8 I E~.~.,o. Y~I~_~~_~~gj7 RECEIPT No .) I I I I ! i I I REF NO I I I I I I i I I I I ****THIRTY FIVE DOLLARS & 00 CENTS RECEIVED FROM DATE REC. NO AMOUNT SCA DESIGN/BUILD 4220 6TH AVE SEt SUITE 301 LACEY WA 98503 12/20/04 34288 35.00 CASH 360 493 6002 MISCELLANEOUS RECEIPT JANINE APPLICATION SCA DESIGN "~ Page 1 ---v- Residential Heat loss and Heat Gain Calculation 12/16/2004 -~_. ---. -~.---,_. -~.~. "-- .~,.. --- ---- .--. --- -- ---.. - ~-- In accordance with ACCA Manual J Report Prepared By' Sound Heating & Air Conditioning For' sca yelm tarra lot 74 yelm wa Design Conditions. Tacoma-McChord Indoor- Summer temperature 68 Winter temperature 75 Relative humidity" 55 Received DEe 2 0 2004 Outdoor' Summer temperature. 82 Winter temperature. 24 Summer grains of moisture 66 Daily temperature range Medium Main Floor 17,161 AfI Rooms 1,458 sqJt 17,161 Infiltration 1,540 - Tightness: Best; Winter ACH 0, Summer ACH. 0 Duct 817 - Supply above 120; Exposed to outdoor ambient; R-8 People 3 900 Miscellaneous 1 200 Fireplace 0 - Best - combustion air from outdoors, glass doors, damper Floor 1 458 sq.ft. 459 - Over garage or open crawl space, Carpeted' R-30 (8 - 9 inch) NWall 1615 sq.ft. 156 - Wood frame, with sheathing, siding or brick; R-19 5 1/2 in. Window 57 sq. ft. 1,015 - Double pane, Vinyl frame, Low emittance - No inside shadmg, Coating' None (clear glass), No outside shading Door 20 sq.ft. 165 0 - Metal; Polystyrene, No storm E Wall 359 sq.ft. 348 0 348 - Wood frame, with sheathing, siding or brick; R-19 51/2 in , R-1 8 1/2 in. Bead board Window 64 sq.ft. 4019 0 4,019 - Double pane, Vinyl frame, Low emittance - No inside shading Coating: None (clear glass); No outside shading. Door 18 sq.ft. 149 0 Building Component Sensible Gain (BTUH) Whole House 1 ,458 sq ft. 17 , 161 Latent Gain (BTUH) 1,438 1,438 1,438 748 o 690 o o o Total Heat Gain (BTUH) 18,599 ( 1.5 tons) ._--_._.~ --~. 18,599 18,599 2,288 817 1,590 1,200 o 459 o 156 R-1 8 ~/2 in. Bead board o 1,015 165 149 FilE COpy Eod 2199SESES21 ~I-J I HnHal-JnOS Total Heat Loss (BTUH) 19,084 19.084 19 084 5,610 909 o o 1,227 2.603 453 945 479 1,007 1 061 431 dSS 10 VO 91 oaa Page 2 sea yelm tarra 12/16/2004 Building Component Sensible Gain (BTUH) Latent Gain (BTUH) Total Heat Gain (BTUH) Total Heat Loss (BTUH) - Metal; Polystyrene; No storm S Wall 258 sq.ft. 250 0 250 724 - Wood frame, with sheathing, siding or brick, R-19 5 1/2 in , R-1 8 1/2 in. Bead board Window 53 sq. ft. 1,632 0 1,632 878 - Double pane, Vinyl frame Low emittance - No inside shading, Coating' None (clear glass), No outside shading. Glassdoor 40 sq.ft. 1,232 0 1,232 698 - French doors, Double pane, Wood or vinyl frame, Low emittance - No inside shading, Coating None (clear glass), No outside shading. W Wall 468 sq ft. 453 0 453 1,313 - Wood frame, with sheathing, siding or brick; R-19 51/2 in, R-1 8 1/2 in Bead board Window 45 sq.ft. 2,826 0 2,826 746 - Double pane, Vinyl frame, Low emittance - No inside shading; Coating None (clear glass); No outside shading. Whole House 1,458 sq.ft. 17,161 1,438 18,599 (1.5 tons) 19,084 HV AC-Calc Residential 