20140179 01-07-2015-st -columban-church-addition-14s170-field-report-visual-soil-inspection-report-f62493 Materials Testing & Consulting, Inc.
Ck-#ec%ni-a1 F'rv,:imrcr+ng A{'1mkIMing•Swclnl In+prceirm 0 Mlrleflah TvAng 0 Fn%-irnnmrnlal C+rmll:¢
I:'Akr rs -d L%%mmnm.Vnm lfVP! +
St. Columban Church Addition - 14S170 - Field Report: Visual Soil Inspection: Report
#F62493
CLIENT St. Columban Catholic Church DATE 01/07/2015
PROJECT LOCATION 506 1 st Street S PERMIT# 20140179
Yelm WA 98597
Inspection Information:
Inspection Date: 01/07/2015 Time Onsite: 11:30 am Weather Conditions: Overcast
Inspection Performed: Visual Soil Inspection
Comments:
Arrived on site to perform inspection of visual soils verification,and T-probe verification for slab on grade sub grade.Upon visual
inspection materials were found to be a tan silty sand with aggregate and dark brown silt with sand and large aggregate.
These materials appear to be in a firm and unyielding state. 1/2"T-probe had penetration of 1/2"to 3/4"inches through out entirety of slab
on grade sub grade,and no pumping was observed.Moisture appeared near optimal.
Images:
UPLOADED: 01/09/2015 07:33:00
REPORTED BY:Sam Hyatt Jr. REVIEWED BY:Deane Ramsdell,Project Manager
+�+�+*�r�+rR•�lr4rr...a..ra1.1„rr,�,
m�frmmmpvdqarnpr hi p filar%dm, .0 3401 • 1113 MnarlLls iuslq l C541MIsly.Ins. All r1010 rsarrrN.
Corp-►rile ■ 777 Cbr1slor Drive + 0arlington, W A 91823 • Phnse 364.75.9.1990 * Fax 362.795.19R@
SV4 Region * 21 IS Black Lako Hlud- S.W.• Olympia, w# 9$512 * phone 340.134.4777 * Fax 340,334.9774
NW RtoIom * BIDS DilPOOL SMCI, Suite 5 * &dlIIaghom, WA 96225 * Ph4me 3dlft.647.406L ' F¢r 1 l l
Visit our we hsile: www.m LC inc.Lll
St.Columban Church Addition-14S170,0110712015,#F62493,Page I of]