561 UDC Fee Schedule UpdatedCITY OF YELM
RESOLUTION NUMBER 561
YELM DEVELOPMENT FEE SCHEDULE
WHEREAS, City of Yelm Ordinance 429 provides for the setting of fees for the
Community Development Department by resolution of the City Council, and
WHEREAS, the City of Yelm has adopted Resolution 358 Yelm Development Fee
Schedule; and
WHEREAS, the City of Yelm has adopted Resolution 447 Building Permit and Plan
Review Fees; and
WHEREAS, the creation of the Unified Development Code Title 18 YMC removed
fee amounts from certain application processes and references the development fee
schedule adopted by the Council; and
WHEREAS, the Unified Development Code Title 18 YMC includes Chapters 18.22
through 18.26 adopting the International Fire, Building, Residential, and Mechanical
Codes, the Uniform Plumbing Code, and the International Energy Codes Commercial
and Residential; and
WHEREAS, these fees must be added to the adopted Development Fee Schedule;
and
WHEREAS, it is the Council's desire to keep development fees commensurate with
the level of review the permit requires;
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Yelm to adopt
the Yelm Development Fee Schedule as shown in Exhibit A.
APPROVED this 13th day of October, 2015.
Ron Harding',
ATTEST:
JA(� I
%nine Schnepf, City Clerk
Res 561 10/13/15
EXHIBIT A
YELM DEVELOPMENT FEE SCHEDULE
Ministerial Actions
Construction Permits...............................................................
See Table A
Right of Way Permit................................................................
$125.00
Certificate of Appropriateness.................................................
$125.00
Civil Plan Review....................................................................
$250.00 + consultant costs
Ministerial Site Plan Review ....................................................
$250.00
Boundary Line Adjustment......................................................
$250.00
Home Occupation Permits ......................................................
$125.00
Final Subdivisions, Administrative Subdivisions . ....................$250.00
+ consultant costs
and binding site plans
Final Short Subdivisions.........................................................
$125.00 + consultant costs
SignPermits...........................................................................$125.00
Street Tree Permit..................................................................
$125.00
Administrative Actions
Administrative Site Plan Review.............................................$750.00
ShortSubdivision.................................................................... $750.00
Administrative Subdivision ......................................................$750.00
Subdivision Alteration or Amendment.....................................$375.00
Administrative Variance.......................................................... $375.00
Quasi Judicial Actions
Hearing Request—Administrative Subdivision .......................$1,250.00**
Preliminary Subdivision...........................................................$2,000.00
SpecialUse............................................................................. $2,000.00
BindingSite Plan.................................................................... $2,000.00
Planned Residential Development .......................................... $375.00
Mixed Use Development......................................................... $375.00
Variance.................................................................................. $2,000.00
Critical Area Exception............................................................ $2,000.00
Leaislative Actions
Amendment of Unified Development Code ............................. $750.00
Conceptual Master Planned Development .............................. $5,000.00 +staff &
consultant costs
Final Master Planned Development........................................$5,000.00 00 +staff &
consultant costs
Yelm Historical Register Listing .............................................. $125.00
Removal from Yelm Historical Register ..................................$125.00
Comprehensive Plan Amendment .......................................... $21000.00
Appeals
Appeal to Hearing Examiner ...................................................$1,250.00**
Appeal to City Council............................................................. $500.00**
Other
State Environmental Policy Act Threshold Determination....... $150.00
Environmental Impact Statement ............................................ Staff and consultant costs
Critical Area Report Review ....................................................$125.00 +consultant costs
Traffic Impact Analysis(TIA)................................................... Staff and consultant costs
Notice of Intent to Commence Annexation .............................. $350.00
Petition of Annexation............................................................. $900.00
Right of Way Vacation, Subdivision, or Easement ..................$750.00
Wireless Communication Facilities Technical ......................... $500.00 +consultant costs
Document Review
Multiple applications submitted concurrently, excluding Environmental, TIA, and
Annexations, are charged one fee based on the highest permit fee.
"Consultant costs" means any outside consultation expenses which the City reasonably
determines are necessary to adequately review and analyze the application.
"Staff costs" means the actual costs of City staff time and resources.
"Waiver of appeal fee
The city council may waive the fee required for filing an appeal when the appellant can:
a. Show that the appeal fee will create a financial hardship; or
b. Show that the appeal fee is a barrier to public fairness; or
c. Show overriding public interest, health or safety; or
d. The appellant is a nonprofit corporation registered with the State of Washington,
and demonstrates to the City Council that the appeal fee would impact the ability
to forward the corporations mission to serve the community of Yelm.
The appellant shall apply for the waiver at the same time as the appeal is filed.