4 0 by HV AC Computer Systems Ltd. LQa{j calculations are fr.;ltirllat~ only actual loads may 'Ii'Jry dl1e to weather and construction dlffomnces 888736-1101 v'd 2199SESES21 ~I-J I l.l:J3HQl-JnOS dSS:10 VO 91 OQQ .. General Notes. STRUCTURAL NOTES These structural notes supplement the drawings. Any discrepancy found among the drawings, these notes, and the site conditions shall be reported to the Engineer, who shall correct such discrepancy in writing Any work done by the Contractor after discovery of such discrepancy shall be done at the Contractor's risk. The Contractor shall verify and coordinate the dimensions among all drawings prior to proceeding with any work or fabrication. The Contractor shall coordinate between the architectural drawings and the structural drawings. The architectural dimensions are taken to be correct when in conflict with the structural drawings. The Contractor is responsible for all bracing and shoring during construction. All construction shall conform to the applicable portions of the latest edition of the International Building Code except where noted Desian Criteria. Live Load 2 Dead Load 3 Partition 4 Wind 5 Earthquake Site Class Design Cat. Use Group R Cd 00 6 Soil Concrete & ReinforcinQ Steel. = 40 PSF (Floors) = 25 PSF (Snow) = 15 PSF (Roof) = 12 PSF (Floor) = 150 PCF (Concrete) = 10 PSF (Floors) = 2003 IBC Exposure B @ 85 mph = 2003 IBe = D = D = I = 65 = 4 = 3 = 1500 PSF, Assumed bearing capacity 1 All concrete work shall be per the 2003 IBC Chapter 19 Tolerances shall be per IBC Chapter 19, Section 07 Mixing, placement, and inspection shall be per Sections 03,04, OS, and 06 2 All reinforcing shall be ASTM A615 Grade 60 except as shown on the plans 3 Concrete shall be in accordance with ASTM 150 fc = 2500 PSI @ 28 day slump = 4" maximum, 6% Air entrained Steel: 1 Anchor bolts shall be ASTM A307 Caroentrv: 1 2X structural framing shall be #2 Douglas Fir .. 2. 4x structural members shall be #2 Douglas Fir 3 6X members shall be #1 Douglas Fir 4 2X joists shall be kiln dried and stored in a dry area prior to installation 5 Floor trusses shall be by Boise Cascade or other approved manufacturer Roof trusses shall be by a preapproved manufacturer and constructed according to the specifications of the Truss Plate Institute Truss manufactures are responsible for all bracing of the trusses including end wall bracing and all other bracing between the building and the trusses unless specifically shown otherwise on the drawings 6 Glue laminated beams shall be 24F-V8 for cantilevered or continuous beams and 24F-V4 for simple spans. (Fb = 2,400 PSI) (Fv = 190 PSI) (E = 1,800,000 PSI) (FcL = 650 PSI) 7 Continuous and cantilevered glue laminated beams shall not be cambered All other glue laminated beams shall be cantilevered for U480 See the framing plans for any exceptions 8 Floor sheathing shall be nailed 6" 0 c edges and 10" field with 1 Od's and roof sheathing shall be nailed 6" 0 c edges and 12" 0 c field with 8d's unless otherwise noted on the drawings. Hardware. All connection hardware shall be Simpson "Strong Tie" Connection hardware exposed to the weather or soil shall be treated as in steel above CAUTION. PLACE TRUSSES PER MANUFACTURER'S RECOMMENDATIONS BRACE PER RECOMMENDATIONS CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND ALL ELEVATIONS ~ TYP/("'AL .