20140179 12-15-2014-st -columban-church-addition-14s170-field-report-visual-soil-inspection-report-f62012 Materials Testing & Consulting, Inc.
Ck-#ec%ni-a1 F'rv,:imrcr+ng A{-1mkIMing•Swclnl In+prceirm 0 Mlrleflah TvAng 0 Fn%-irnnmrnlal C+rmll:¢
I:'Akr rs -d L%%mmnm.Vnm lfVP! +
St. Columban Church Addition - 14S170 - Field Report: Visual Soil Inspection: Report
#F62012
CLIENT St. Columban Catholic Church DATE 12/15/2014
PROJECT LOCATION 506 1 st Street S PERMIT# 20140179
Yelm WA 98597
Inspection Information:
Inspection Date: 12/15/2014 Time Onsite: 07:49 AM Weather Conditions: Overcast,Sprinkling.45 deg F
Inspection Performed: Visual Soil Inspection
Comments:
MTC inspector on site to perform visual soil inspection and tprobe verification for perimeter footing sub grade.Upon visual inspection of
materials found to be a tanning Silty sand with aggregate and dark brown silt with sand and large aggregate.
These materials were NOT in a firm and unyielding state.T probe had penetration of 2 to 8 inches through out entirety of perimeter
footing,with one spot pumping up to 3 inches.
Contractor has stated will address the issues and call for a re inspection on a later date once the issues have been addressed.
Materials for perimeter footing subgrade were UNFIRM AND YIELDING.
Images:
UPLOADED: 12/15/2014 07:58:00 UPLOADED: 12/15/2014 07:58:00
Pic of perimeter footing S.G. Area of pumping material
REPORTED BY:Sam Hyatt Jr. REVIEWED BY:Deane Ramsdell,Project Manager
+�+�+*�r�+rR•�lr4rr...a..ra1.1„rr,�,
m�frmmmpvdqarnpr hi p filar%dm, .0 3401 • 1113 MnarlLls iuslq l C541MINly.Ins. All r1010 rsarrrN.
Corp-mrile ■ 777 Cbr1slor Drive + 0arlington, W A 91823 • Phnse 364.75.9.1990 * Fax 362.795.19R@
SV4 Region * 21 IS Black Lako Hlud- S.W.• Olympia, w# 9$512 * phone 340.534.4777 * Fax 340,334.9779
NW RtoIom * BIDS DilPOOL SMCI, Suite 5 * &dlIIaghom, WA 96225 * Ph4me 3dlft.647.406L ' F¢r 1 l l
Visit our we hsile: www.m LC inc.Lll
St.Columban Church Addition-14S170,12/15/2014,#F62012,Page I of]