20150332 Sewer Cmts Rev 2 12152015Karen Bennett
From: Randy Hatch
Sent: Tuesday, December 15, 2015 12:05 PM
To: jim.gibson @scjalliance.com
Cc: Ryan Johnstone; Karen Bennett
Subject: Emailing - 20151214212153.pdf
Attachments: 20151214212153. pdf
Jim,
Our Sewer Specs. call for a clean out 2' from the bldg. ( page 7 -51, 7G.030 ), but because of the short run of side sewer
and where it is located the Sewer Dept. is fine with the purposed tie in to the existing side sewer but needs to include
the red lines on Sewer Notes #2 and #4, along with the Directors approval.
#2)- No 90's. Need two 45's with a minimum 1' between them. This is also a good place for the inline two way sweeping
sanitary clean out tee.
#4)- This clean out is not needed.
If you have any questions don't hesitate to contact me.