\'HEAR WALL NOTE.\' Use 1/2" dIa. by 10" Anchor Bolts (AB's) wIth single plates and 1/2" dIa. by 12" AB's WIth double and 3x plates spaced as shown on the drawings AB's shall have 7" of embedment Into footing, shall be centered In the stud wall, and shall project through the bottom plate of the wall and have a 2x2x3/16 plate washer All wall sheathmg shall be 1/2" CDX plywood, 5/8" T1-11 SIding, or 7/16" OSB WIth extenor exposure glue and span rated "SR 24/0" or better All free sheathmg edges shall be blocked with 2x4 or 2x6 flat blockmg except where noted on the drawings or below All naIls shall be 8d or 10d common (8d common naIls must be 0 131 mch dIameter, Senco KC27 Nalls are eqUIvalent. If 10d common nails are called for the diameter must be 0 148 Inches, Senco MD23 Nails are eqUIvalent) Nail sIze and spacing at all sheathing edges shall be as reql\1red below or as m the draWings. Nail spacings shall be 12" 0 c for all field nalltng except as noted Hold downs are SImpson "Strong Tie" and shall be 1I1stalled per the manufacture's recommendatIon. EqUIvalent hold downs by Umted Steel Products Company "Kant-Sag" that have lCBO approval can be substItuted m place of SImpson hold downs All floor systems must be blocked sohd below member that the hold down IS attached to ThIS block should be equal to or larger than the member the hold down IS attached to and be placed as a "squash block" All double and tnple studs shall glued and nailed together WIth I Od's at 3" 0 c for each layer All 4x studs are to be #2 DF and all 6x studs are to be #] DF when used for hold downs and shear walls ALL WALL AND ROOF FRAMING LUMBER SHALL BE DOUG-FIR #2 OR BETTER. NOlE MST STRAPS attaches to (2) 2x or 4x studs In wall above and below unless noted otherwIse Nail all holes WIth ] 6d smkers SHEAR WALL SCHEDULE 6 sheathmg natled WIth 8d's at 6" on center all edges L~ sheathmg nailed WIth 8d's at 4" on center all edges and 4x or 6x studs at panel edges HOLD DOWN SCHEDULE @ PHD2 attaches to concrete foundatIon WIth a 5/8" dJa bolt WIth 15" mlmmum embedment Into concrete PHD2 attaches to double 2x studs or 4x or 6x stud WIth (10) SImpson SDS 1/4 X 3 Wood Screws 111 wall above (, ~. LJ ,'1 I U 'I I U 'I U " U ,., u ,., U 'l L.J 'l U 'l L.J 'l U 'l LJ 'I U 'l L.J 'l LJ 'l U 'I U 'I U ,., '-----.! STRUCTURAL CALCULATION For SCA Design Build For Lutzehiser Residential Lateral and Vertical Design Project # 2004193 November 8, 2004 Precise Engineering Inc. 102 Otto Rd * Centralia, WA 98531 (360) 736-1137 * Fax (360) 807-8893 e-mail: precise@localaccess.com n u 1/ u n L.J 'I u n STRUCTURAL CALCULATIONS For SeA DesIgn BUIld For Loutzehlser ResIdentIal Lateral and VertIcal DesIgn Job# 2004193 November 8, 2004 L.J II u II u n u 'I u II u n u By PRECISE ENGINEERING INC II u HAROLD HAHNENKRA 1'1', P.E 'I U 'I LJ II u n LJ n , -.J "I J l J n u n SCOPE ProvIde