Loading...
10616 Bald Hill Rd Letter to Dave SpillerTHE 4 '9i a, e YELM WASHINGTON July 7, 2016 David Spiller, P.E. Hattan Godat Pantier 1840 Barnes Blvd. SE Tumwater, WA 98512 Dear David: City of Yelm Community Development Department 105 Yelm Auenue West P.O. Sox 479 Yelm, WA 98597 The Community Development Department has reviewed the information you have submitted regarding the expansion of Dels Farm Supply to tax parcel number 64303200700 at 10616 Bald Hill Road SE. Upon full review of the information submitted, it is the determination of the Community Development Department that the business was expanded without all required permits and approvals from Thurston County and the City of Yelm and that a site plan review approval will be required in order to continue operation. I have attached a site plan review application and environmental checklist for your information and use. Civil engineering plans will be required, as well as a building permit to use the building on the property for commercial storage. In order to help you plan, I offer the following general comments which will be required as part of the site plan review. Please note, these are preliminary in nature and may change through the land use permitting process. Street and Parking Lot Improvements Frontage improvements will be required for the property frontage along SR 507 and Bald Hills Road, both of which are identified as urban arterials by the Comprehensive Transportation Plan. The City is willing to defer frontage improvements along SR 507 and the portion of the property along Bald Hills Road within the 100 year floodplain or the shoreline jurisdiction, whichever is greater. The interior drive aisles and parking shall be consistent with the City's parking details and the development guidelines. A minimum of one parking space for every 250 square feet of gross floor area is required, with a minimum of 8 stalls. ADA parking must be provided. A parking plan shall be submitted to the Community Development (360) 458 -3835 (360) 458 -3144 FAX www.c1.ye1m.w¢.us Department for review and approval at the time of application for site plan review. All required parking areas must be paved, striped and landscaped. The City has adopted a Transportation Facility Charge (TFC) of $750.00 per PM peak trip. The Code provides a default table that the applicant can use to determine new PM trips generated. The trip generation rate for miscellaneous retail is 2.4 per 1,000 square feet. Sewer The proposed site will be required to connect to the City's sewer system. There are existing services in Morris Road at its intersection with Bald Hills Road. The STEP system shall be designed and installed per the City of Yelm Development Guidelines. Commercial sewer connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $5,417 per a residential connection (fee subject to change) inside the City limits. An inspection fee of $145.00 per ERU will also be required. These fees are payable a building permit issuance. Stormwater Developments with over 5,000 square feet of impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. If stormwater mitigation is required the types of stormwater mitigation may be wet ponds, bioswales and filter strips. The stormwater disposal is 100% infiltration, which can be accomplished through open ponds or underground galleries. All building roofs will be directed to underground galleries that are separate from the stormwater treatment system. All storm water facilities shall be located outside the right of way in a separate tract to be maintained by the property owner. At this time sand filters and "alternate technologies" are not permitted as stormwater mitigation. Water The proposed site would need to connect to the City's water system. There is an existing water line in Bald Hills road. Commercial water connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $1,500 per a residential connection (fee subject to change) inside city limits. The project engineer shall submit water use calculations to determine the water use this project may consume. This fee is payable at building permit issuance. July 7, 2016 Page 2 of 4 An irrigation meter shall be installed and an approved backflow prevention device will be required for all landscape irrigation connections. Zoning and Setbacks The property is zoned Commercial (C -1), Chapter 17.26 YMC. This district allows retail as a permitted use subject to site plan review. Setbacks: Front property line 15 feet Side property line 10 feet Rear property line 20 feet Applications to develop, remodel or improve properties and structures within this zone shall require review and approval of a site plan in accordance with Chapter 17.84 YMC. Ingress /Egress Ingress and egress at the site shall be consistent with the Yelm Development Guidelines, section 413.140. Accesses shall be reviewed for vehicle and pedestrian safety. Landscaping Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of streets, parking areas, and building elevation. This landscaping is used around the perimeter of a site, and adjacent to buildings. Type II landscaping is characterized by an 8 foot landscape strip between uses and a 5 foot strip around buildings of any combination of evergreen and deciduous trees (with no more than 50 percent being deciduous), shrubs, earthen berms and related plant materials or design features may be selected; provided, that the resultant effect is to provide partial screening and buffering between uses and of softening the appearance of streets, parking and structures. Type IV landscaping is intended to provide visual relief and shade in parking areas. At least 24 square feet of landscape development for each parking stall proposed. Each area of landscaping must contain at least 100 square feet of area and must be at least six feet in any direction. Each planting area must contain at least one tree. Live groundcover shall be provided throughout each landscaping area. No parking stall shall be located more than 50 feet from a tree. Type V landscaping is required in storm water retention areas, if required. The floor and slopes of any stormwater retention /detention area shall be planted in vegetation that is July 7, 2016 Page 3 of 4 suitable and will thrive in hydric soils. The landscaping of the stormwater facility shall be incorporated with all on -site landscaping. A conceptual landscaping plan is required with the application for site plan review. Final landscaping and irrigation plan is required as element of civil construction drawings, with installation prior to occupancy. The refuse area must be large enough to accommodate a dumpster and recycle bin. Refuse areas must be screened with an enclosure of a material and design compatible with the overall architectural theme. A six foot wall or fence shall enclose any outdoor refuse collection point. The fence shall be a solid material such as wood or masonry. Application and Process Site Plan Review, Chapter 17.84, is an administrative process. Minimum application requirements are located in Section 17.84.060 and are listed on the application form. A project of this size can expect completed review in approximately 14 to 18 weeks. Land use approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion of all conditions of land use approval, the applicant can submit building plans for approval. Sincerely, Grant Beck, Director Department of Community Development July 7, 2016 Page 4 of 4