Tami - 03/30/2016 - 227
Case Number: MPD-05-0495-YL
Applicant: Tahoma Terra LLC.
th
4200 6 Avenue SE, Suite 301
Lacey, WA 98503
Agent: Steve Chamberlain, P.E.
Request: Final Master Site Plan Approval
Recommendation: Approval
Proposal
Tahoma Terra LLC has made application for a final master site plan on the portion of
the Tahoma Terra Master Plan Development located west of Thompson Creek.
The final master site plan tracts identified for future residential subdivisions, medium
and high density residential ares, and parks and open space.
Public Notices
A Notice of Application was mailed to local and state agencies, and surrounding
property owners within 1,000 feet of the subject site on March 21, 2006. This notice
was also posted at City Hall.
The Mitigated Determination of Non-significance was mailed to agencies with
jurisdiction and environmental expertise on May 26, 2005. This determination was also
posted at City Hall on the same date, and published in the Nisqually Valley News on
May 27, 2005.
A Notice of Public Hearing was mailed to the applicant and parties of record on Friday,
May 5, 2006. This notice was also posted at City Hall on the same date, and published
in the Nisqually Valley News on April 28, 2006 and May 12, 2006.
State Environmental Policy Act
The City’s SEPA Responsible Official issued and published a Mitigated Determination of
Non-Significance on May 24, 2005, based on Section 197-11-158 WAC. This Mitigated
Determination of Non-Significance is based on the project as proposed and the impacts
and potential mitigation measures reflected in the applicant’s environmental documents.
In addition, pursuant to Section 197-11-754 WAC, the following documents were
adopted by reference:
Final Environmental Impact Statement, January 1995, City of Yelm
Comprehensive Plan and Joint Plan with Thurston County.
Final Environmental Impact Statement, March 1993, Southwest Yelm
Annexation.
Addendum to the Final Environmental Impact Statement for the Southwest Yelm
Annexation, July 1994, Thurston Highlands Master Plan Application.
Environmental Checklist and Mitigated Determination of Non-Significance,
September 1999, Prairie View Master Plan.
Critical Areas Study, December 1997, IES Associates
Environmental documents submitted as part of the application include:
Expanded Environmental Checklist, March 2005, SCA Consulting Group
Updated Wetlands Analysis, March 2005, The Coot Company
Preliminary Drainage and Erosion Control Report, March 2005, SCA Consulting
Group
Transportation Impact Analysis, February 2005, Transportation Engineering NW
The MDNS contained the following conditions:
1. The developer shall mitigate transportation impacts through the payment of a
transportation facility charge (TFC) pursuant to Chapter 15.40 YMC. The fee
shall be paid at the time of building permit issuance.
2. The applicant shall be responsible for the following transportation improvements:
Prior to the final subdivision approval of any lots the applicant shall
reconstruct Longmire Street to a modified collector standard from the project
entry to Yelm Avenue West (SR 510).
Prior to the approval of any development permit (including a final subdivision)
which includes the 90th peak P.M. trip generated from the project, the
applicant shall construct a center left-turn lane on Yelm Avenue West (SR-
510) at the Longmire Street intersection with sufficient storage to serve the
anticipated traffic volumes generated by the project.
Prior to the approval of any development permit (including a final subdivision)
which includes the 513th peak P.M. trip generated from the project,
February 14, 2007 Page 2 of 5
construction of the Killion Road Boulevard extension from the property to
Yelm Avenue West (SR-510) along with the realignment of Killion Road, a
traffic signal, and left turn lanes on all four legs of the intersection with
sufficient storage to serve the anticipated traffic volumes generated by the
project.
Prior to the approval of any development permit (including a final subdivision)
which includes the 1,100th peak P.M. trip generated from the project,
reconstruct Mosman Avenue to modified collector standards from Longmire
Street to 1st Avenue (SR-507) and the Mosman Avenue/1st Avenue
intersection to include realignment and a center left-turn lane on 1st Avenue
(SR-507) with sufficient storage to serve the anticipated traffic volumes
generated by the project.
Prior to the approval of any development permit (including a final subdivision)
which includes the 1,301st peak P.M. trip generated from the project, define
and construct the Mosman Avenue connector between Longmire Street and
Solberg Street OR; continue the Boulevard to SR 507 through the Thurston
Highlands property.