stnlctural calculatIOns for lateral and vertIcal desIgn of slllgle family resIdence Wall 2x6 Studs @ 16"oc Dead Load = 1 Opsf Floor' I JOIStS at 16"oc Dead Load = 12psf Part. Load = lOpsf LIve Load = 40psf u n LJ LOADS AND MATERIALS 'I Roof: u 'I u 'I LJ (I u II LJ II LJ Wind n u SeIsmIc n u 'I u Soli II LJ Lumber (I LJ Concrete n u '1 J n I L.J n I L.J n J Comp Roofing (2 layers) Pre-engmeered Trusses @ 24" oc Roof Sheathmg InsulatIon 5/8" GWB Misc 5 Opsf 2 9psf 1 5psf I 2psf 2 8psf UQ~f 149>>] 5psf 25psf Dead Load = Snow Load = 85 MPH Exp B SIte Class DeSIgn Category Use Group R Cd Do = D D I 6 5,2.2 4 3 1500psf Allowable Beanng (Assumed) 2x > 4x 6x> GLB = #2DF #lDF 24f-v4 for sImple span 24f-v8 for cont. and cantilever 2500pSl Grade 60 fc Rebar II u n u n LATERAL DESIGN LJ n Wind Loading: Simplified (IBC 1609 6) LJ Ps = 1\ IwPs30 n u 1\= 1= ps30 = 1 1 10 (Roof) 12.4 (Wall) II u n P - s- 10 (Roof) 12.4 (Wall) I LJ n u Loutzehiser Date and Time 11/8/2004 7 43 56 AM n LJ MCE Parameters - Conterminous 48 States Zip Code - 98597 Central Latitude = 46861391 Central Longitude = -122 521453 MCE MAP VALUES Short Period Map Value - Ss = 115 6% g 1 0 sec Period Map Value - S1 = 35 1 % g RESIDENTIAL DESIGN INFORMATION Short Period Map Value - Ss = 1156% g Soil Factor for Site Class 0 - Fa = 1 04 Residential Site Value = 2/3 x Fax Ss = 80 0% g Residential Seismic Design Category = 01 n LJ n LJ n LJ n LJ Seismic Loading: Simplified (IBC 1617.5) n V = (1 2S05/1 4 R )Wt. LJ II u Sos R= R= 08 6 5 (Wood Shear Wall) 25 (Cantilever Column) II I U n I v= v= 0.105 WI. 0274 WI. (Wood Shear Wall) (Cantilever Column) u n J n J n PRECISE ENGINEERING, INC. Centra1ia, W A 98531 (360) 520-1262 FAX (360) 736-1789 Job' _____________._._.._ u Date' By' n Sheet. Page _of u L:/-Oy 6:~ L. p?:" f / 6- ;~ ~ n u '1 LJ c( '1) ~) (~ ) '1 n .--...---------. .-.---..---.1 _.._{~ -'-'-([3) u n u n ~~~___J.-.----I LJ n L.J n L.J L_...._.....__ ...... n LJ .{ c. ) '- . n u 0::> I~ T"" 7>/4>->A~..A r,,-A....,/ n /- 'L.. (5+ t) /2. t-I --' '" & - ~ /:; r_~\ It.. 1-/ ,- / I) ~ 1.:- .- f ~(J oj... r;: ~ ? --~ -C('~Jf? r- /6 ;.",j >-. "L",. "2. L J "'-. u n )<, 7 /' p) LJ K \..<2 :;__7' 2_'7 L_ "7 /> c;;"" <___ n LJ n LJ - "'- - /-\ '~.1,. ':>Lp,) + ~LJ ~.,~ / y.\. <..1 ~-1' -1:',J I C. ~ ~ fly<< :: /</1...6 '-I.. --:;.' ]-{. '-. y. s:~ 0 V5'p n __'7 ~/ /=~ . '79/.)' I LJ n u n LJ -- ~- ----- -~-~ ~------- ----- -~--~--- -------------- n LJ n PRECISE ENGINEERING, INC. CentraJia, W A 98531 (360) 520-1262 FAX (360) 736-1789 Job' LJ Date:____ _By n Sheet Page _of L.J n S-i~.f --vv/ J_.._ LJ 'I L.J L./ 1-/ Q~ ~ / 1/; n , ..- /C)- I P~-) '-j ~ ))-- .- ? -z.. /' 1.jP - . ~23 J:)6 L.J n I.t,./,..t'~ /___-6 (>/'t 5.<;) 'L X- '/"' -' ,-' ~;;")6' \) 2/// u -"""2-" ,j -J _::0." n u y~ (; .-:./ / _<::- (/// ~ J J\~) n u 4.-> /./\....>./:-::,. "'::'" t- ..--,.--/.- '~'-::7 l:~ ) ~....,.