Loading...
561 UDC Fee Schedule UpdatedCITY OF YELM RESOLUTION NUMBER 561 YELM DEVELOPMENT FEE SCHEDULE WHEREAS, City of Yelm Ordinance 429 provides for the setting of fees for the Community Development Department by resolution of the City Council, and WHEREAS, the City of Yelm has adopted Resolution 358 Yelm Development Fee Schedule; and WHEREAS, the City of Yelm has adopted Resolution 447 Building Permit and Plan Review Fees; and WHEREAS, the creation of the Unified Development Code Title 18 YMC removed fee amounts from certain application processes and references the development fee schedule adopted by the Council; and WHEREAS, the Unified Development Code Title 18 YMC includes Chapters 18.22 through 18.26 adopting the International Fire, Building, Residential, and Mechanical Codes, the Uniform Plumbing Code, and the International Energy Codes Commercial and Residential; and WHEREAS, these fees must be added to the adopted Development Fee Schedule; and WHEREAS, it is the Council's desire to keep development fees commensurate with the level of review the permit requires; NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Yelm to adopt the Yelm Development Fee Schedule as shown in Exhibit A. APPROVED this 13th day of October, 2015. Ron Harding', ATTEST: JA(� I %nine Schnepf, City Clerk Res 561 10/13/15 EXHIBIT A YELM DEVELOPMENT FEE SCHEDULE Ministerial Actions Construction Permits............................................................... See Table A Right of Way Permit................................................................ $125.00 Certificate of Appropriateness................................................. $125.00 Civil Plan Review.................................................................... $250.00 + consultant costs Ministerial Site Plan Review .................................................... $250.00 Boundary Line Adjustment...................................................... $250.00 Home Occupation Permits ...................................................... $125.00 Final Subdivisions, Administrative Subdivisions . ....................$250.00 + consultant costs and binding site plans Final Short Subdivisions......................................................... $125.00 + consultant costs SignPermits...........................................................................$125.00 Street Tree Permit.................................................................. $125.00 Administrative Actions Administrative Site Plan Review.............................................$750.00 ShortSubdivision.................................................................... $750.00 Administrative Subdivision ......................................................$750.00 Subdivision Alteration or Amendment.....................................$375.00 Administrative Variance.......................................................... $375.00 Quasi Judicial Actions Hearing Request—Administrative Subdivision .......................$1,250.00** Preliminary Subdivision...........................................................$2,000.00 SpecialUse............................................................................. $2,000.00 BindingSite Plan.................................................................... $2,000.00 Planned Residential Development .......................................... $375.00 Mixed Use Development......................................................... $375.00 Variance.................................................................................. $2,000.00 Critical Area Exception............................................................ $2,000.00 Leaislative Actions Amendment of Unified Development Code ............................. $750.00 Conceptual Master Planned Development .............................. $5,000.00 +staff & consultant costs Final Master Planned Development........................................$5,000.00 00 +staff & consultant costs Yelm Historical Register Listing .............................................. $125.00 Removal from Yelm Historical Register ..................................$125.00 Comprehensive Plan Amendment .......................................... $21000.00 Appeals Appeal to Hearing Examiner ...................................................$1,250.00** Appeal to City Council............................................................. $500.00** Other State Environmental Policy Act Threshold Determination....... $150.00 Environmental Impact Statement ............................................ Staff and consultant costs Critical Area Report Review ....................................................$125.00 +consultant costs Traffic Impact Analysis(TIA)................................................... Staff and consultant costs Notice of Intent to Commence Annexation .............................. $350.00 Petition of Annexation............................................................. $900.00 Right of Way Vacation, Subdivision, or Easement ..................