Plans for approval of all transportation improvements associated with Yelm
Avenue (SR 510) and 1st Avenue (SR 507) shall be submitted to the Washington
Department of Transportation and the City of Yelm for review and approval and
all required improvements shall be constructed by the applicant pursuant to
approved plans, and inspected and approved by the City of Yelm and
Washington Department of Transportation.
3. To mitigate previous impacts from agricultural activities to surface waters, plant
communities and animal communities along the Thompson Creek corridor and its
associated wetlands, the applicant has prepared a mitigation and enhancement
plan to improve the surface water features of the site for both habitat and
recreation purposes. Each Final Master Site Plan shall include a schedule for
implementing improvements tied to the number of dwelling units of each
subdivision within the Master Planned Community.
4. The developer shall enter into an agreement with Yelm Community Schools to
mitigate project impacts to the School District.
5. Prior to the approval of any development permit (including a final subdivision)
beyond the 89th lot, the applicant shall convey water rights to the City of Yelm
sufficient to serve the proposed use within that area of the final master site plan
and the first 89 lots. The conveyance shall be made to the City through a water
rights agreement between Tahoma Terra, LLC and the City of Yelm. This
condition is not applicable if the City obtains water rights through the Department
of Ecology which are sufficient to serve the projected density of the City, its urban
growth area, and the subject property.
February 14, 2007 Page 3 of 5
6. Prior to disturbance of any identified geologic hazard area, the applicant shall
submit to the City of Yelm Community Development Department a geotechnical
report that identifies established best management practices for all activity within
the geologic hazard areas and only allows activities which:
will not increase the threat of the geological hazard to adjacent properties
beyond pre-development conditions;
will not adversely impact other critical areas;
are designed so that the hazard to the project is eliminated or mitigated to a
level equal to or less than pre-development conditions;
are certified as safe as designed by a qualified engineer or geologist.
7. Prior to building permit issuance, the applicant shall enter into a mitigation
agreement with the City of Yelm which includes a mitigation fee toward the
replacement of a police station required to be expanded in order to serve the
proposed development. The mitigation fee shall be based on the applicant’s
aliquot impact on the need for replacement police station, which is $310 per
housing unit.
Conceptual Master Plan Approval
The Hearing Examiner approved a conceptual master site plan on August 2, 2005, with
conditions to ensure that the conceptual plan is consistent with the Comprehensive
Plan. The Yelm City Council approved the conceptual master plan on August 10, 2005.
The final master site plan for the portion of the property west of Thompson Creek is
compatible with the recommendation on the Conceptual approval, provided that the
Final Master Plan Development Guidelines are adopted through the approval of the final
master site plan.
These Guidelines ensure that the development of the final master site plan area through
the land use permitting process (subdivisions, binding site plan, townhome
developments, planned residential developments, and commercial site plan reviews) is
consistent with the conceptual site plan approval and the City’s Comprehensive Plan.
Specifically, the Final Master Plan Development Guidelines modify the City’s standards
for development, including those development regulations found in the Zoning Code
(Title 17 YMC), the Subdivision Code (Title 16 YMC), Critical Areas and Resource
Lands (Title 14.08 YMC), the Development Guidelines (Chapter 15.48 YMC), and the
Design Guidelines for commercial development.
For example, the front yard setback in the final master site plan area for residential
single family dwellings is proposed to be 10 feet instead of 15 feet within this phase of
Tahoma Terra.
February 14, 2007 Page 4 of 5
The Final Master Plan Development Guidelines do not modify the permitting process,
enforcement, uses within zoning districts, or other portions of the Yelm Municipal Code
that relate to the home buyers or business owners within the development. The
Guidelines are meant to govern the developer and building to ensure the built
community is consistent with the conceptual plan, which has been reviewed for
consistency with the City’s Comprehensive Plan.
Community Development Department Recommendation
The applicant has established that the request for final master site plan approval
satisfies all criteria set forth in Section 17.62 YMC, and meets all other requirements of
the Yelm Municipal Code. Therefore, the final master site plan should be approved and
the attached Tahoma Terra Final Master Plan Development Guidelines should be
adopted.
February 14, 2007 Page 5 of 5