~... /;... ..,:' J n u n LJ n LJ n u r[ LJ n LJ n LJ n LJ n U n u n LJ L J C. J C. ~ CJ C J C J C- J C J C J C J C J L ~ precise E.ngineering, Inc ~ 02 otto Road centralia, WA. 953~ Label Level Loading Width Length snearV snearv Moment T::C Nailing Requirement (plf) (ft) (ft) (lbs) (plf) (ft-IbS) (lbS) ~-2 roof ~ ~ ~ 6 200 2~ 3 ~ ~ ~6 0 52.3 5580 0 2M6 8d@6 cap::HO 2-3 roof ~~; 6 10 ~5 0 3906 26.0 6836 456 8d@6 cap::; 10 3-4 roof ~69 6 280 4~ 0 23144 519 ; 6620 8 4054 8d@6 cap::~10 A-B roof 996 50 ~4 0 2490 H8 3~1 3 22.2 M@6 cap:::~10 B-C roof ~42.6 520 ~3 3 3107 6 278 ~ 4M 98 8 36158 blOCK Mat 4 for ~ 2' cap:: 360 L_~ L. J L. J L J L J L J L J [J [ J [ J [ J L J l J l J L J L J L J L j L j LOAD TO LINES Roof Level Line # ~ ~ t ~ i Total ~l '~i B Sub Total Total ~ ! 1 ,1 0 Q 'j \\ :1 ~ 0 0 1 1116 J t ! ~ 1 1116 J I l i ~ 0 1116 i I ~ ~,~ 0 i j1 :j ~ ~ 0 0 2 1116 ~ 391 I 1 ~ ~ 1507 )j ~ ~ ;! ~ 0 1507 ~ J ~ 1 ~ 0 ~ ~ ~ j ~ 0 0 3 ~ 391 I 2375 1l ~ 2766 j ;1 ~ 1 ~ 0 2766 ,~ ~ :1 'I 4 0 ~., j ~,',~ 0 0 ';J ,,1 !I 'j ;'J l j ,,\ ~ 4 ~ ~ 2375 ~ ,1 , 2375 ~ i '~ il 1 0 2375 ~ ~ ;lj ,I SUM 7764 :} :j j ~ J 0 7764 ] .~ 1 l 1 0 i ~:j ~ 1 0 0 A 2491 ~ 1 ~l 2491 1 j 11 0 249 1'1 j J 0 "'J" ,J 0 0 ~ ~ 1 , , .~ ~ 1 I ! B 249 :] 3708 ~ ~ : i 3957 11 1! j 0 3957 '1 ,1 j " 1 0 " j ; . l 0 0 l ~ ~ ~ j i 1 1 1 ~ C :1 3708 1 j i 3708 1 i J 1 i 0 3708 .1 j '1 Sum 7914 1 I ii 0 7914 .,1 '0:' , 0 0 J;l i J ~ I -j ~ L J L_J c ] LJ &, Lh. C J t~~t qA- ~ <1 C J [_J l. {, -;) ~~11 [ ] [ ] [ J [ J [ J [ ] [_J [ ] [ ] [ ] [ ] [ ] Anchor Bolt Capacity 112" Dia. 2x Sill = 912 'X- 5/8" Dia. 2x Sill = 1328 / 112" Dia. 3x Sill = 1120 5/8" Cia. 3x Sill 1664 Plate Hei 1 st Floor Wall Hei ht = 2nd Floor Wall Hei ht = 3rd Floor Wall Height = JOB' Date Sheet By' Page Of SHEAR WALLS Wall Lev V Walls Avaiiiable Total v Wall I AB Uplift Wall Wt Net Total Holdown 1 2 3 4 5 Wall Type Spac. Sect Down Uplift Uplift I ~ II/IL LI, >- t.~- it'>' -.,,{' 72- I Iu-p S''/-b. / 7 Lh.s ;p -~/ ]> ;vi.;, /\/::: I)..,,' ~..i- I - 1- 77::- ;.:: 0 ..., ;: I h 2.~7 I 4Y 2.~9 ,? /> L.. /-7")) --rc J rnt1 7 'J-b& '-I /1.1) I I li." U- 7L~ I '7P ;> ./ (--p y /t......../A tJid /dJ% A I I , / I I 'i /;>1) ~'?)~ 4f 'h.ts k/ (' ::::,.../ ?,y 9P ) V)) ;> 9/ 1/"> ..}-' /0 ifv 't' Y '-J / '-'"'r('~ - I~ . /\/f, ~.::..;- I I I I I I I I I I , I I I I ~ et ? to! ~ ~."\ I I I -~ ~- i ILrc? p.~ 'L Is..[-I.A:>o~ I I?~ /V:t:i:. L. -;J2 ::::;;- ~ i I I , I I I I I ? I~-v ~95f 21 I I , I~/ J.6P / 17-',? V.s>7 ~I IJ ~ 'i I Y/::.-I/V,{<f\~o t- /~~ I ! , I i I I i I I C Tt~ ~)vi 2. 3j~ ]); I 9 ~-- 29'~ <.....--' IS 2- I (> / 2..2- I 1/~WA ! I I I I , I I i I I ! ! I I 1 I I I I I I i i I I I I I I I , I I I I I I I I I I I , I i ! I I I I , I I I I i , I I ! I ! I ! I ! , I I I i I i I I I I I I I ! I I I , I ! I I I I , ! I I I I I I I I I I I I I I i I ! ! I I ~\. n LJ Level n u n LJ 11 LJ n u n LJ n LJ (I LJ n u n u (I u n u n LJ (I LJ (I u (I LJ n u n u 11 i LJ --;, ---- //<:.J>/->..L/ Location '\r=A~ if1i _~A~Ek__'d Span # LDF / /J- Della ..}. 'C) "- :r C ~ ~ ,. Y'-'- __~=-___ji~ .__.. _._..__.____ 2..'"2- 2.:~ )I 9./ . /,"1- J ~ ~ 9. ~ Location /-/1..-../ 6:s ../../.:!J- 240- ~2. X fj SI., -:; :-1 (.-/ -=-_._______________.__ //9 ..JYJ' /p-P ~~ 5.->( ~/-/ Localion fbp'):b,..~ 9 Load S I A R Size Span LDF Delta Load S I A R Size Span Vertical Design LDF /../-.