$750.00 Wireless Communication Facilities Technical ......................... $500.00 +consultant costs Document Review Multiple applications submitted concurrently, excluding Environmental, TIA, and Annexations, are charged one fee based on the highest permit fee. "Consultant costs" means any outside consultation expenses which the City reasonably determines are necessary to adequately review and analyze the application. "Staff costs" means the actual costs of City staff time and resources. "Waiver of appeal fee The city council may waive the fee required for filing an appeal when the appellant can: a. Show that the appeal fee will create a financial hardship; or b. Show that the appeal fee is a barrier to public fairness; or c. Show overriding public interest, health or safety; or d. The appellant is a nonprofit corporation registered with the State of Washington, and demonstrates to the City Council that the appeal fee would impact the ability to forward the corporations mission to serve the community of Yelm. The appellant shall apply for the waiver at the same time as the appeal is filed. Appellant shall provide documentation to the satisfaction of the City Council that the appeal fee should be waived. Refund of appeal fee The Hearing Examiner may refund a portion of or the entire appeal fee if a finding is made that the original decision was based on unreasonable grounds or without proper consideration of circumstances. Refund of Hearing Request —Administrative Subdivision Fee The Hearing Examiner may refund a portion of or the entire hearing request fee when the applicant can: a. Show that the fee will create a financial hardship; or b. Show that the appeal fee is a barrier to public fairness; or c. Show overriding public interest, health or safety; or d. The appellant is a nonprofit corporation registered with the State of Washington, and demonstrates to the Hearing Examiner that the fee would impact the ability to forward the corporations mission to serve the community of Yelm. Table A Buildina Permit and Plan Review Fppc Total Valuation Fee $1.00 to $500.00 $23.50 $501.00 to $2,000.00 $23.50 for the first $500.00 and $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 and $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $391.25 for the first $25,000.00 and $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 and $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $993.75 for the first $100,000.00 and $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,000.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 and $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $5,608.75 for the first $1,000,000.00 and $3.15 for each additional $1,000.00 or fraction thereof. Plan Review 65% of Building Permit Fee Stock Plan Review Fee 65% of Building Permit Fee for the first plan, 65% of first plan fee for subsequent plans with no revisions Signs $20.00 per approved sign Other Inspection Fees 1) Inspections outside of normal business hours $47.00 2) Re -inspection Fees $47.00 Plumbina Permit Fees Unit Unit Fee Plumbing Permit $20.00 Plumbing Fixture $7.00 per Fixture Gas Piping $5.00 up to 5 fixtures, $1.00 for each additional Backflow device over 2 inches $15.00 Medical Gas Piping $50.00 up to 5 inlets for each gas t pe, $5.00 for each additional Mechanical Permit Fees Unit Unit Fee Mechanical Permit $20.00 Furnace 1) Installation or relocation of each forced air $13.25 furnace including ducts and vents up to and including 100,000 Btu/h 2) Installation or relocation of each forced air $16.25 furnace including ducts and vents over 100,000 Btu/h 3) Installation or relocation of each floor furnace $13.25 and vent 4) Installation or relocation of each suspended $13.25 heater, recessed wall heater or floor mounted unit heater Appliance Vents $7.00 Repairs or Additions For the repair of, alteration of, or addition to each $12.25 heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code Boilers, Compressors and Absorption Systems 1) Installation or relocation of each boiler or $13.15 compressor to and including 3 hp, or each absorption system to and including 100,000 Btu/h 2) Installation or relocation of each boiler or $24.25 compressor over 3 hp to and including 15 hp, or each absorption system over 500,000 Btu/h 3) Installation or relocation of each boiler or $33.25 compressor over 15 hp to and including 30 hp, or each absorption system over 1,000,000 Btu/h 4) Installation or relocation of each boiler or $49.50 compressor over 30 hp to and including 50 hp, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h 5) Installation or relocation of each boiler or $82.75 compressor over 50 hp or each absorption system over 1,750,000 Btu/h Air Handlers and Evaporative Coolers Up to 10,000 cfm $9.50 Over 10,000 cfm $16.15 Evaporative cooler other than portable $9.50 Ventilation and Exhaust Each fan connected to a single duct $6.50 Each system not a portion of any heating or a/c $9.50 system authorized by a permit Installation of each hood $9.50 Incinerators Each domestic type $16.25 Each industrial type $66.50 Fuel Gas Piping Gas piping system, 1 - 5 outlets $5.00 Each additional system, per outlet $1.00 Process piping Hazardous process piping system (HPP), 1 - 4 $5.00 outlets HPP system, 5 or more outlets, per outlet $1.00 Non -hazardous process piping system (NPP, 1 - $2.00 4 outlets NPP system, 5 or more outlets, per outlet $0.50 Miscellaneous Each appliance other than those listed above $9.50