Appellant shall provide documentation to the satisfaction of the City Council that the
appeal fee should be waived.
Refund of appeal fee
The Hearing Examiner may refund a portion of or the entire appeal fee if a finding is
made that the original decision was based on unreasonable grounds or without proper
consideration of circumstances.
Refund of Hearing Request —Administrative Subdivision Fee
The Hearing Examiner may refund a portion of or the entire hearing request fee when
the applicant can:
a. Show that the fee will create a financial hardship; or
b. Show that the appeal fee is a barrier to public fairness; or
c. Show overriding public interest, health or safety; or
d. The appellant is a nonprofit corporation registered with the State of Washington,
and demonstrates to the Hearing Examiner that the fee would impact the ability
to forward the corporations mission to serve the community of Yelm.
Table A
Buildina Permit and Plan Review Fppc
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 and
$3.05 for each additional $100.00 or
fraction thereof, to and including
$2,000.00.
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 and
$14.00 for each additional $1,000.00
or fraction thereof, to and including
$25,000.00.
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 and
$10.10 for each additional $1,000.00
or fraction thereof, to and including
$50,000.00.
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 and
$7.00 for each additional $1,000.00
or fraction thereof, to and including
$100,000.00.
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 and
$5.60 for each additional $1,000.00
or fraction thereof, to and including
$500,000.00.
$500,000.00 to $1,000,000.00
$3,233.75 for the first $500,000.00
and $4.75 for each additional
$1,000.00 or fraction thereof, to and
including $1,000,000.00.
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00
and $3.15 for each additional
$1,000.00 or fraction thereof.
Plan Review
65% of Building Permit Fee
Stock Plan Review Fee
65% of Building Permit Fee for the
first plan, 65% of first plan fee for
subsequent plans with no revisions
Signs
$20.00 per approved sign
Other Inspection Fees
1) Inspections outside of normal business hours
$47.00
2) Re -inspection Fees
$47.00
Plumbina Permit Fees
Unit
Unit Fee
Plumbing Permit
$20.00
Plumbing Fixture
$7.00 per Fixture
Gas Piping
$5.00 up to 5 fixtures, $1.00 for each
additional
Backflow device over 2 inches
$15.00
Medical Gas Piping
$50.00 up to 5 inlets for each gas
t pe, $5.00 for each additional
Mechanical Permit Fees
Unit
Unit Fee
Mechanical Permit
$20.00
Furnace
1) Installation or relocation of each forced air
$13.25
furnace including ducts and vents up to and
including 100,000 Btu/h
2) Installation or relocation of each forced air
$16.25
furnace including ducts and vents over 100,000
Btu/h
3) Installation or relocation of each floor furnace
$13.25
and vent
4) Installation or relocation of each suspended
$13.25
heater, recessed wall heater or floor mounted
unit heater
Appliance Vents
$7.00
Repairs or Additions
For the repair of, alteration of, or addition to each
$12.25
heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling,
absorption, or evaporative cooling system,
including installation of controls regulated by this
code
Boilers, Compressors and Absorption Systems
1) Installation or relocation of each boiler or
$13.15
compressor to and including 3 hp, or each
absorption system to and including 100,000
Btu/h
2) Installation or relocation of each boiler or
$24.25
compressor over 3 hp to and including 15 hp, or
each absorption system over 500,000 Btu/h
3) Installation or relocation of each boiler or
$33.25
compressor over 15 hp to and including 30 hp, or
each absorption system over 1,000,000 Btu/h
4) Installation or relocation of each boiler or
$49.50
compressor over 30 hp to and including 50 hp, or
for each absorption system over 1,000,000 Btu/h
to and including 1,750,000 Btu/h
5) Installation or relocation of each boiler or
$82.75
compressor over 50 hp or each absorption
system over 1,750,000 Btu/h
Air Handlers and Evaporative Coolers
Up to 10,000 cfm
$9.50
Over 10,000 cfm
$16.15
Evaporative cooler other than portable
$9.50
Ventilation and Exhaust
Each fan connected to a single duct
$6.50
Each system not a portion of any heating or a/c
$9.50
system authorized by a permit
Installation of each hood
$9.50
Incinerators
Each domestic type
$16.25
Each industrial type
$66.50
Fuel Gas Piping
Gas piping system, 1 - 5 outlets
$5.00
Each additional system, per outlet
$1.00
Process piping
Hazardous process piping system (HPP), 1 - 4
$5.00
outlets
HPP system, 5 or more outlets, per outlet
$1.00
Non -hazardous process piping system (NPP, 1 -
$2.00
4 outlets
NPP system, 5 or more outlets, per outlet
$0.50
Miscellaneous
Each appliance other than those listed above
$9.50