\- Della Load S I A R Size Location Span LDF Della Load S I A R Size ~~ 13<~~ 0'/0..-'- ).6. t) "2J/.1 21 ~.(> 2..~"t /~<,.- <r?X .5'- ~'- V/2-~A/ :e.~_____ -r~7::>- ,/... / J -- 2-J.--ih ) ~'ff.-t' -S~ ~, -> Zl"-______ ~5 .) ~/~ (~6 6,A .6. . L-- "~ I .~__tt. >:?!. .~._~:_'_.._ 6.~> 6-~ lLJ> 6-.~ 'I LJ Level 'I LJ 'I LJ 'I u n LJ 'l LJ n u II LJ 'I u 'I u 'I ~ n u 'I u 'I LJ 'I u n LJ n u 11 LJ 'I I L.J ;e:r Location Span LDF Della Load A' ,--.-",- AA .-.. j Lf L_." ~J- //-' 2.Ytl 2..:;"1' Vertical DeSign -r~ \ ,; I J-'L Lj9 r J LrJ . .__~_-- ~>b 9 f-- f~ J.) L ~ 4.-1 (7 < <~ ~ IJ /J '7 L't 7 /- ..'l L-l: /' :t.f.;t;c') _ (.;- --- S 4-"J I 1'/6 A LP R 7-; Size S;(4j ~ 7. '-. Location r ~.u..; Span .:.s;' I.j- " .;:) I A R Size ,r-';// ('" I -::) /~ ""....? /2-I:>'~ !-.- _..-........ . .,d..".... .'._..... .. .."..... .._.~_ ."J. ._....~.... "_.~ -./ "il.... .~ (-/..:_! b LOF Delta Load S I A R Size Location Span LOF Della Load S I A R Size Location Span LDF Delta Load ./../ 6' )<:...J/ ~ 7"l7k :')J ~ //'..r-' C~ -./ ) j '-It- ;d 2../ i) ______._______~_ 9-1/ /2..) )-.t tv ~~Y I ~)77L-?.J.j , '---'---"--"" ~ /Y"-; &'" ~ 4';/ /,.A~l~ 6X.r .-y .>< cP IIliI II BOISE'. u BC CALC@ 9 DESIGN REPORT - US Tuesday, November 09, 2004 08"19 II Single 9 1/2" BCI@ 400-1.9 OF I Job Name: U Address: City, State, Zip: , II Customer" Code reports: ICC ESR (Pending) File Name: BC CALC Project J02 Description: Specifier" Designer' Company" Misc" u II LJ n LJ BO, 1_3/4" II LL 423 100 DL 73 100 LJ n General Data I Version: US Imperial LJ Member Type: Joist n Number of Spans: 2 Left Cantilever' No U Right Cantilever' No II Slope: OC Spacing: 16" U Repetitive: Yes Construction Type: Glued 14-06-00 ...... 14-06-00 B1,3-1/2" LL 1208 Ibs DL 242 Ibs B2, 1-3/4" LL 423 Ibs DL 73100 Total of Horizontal Design Spans = 29-00-00 n Disclosure J The completeness and accuracy of the input must be verified by anyone who would rely on the output as II evidence of suitability for a I particular application. The output L.J above is based upon building code-accepted design properties n and analysis methods. Installation of BOISE engineered wood LJ products must be in accordance with the current Installation Guide and the applicable building codes. n To obtain an Installation Guide or if ~ you have any questions, please call (800)232-0788 before beginning product installation. II I BC CALC@, BC FRAMER@, BCI@, U BC RIM BOARDTM, BC OSB RIM BOARDTM, BOISE GLULAMTM, n VERSA-LAM@, VERSA-RIM@, VERSA-RIM PLUS@, LJ VERSA-STRAND TM, VERSA-STUD@, ALLJOIST@ and AJS ™ are trademarks of n Boise Cascade Corporation. U II u II u Page 1 of 1 n u Load Summary 10 Description Load Type Ref Start End Type Value OCS Our 1 Standard Load Unf Area Left 00-00-00 29-00-00 Live 40 psf 16" 100% Dead 10 psf 16" 90% 2 Partition Load Left 00-00-00 29-00-00 Live 33 plf 16" 100% Controls Summary Control Type Value % Allowable Duration Load Case Span Location Pos. Moment 1534 ft-Ibs 62.1% 100% 15 2 - Internal Neg. Moment -2103 ft-Ibs 85.1% 100% 1 1 - Right End Reaction 490 Ibs 51.5% 100% 13 1 - Left Int. Reaction 1427 Ibs 696% 100% 1 1 - Right Cant. Shear 7131bs 51.9% 100% 1 1 - Right Total Load Defl. U57? (0.302") 62.4% 15 2 Live Load Defl. U654 (0.266") 734% 13 1 Total Neg. Defl. -0.084" 16.8% 13 2 Max Defl. 0.302" 30.2% 15 2 Span I Depth 18.3 n/a 1 Notes Design meets User specified (L/360) Total load deflection criteria. Design meets User specified (U480) Live load deflection criteria. Design meets arbitrary (1 ") Maximum load deflection criteria. Minimum bearing length for BO is 1-3/4" Minimum bearing length for B1 is 3-112" Minimum bearing length for B2 is 1-3/4" EnteredlDisplayed Horizontal Span Length(s) = Clear Span'" 1/2 min end bearing'" 1/2 intermediate bearing n LJ n TYPICAL SHEAR WALL NOTES LJ u Use 1/2" dla. by 10" Anchor Bolts (AB's) wIth smgle plates and 1/2" dia. by 12" AB's wIth double and 3x plates spaced as shown on the drawmgs AB's shall have 7" of embedment into footmg, shall be centered m the stud wall, and shall project through the bottom plate of the wall and have a 2x2x3/16 plate washer " n u All wall sheathmg shall be 1/2" CDX plywood, 5/8" Tl-ll sldmg, or 7/16" OSB WIth extenor exposure glue and span rated "SR 24/0" or better All fi-ee sheathmg edges shall be blocked WIth 2x4 or 2x6 flat blockmg except where noted on the drawmgs or below n u Jl All naIls shall be 8d or lOd common (8d common natls must be 0 131 mch dIameter, Senco KC27 Nalls are eqUIvalent. If 10d common naIls are called for the diameter must be 0 148 mches, Senco M023 Nalls are eqUIvalent) Nail SIze and spacmg at all sheathmg edges shall be as reqUIred below or as m the drawmgs. Natl spacmgs shall be 12" 0 c for all field nailmg except as noted II I LJ u Hold downs are SImpson "Strong Tie" and shall be mstalled per the manufacture's recommendatton. EqUIvalent hold downs by Umted Steel Products Company "Kant-Sag" that have ICBO approval can be substItuted m place of SImpson hold downs. All floor systems must be blocked sohd below member that the hold down IS attached to This block should be equal to or larger than the member the hold down IS attached to and be placed as a "squash block" n u n u n I U All double and tnple studs shall glued and nailed together WIth 10d's at 3" 0 c for each layer All 4x studs are to be #2 DF and all 6x studs are to be # 1 DF when used for hold downs and shear walls n ALL WALL AND ROOF FRAMING LUMBER SHALL BE DOUG-FIR #2 OR BETTER. , LJ NOTE. MST STRAPS attaches to (2) 2x or 4x studs m wall above and below unless noted otherwIse NaIl all holes WIth I6d smkers n LJ SHEAR WALL SCHEDULE n LJ u 6" sheathmg nailed WIth 8d's at 6" on center all edges L~ sheathmg nailed WIth 8d's at 4" on center all edges and 4x or 6x studs at panel edges n n u HOLD DOWN SCHEDULE n LJ @ PHD2 attaches to concrete foundatIOn WIth a 5/8" dla bolt WIth 15" m\JlImum embedment mto concrete PHD2 attaches to double 2x studs or 4x or 6x stud WIth (10) Simpson SDS 1/4 X 3 Wood Screws m wall above n u (I LJ ''I I U n u n u n STRUCTURAL NOTES u '1 L.J General Notes. Ii These structural notes supplement the drawings Any discrepancy found among the drawings, these notes, and the site conditions shall be reported to the Engineer, who shall correct such discrepancy in writing Any work done by the Contractor after discovery of such discrepancy shall be done at the Contractor's risk. LJ The Contractor shall verify and coordinate the dimensions among all drawings prior to proceeding with any work or fabrication. The Contractor shall coordinate between the architectural drawings and the structural drawings. The architectural dimensions are taken to be correct when in conflict with the structural drawings. The Contractor is responsible for all bracing and shoring during construction n I LJ n J All construction shall conform to the applicable portions of the latest edition of the International Building Code except where noted u Desicm Criteria. 1 Live Load = 40 PSF (Floors) = 25 PSF (Snow) 2. Dead Load = 15 PSF (Roof) = 12 PSF (Floor) = 150 PCF (Concrete) 3 Partition = 10 PSF (Floors) 4 Wind = 2003 IBC Exposure B @ 85 mph 5 Earthquake = 2003 IBG Site Class = D Design Cat. = D Use Group = I R = 6.5 Cd = 4 00 = 3 6 Soil = 1500 PSF, Assumed bearing capacity Concrete & Reinforcina Steel: n LJ n u II n u n u n u 1 All concrete work shall be per the 2003 IBC Chapter 19 Tolerances shall be per IBC Chapter 19, Section 07 Mixing, placement, and inspection shall be per Sections 03, 04, 05, and 06 All reinforcing shall be ASTM A615 Grade 60 except as shown on the plans Concrete shall be in accordance with ASTM 150 fc = 2500 PSI @ 28 day slump = 4" maximum, 6% Air entrained Ii I U 2. II 3 u n Steel: u 1 Anchor bolts shall be ASTM A307 n u Carpentry: n 1 2X structural framing shall be #2 Douglas Fir LJ n L.J II u II u 2. 4x structural members shall be #2 Douglas Fir II 3 6X members shall be #1 Douglas Fir LJ 4 2X joists shall be kiln dried and stored in a dry area prior to installation II 5 Floor trusses shall be by Boise Cascade or other approved manufacturer Roof trusses shall be by a preapproved manufacturer and constructed according to the specifications of the Truss Plate Institute L.J II u Truss manufactures are responsible for all bracing of the trusses including end wall bracing and all other bracing between the building and the trusses unless specifically shown otherwise on the drawings II u 6 Glue laminated beams shall be 24F-V8 for cantilevered or continuous beams and 24F-V4 for simple spans. II u (Fb = 2,400 PSI) (Fv = 190 PSI) (E = 1,800,000 PSI) (FcL = 650 PSI) II u 7 Continuous and cantilevered glue laminated beams shall not be cambered All other glue laminated beams shall be cantilevered for U480 See the framing plans for any exceptions. n LJ 8 Floor sheathing shall be nailed 6" 0 c. edges and 10" field with 1 Od's and roof sheathing shall be nailed 6" 0 c edges and 12" 0 c field with 8d's unless otherwise noted on the drawings II u Hardware. II All connection hardware shall be Simpson "Strong Tie" Connection hardware exposed to the weather or soil shall be treated as in steel above LJ II CAUTION: u PLACE TRUSSES PER MANUFACTURER'S RECOMMENDATIONS BRACE PER RECOMMENDATIONS n CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND ALL ELEVATIONS u II u II u II LJ II u II LJ II w